0% found this document useful (0 votes)
17 views4 pages

4-Ayelo Pius CV

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 4

AYELO PIUS AANU

ANTHONY OKOTETE STREET OFF OTUAMA LAYOUT UDU DELTA STATE, NIGERIA

+2347060499700 # [email protected] # LINKEDIN.COM/ WWW.LINKEDIN.COM/IN/PIUS -


AYELO-5834A784

Summary
• An API certified inspector, AWS certified welding inspector and multidisciplinary NDT
inspector with good knowledge on application of codes and standards, having over 12
years of experience in Pressure vessel inspection, piping inspection, Tank inspection,
Magnetic particle testing, penetrant testing, Radiographic testing, Ultrasonic thickness
measurement/flaw detection, Boroscope inspection, and corrosion coupon retrieval,
installation/ERP data logging in the oil and gas industry.
• Possess strong technical, supervisory, and problem-solving skills with the ability to work
at height, in confined space, remote areas and challenging conditions on both onshore
and offshore platforms and on various projects.

Skill Highlights
• In-service Inspection • NDT
• Planning/Supervision • QAQC
• Good knowledge and Experience in • Fluent in spoken and written English
Microsoft office • Good leadership and communication skill.
• High HSE awareness and compliance • Fast learner.

Experience
TOTALENERGIES E & P NIGERIA : JULY 2013 TILL DATE

TOTALENERGIES E & P NIGERIA (November 2017 till date)


PLANT INSPECTOR/INSPECTION ENGINEER

• Carrying out onstream, Intrusive, Non-Intrusive inspection and corrosion monitoring of Pressure
vessels (such as heat exchangers, separators, scrubbers, reboilers air coolers) tanks and Piping.
• Supervision of Non-destructive Examination (NDE) Technicians.
• Carry out identification of piping on site with P & ID and ISO. Allocation of condition monitoring
locations (CML’s) on ISO drawing for Ultrasonic Thickness Measurement (UTM)/NDT.
• Prepare onsite ISO drawing/sketch and input marked-up CML
• Involved in daily work planning and Shutdown planning with Site and office inspection team.
• Witnessing of third-party calibration of pressure safety valves (PSVs) and of hydro test activity on
pressure vessels and piping.
• Onstream Corrosion coupon retrieval and installation.
• ERP data logging on corrosion probe.
• Review of NDT reports (thickness measurement readings, Magnetic particle, and Penetrant testing
results and preparation of detailed inspection reports in line with company written scheme of
Examination (WSE).

• Carrying out Boroscope inspection on equipment parts of pressure vessels and piping with limited
access.
• Carry out on-stream NDT (ultrasonic thickness measurement, MT, PT, and RFI on pipings and vessels.
• Follow-up of external contractors for lifting equipment recertification campaigns
• Pre-shutdown planning FFSD for static equipment and execution of planned activities on-site
• Permit to work preparation.
• Working with various departments like production, maintenance, HSE, ECP and Utility to ensure
the integrity of site equipment and ensure inspection activities are done according to written
procedures and in line with company HSE policy.
• Joint Investigation Visit (JIV) Inspection of leaks on wellhead flowlines/export lines, investigating
cause of leak, reporting inspection findings and giving first stage recommendation for repair.

ACHIEVEMENT: Successfully Carried-out UTM/Corrosion monitoring of wellhead flow lines, choke


valves and wellhead manifolds of over 90 oil/gas producing and water injection wells and discovered
internal corrosion by external UTM on a high sand producer flow line and choke valves. Affected choke
valves and eroded section of flow line were replaced, thereby preventing leaks and spill. Yearly
inspection program accomplished within the specified timeframe. Successfully performing intrusive
inspection of over 20 vessels in shutdown 2.10 and repair of MIC (microbiologically induced corrosion)
affected LLP separator.

NIGERIAN NATIONAL PETROLEUM COOPERATION – NNPC (July 2022 – February 2023)


PORTHARCOURT REFINERY - Turnaround Maintenance
API 570 PLANT INSPECTOR

• Supervision of Non-destructive Examination (NDE) Technicians.


• External and internal Visual Inspection of pipings.
• Carry out identification of piping on site with P & ID, onsite inspection isometric drawing and
allocation of condition monitoring locations on ISO for Ultrasonic Thickness Measurement (UTM) by
NDE technician.
• Involved in daily work planning and Shutdown planning with QAQC team Lead.
• Analysis of piping base on visual inspection condition, UTM readings using company grading system
and specification.
• Review of NDT reports (thickness measurement readings, Magnetic particle, and Penetrant testing
results and preparation of detailed inspection reports in line with company written scheme of
Examination (WSE).
• Reporting and documentation.
• Liaise with QAQC lead on results, recommendation, repairs and daily planning.

TOTALENERGIES E & P NIGERIA (August 2014 to November 2017)


NDT INSPECTOR / API INSPECTOR

• Carry out onsite NDE such ultrasonic thickness measurement, magnetic particle/penetrant
testing and RFI on process piping/pressure vessels.
• Supervision of Non-destructive Examination (NDE) Technicians.
• Carrying out Intrusive and Non-Intrusive inspection and corrosion monitoring of Pressure
vessels (such as heat exchangers, boilers, separators, air cooler, scrubbers, insulated vessel etc.)
tanks and Process Piping.
• Carry out identification of piping on site with P & ID, onsite inspection isometric drawing and
allocation of condition monitoring locations on pipe drawing for Ultrasonic Thickness
Measurement (UTM) by NDE technician.
• Carry out inspection of pressure equipment during shutdown maintenance at OML 58
Obagi flow station and Obite gas plant.

• Involved in daily work planning and Shutdown planning with Site and office inspection
team.
• Witnessing of third-party calibration of pressure safety valves (PSVs) and Witness of hydrotest
activity on pressure vessels and piping.
• Review of NDT reports (thickness measurement readings, Magnetic particle, and Penetrant
testing results and preparation of detailed inspection reports in line with company written
scheme of Examination (WSE).
• Carrying out Boroscope inspection of difficult-to-reach equipment parts of pressurevessels
and piping.
• Carry out inspection of flare tips during plant shutdowns.

ACHIEVEMENT: Participated in four (4) successful plant shutdown inspections of over 100 pressure
vessels between the year 2014 to 2017 at Obagi flow station and Obite gas plant in River state Nigeria
for Total Energies Nigeria without recording any incident/accident.
Successfully completed piping base line inspection campaign for over 500 piping group at
OML58 (Obagi flow station and Obite gas plant).

TOTAL E & P NIGERIA (July 2013 to August 2014)


(contracted by Arco Pipeline Solutions)
NDT INSPECTOR

• Carrying out Intrusive and Non-Intrusive inspection and corrosion monitoring of Pressure
vessels (such as heat exchangers, HP separators, air capacitors, reboilers, compressors etc.)
tanks and Piping.
• Carry out identification of piping on site with P & ID, onsite inspection isometric drawing and
perform NDE
• Carry out Ultrasonic thickness measurement and area scanning of pressure equipment during
shutdown maintenance at OML 58 Obagi flow station and Obite gas plant for TotalEnergies
Nigeria.
• Routine inspection as per annual inspection program.
• Carrying out Boroscope inspection of difficult-to-reach equipment parts of pressurevessels and
piping.
• NDE reporting and documentation.
• PTW Preparation

ACHIEVEMENT: Successfully completed piping baseline inspection campaign for over 300 piping
groups at OML58 (Obagi flow station and Obite gas plant) for TotalEnergies Nigeria.

ODERA GROUP (April 2011 to July 2013)


PROJECT: E & A TANK FARM CONSTRUCTION
NDT INSPECTOR

• Perform Radiography testing on welded joints and interpretation of results.


• Carry out NDT for Welders Qualification Test and critical welds
• Perform Ultrasonic flaw Inspection and Magnetic Particle Inspection.
• Interpretation and evaluation in accordance with the application code.
• Ensure all NDT policies and procedures are properly implemented and practice through
regular/periodical internal audit.
• NDE reporting and documentation.
Education
Higher Diploma - Mechanical Engineering - 2010
Petroleum Training Institute, Nigeria
National Diploma - Mechanical Engineering - 2006
Petroleum Training Institute
National youth service corp. (NYSC), Nigeria - 2011
NYSC Discharge Certificate No: A00921451

Certification & Training


API 570 Certified Piping inspector (57783)
API 510 Certified Pressure Vessel inspector (61973)
AWS Certified Welding Inspector (14122311)
SIX SIGMA – White Belt
IRATA certified rope access technician level 1 (1/143490)
ASNT SNT level 2 Certification in UT, RFI, MT and PT
Rescue at height (IL3016469)
Six (6) Months NDT Training in accordance to EN473 Standard
Quality Management System Training (QMS: ISO 9001:2008)
Basic firefighting certification
Confined Space/PTW Induction Training
Totalenergies – Safety HSEPASS Training
Personal Data
Sex: Male
Date of Birth: 08/05/1984
Marrital Status: Married
Nationality: Nigerian

Referees
Elijah Ayansina - Inspection Lead Totalenergies E & P Nigeria (EGINA FPSO)
Contact: +2348034698557
Email: [email protected]

You might also like