DYC - Srinivasan
DYC - Srinivasan
DYC - Srinivasan
PANCHAMOORTHY
COMPEX EX 01-04 HOLDER
ULN: 80500571
1
OBJECTIVE
Ex Inspection & repair supervision for E&I Equipment’s as per IEC standards.
Responsible for Permit to work authorization either as Holder or as Applicant.
Accountable for ensuring that the contract specifications, international codes and
regulatory compliance requirements are met.
Supervision of repair activities for rectification of comments during Ex inspection.
Ensure compliance with the Project Quality Plan, Project HSE Plan and Execution
Strategy relating to the projects assigned.
Generate daily, weekly & monthly reports along with Ex Register as per the approved
format
Well-versed with Ex software usage, synchronization and data transfer.
Carry out any additional activities as assigned by the Project Manager.
Prepare execution methodology, execution schedule.
Assign work to the charge-hands and technicians.
Ensure the proper maintenance of equipment's (For Tie-in jobs).
Installation of E&I system, trouble shooting.
Assisting the design of E&I system.
Preparation of BOQ of the required materials.
Preparation of list of spare parts required.
Ensures the quality records, acceptance certificates, mechanical completion certificates
and the documentation for specific systems and buildings/areas are prepared and
collated in accordance with project requirements
Coordinate with the planning and scheduling department to ensure milestone dates are
understood for each turn over area
Coordinate with the site QC manager for the completion of as-built turnover
documentation
Resolve any discrepancies between the completed milestone and quality
documentation
Review supplier inspection and test plans against the milestone scope of work
Coordinate with the commissioning department to define the scope of work
Assist the site subcontractors to compile turnover dossiers
Provide progress information for incorporation into project reports
Consider the implications of delays in QC as-built turnover documentation and bring to
the attention of the site QC manager
HVAC system installations (Electrical parts).
Monitor and control the status of punch list and exception lists relevant to quality
dossiers
Attend the weekly QA/QC, and commissioning meetings
Coordinate any inconsistencies with test packages with the field QC site inspectors
Provide progress data to the planning and scheduling department
Familiar with NEC, IEEE, NEMA, IEC, NFPA, NETA, API, NFPA, RAS gas standards.
Assign work to the charge-hands and technicians.
Ensure the proper maintenance of equipment's.
Installation of E&I system, trouble shooting.
Assisting the design of E&I system.
Preparation of BOQ of the required materials.
Preparation of list of spare parts required.
Assist, coordinate, carry out & implement the QA/QC program, arrange & conduct
meeting under the Project/Site Manager direction.
Visit the construction/fabrication site daily to check whether all works, materials,
equipment, are in accordance with QA/QC program, Project drawing & specification.
When defective materials, equipment, or workmanship are found, immediate action to
be taken to correct them, & to report the corrective action to the Project/Site Manager.
Conduct all required tests in accordance with contract documents and to prepare fill in
& sign all reports & forms as necessary for the compliance with Contract Quality
Standards
Preparation of ITP & QCP.
Carrying out preliminary inspection of materials & reviewing the material certificates.
Preparing for the inspection & material traceability certificates &updates the records.
Planning / organizing and checking of work progress & schedules to meet the
deadlines/target dates & implementing QA/QC plans.
Obtain any necessary approval for changing as appropriate procedure & for reforming
requiring special procedures.
Identifying & issuing of non-conformity as observed during working.
HVAC system installations (Electrical parts).
Coordinate quality control & represent matters with the client.
Planning work execution as per work vender specifications / requirements & work
target.
Supervising & coordinating with work force in executing job to completion on time as
per work plan & with safety precautions/procedures.
Preparing the QA/QC Dossier for the project.
Follow the ISO 14001 & ISO18001 procedures and implement the procedures in all
company activities.
INDIAN PROJECTS
Full visual check, Dimension Check & panel energization and functional test checked.
Appearance and arrangement of the system hardware components are checked visually for
quality & damages.
Visual Inspection for enclosure checked paint shade.
Visual inspection for finish of internal components, gaskets, gland plates, cable entries, Cable
plug, Haz loc, rating plate, tag plates checked.
Checked for overall dimension, mounting dimension, cable entry & number of cable entries,
Painting DFT verified.
Checked for mechanical operation of doors, hinge, and lock performance. Also checked the
internal wiring of the panels.
Checked the continuity between PE points. Checked for wiring continuity.
Panel Power On checked No spark found good. Checked at rated voltage. Functional
verification of control circuit.
Dielectric test, Test voltage: KV for 1 sec, Insulation resistance (Before & after HV): 500VDC.
Functional Checks: Functionality of the system & Components checked as per the approved
documents
Functional Verification of Control Circuits.
Bill of materials checked as per approved Factory Acceptance Test Procedure.
Internal ferrule details checked as per approved Wiring diagrams.
Electrical checks done as per approved wiring diagrams.
Incoming and outgoing voltage checked with approved wiring diagram.
Functional and operational check done on components like VFD, MCB, PANEL LAMP, LIMIT
SWITCHES as per approved Factory Acceptance Test procedure.
VFD functional test (Start, Stop, Trip commands checked as per approved FAT procedures)MCB
functional test (ON -OFF) conditions checked as per approved FAT procedures.
Panel Lamp and Limit Switches test (ON-OFF) conditions checked as per approved FAT
procedures.
PERSONAL INFORMATION
All credentials will be made available in original for your requirement on request.
SRINIVASAN PANCHAMOORHTY
Chennai, India
CONTACT DETAILS:
WHATSAPP (+91 8591929410)
[email protected]
The International Scheme for competency validation and certification of
personnel who work in explosive atmospheres
Srinivasan Panchamoorthy
Candidate ULN : 80500571
Ex01 Preparation & Installation of Ex'd', 'n', 'e' and ‘p' electrical equipment Rev 2
Ex02 Maintenance & Inspection of Ex'd', 'n', 'e' and ‘p' electrical equipment Rev 2
This certificate confirms that the named individual was assessed and conforms to the CompEx Scheme requirements, relating to the competency modules and standards
listed above. This certificate does not and should not be used to infer or as verification of underpinning occupational qualifications. Verification of any role required
technical qualifications are the sole responsibility of the employer.
© CompEx Certification Limited 2023. This certificate remains the property of CompEx Certification Limited which reserves the right to withdraw this certificate if there is
a failure to comply with the requirements of the CompEx Scheme. CompEx Certification Limited is accredited by UKAS to ISO/IEC 17024: 2012, certification body No.
0270.
COVID-19 Vaccination Certificate
Issued in India by Ministry of Health & Family Welfare, Govt. of India
Certificate ID 67344212838
Beneficiary Details
Beneficiary Name Srinivasan
Gender Male
Vaccination Details
Dose Number Date of Dose Vaccine Name Batch Number Vaccine Type Manufacturer
COVID-19 vaccine,
1st 2021-07-24 COVISHIELD 4121MC033 non-replicating viral vector Serum Institute of India
In case of any adverse events, kindly contact the nearest health centre
This certificate is compliant with WHO-DDCC:VS data dictionary