0% found this document useful (0 votes)
32 views3 pages

EB (Solar Plant)

Uploaded by

Arun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views3 pages

EB (Solar Plant)

Uploaded by

Arun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

From

S.ARUNKUMAR
EB No: 03-092-003-407
Alampalayam, Muthur – 638 105.
Mob : 97888 52707, 97888 52502.

To
The Assistant Engineer
TNEB, Muthur – 638 105.

Sir,
Sub :
1. PMSURAYGHAR Scheme – Inspection Report Defects - Reg.
2. EB Bill - Without Considering Solar Power – Reg.

Warm Greetings. My Solar Roof Top Plant registration details are as follows

Application On 14.02.2024

Feasibility Approval On 26.03.2024

Work Completed on 4 Month 2024

Work Completion Accepted By TNEB on 14.05.2024

Bi Direction Meter Installed on June 2024

After Acceptance 5 Month Delay for Inspection Due to

1. AE Medical Leave
2. Over Work Load of Deputation AE
3. Weekly One Day Visit by Deputation AE to Muthur Office
In my house, Bi Direction Meter Installed. But not updated in TNEB Computer System.

Because of this, a problem happen for August 2024 Bill Generation.

 Billing System not accepts Old meter reading because of New Meter installed.

 Billing System not accepts New meter reading because of New Meter details are

not Inspected and updated.

 After discussion with CE office, Coimbatore, My bill was generated with

amount of Rs.3773.

 I paid Rs. 3777 after getting following assurance from our office.

o Request me to pay bill of August 2024 otherwise disciplinary actions by

CE office may be taken against some officials.

o In Next bill, Solar Plant current generation is considered.

o No need to Pay in Next EB Bill like normal bill.

o Inspection work will be completed very soon.

Bi direction Meter Installed on 15.10.2024

Inspection completed on 15.10.2024

Inspection Report Return to TNEB on 25.10.2024

Reason for Return : Name and Designation of Discom Nodal Person approving

the inspection report is Blank


Meanwhile,

1. My New EB Bill was generated without consideration of Solar Plant Power


Generation.
2. October 2024 Bill Amount is Rs. 2777.
3. Pass 8 Month, I am doing this work and Wait for Completion.
4. More than 15 times, I visited our office.
5. More than 50 times, I called to Mobile Number : 9445852105. But always
busy. May be my number is in call block list.
6. I am waiting for favourable reply from TNEB.
7. If it is not possible due to any reason then
“To Whom I have to complaint?”
For rectifying my problems.
8. Kindly do the needful

Thanking you

Yours Truly

S.Arunkumar