0% found this document useful (0 votes)
12 views13 pages

Synopsis Report Sample

report format

Uploaded by

aayushsawant511
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views13 pages

Synopsis Report Sample

report format

Uploaded by

aayushsawant511
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

THAKUR

THAKURPOLYTECHNIC
r4 Tme Areste Pges ecarsc Lrpreerrs E r A a C o m n
Egreeg Errs ErgeG

To,
The HOD,
Mrs.Suwana Thakre,
Thakur Polytechnic,
Kandivli (E)
Subject: Group formation
Respected Sir/Madam.
Information
We the students of Thakur polytechnic , studying in Third year,
Technology Engineering request you to grant permission to the group we have formed
for Project.

The group details are given below:


Sr no. Name of students Roll no Percentage % (2nd year)
1 Kanak Rai 51 70
43 80
2 Viraj Chheda
Sameer Shaikh 57 87.5
3
Pratham Koltharkar 59 85.65
4

Thanks You!

Your's Faithfully,
1. Kanak Rai

2. VirajChheda
3. Sameer Shaikh
4. Pratham Koltharkar

Academic year 2023-2024


Name of department Information Technology (IT)
Project Title Customer Churn Prediction
TNAKUR

Thakr Comyiex, Kandval Esg, nta. 400101.


THAKUR POLYTECHNIC
(prned by AICTE, Reepahed by CGate laharabira &AMated |NHTE
Tel 2854 2S1/84 340/28S4 TorI67798300 /301/ 021 00"Fan : 2054 193
Emal toyhaundcalon org ebude ww oymba n
paly

* Tg Acoedaed Progames Mechancal Engneerng| Elwcons Tele CommncationEngneerng| Elecroncs Érgneerng (we -15q3 2012 ke 3Yars)
Tne AcddProaen lechanca Engneenny jEcroncs &Tele Conmunicatbon Engneerng|Ecroncs Engnerng |
Computer Engneerng | thntrmaton Tedtnoogy (v 2Years uplo 06 2019)

Members Name of the Students Roll no. Signature


1. Kanak Rai 51 Kl
2. Viraj Chheda
Sameer Shaikh
43 Vghhola
3. 57
4. Pratham Koltharkar 59

Whether the project is sponsored :Yes/No


If Yes give details:
Name of Sponsor NA
Name of Guide NA
Name of Project Ms. Kiran Patil
Guide
YHAKUR
hak Conclen, Kandva Eag, Mnta. 0101.
THAKUR POLYTECHNIC
dba AKT, Recogaied by (iert. o Slaharnhira & Arsated to uSNTEY
Tet 2364 2481/ 2854 J543/ 254 770716779A00 / 391/ XY2 303-fan 2854 13
Eral ttoytoakusecaten. org Websde wrs tpolymta
TRUSTS
"1 Tne Accredated Progmes Mechncal Engreerng IElectrorcs &TeleComvnrcatgn Engrorngi Electorcs Erqneetng we 157017t3re
*rd Tne AcaredaedProgaes Comcter
AlechancalErgneerng
Engneerng|I Irdomaton
ElectrorncsTectnology
&Tee Conraten Engneorg! Eecroc Engneerngi
ttor 2 Years ugto 30-0199

Industrial Project (Information Technology)


Rationale:

In the field of Computer and Information Technology various technology


(hardware and Software) needs to be integrated and proper paradigms
necds to be implemented to develop any kind of computer applications.
Hence becomes essential to get hands on experience for developing
industrial applications. This subjects essential to understand the
implementation of the system development process ie. analyse, design,
coding, debugging and testing. This will help the students to acquire skills
and attitudes to work as programmer, Network administrator, T'echnical
assistant .Further more the student will be able to find out various sources
of technical information and develop self-study techniques to prepare a
project and write a project report.
Objectives:
Group projects can help students develop a host of skills that are
increasingly important in the professional world. Properly structured,
group projects can reinforce skills that are relevant to both group and
individual work.The students should be able to:

1. Work in Groups, Plan the work, and Coordinate the work.


2. Develop leadership qualities
3. Develop Innovative ideas.

4. Practically implement the acquired knowledge.


5. Develop basic technical Skills by hands on experience.
6. Document and Write project report.
7. Develop skills to use latest technology in Computer/Information
Technology field.
8. Analyze the different types ofCase studies.
9. Testing of software and hardware.
10. Maintaining systems and accessories.
YNAKUR
Thaku Comex, Kandvai Easd, Mnta 400101
THAKUR POLYTECHNIC
(heretdb ACTL, Recogad by Cent. o Maharanatra &Aated lo 1S8TE)
e 2054 2911 2854 15A0 1284 170/67794301 01/2/0)"Fu 24 1%3
Emal ttoygrahurtaln org Wetste w poymbai in

*1 Tene Acoredaed Progaes Mschancal Engnegng | EecPONCs &Te CoemrcatbonErgnrrg LEectroncs Ergreetng (wa Lt509 012 3Yea)
d Tne Acoedaed Proyarnes Mechanical Engneerng| Electroncs &Tese Commticaton Engoerng| Eecroriea Engrearing |
Compute Ergneervng! toraton Tectokogy (tor 2 Yaars upto 30-06 20199

Following activities related toproject are requiredto be dealt with, during


Fifthsemester:
1. Form project groupof 4-5 students and select group leader amongstthem.
2. Do market surveys, collect information, analyze the information and
select the project (For Three topics).
3. Present three project topics with problem definition. (Out of these one
willbe selected)
4. Prepare plan, which describes how the system will be developed.
5. Prepare the list of requirement.
6. Distribute the Project Module.
7. Prepare a synopsis of the project.

Following activities related to project are required to be dealt with, during


Sixth semester:

1. Implement the project plan prepared in fifth semester.


2. Do testing of developed project.
3. Debug theerrors found during testing.
4. Prepare Project Report andCoding Specifications.
5. Submit Project along with project report.
TNA

Thakr Comglea Kanda East Mta 400101


THAKUR POLYTECHNC
seered AKTL Rrcegaed by Cant of aharanàtra & ATSaled e v T
Te 854 2481/2854 1540 12854 7707I7743001x1/ 2300 "Fa 2854 183 poly
TRUSTS
..Toe Accreduaned Pogramnes
Mecharca Engreorng i Electrrcs & Ten Comn
E c n tngnerng |Elecors Egneerng me L15032012 or 3 Years)
Te Aocresaed Pogaes Mechana Eareera Calon Engnoerng |Eecroncs Engreerng
Compuhor Ergneerng l kdomaton ectrooy tor 2 Years uto 30-06 2019)

Name of Activity WEEK OF


Sr.
MONTH MONTH
No.
1. Group Formation 3

2. Selection of three project tropic for 4


presentation AUG
3. Selection of three project tropic for 5
presentation
4. Presentation of three topic and final 1,2
project topic selection
SEPT 3
5. Allotment of project guide
4
6. Discussion with project guide
5
7. Information Gathering
8. Literature Review 2
OCT 3
9. Project ProposalSubmission
10. Gathering information books and different 1
websites
11. Seminar onthe finalised project topicto 2
project guide
12, Study of technology needed to implement NOV 3

the project
13. Study of technology and hardware 4
components
14. Estimation of cost of budget
15. Information Gathering and 1
Documentation DEC
16. Presentation to project guide 2

Sign of Project Guide:


THAKUR

Thukur Congex Kandva(East, Munba 400101.


THAKUR POLYTECHNIC ie: 2454 2481/2834 35s40 I 2864 T77/67796300/01/3021 300-Fax: 2854 1983 tpoly
(Appres e by AICTE, Recogained by Gent. of Maharanhtra& AfEated to US8TO Emal pohgudcalon org "Webule olyua in
TRUSTS Anoed Nta ard ofAoeon Nre Oa SOrt 2015 Csfad heth se) Etd t999

*1u Tme Accrediated Programnes Mechanca Engneonng| Eectroncs &Tale ComunicatonEngneerng|Electroncs Enginoeng me 15052012 e
" Tte Acoredated Proammos Mechanical Engncerng i Electronca& Tele Comuicabon Crgineeng !Electonics Engineering |
Cater Ergneerng I|htormation Tectnology (tor 2Year upto 30-06-2019)

Project Progress Report


A progress report would provide the necessary update of a project work.
An assessment that takes place during a project or process, that conveys
details such as

What sub-goals have been accomplished


What resources have been expended
What problems have been encountered
Whether the project or process is expected to becompleted on time and
within budget.

Progress reports are used to determine whether changes are necessary to


an ongoing effort.
THAKUR
Thakr Comgien, Kanbva (Esg Mnta.400101
THAKURPOLYTECHNIC el: 2854 2481/ 2034 3S40 1Z854 TO7/671600/ 301/32 / 303Fa:2854 1% lpoy
(Aprevcd by AICTE. Reoçahed by Gevt of aharanhtra &AffNated to MSaTE) Emal tpotaludtcn org Wb wpoyntn
TRUSTS Aedles ty AtcnN Boad of ArssEa0on Nee Os sO O1 2)15s Cnahed eeha)
"M Tme Accvedaed Programmes Mechanca Engneerng |Ectroncs &Telg Commicaon Ergneerng iElectrorscs Enginetng (we130-2012 Te
'hd Timo AccrediatedProgrames Mechanical EngnoeringjElectronics &Toie-Commuticeon Ergneereg |Eectrornis Engreringi
Conpter Engneerng Itosmaton Techvckogy (tor 2Years ugto 30 08 2019)

Project Activities

Month: August

Sr. Week Description of Name of the Remark Sign


No. Work Done Group Member
1. 3rd Week Group Formation 1.Kanak
2.Viraj
3.Sameer
4.Pratham
2. 4thWeek Selection of three 1.Kanak
project topic for 2.Viraj
presentation 3.Sameer
4.Pratham
5th Week Selection of three 1.Kanak
3.
project topic for 2.Viraj
presentation 3.Sameer
4.Pratham
THAKUR

THAKUR POLYTECHNIC
AKTE Recegmlcd
AAated N
G t MSAarnhea & e MEATE)

. . t eedaed Pogrmes Mechanca Ergnrng iF


Ectrs & Talen
Cc Engnerrg |E ecrnos Ergneneg (waLts0012 or ) ars
-D Aceredated Pegraes Mecharcal Engneer
Compuse Ergneerng | rdormaten CommKaten Engneerng |Eiectronscs Ergrearngi
Tectelogy (or 2 Yoars ugto
9082019)

Project Activities

Month: September

Sr. Week Description of Name of the Remark Sign


No. Work Done Group Member
1. 1and 2nd Presentation of 1.Kanak ompleke

Week three topic and 2.Viraj


final project topic 3.Sameer
selection 4.Pratham
3rd Week Allotment of 1.Kanak
project guide 2.Viraj
3.Sameer
4.Pratham
Canplete
3 4th Week Discussion with 1.Kanak
project guide 2.Viraj
3.Sameer
4.Pratham
4 5th Week Information 1.Kanak
Gathering 2.Viraj
3.Sameer
4.Pratham
THAKUR
Zagd Singh Chndasl huti(Riy)
Thaâur Comciex, Kandv (Eas), ta 40101
THAKUR bs
POLYTECHNIC
ACTE. Recegaisd Gan. Maharare ARãated
y e & to
Tel 2864 2481 /2854 350I2254 T7O7 /677A0I01/302 I 03"Fa 2A 13 poy
RUSTS Artettedty Nater B AccdKKn Nre Ds $0 9001 2015 CaNaf\USaTE)
tota a) Eal octaurdcatcn og" Webla va
pohba
....Toe Accredated ProgrammesMechancal Engineorng
|Eectonics & Tele
T AccredateN Prgaenes
AMechancal EngnoengiEetroncs &Tehe CommricanEngieerng Engneerng 1Eectroeacs Engnoerng
Computer Engneerng ! tnormaton TechnoogyComuricanbon Eectronica Engineerng (wes1303-70123T
(tor 2 Years ugto 30082019)

Project Activities

Month: October

Sr. Week Description Name of Remark Sign


No. of Work the Group
Done Member
1. 2nd Week Literature 1.Kanak Conplebed,
Review 2.Viraj
3.Sameer
4.Pratham
2. 3rd Week Project 1.Kanak Congleles
Proposal 2.Viraj
Submission 3.Sameer
4.Pratham
THAKUR 400101
Thaiur Comçiex Kandval Easg Mta 190
7707i67796300 ! 301/ 302/ 30)" Fzx 2054
THAKUR POLYTECHNIC et: 2854 2481/2854 3540 12854
Websta woymba in
aharanatra &AMkstd to 1[sTD Emal toygtskrdcatcn.org
(Aerwed b AKTE, Recoçaised by Cent, of
for J Years)
TRUSTS Engnrng | Electorcs
Engineerng e15032012
Te Acoedated Programnes Mechsnca Engnoonng | Electroncs& Tele-ConicatonEoeerng | Eloctronics Engneern
& Te'e Connricaton
h Tne Acareated Progrnmaos AMechancal Engnoenng EtonicsTechnoogy (for 2 Years upto 0-06 2019)
Computer Engneerrg tntymaon

Project Activities

Month: November

Remark Sign
Sr. Week Description of Work Name of the
Done Group
No.
Member
1. 1st Week Reading IEEE paper 1.Kanak Groplety

or gathering 2.Viraj
information books 3.Sameer
anddifferent 4.Pratham
websites c o m p l e s e

Seminar on the 1.Kanak


2. 2nd Week
finalised project 2.Viraj
3.Sameer
topic to project
4.Pratham
guide
1.Kanak
3 3rd Week Study of technology
needed to implement|2.Viraj
the project 3.Sameer
4.Pratham
1.Kanak
4 4th Week Study of technology 2.Viraj
and hardware
3.Sameer
components
4.Pratham
Estimation of cost of 1.Kanak
Coroplekd
5. 5th Week
budget 2.Viraj
3.Sameer
4.Pratham
THAKUe Îhau Congex, Kand Est Mrta . 400%01
THAKUR POLYTECHNIC Eal pohygrakredtn org bata ws omba
(ArRb AKTL, Recogaled by Cent, ef Mahat nhtra &Afflatrd ta MSRTE)
hcceed h Nston Boerd d Acuredon Nre (Dots 90 t 2015 CasBest nshdel
1RUSTS
"u Tme Acoredated Programes Mechaca Engneering IElenCs &Tele Cormrstion Eroreerra t fiecroescs Ergireetrg we153-2017 k 3Tean)
TneArodsted Progres Mechancal Engreeng|Electrorice& Tee Comrnricston EngneerngiElectrrca Engneenn
Comptee Engneerng | trdmaton Tectnoloy (tor 2Yeors vgto 06 2019)

Project Activities

Month: December

Description of Work Name of the Remark Sign


Sr. Week
No. Done Group Member
1st Week Information 1.Kanak
1.
Gathering and 2.Viraj VGood
Documentation 3.Sameer
4.Pratham
2nd Week Presentation to 1.Kanak
2.
project guide 2.Viraj
3.Sameer
4.Pratham
THAKU Zagd Sngh Chontali husti(Rgd)
THAKUR POLYTECHNIC
(APprsed by AICTL Recoad by Got elMah
1ahurntra &Aated ta MSRTE
Daâr Comclex, Kandval East, Lkta.400101.
e2234 2481/254 340 12254 T707 /677sAOI 01 03/303. Fax:2e54 183 tpoly
Ealpoytandcaton org Weba bomtain
.Te AcOedated Programnes Mecanca Estg t99
EngneerngIBectronics & Tele Co
"d Tme Aconedatd Proganes Nechancal EngnoengiBectn &eoncalion Engneerrg|Electroncs Ergneerng(we s15032012 to 3Yoars)
e Commuicalon Engooerng
Camçser Engneerng | Irtomabon Tectnology (tor 2 |Eectronica Engineenng !
Years upto 30-082019)

Synopsis Format
THAKUR
Lag Sngh Ckntakle husti(Ryl)
Thakur Coçiea Kandat Esst), Mta 400101.
THAKUR POLYTECHNIC
(Apgreved by ICTE Recoçaised by Cntel aharanhira &Afrkatcd le SaIN
Te: 2854 241/25435431854 T707167A3DI 301/ 92 303- Fa 28A 193 |pay
TRUSTS Aceies y

*tt Time Acredated Programes


Mechanca Engnering |Electrorcs & Teto Comunicaton Engneerng IEectoeiCs Engoerngwe 1505212 o
Te Acoresae Progaes Mecharcal Engreenng jElectronics &Tele Conemricaton Engnoerng! Eoctrorics Enginoeringl
Conçter Egneerng | trtormaton Tectnoogy (tor 2 Years upto 0-08 2019)

Synopsis shallconsist of following details:

1. Academic year: 2023-2024


2. Course year : IF5I/ TYIF
3. Name of the proposed projects (as per priority)
I. Customer Churn Predicition
II. Predictive Analytics for the Stock Market
II. Price Comparision Website For - Online Shopping

4Name of Studentsin project group.


L Kanak Rai - 51

II. Viraj Chheda - 43


II. Sameer Shaikh - 57
IV. Pratham Koltharkar - 59

5. Whether the project is sponsored: Yes/No


If yes give details:
a) Name of Sponsor: None
b) Name of Project Selected: Customer Churn Predicition
c) Name of Guide & Signature: Ms. Kiran Patil
d) Name of HOD & Signature: Mrs. Suwarna Thakre

You might also like