0% found this document useful (0 votes)
494 views1 page

Murex Architecture Trade Booking

Murex Architecture
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
494 views1 page

Murex Architecture Trade Booking

Murex Architecture
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 1

Pretrade- just like trade template and validator just a combination.

it can be implemented on any importing object

when you save a trade, murex saves a contract and trade .

contract has its workflow. Trade gets saved and flow to Post trade workflow.

for import/export in murex - we use Exchange workflow-

For import

we import via interface , Like SWIFT & CSV

then we translate that to MXML with the help of MXML translator like CSVtoMXML

and then this MXML gets saved into database.

for export-

we take MXML and send to Amendment Agent ( which is used to move things between
various workflows inside Murex)

then a translator take things into hand and then translates this MXML to required
format such as SWIFT,CSV,Paper format.

and then a interface take these things and send them outside such as JMS or MQ
interface.

exchange workflow is used to import & export everything in and out of calypso.

same schema is used in all things.

IN order to define the PreTrade rules, we cant do that in GUI, we need to use Murex
Scripting Language and a Developer for that.

You might also like