16 Transformer

Uploaded by

MAKARANTH V.L
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Dubai International Airport Risk Assessment Ref: AX324/RA-016

Risk Assessment Sheet Expansion Phase 2 Rev No: 00


Contract No.: AX324 MMS No.: 10018
Date: 23.07.2005
Page 1 of 2

Risk Assessment for: Tramsformer

Risk Revised Risk Risk


Risk Classification
Significant Potential Population Level Responsibility for Classification Level Responsibility for
Ref Activity Element Low/ Action to be Taken to Reduce Risk Low/ Residual Risks
Hazards at Risk Likelihood Severity Risk Implementation Severity Risk Monitoring
Medium/ Medium/
(L) (S) Rating (R) High (S) Rating (R) High

1 Delivery Vehicle and Material Transport in public 5 – 15 1 4 4 L  Vehicle registered & driver licensed. TSO --- --- --- ------ ----
Plant Management movement area  Material controller to monitor deliveries. MC
 Crush  Provide induction to regular drivers. SM
 Collision

2 Lifting & Manual Over hanging Load 5 – 15 6 3 18 M  Close supervision, protect the area, use certified lifting SS 2 12 M  People crossing into the barricaded SS
Handling Operation  Falling Objects tools. area.
 Damage to  Crane should have current certification. TSO  Mechanical failure of lifting SPE
property and  Operators should be licensed and banksman authorised. TSO equipments.
equipment  Barricade the area of the lift. SS
Environment Hazards  Comply with DCA rules & complete their checklist SS
 Heat Stress when working with lifting equipments.
 Provide sufficient rest breaks and ensure availability of SS
drinking water.

3 Installation of Work at Height 30 6 4 24 M  Close supervision and have a Tool Box Talk. SS 2 12 M  People crossing into the barricaded SS
Transformer  Falling Materials  Barricade the area of the work. SS area.
 Fall of Persons  Crane should have current certification. TSO  Mechanical failure of lifting SPE
Material Handling  Operators should be licensed and banksman authorised. TSO equipments.
 Mechanical Aid Comply with DCA rules and complete their checklist (Even after the implementation of the
Failure when working with lifting equipments. control actions the risk level is
Environmental Hazards  No persons should stand below the swing radius of the SS Substantial, so competent supervision
 Heat Stress load. must be available through out the period
Physical Injuries  Ensure use of P.P.E (Safety, Hamess, Hand Gloves). SS / TSO of execution of the job).
 Injuries when  Provide sufficient rest breaks and ensure availability of SS
handling sharp drinking water.
objects  Installation to be done as per recommendation of the SPE / SS
 Slips suppliers

4 Work with Cutting Electrical 5 – 15 1 4 4 L  Use only authorised people to work with power tools. SS / TSO 1 4 L  Damage to the tools. SS / Operatives.
Machine and Hand  Electrocution,  110V to be used for electrical hand tools. SS
Power tools  Burns  On tape joints in electrical cables, use male-female SS
Physical Hazards socket.
 Moving / Rotating  As far as reasonably practicable cable should not cross SS
mechanical parts walkways.
 Trailing electrical  Regular maintenance of all hand tools. SPE
leads  Close supervision. SS
 Noise and dust  Maintain proper housekeeping. SS / TSO
emission  Ensure use of P.P.E (Goggles, Car Plugs, Nose Masks, SS / TSO
Environmental hazards Hand Gloves).
 Heat Stress  Provide sufficient rest breaks and ensure availability of SS
drinking water.

5 Testing of Electrical Hazards 5 1 4 4 L  Lock out and Tagging System to be followed during any PM --- --- ---
Transformers  Electrocution test or maintenance work
 Fire  Ensure personnel’s, tool and material are removed from SS / TSO
 Burns the rest area before the test starts
 Flash  The areas to be barricaded and warning signs posted. SS / TSO

AX324-SAF-01
Dubai International Airport Risk Assessment Ref: AX324/RA-016
Risk Assessment Sheet Expansion Phase 2 Rev No: 00
Contract No.: AX324 MMS No.: 10018
Date: 23.07.2005
Page 2 of 2

Risk Classification
Likelihood (L) :
Time:
Continuous 5 hrs. plus 2 to 4 hrs. .25 to 1 hr. 10 min. or less
No. Exposed:
100 plus 6 6 5 4 3
50 to 100 6 5 4 3 3
25 to 50 6 4 3 2 2
15 to 25 6 3 3 2 1
5 to 15 6 3 2 1 1
1 to 5 6 2 1 1 1

Severity (S): Not Harmful (NH) = 1; Slightly Harmful (SH) = 2; Harmful (H) = 3; Extremely Harmful (EH) = 4; Multiple Casualties (M) = 5; Catastrophic (C) = 6

Risk Rating: Determined as Likelihood x Severity

AX324-SAF-01