7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

SAP Certified Application Associate - SAP S/4HANA


Production Planning and Manufacturing - Full

You got 79 of 79 possible points.


Your score was: 100 %

Question Results

Question: Score 1 of 1

You want to schedule an operation finitely, without moving other operations.


Which scheduling strategy do you select?

Response:

Squeezing

Insert operation

Scheduling working time only

Find slot

Question: Score 1 of 1

What capabilities does SAP S/4HANA embedded analytics provide?


There are 2 correct answers to this question.

Response:

Comparison of current data with historical data to identify trends

Real time decision support

Automatic update of story boards

Strategic analysis

https://www.erpprep.com/user/quiz/1748789/userresults 1/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

In your project, you have several materials that are planned by different people.
How can you assign the planning responsibility?
Please choose the correct answer.

Response:

MRP group

MRP type

MRP controller

MRP planning file

Question: Score 1 of 1

How can you limit the validity of a bill of material (BOM)?


There are 2 correct answers to this question.

Response:

By plant

By industry

By mater al type

By period

Question: Score 1 of 1

Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.

Response:

Shipments

Planned independent requirements

Material documents

Sales orders
https://www.erpprep.com/user/quiz/1748789/userresults 2/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question.

Response:

Using purchasing costs for automated source prioritization

Using run schedule quantities for in-house production

Using quotations for internal and external procurement

Using stock transfer reservations for stock transfer

Using purchase orders for external procurement

Question: Score 1 of 1

In which customizing activity do you set up automatic routing selection for


production orders?
Please choose the correct answer.

Response:

Define order-type-dependent parameter

Define production scheduling profile

Define scheduling parameters for production orders

Define selection profiles

Question: Score 1 of 1

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?

Please choose the correct answer.

https://www.erpprep.com/user/quiz/1748789/userresults 3/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

Top of Yellow

Top of Red

Top of Green

Top of Red Base

Question: Score 1 of 1

What are the possible categories for the Business Partner master data object in
SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Group

Person

Vendor

Organization

Customer

Question: Score 1 of 1

Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.

Response:

Production scheduling profile

Material master

Production version

MRP profile

https://www.erpprep.com/user/quiz/1748789/userresults 4/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

A material has been set up as a phantom assembly by entering the special


procurement key in the material master. How can you switch off the phantom
assembly in a specific bill of material (BOM)?

Please choose the correct answer.

Response:

Change the explosion type of the phantom assembly in the BOM.

Change the item category of the phantom assembly in the BOM.

Change the special procurement key of the phantom assembly in the BOM.

Change the phantom item indicator for the phantom assembly in the BOM.

Question: Score 1 of 1

A planner wants to interactively resolve an overload situation on a resource


using advanced planning tools without any automatic rescheduling activity by
the system.

Which combination of settings for resource and detailed scheduling strategy are
required to receive related alerts?

Response:

Infinite resource and finite strategy

Finite resource and infinite strategy

Infinite resource and infinite strategy

Finite resource and finite strategy

Question: Score 1 of 1

What are the consequences when you assign a planned order to a production
line manually, using the planning table in repetitive manufacturing?
Please choose the correct answer.

Response:

The planned order's components are copied o the picking list.

https://www.erpprep.com/user/quiz/1748789/userresults 5/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

The planned order generates capacity requirements.

The planned order is converted a production order.

The planned order's component availability is checked

Question: Score 1 of 1

Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.

Response:

The maximum mater all number length is 40 for external numbers and 18 for
internal numbers

The number of leading zeros for internal numbers is client-specific.

The display template for material numbers applies to all clients.

In Customizing you can decide by material type whether to use the long material
number.

Question: Score 1 of 1

What is the difference between co-products and by-products?


Please choose the correct answer.

Response:

Only co-products appear in the process or production order settlement rule.

Only co-products are identified by a special item category in the bill of material
(BOM).

Only by-products have a zero inventory valuation.

Only co-products can be manufactured in isolation from the main product.

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/1748789/userresults 6/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Which of the following functions can be performed when the production order
has the status “Created” (CRTD)?
Please choose the correct answer.

Response:

A user trigger material availability check via mass processing (transaction COHV)

A user can trigger material staging via mass processing (transaction COHV).

A user trigger printing of shop floor paper manually (transaction CO02).

A user can schedule a background job to release production orders (transaction


COOIS).

Question: Score 1 of 1

You want to schedule an order in the graphical planning board. What are valid
planning directions?
There are 2 correct answers to this question.

Response:

Infinite sequencing

Backwards

Squeezing in

Forward with reverse

Question: Score 1 of 1

On which of the following levels can you influence the availability check for the
components of production orders?
There are 2 correct answers to this question.

Response:

Production order type

Material master

Production controller

https://www.erpprep.com/user/quiz/1748789/userresults 7/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

MRP controller

Question: Score 1 of 1

Mode selection is one of the scheduling options available in Advanced Planning


in SAP S/4HANA. When can you use mode selection?
Please choose the correct answer.

Response:

When multiple operations are maintained for one product

When alternate resources are used within one operation

When multiple planned orders exist on one resource

When multiple production versions are maintained for one product

Question: Score 1 of 1

Which technological advances enabled the development of SAP S/4HANA as the


digital core?
There are 3 correct answers to this question.

Response:

Capability to add to server landscape and scale

Advances in the three-tier architecture approach

Wide adoption of web standards such as Service oriented architecture

Big and affordable memory

Multi core processors enabling parallelism of tasks

Question: Score 1 of 1

What is a typical transportation processing SAP Transportation Management?


Please choose the correct answer.

Response:

https://www.erpprep.com/user/quiz/1748789/userresults 8/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Transportation Planning, Order Management, Transportation Execution, Freight


Costing and Settlement, Analytics and Reporting

Transportation Planning, Transportation Execution, Order Management, Freight


Costing and Settlement, Analytics and Reporting

Order Management, Transportation Planning, Freight Costing and Settlement,


Transportation Execution, Analytics and Reporting

Order Management, Transportation Planning, Transportation Execution, Freight


Costing and Settlement, Analytics and Reporting

Question: Score 1 of 1

Which of the following elements does MRP take into account during net
requirement calculation?
There are 2 correct answers to this question.

Response:

Safety stock

Purchase orders

Lot size

Maximum stock level

Question: Score 1 of 1

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Purchase orders

Collective orders

Stock transfers

Planned orders

Transfers from batch to batch


https://www.erpprep.com/user/quiz/1748789/userresults 9/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which alternative item strategies are available in bills of materials (BOM) in SAP
S/4HANA?
There are 2 correct answers to this question.

Response:

Simultaneous

First in first out (FIFO)

100% check

By usage probability

Question: Score 1 of 1

What are the key aspects of SAP S/4HANA?


There are 2 correct answers to this question.

Response:

SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.

SAP S/4HANA increases the data footprint.

SAP S/4HANA is built on SAP HANA

SAP S/4HANA has minor changes on data model.

Question: Score 1 of 1

What are pillars of SAP Activate?


There are 2 correct answers to this question.

Response:

SAP Best Practices

SAP MaxAttention
https://www.erpprep.com/user/quiz/1748789/userresults 10/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Guided Configuration

Premium engagement

Question: Score 1 of 1

The setup time on the production line to produce a material is extensive. You
would like to avoid multiple setups and limit the production of the material
based on a planning calendar.

Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.

Response:

Periodic lot sizing

Minimum lot sizing

Exact lot sizing

Fixed lot sizing

Question: Score 1 of 1

For a production version to be valid and consistent what requirements must be


fulfilled?
There are 3 correct answers to this question.

Response:

The assigned routing must be a rate routing.

The lot size range must be within the lot-size range of the assigned routing.

The assigned routing and bill of materials (BOM) must be valid in the entire validity
period.

The deletion flag must NOT be set for the bill of materials (BOM) or the routing.

The assigned routing must NOT have alternative sequences.

https://www.erpprep.com/user/quiz/1748789/userresults 11/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which capabilities does the Alert monitor have?


There are 3 correct answers to this question.

Response:

Nominate time-dependent substitutes for a planner

Automatically send alerts with Alert Notification Engine

Generate alerts based on defined threshold values

Automatically predict alerts in future planning cycles

Automatically reschedule in case of overload alerts

Question: Score 1 of 1

Your project uses process orders for the production of liquid chemicals. What
can you define to ensure that the production flow happens only in physically
connected tanks?
Please choose the correct answer.

Response:

Operation network

Work center hierarchy

Setup matrix

Resource network

Question: Score 1 of 1

How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.

Response:

Maintain adjustment parameter in the MRP group

Set the requirements reduction indicator in the requirements class


https://www.erpprep.com/user/quiz/1748789/userresults 12/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Use a planning strategy with requirements consumption

Reorganize planned independent requirements

Question: Score 1 of 1

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Optimization of the production plan

Source determination for external procurement

Long-term production planning

Calculation of inventory buffer size

Question: Score 1 of 1

You are using the document management system (DMS) . Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.

Response:

Work center

Routing header

Bill of material

Material master

Question: Score 1 of 1

A planner updated a production order status from partially confirmed “PCNF” to


technically completed “TECO” by mistake.

https://www.erpprep.com/user/quiz/1748789/userresults 13/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

What impact would this have to other users for this specific production order?
Please choose the correct answer.

Response:

The production manager can still see the capacity requirements

The buyer can still see component reservations

The production operator cannot enter additional confirmations

The warehouse clerk still carry out goods issue transactions

Question: Score 1 of 1

MRP created a planned order for a material that has one single material from
stock as a component. What happens to this dependent requirement when you
convert the planned order into a production order?

Please choose the correct answer.

Response:

It is converted into a reservation.

It is converted into a planned order.

It is converted into a schedule line.

It is converted into a production order.

Question: Score 1 of 1

What are benefits of the Engineering Workbench?


There are 2 correct answers to this question.

Response:

Undo/redo functionality of planned changes

Simulation of planned changes for costing and mater all requirements planning

Detailed selection of bill of materials (BOM)items and operations

Simultaneous processing of different bill of materials (BOM) items and operations


https://www.erpprep.com/user/quiz/1748789/userresults 14/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.

Which is the appropriate planning strategy to use?

Response:

50 – Planning without final assembly

40 – Planning with-final-assembly

20 – Make to order production

10 – Anonymous make-to-stock

Question: Score 1 of 1

In a production process, you need a certain amount of liquid as input material.


The source tank is directly connected to the reactor. How can you process
consumption postings?
Please choose the correct answer.

Response:

Transfer order

Picking list

Backflushing

Kanban

Question: Score 1 of 1

What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.

https://www.erpprep.com/user/quiz/1748789/userresults 15/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

Wait

In use

Full

Empty

Question: Score 1 of 1

A warehouse manager likes to streamline the goods receipt (GR) process for
production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.

Response:

Production scheduling profile

Scheduling margin key

Confirmation profile

Operation control key

Question: Score 1 of 1

What are main innovations in manufacturing in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Monitor Production Orders Fiori app

Flow manufacturing

Rough-cut capacity planning

Lock-free inventory movements

Material Coverage Fiori app

https://www.erpprep.com/user/quiz/1748789/userresults 16/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.

Response:

Concur

SAP Fieldglass

SAP Hybris

SAP Visual Enterprise

SAP Human Capital Management

Question: Score 1 of 1

You are using heuristic SAP_ERP_001. Which of the following criteria are
included in the automatic source determination logic when a planned order is
created?
Please choose the correct answer.

Response:

Delivery date

Component availability

Costs

Vendor rating

Quota arrangement

Question: Score 1 of 1

When would you use reporting point backflush in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

When you need to determine the work in progress

https://www.erpprep.com/user/quiz/1748789/userresults 17/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

When goods issues can wait for final confirmation

For production lines with short lead times

You require an up-to-date inventory for components

Question: Score 1 of 1

You are transferring data from SAP S/4HANAlo embedded PP/OS. What master
data objects are mapped to a location?
There are 3 correct answers to this question.

Response:

Warehouse number

Customer

Plant

Workcenter

Supplier

Question: Score 1 of 1

In which of the following master data objects can you define the production
order default storage location for a material component?
There are 2 correct answers to this question.

Response:

Material master of the finished product

Work center, in the production supply area

BOM, in the item for the material

Routing, in the component allocation

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/1748789/userresults 18/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

When working with both cross-plant and plant-specific material statuses in the
mater al master, which status has the highest priority?
Please choose the correct answer.

Response:

The most restrictive status

The least restrictive status

The plant-specific status

The cross-plant status

Question: Score 1 of 1

Which of these are layers in SAP Best Practice content?


There are 3 correct answers to this question.

Response:

Building blocks

Process diagrams

Configuration guides

Solution packages

Scope items

Question: Score 1 of 1

You have maintained the parameters for simple discontinuation in the material
master of a component. Which business process will be affected if the available
stock is zero and the discontinuation date is in the past?

Please choose the correct answer.

Response:

Material requirements planning

Production order release

https://www.erpprep.com/user/quiz/1748789/userresults 19/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Backflushing

Kanban

Question: Score 1 of 1

Which advanced functionality has been embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Backorder processing

Available-to-promise

Capacity planning

Supply Network Planning

Demand planning

Question: Score 1 of 1

At the end of the MRP run you receive the exception message “Reschedule In
Operation”. What caused the message to be generated?
Please choose the correct answer.

Response:

A firmed planned receipt cannot be rescheduled

The requirements date occurs before that of a firmed planned receipt

The requirement no longer exists

The requirements date occurs that of a firmed planned receipt

Question: Score 1 of 1

Which of the following is an advantage of MRP Live and NOT available in


classical MRP?
There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/1748789/userresults 20/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

MRP Live can create production orders automatically

MRP Live can plan materials with recursive BOMs

MRP Live can priorities demand from sales orders

MRP Live can propose alternative solutions

Question: Score 1 of 1

What are some of the advantages of using Kanban?


There are 2 correct answers to this question.

Response:

Replenishments are based on centralized planning

Replenishments are created close to the actual need

It is a simplified form of production control

It is mostly accomplished by manual postings

Question: Score 1 of 1

A customer is considering switching from order-related settlement to product-


related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.

Response:

They can be used for repetitive manufacturing.

They can be applied to make-to-stock production order.

They can be created automatically during month end process.

They can be used for manufacturing with collective orders.

https://www.erpprep.com/user/quiz/1748789/userresults 21/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

The production plan is being disrupted by last minute demands that are entered
in the system. Which is the most efficient way to handle last minute demands
and protect the current production plan?

There are 2 correct answers to this question.

Response:

In the material master record, set MRP type to P1 and a planning time fence on the
replenishment lead time of the material

In the material master record, set MRP type to P4 and a planning time fence on the
replenishment lead time of the material

Manually firm all planned orders for materials within the replenishment lead time of
the material

In the stock requirements list, set a manual firming fence for a date based on the
replenishment lead time of the material

Question: Score 1 of 1

The settings for MRP can be maintained at different levels. If settings have been
maintained in different places, in which sequence does the system search for the
MRP settings?
Please choose the correct answer.

Response:

Material Master –> Plant Settings –> MRP Group

Plant Settings –> MRP Group –> Material Master

Material Master –> MRP Group –> Plant Settings

MRP Group –> Material Master –> Plant Settings

Question: Score 1 of 1

Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.

Response:

https://www.erpprep.com/user/quiz/1748789/userresults 22/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Planning horizon

Net change planning

MRP list

Parallel processing across servers

Question: Score 1 of 1

Where can you find the latest in version of the Simplification List for SAP
S/4HANA?
Please choose the correct answer.

Response:

SAP Help Portal

SAP Solution Manager 7.2

SAP Support Portal

SAP Best Practices Explorer

Question: Score 1 of 1

Your project team decides to use a make-to-order planning strategy for a


strategic material in discrete manufacturing. What is the impact of this decision?
There are 3 correct answers to this question.

Response:

Sales order-specific stock is created

Storage location MRP areas are required.

Sales order-specific planning run is required.

Net requirements calculation is sales order-specific.

Production orders are created with sales order reference.

https://www.erpprep.com/user/quiz/1748789/userresults 23/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which task list types can have parallel sequences?


There are 2 correct answers to this question.

Response:

Master recipes (2)

Routings (N)

Rate routings (R)

Reference operation sets (S)

Question: Score 1 of 1

How would you define pegging in the context of Advanced Planning?


Please choose the correct answer.

Response:

An evaluation that is ordered according to the network structure of all related


products and represents the coverage of issue elements with receipt elements.

An evaluation to verify if there are mater al or capacity shortages in the network


after the production planning run.

An evaluation that is ordered according to the bill-of-material structure of all


related products and represents the relationship between the receipt and the issue
elements.

An evaluation to verify if there are overstock situations in the balance between


receipt and issue elements after the production planning run.

Question: Score 1 of 1

The method in which a production order is credited or debited depends on the


variant of cost object controlling (COC). What basis can be used to carry this
out?
There are 2 correct answers to this question.

Response:

Order-related

https://www.erpprep.com/user/quiz/1748789/userresults 24/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Cost-related

Product-related

Milestone-related

Question: Score 1 of 1

What is the purpose of a reporting point confirmation in repetitive


manufacturing?
There are 2 correct answers to this question.

Response:

To stage different components for a production line simultaneously

To determine the work in progress along the production line

To provide timely updates of inventory management for the staged components

To reduce the total production lead time for along production line

Question: Score 1 of 1

What are attributes of the SAP S/4HANA Simplification list?


There are 3 correct answers to this question.

Response:

It details transaction and solution capabilities at a functional level

It can have a business and a technical impact

It contains references to the relevant training material

It is only a grouping of related technical simplifications

It was created for better planning and estimation of your way to S/4HANA

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/1748789/userresults 25/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.

Response:

Online transaction processing (OLTP)

Extract on, transformation, and loading (ETL)

Online analytical processing (OLAP)

Pre computed aggregation views

Question: Score 1 of 1

Your customer wants to include restricted-use stock as a potential receipt in the


existing ATP check for component availability.

Which information is required to implement this change request in the scope of


check?
There are 2 correct answers to this question.

Response:

The checking group from the material master

The checking rule from the business application

The ATP category for restricted-use stock

The checking control for the order type

Question: Score 1 of 1

What is the first step in the MRP run?


Please choose the correct answer.

Response:

Net requirements calculation

Source determination

BOM explosion

https://www.erpprep.com/user/quiz/1748789/userresults 26/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Lot size calculation

Question: Score 1 of 1

Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.

Response:

MBNL

MMBE

MIGO

MB02

Question: Score 1 of 1

Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.

Response:

Control cycle

Production supply area

Kanban container

Rate routing

Question: Score 1 of 1

Which material-specific information can be transferred to a transportation lane


in PP/DS?
There are 3 correct answers to this question.

Response:

Outline agreement

https://www.erpprep.com/user/quiz/1748789/userresults 27/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Purchasing info records

Special procurement keys

Production versions

Quota arrangements

Question: Score 1 of 1

In Demand-Driven Replenishment, materials are classified according to several


criteria. What criteria can you use?
There are 3 correct answers to this question.

Response:

Demand variation

Minimum order quantity

Average daily usage

Usage in bill of materials

Goods issue value

Question: Score 1 of 1

What steps are possible in a PP/DS production planning run?


There are 3 correct answers to this question.

Response:

Backorder processing

Optimization

Detailed scheduling functions

Demand consumption

Heuristics

https://www.erpprep.com/user/quiz/1748789/userresults 28/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

How can SAP S/4HANA support a GMP compliant production process?


There are 3 correct answers to this question.

Response:

Use of the digital signature function to check and run business processes

Recipe approval with Engineering Change Management

Use of the GMP compliant flag in relevant master data applications

Documentation of quality data with Quality Management

Predefined GMP compliant process order types to meet audit requirements

Question: Score 1 of 1

What is the valid sequence of key activities in production order processing?


Please choose the correct answer.

Response:

Creation, scheduling, release, variance calculation, confirmation

Creation, scheduling, release, material withdrawal, confirmation

Creation, staging, release, material withdrawal, confirmation

Creation, release, scheduling, material withdrawal, confirmation

Question: Score 1 of 1

Which of the following apply to MRP Live?


There are 2 correct answers to this question.

Response:

The sequence of planning materials is calculated across plants.

The BAdIs for classical MRP also apply to MRP Live.

https://www.erpprep.com/user/quiz/1748789/userresults 29/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Planned orders need to be converted to purchase requisitions for externally


procured materials.

The definition of the planning scope is more flexible.

Question: Score 1 of 1

A material in your company is planned with planning strategy 70 (Planning at


assembly level). The consumption mode has been set to backwards with a
consumption period of 12 days.

Starting from when are the 12 days counted backwards?


Please choose the correct answer.

Response:

From the planned independent requirement date of the material

From the dependent requirement date of the material

From the availability date of the related finished good

From the requested delivery date of the related finished good

Question: Score 1 of 1

Which of the following time elements does MRP use during backward scheduling
for in-house production?
There are 2 correct answers to this question.

Response:

Planned delivery time

Opening period

Planning time fence

Goods receipt processing time

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/1748789/userresults 30/31
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Which methods can you use achieve a feasible production planning case of
capacity constraints?
There are 3 correct answers to this question.

Response:

Execute a new production planning run.

Reduce the planning window.

Form optimal sequences to reduce setup times.

Adjust the available capacity.

Select an alternative mode on a resource.

Question: Score 1 of 1

Where does the system check master data selection settings during the creation
of planned orders and production orders?
There are 3 correct answers to this question.

Response:

In the production version

In the bill of materials (BOM)

In the MRP controller

In the production order type

In the routing

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/user/quiz/1748789/userresults 31/31

You might also like