0% found this document useful (0 votes)
103 views18 pages

Method Statement For Roofing Aluminum Cladding Installation

Uploaded by

mamba Cho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views18 pages

Method Statement For Roofing Aluminum Cladding Installation

Uploaded by

mamba Cho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Method Statement For Aluminum Cladding Installation Revision No: 1

264-00296-40 and 264-00297-40

Londoner Grand L8 & L4 Pool Deck Refresh

Method Statement For Roofing Aluminum Cladding Installation

Rev. 1

Revision No. Date Amendment


1 6 Nov 2024 -

Prepared by: Reviewed by: Reviewed by: Approved/ Endorsed by:

Name: Si Tou Heng Name: Liu Kun Fong Name: Eric Chow Name: Gavin Wong

Post: Senior Project Coordinator Post: Safety Officer Post: Senior Project Post: Deputy Project Director

Manager

Date:6/11/2024 Date: 6/11/2024 Date: 6/11/2024 Date: 6/11/2024


Method Statement For Waterproofing Application Revision No:1

CONTENTS

1. Objective
2. Scope of Works
3. Logistic
4. Method
5. Materials/Resources
6. Safety
7. Environmental
8. Safety
9. Permits and License
10. Employee and Third-Party Briefings
11. Emergency Contact List

APPENDICES

Appendix A – Shop drawing

Appendix B – ITP

Appendix C – Risk Assessment

1|Page
Method Statement For Waterproofing Application Revision No:1

1. Objective
This method statement indicates the supply and installation of roofing structural steel framing,
waterproofing and aluminum cladding, under the scope of works 264-00296-40 and 264-
00297-40 - Londoner Grand L8 & L4 Pool Deck Refresh by Circle Engineering Company Ltd.

2. Scope of Works
Londoner Grand L8 pool suite roofing area

2|Page
Method Statement For Waterproofing Application Revision No:1

3|Page
Method Statement For Waterproofing Application Revision No:1

3. Logistic

4|Page
Method Statement For Waterproofing Application Revision No:1

4. Method
1.1. Preparation
 Verify on site dimensions including wall-to-wall dimensions and levels, and check
against approved shop drawings to see if the area provided are within acceptable
tolerance.
 Working area to be fenced with fencing with stickers as required.
 Check and verify the numbering tags on the packing of delivered items to ensure
that the items are delivered to the correct location for installation.
 The site needs to be supervised by the relevant person in charge.

5|Page
Method Statement For Waterproofing Application Revision No:1

Roofing Detail

1.2. Construction Sequence


This proposal recommends implementing waterproofing construction after the
installation of the steel frame. This approach aims to better protect the waterproofing
membrane, minimize the need for construction personnel to walk on it, and prevent
damage from welding slag that may melt due to high temperatures during welding.
Construction sequence detailed as below:
 Working platform set up for subsequent working at height. Erect working platform
before the installation works started: a mixed working platform including scissor
platform lift, aluminum scaffolding will be set up on indicated location for the works,
scaffolding erection method and as per below shown:

6|Page
Method Statement For Waterproofing Application Revision No:1

Working Platform Erection Scenario

 Polishing of the old waterproofing membrane with angle grinders and safety
equipment (PPE).
 Invitation of Owner Representative and Consultant for inspection for the roofing
surface to receive the new waterproofing membrane once the polishing work
completed.
 Setting -out for steel plate then drilling holes for the anchor bolts.
 Waterproofing applied at the bottom of steel plate areas. Step 1:

7|Page
Method Statement For Waterproofing Application Revision No:1

 Priming: Prepare a 1:1 by volume Nitoproof 725 / clean water mixture. Apply primer
and allow to wet/ soak in to the substrate and dry to a tacky state before coating.
Step 2: Waterproofing Application: Nitoproof 725 should be applied in one coat by
roller or brush or by airless spray at a wet film of 0.8mm.
 Waterproofing Curing (24H).
 Installation of steel plate with anchor bolts.
 Pull-out testing by the third party.
 Connection of the steel frame by welding method.
 Weld testing by the third party.
 Brushing zinc rich epoxy coating to welding locations of steel frame.
 Sika 214 grouting for the gap between of the steel plate and RC roofing surface.
 Waterproofing applied for the whole area of RC roofing surface, Step 1: Priming:
Prepare a 1:1 by volume Nitoproof 725 / clean water mixture. Apply primer and
allow to wet/ soak in to the substrate and dry to a tacky state before coating. Step 2:
Waterproofing Application: Nitoproof 725 should be applied in one coat by roller or
brush or by airless spray at a wet film of 0.8mm.
 Waterproofing Curing (24H). It is a critical step in the waterproofing process,
ensuring that the applied waterproofing membrane adheres properly and achieves
its intended performance.
 Installation of #316 S.S. gutter with bird net.
 Installation of alum. panel & Half Circular copping, implant weather sealant.

5. Equipment
 Aluminium Scaffolding

Photo for reference only

8|Page
Method Statement For Waterproofing Application Revision No:1

 Plasma Cutter Machine

Photo for reference only

 Stirring machine

Photo for reference only

 Impact Drill

Photo for reference only

9|Page
Method Statement For Waterproofing Application Revision No:1

 Safety Anti-fall Rope

Photo for reference only


 Scissor Platform

Photo for reference only

1. Safety
Place health and safety as our number one priority over all other business considerations.
7.1 Emergency Arrangements
In the event of accident/serious accident
 Report site supervisor to PM/SPM and the relevant parties immediately
 Relevant works would be ceased for investigation work.
 First aider would present to provide preliminary treatment of the injured.
 Direct the injured to the hospital immediately of necessary.

In the event of a fire

10 | P a g e
Method Statement For Waterproofing Application Revision No:1

 Powder type fire extinguishers would be used to fight the fire.


 If the fire is out of control, report to fire department of the situation immediately.
 Evacuate all workers to safe place

In the event of typhoon signal is hoisted


 Secure all loosely fixed construction materials.

7.2 Special Skill Training


 Obtain valid Zero Harm Induction Training card
 New worker safety induction training
 Weekly site safety training / toolbox talks
 Scissor platform operator training
 Hand held cutting training

5.3.1Personal Protective Equipment and Safety


 Safety helmet with chin strip, safety boot/shoes, reflective vest

Photo for reference


 Safety harness with double lanyard

Photo for reference

 Gloves

Photo for reference

11 | P a g e
Method Statement For Waterproofing Application Revision No:1

 Safety goggles for grinding / cutting works

Photo for reference


 Mask for dusty working conditions

Photo for reference

7.3 KPI – Reportable Accident – Flow Chart

7.5 Emergency Arrangements:


In the event of accident/serious accident
 Report site supervisor to PM/SPM and the relevant parties immediately
 Relevant works would be ceased for investigation work.
 First aider would present to provide preliminary treatment of the injured.
 Direct the injured to the hospital immediately of necessary.
In the event of a fire

12 | P a g e
Method Statement For Waterproofing Application Revision No:1

 Powder type fire extinguishers would be used to fight the fire.


 If the fire is out of control, report to fire department of the situation immediately.
 Evacuate all workers to safe place

In the event of typhoon signal is hoisted


 Secure all loosely fixed construction materials.
7.6 Special Skill Training
 Obtain valid Zero Harm Induction Training card
 New worker safety induction training
 Weekly site safety training / toolbox talks
 Scissor platform operator training
 Hand held cutting training
7.7 Environmental Management
 Dust and construction refuse (dust control especially from gypsum block wall)
 Ensure workers to wear dust mask to provide protection against dust during the
cutting / trench cutting of gypsum blocks for conceal MEP fixtures.
 Maintain good ventilation in working area
 Provision of warning notice/ signage to identify the working area
 Provision of clear working zone by warning notices/ signages
 The working area shall be kept tidy at all times; construction refuse will be collected
on a regular basis.
 Use the debris bag for packing, and the weight less than 16kg for manual handling

Photo for reference

7.8 Water and waste water control

 Plastic water storage containers shall be used to storage waste water temporarily,
and shall be sealed up properly. It shall be disposed at designated waste water
disposal point assigned by the main contractor. The containers shall not be left

13 | P a g e
Method Statement For Waterproofing Application Revision No:1

open from time to time, and shall not be kept inside the hoarding for a long time
except during the cement mixing and plastering process.
 Wooden cover with canvas to cover up the opening

2. Permits and License


 Noise permits will be obtained from FM/ Ops for working exceed normal working
hours
 Scissor Platform working permit (Form 2,4,5,6,13)
 CPI sample photo (for reference)

 Aluminium working platform permit (Form 13)

3. Employee and Third Party Briefings


 For safety, when starting a new construction area, our safety officer will provide
training to our workers for what their job hazard and precaution.
 During install process, our foremen will provide training and briefing to our workers
for the construction process and follow the field control sheet.

4. Emergency Contact List


Site Representative
Name Company Position Contact
Mr. Gavin Wong Circle Deputy Project Director 6339 1981
Mr. Eric Chow Circle Senior Project Manager 6688 2437
Mr. Sitou Heng Circle Senior Project Coordinator 6636 8819
Mr. Wong Chan Fai Circle Site Agent 6638 2626
Mr. Liu Kun Fong Circle Safety Officer 62661800
Mr.Cheng Tai Weng Circle Safety Officer 66560185

14 | P a g e
Method Statement For Waterproofing Application Revision No:1

Appendix A: Shop Drawing

15 | P a g e
Method Statement For Waterproofing Application Revision No:1

Appendix B: ITP

16 | P a g e
Method Statement For Waterproofing Application Revision No:1

Appendix C: Risk Assessment

17 | P a g e