4410-001-405-PVI-Y-223-R02 Page 2 of 10
Test Setup for North Karanpura II PADO FAT
PADO Ethernet
PADO WORK
SERVER Switch
STATION
PADO Server:
• Function:
This node is used as PADO Server.
PADO Workstation:
• Function:
This node is used as Workstation for PADO server.
• Software modules loaded:
PADO Visualization Screens.
4410-001-405-PVI-Y-223-R02 Page 3 of 10
• Objective: Verification of the SR4/ SR:EPOS scope of supply and
functionality
4410-001-405-PVI-Y-223-R02 Page 5 of 10
4.0.0 What If Analysis Sample test case like
available with the
scenarios as per MS Temp
attached Annexure-4 Feed Water I/L Temp
will be demonstrated.
Note 1: Excel Sheet with calculation formulasshall be prepared for checking the results. In this
sheet the expected value will be calculated based on measurement data during FAT. This will be
compared with calculated results of PADO.During Test some input values will be changed and
corresponding changes will be shown in Excel sheet and PADO Screens and values will be
compared, the excel sheet has been attached as Annexure-1.
Note 2.: To demonstrate the functionality of soot blowing module the efficiencies of heating
surfaces must be changed over the time like they change on site i.e. slow decreasing trend and
rapid increase after soot blowing. Such trends for all heating surfaces must be available for the
BCM module. All parameters for BCM like time periods for soot blowing and limits for efficiencies
must be set corresponding to the trends with these artificial efficiencies trends. Preparation of
such data or collecting the data is practically difficult. Hence this feature will be demonstrated with
other site data.
However, Actual functioning with site specific settings shall be demonstrated at site.
4410-001-405-PVI-Y-223-R02 Page 6 of 10
• Objective: Verification of the topology of the unit model
6.0.0 Graphical Modeling Tool
Sr. Description Test Procedure Expected System Remarks
No. Results Results
6.0.1 Topology of unit Topology of the Topology of
thermodynamic model Plant can be seen in the plant has
the Graphical been taken
Toolkit. General care.
functionality of
Graphical modeling
tool (e.g.
modification of unit
model, modification
of component
characteristics etc.)
will be
demonstrated.
4410-001-405-PVI-Y-223-R02 Page 7 of 10
• Objective: Verification of the SR1 scope of supply and functionality
a. Creep & Fatigue value for one component will be calculated by excel sheet with formulas
(Annex-2).
b. Impact of cyclic loading will be demonstrated by two calculation with data stored in SR1
archive .One data set will show moderate load changes and the other will have significant load
changes as it is a case during flexibilisation of unit operation. Comparison of these two cases will
show the effect on the fatigue.
4410-001-405-PVI-Y-223-R02 Page 8 of 10
Objective :SRx (general data server module)
11.0.0 SRxVis (Visualization)
11.0.1 System files for the visualization module SRxVis installed and operating
Menu “File”
11.0.2 New Chart, New Process graphic, new data table, Open, open and move
to time, save, save as, save all, workspace, print, print preview, page
setup, setting, set graphics, recent file and exit.
Menu “Edit”
11.0.3 (Diagram) Cut, Copy, Paste, Delete, undo and redo.
Menu “View”
11.0.4 simple menu, status bar, tool bar, tabs, view time bar, view log.
11.0.5 Move have several option like previous time frame, previous time interval
etc.
Menu "Diagrams"
11.0.6 Chronology, cumulative frequency, xy diagram, time interval, use as X
axis, highlight selected tag, filter selected tags, filter selected tags, show
all tags, show/hide selected tags
11.0.7 Inserting title, insert tags, insert user defined formula
11.0.8 Copy tag-name, copy with option, copy bitmap, copy chart, duplicate
chart, global chart setting, properties.
Menu "Parameter"
11.0.9 Parameter editor
Menu "Process sheets"
11.0.10
Accessing all visualization sheet as mentioned in serial no "1.0.0
Menu "MP checklists
11.0.11 Measurement verification list - it list out all measurement values and their
status.
Menu "Documentation"
11.0.12
SRxParameter Editor, SRx Vis user interface - this is the link of help
documents.
Menu "Windows"
11.0.13 Close, close all, close all srx details, cascade, tile vertical, tile horizontal,
arrange icons.
Menu "Help"
11.0.14 Help and about SR: SUITE- gives the detail of SR suite version.
4410-001-405-PVI-Y-223-R02 Page 9 of 10
• Objective: Verification of SR::FT – Water Chemistry Management and
Diagnostic.
12.0.0 SR::FT
Sl. No. Description Test Procedure System Results Remarks
12.0.1 Fault Tree Sample Fault Trees will be Some false fault will
shown with explanation of be generated to
functionality explain its
functionality.
4410-001-405-PVI-Y-223-R02 Page 10 of 10