GOVERNMENT OF INDIA
केंद्रीयलोकनिर्ााणविभाग
CENTRAL PUBLIC WORKS DEPARTMENT
Name of work: Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
NIT No : 18/EE/CCD/2024-25
Name of work: Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
INDEX
Sl. No Description Page No
1 Cover page of the NIT 1
2 Index 2
3 Part-A (Cover page) 3
4 Notice Inviting e-Tender 4-5
5 Information & Instruction for bidders for e-biding 6-8
6 List of Documents to be submitted /Uploaded in by the bidders 9-10
7 CPWD -6 for e-Bidding 11-15
8 Format for Receipt of Original EMD-Annexure-1 16
9 Undertaking regarding obtaining GST registration Certificate—Annexure-2 17
10 Declaration about Site Inspection- Annexure-3 18
11 Notarized Affidavit of ‘Non-black listing’ by CPWD / State / Central Government 19
Departments / PSU / Autonomous bodies – Form ‘A’- Annexure-4
12 Information regarding eligibility letter of Transmittal- Annexure-5 20
13 Notarized Affidavit of Undertaking on structural stability and soundness of already
21
completed buildings and infrastructure projects – Form ‘F’ - Annexure-6
14 Affidavit (For and to Undertake to keep the validity of the bank guarantee intact) -
22
Annexure-7
15 Format of Bank Guarantee for Earnest Money Deposit/Performance
23 - 24
Guarantee/Security Deposit/Mobilization Advance
16 Form CPWD 7 (Percentage Rate Tender and contract for works ) 25-26
17 Acceptance 27
18 Part-B (Civil Works) 28
19 Form of Schedules (A-F) for Civil component i/c Milestones etc., 29-36
20 Table-I Recovery rates for quantities beyond permissible variation 37
21 Form of Application by the Contractor for seeking Extension of Time – Annexure-8 38-39
22 Form of Application by the Contractor for seeking Rescheduling of Milestones– 40
Annexure-9
23 Materials & quality Assurance 41-44
24 General Terms and Conditions 45-48
25 Special Conditions 49-63
26 Particular Specification and Special Conditions for Cement and Steel to be brought by 64-68
the Contractor
27 List of approved make of Materials (for Civil works) 69-85
28 Part-C (Schedule of Quantities) 86
29 Schedule of Quantities - Civil components 87-91
30 General Abstract for Quoting Rate (on Percentage basis) 92
Certified that this NIT contains pages from 01 to 92 ( Ninty two only including the cover page)
NIT No.18/EE/CCD/2024-25
Name of work: - Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
The Bid forms and other details can be obtained from the website
https://etender.cpwd.gov.in or https://eauction.cpwd.gov.in
Executive Engineer,
Coimbatore Central Division,
CPWD, Coimbatore-641002.
-----------------------------------------------------------
Executive Engineer,
Coimbatore Central Division,
CPWD, Coimbatore - 641 002.
Name of work: Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
1. The contractor submitting the tender should read the schedule of quantities, additional
conditions, additional specifications, particular specifications and other terms and
special conditions given in the NIT and architectural drawings. The Bidder should also
read the General Conditions of Contract 2023 for Maintenance Works with
amendments/ modification up to the previous day of the last date of submission of
tender, which is/will be available as Government of India Publications; however,
provisions included in the tender document shall prevail over the provisions contained
in the standard form. The set of drawings and NIT shall be available with The
Executive Engineer, Coimbatore Central Division, CPWD, Coimbatore-641002
(Telephone No.0422-2547980, Fax No.0422-2547981). The contractor should also visit
the site of work and get acquainted himself with the site conditions before tendering.
The following conditions, which already form part of the tender conditions, are
specially brought to his notice for compliance while filling the tender. They are
requested to comply following instructions.
2. Tenders with any condition including that of conditional rebates shall be rejected.
Rates of such tenders shall not be entered in the tender opening register at the time of
opening of tender.
4. GST as applicable and LabourCess @ 1% shall be borne by the contractor himself. The
contractor shall quote his rates considering all such taxes.
5. It will be obligatory on the part of the Bidder to tender for and sign the tender
documents for all the component parts. The department reserves right to accept tender
in full or in part.
7. Applicants are advised to keep visiting the above mentioned web-sites from time to time
(till the deadline for Tender submission) for any updates in respect of the tender
documents, if any. Failure to do so shall not absolve the applicant of his liabilities to
8. Those contractors, who are not registered or have not updated their profile on the
website mentioned above, are required to get registered / update their profile
beforehand. The necessary training materials including the videos with step to step
process are available on download section of https://etender.cpwd.gov.in.
9. The intending bidder must have valid Class-III digital signature certificate with
encryption key (combo type) to perform any operations / transactions on the e-tendering
portal / website and the bidder should download and install the eMsigner on their
system as per instructions available on download section.
10. The intending Bidders has to fill all the details such as Banker’s name, number, amount
& date of Earnest Moneyin the form of Insurance Security Bonds, Account Payee
Demand Draft, Fixed Deposit Receipt, Banker’s Cheque or Bank Guarantee (as
prescribed) issued by a Commercial bank(Drawn in favour of the Executive Engineer,
Coimbatore Central Division, CPWD, Coimbatore-641002 (Telephone No.0422-
2547980, Fax No.0422-2547981) shall be scanned and uploaded to the e-tendering
website within the period of Bid submission. In case of submission of EMD in the form
of FDR, it is in the tenderer’s own interest to keep the FDR valid as long as it is
required. A part of earnest money is acceptable in the form of bank guarantee also. In
such case, 50% of earnest money or Rs 20 Lakhs, whichever is less, will have to be
deposited in shape prescribed above, and balance in shape of Bank Guarantee issued by
a Scheduled Bank valid for a period of 90 days or more which is to be scanned and
uploaded by the intending Bidders.
11. The original EMD receiving authority releases the EMD to unsuccessful bidders after the
expiry of stipulated bid validity Period or immediately after acceptance of the successful
bidder, whichever is earlier, after verification from the e-tendering portal website
(https:// etender.cpwd.qov.in> closed Tender>all) that the Particular contractor is not
L-1tenderer and work is awarded
12. The original EMD should be deposited either in the office of Executive Engineer
inviting bids or Division office of any Executive Engineer, CPWD within the period
of bid submission. The EMD receiving Executive Engineer (including NIT issuing
Executive Engineer) shall issue a receipt of deposition of earnest money deposit to the
bidder in a prescribed format (as given in CPWD-6) uploaded by tender inviting
Executive Engineer in the NIT. This receipt shall also be uploaded to the e-tendering
website by the intending bidder up to the specified bid submission date and time.
13. Contractor shall not divert any advance payments or part thereof for any other purpose
other than needed for completion of the contracted work. All advance payments
received as per terms of the contract (i.e. mobilization, secured advance against
materials brought at site, secured advance against plant & machinery and / or for work
done during interim stages, etc.) are required to be re-invested in the contracted work to
ensure advance availability of resources in terms of materials, labour, plant &
machinery needed for required pace of progress for timely completion of work.
15. Information and instructions for Bidders posted on website shall form part of Tender
Document.
16. If any information furnished by the applicant is found incorrect at a later stage, he shall
be liable to be debarred from tendering/taking up of works in CPWD. The department
reserves the right to verify the particulars furnished by the applicant independently.
17. Contractor can upload documents in the form of JPG format and PDF format.
18. Contractor must ensure to quote Percentage rate (s) of each sub works, in case, if a
bidder does not quote any percentage above/below on the total amount of the tender
or any section/subhead in percentage rate tender, the tender shall be treated as
invalid and will not be considered as lowest bidder.
19. Contractor must ensure to quote rate in the prescribed column(s)meant for quoting rate
in figures appears in yellow colour and the moment rate is entered, it turns sky blue. In
addition to this, while selecting any of the cells a warning appears that if any cell is left
blank the same shall be treated as “0”.Therefore, if any cell is left blank and no rate is
quoted by the bidder, rate of such item shall be treated as “0) (ZERO).However, if a
tendered quotes nil rates against each item in item rate tender or does not quote any
percentage above/below on the total amount of the tender or any section/sub head in
percentage rate tender, the tender shall be treated as invalid and will not be considered
as lowest tendered.
20. After ascertaining the eligibility of participated bidders the Technical bids shall be
opened first on due date and time as mentioned above in case of two bid system. In
single bid system, the financial bids will be opened only after ascertaining the eligibility
of participated contractors.
21. On opening date, the contractor can login and see the bid opening process. After
opening of bids, he will receive the competitor bid sheets.
Executive Engineer,
Coimbatore Central Division,
CPWD, Coimbatore-641002.
Insurance Security Bond, Account Payee Demand draft, Fixed Deposit Receipt, Banker’s
1.
Cheque or Bank Guarantee (as prescribed) issued by commercial Bank drawn in favor of
Executive Engineer, Coimbatore Central Division, CPWD, Coimbatore against EMD
having validity for 90 days or more.
Copy of receipt for deposition of Original EMD issued from the division office of any
2.
Executive Engineer, Central PWD, including NIT issuing along with Office Stamp-In
the proforma prescribed in Annexure-1
Enlistment Order of the Contractor in appropriate Category and valid on the date of
3.
opening of tender. Enlistment order issued by enlistment authority, with validity duly
extended, in favor of the CPWD contractor shall only be considered.
GST registration certificate of Tamil Nadu, if already obtained by the bidder. If the bidder
4.
has not obtained GST registration as applicable, then he shall scan & upload following
undertaking along with bid documents.
"If work is awarded to me, I / we shall obtain GST registration certificate as
applicable, within one month from date of receipt of award letter or before release of
any payment by CPWD, whichever is earlier, falling which I / we shall be responsible
for any delay in payments which will be due towards me / us on account of work
executed and/or any action taken by CPWD or GST department in this regard."
5. GST filed return acknowledgement of JUNE 2024 or thereafter
11. Any other Document as specified elsewhere in the press notice and NIT as mandatory.
AFFIDAVIT - Form ‘C’ ( Undertaking to keep the validity of the bank guarantee
intact) as prescribed in Annexure-7).
** However, the successful L1 bidder has to submit the original hardcopy of the above
uploaded documents to the Engineer-in-charge for the purpose of verification within a
week time.
10
1. The Estimated cost of the work is Rs.14,15,621/- This estimate, however, is given
merely as a rough guide.
2. The enlistment of the contractors should be valid on the last date of submission of
bids. In case the last date of submission of bids is extended, the enlistment of
contractor should be valid upto the extended date of submission of bids.
3. The authority competent to approve NIT for the combined cost and belonging to the
major discipline will consolidate NITs for calling the bids. He will also nominate
Division which will deal with all matters relating to the invitation of bids. For
composite bid, besides indicating the combined estimated cost put to bid, should
clearly indicate the estimated cost of each component separately. The eligibility of
bidders will correspond to the combined estimated cost of different components put to
bid.
4. Agreement shall be drawn with the successful Bidders on prescribed Form No.
CPWD7which is available as a Govt. of India Publication and also available on
website https://etender.cpwd.gov.in orhttps://eauction.cpwd.gov.in. Bidder shall
quote his percentage rate(s) as per various terms and conditions of the said form
which will form part of the agreement.
5. The time allowed for carrying out the work will be 90 days from the date of start as
defined in Schedule ‘F’ or from the first date of handing over of the site, whichever is
later, in accordance with the phasing, if any, indicated in the Bid documents.
(i) The site for the work is available and provided by the client.
6. The bid document consisting of plans, specifications, the schedule of quantities of
various types of items to be executed and the set of terms & conditions of the contract
to be complied with and other necessary documents can be seen on
websitehttps://etender.cpwd.gov.in orhttps://eauction.cpwd.gov.inat free of
cost. The Scope of the work can be discussed at the office of the Executive Engineer,
Coimbatore Central Division, CPWD, Coimbatore-641002 (Telephone No.0422-
2547980, Fax No.0422-2547981)
7. The standard publications like General Conditions of Contract, Applicable Delhi
Schedule of Rates for Civil and Electrical, Applicable Specifications for Civil and
Electrical works and Applicable Delhi Analysis of Rates for civil and electrical with
amendments / correction slips up to the last date of submission of Bids can be seen
free of cost from website www.cpwd.gov.in.
8. After submission of the Bid the contractor can re-submit revised Bid any number of
times but before last time and date of submission of Bid as notified.
9. While submitting the revised Bid, contractor can revise the rate of one or more
item(s) any number of times (he need not re-enter rate of all the items) but before last
11
13. The original EMD should be deposited either in the office of Executive Engineer
inviting bids or division office of any Executive Engineer, CPWD within the period
of bid submission. The EMD receiving Executive Engineer (including NIT issuing
Executive Engineer) shall issue a receipt of deposition of earnest money deposit to the
bidder in a prescribed format(given below) as uploaded by tender inviting Executive
Engineer in the NIT. This receipt shall also be uploaded to the e-tendering website by
the intending bidder up to the specified bid submission date and time.
14. Copy of Enlistment Order and other documents as specified in the press notice
shall be scanned and uploaded to the e-Tendering website within the period of bid
submission. However, certified copy of all the scanned and uploaded documents
as specified in press notice shall have to be submitted by the lowest bidder only,
within a week physically in the office of tender opening authority.
15. Online bid documents submitted by intending bidders shall be opened only of those
bidders, whose submitted EMD deposited with any division office of CPWD and
other documents scanned and uploaded are found in order.
16. The contractors registered prior to 01.04.2015 on e-tendering portal of CPWD shall
have to deposit tender processing fee at existing rates, or they have option to switch
over to the new registration system without tender processing fee any time.
The bid submitted shall be opened at 03.30 PM on 30/07/2024.
The Bid submitted shall become invalid if:
(i) The Bidder is found ineligible.
(ii) The bidder does not deposit original EMD with division office of any Executive
Engineer, CPWD.
(iii)The bidder does not upload all the documents (including GST registration) as
stipulated in the bid documents including the copy of receipt for deposition of original
EMD.
(iv) If any discrepancy is noticed between the documents as uploaded at the time of
submission of bid and the certified hard copies as submitted physically by the
lowest tender in the office of tender opening authority within a week.
12
13
14
27. Criteria of eligibility for submission of bid documents - Joint ventures and Special
Purpose Vehicles are not accepted.
15
Name of Work: Repair and painting works for overhead water tank in RAF
(1)
campus, Coimbatore.
(* To be filled by NIT approving authority/EE at the time of issue of NIT and uploaded
along with NIT)
(1) Name of the Contractor#:
(2) Form of EMD#:
(3) Amount of Earnest Money Deposit#:
(4) Date of Submission of EMD#:
Signature,
Name and Designation of EMD receiving Officer
/EE along with Office Stamp
# To be filled by EMD receiving officer/EE
16
lf work is awarded to me, I/we shall obtain GST registration Certificate of the
State, in which work is to be taken up within one month from the date of receipt
of award letter or before release of any payment by CPWD, whichever is earlier,
failing which I/We shall be responsible for any delay in payments which will be
due towards me/us on account of the work executed and/or for any action taken
by CPWD or GST department in this regard.
17
To,
Sub: NIT No:18/EE/CCD/2024-25 for the work Repair and painting works for
overhead water tank in RAF campus, Coimbatore.
Dear Sir,
It is hereby declared that as per CPWD–6 for e-Bidding, I/ We the bidder inspected and
examined the subject site and its surrounding and satisfy myself/ ourselves as to the nature
of the ground and sub-soil(so far as is practicable),the forms and nature of the site/ ourselves
before submitting the bid, the accommodation which may require and all necessary
information as to risks, contingencies and other circumstances which may influence or affect
our bid have been obtained. I/We the bidder shall have full knowledge of the site and no
extra charge consequent upon any misunderstanding or otherwise shall be claimed in later
date.
I /We bidder shall be responsible for arranging and maintaining at own cost all materials,
tools & plants, water, electricity access, facilities for workers and all other services required
for executing the work unless otherwise specifically provided for in the contract documents.
Submission of a bid by me/us implies that I / We have read this notice and all other contract
documents and has made myself /ourselves aware of the scope and specifications of the
work to be done and local conditions and other factors having a bearing on the execution of
the work.
Yours faithfully
18
AFFIDAVIT
Name of work: Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
I/we undertake and confirm that our firm/partnership firm has neither been
blacklisted/nor been suspended for doing business by any state/Central
Departments/PSUs/Autonomous bodies during the last 7 years of its operations.
Further that, if such information comes to the notice of the department then I/we
shall be debarred for bidding in CPWD in future forever. Also, if such information
comes to the notice of department on any day before date of start of work, the
Engineer-in-charge shall be free to cancel the agreement and to forfeit the entire
amount of Earnest Money Deposit/Performance Guarantee (Scanned copy of this
notarized affidavit to be uploaded at the time of submission of bid).
19
From:
To,
Subject: Name of work: Repair and painting works for overhead water tank in RAF
campus, Coimbatore.
Sir,
Having examined the details given in tender notice and bid document for the above work,
I/we hereby submit the bid along with all required information and documents.
I/we hereby certify that all the statements made and information supplied by me is true
and correct.
I/we have furnished all information and details necessary for bid and have no further
pertinent information to supply.
I/we also authorize the Executive Engineer, CPWD, Coimbatore Central Division,
Coimbatore to approach individuals, employers, firms and corporation to verify our
details, if required.
Certificate: It is certified that the information given by me/us in the bid are correct. It is
also certified that I/we shall be liable to be debarred, disqualified/cancellation of
enlistment in case any information furnished by me/us found to be incorrect.
Contact details of our authorized representative are as under:
Name
Mobile Number:
Email id:
Contact Address:
Signature(s) of Bidder(s)
Seal of bidder
Name of Bidder:
Contact Address:
Email Id of Bidder:
Mobile Number of Bidder(s):
20
Name of work: Repair and painting works for overhead water tank in RAF
campus, Coimbatore.
I/we undertake and confirm that any building / infrastructure constructed by our
firm/partnership firm/company has not suffered any failure, making it unfit for
intended use, either due to structural design and defects or due to use of sub-
standard materials or execution of sub-standard work, poor workmanship or any
other reason during the last 25 (Twenty five) years
I/we, also undertake that in addition to above, the Engineer-in-charge shall be free
to debar us forever from tendering in CPWD.
21
AFFIDAVIT
Undertake to keep the validity of the bank guarantee intact
I / We also indemnify the Government against any losses arising out of no encasement of the bank
guarantee if any.
(Deponent)
Signature of Contractor
Note: The affidavit is to be given by the Executants before a first class Magistrate
22
Date:
Witnesses:
Signature.................. Authorized signatory
Name and address Name
Designation
Staff code no.
Bank seal
Signature..................
Name and address
*Date to be worked out on the basis of validity period of 90 days where only financial bids are
invited and 90 days for two/three bid system from the date of submission of tender.
**ln paragraph 1, strike out the portion not applicable. Bank Guarantee will be made either for
earnest money or for performance guarantee/security deposit/mobilization advance, as the case
may be.
24
Tender for the work of: Repair and painting works for overhead water tank in RAF
campus, Coimbatore.
TENDER
I/We have read and examined the notice inviting tender, schedule, A, B, C, D, E & F
Specifications applicable, Drawings & Designs, General Rules and Directions, Conditions
of Contract, of 2023 with amendments up to the last date of submission of tenders, clauses of
contract, Special conditions, Schedule of Rates & other documents and Rules referred to in
the conditions of contract and all other contents in the tender document for the work.
I/We hereby tender for the execution of the work specified for the President of India
within the time specified in Schedule ‘F’ viz., schedule of quantities and in accordance in all
respect with the specifications, designs, drawing and instructions in writing referred to in
Rule-1 of General Rules and Directions and in Clause 11 of the Conditions of contract of
2023 with amendments up to the last date of submission of tenders and with such materials
as are provided for, by, and in respect of accordance with, such conditions so far as
applicable.
I/We agree to keep the tender open for Thirty (30) Days from the last date of receipt of
bids and not to make any modification in its terms and conditions.
A sum of Rs. 28,312 /-will be deposited by me/us with EE calling the tenders in
cash/receipt treasury challan / deposit at call receipt of a scheduled bank/fixed deposit
receipt of scheduled bank/demand draft of a scheduled bank/ bank guarantee issued by a
scheduled bank as earnest money.
Copy of earnest money deposit receipt of prescribed amount deposited in the form of
Insurance Surety Bonds, Account Payee Demand Draft, Fixed Deposit Receipt, Banker’s
Cheque or Bank Guarantee (as prescribed) issued by a Commerical Bank, is scanned and
uploaded (strike out as the case may be). If I/We, fail to furnish the prescribed performance
guarantee within prescribed period, I/We agree that the said President of India or his
successors, in office shall without prejudice to any other right or remedy, be at liberty to
forfeit the said earnest money absolutely. Further, if I/We fail to commence work as
specified, I/We agree that President of India or the successors in office shall without
25
Further, I/We agree that in case of forfeiture of Earnest Money or Performance Guarantee
as aforesaid, I/We shall be debarred for participation in the re-tendering process of the work.
I/We undertake and confirm that eligible similar work(s) has/have not been got executed
through another contractor on back to back basis. Further that, if such a violation comes to
the notice of Department, then I/We shall be debarred for tendering in CPWD in future
forever. Also, if such a violation comes to the notice of Department before date of start of
work, the Engineer-in-Charge shall be free to cancel the agreement and to forfeit the entire
amount of Earnest Money Deposit/ Performance Guarantee
I/We hereby declare that I/We shall treat the tender documents drawings and other records
connected with the work as secret/confidential documents and shall not communicate
information/derived there from to any person other than a person to whom I/We am/are
authorized to communicate the same or use the information in any manner prejudicial to the
safety of the State.
Witness: **
Address: **
Occupation: **
*To be filled in by EE
** To be filled in by the contractor
26
The above tender (as modified by you as provided in the letters mentioned hereunder) is
accepted by me for and on behalf of the President of India for a sum of
Rs..………........................................*……….……..
(Rupees………..………………………………………*…………………………………………
…………………………….....………………...)
The letters referred to below shall form part of this contract agreement:-
(a) *
(b) *
(c) *
Signature …………………*……………………
Designation ………………*………
Dated:*……..
27
28
(Separate Performa for Civil, Elect & Hort. Works in case of Composite Tenders)
(Operative Schedule to be supplied separately to each intending Bidder)
SCHEDULE ‘A’ :
SCHEDULE 'C'
Tools and plants to be hired to the contractor
NIL
SCHEDULE ‘D’
Extra schedule for specific requirements /document for the work, if any.
Civil work:
Name of Work: : Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
29
Clause 1
30
acceptance
Corrections : Nil, Deletions : Nil, Insertions : Nil, Overwriting : Nil, AE (P) EE
Clause 1A
Whether clause 1A shall be applicable: Yes
Clause 2
a) Authority for fixing compensation Chief Engineer, CPWD, Madurai or any other
under clause 2 authority to be notified by the CPWD
directorate from time to time.
Clause 5
Number of days from the date of 10 (TEN) days or date of handing over
issue of letter of acceptance for of site whichever is later.
reckoning date of start
Clause 5.2.
Mode of recording hindrance Online through Contractor Login TAB
available in www.cpwd.gov.in in compliance
to the directions and detailed procedures
contained in OM issued vide:
DG/MAN/394 dated 28.01.2020 issued vide
F.No: CSQ /CM/16(1)/2020 e file
No:9081700 and any subsequent amendment
made from time to time by the directorate.”
Clause 5.4
Schedule of rate of recovery for delay in : Rs.2500/- per week or part basis
submission of modified programe
31
Note: - The withheld amount shall be released, if and when subsequent milestone is achieved within
respective time specified. The main contractor will ensure that electrical components of the work
are executed in time without giving any chance for slippage of milestone an account of delay in
execution of associated electrical works by him. However, in case milestones are not achieved by
the contractor for the work, the amount shown against milestone shall be withheld by the Engineer-
in-charge of the respective components.
Time allowed for execution of work: 90 days.
Authority to decide:
(i) Extension of time Engineer – in – charge
(ii) Rescheduling of mile stones Chief Engineer, CPWD, Madurai
32
Clause: 7A
Whether Clause 7A shall be applicable : Yes
No Running account bill shall be paid for the
work till the applicable labour licenses,
registration with EPFO, ESICand BOCW
Welfare Board, whatever applicable are
submitted by the contractor to the Engineer-
in-charge.
Clause 8 A
Clause 9
Clause 10A
Clause 10C
Clause 10CC
Payment due to Increase / Decrease in Not Applicable
Prices/ Wages after Receipt of Tender for
Works
33
Clause 12
Clause 16
Chief Engineer,
Competent Authority for O/o CE Madurai CPWD, Madurai-17 any other
deciding reduced rates.
12.3 authority to be notified by CPWD from time to time.
shall apply for building
work
Clause 17
Defect liability period 12 (Twelve) months from the date of handing over of
the completed work
Clause 25
Procedure for conciliation and arbitration for settlement of Disputes will be dealt as per
OM No. issued vide DG/SOP/22, Dated: 02.08.2021.
34
Experience
Minimum
n of contractor in the event
Sl. No.
Nos.
Discipl
Technical of not fulfilling
ine
Representati provision of clause 32
ve Figures Words
(in Rs.)
1. Graduate Civil Project 2 Yrs for
Engineer manager Degree 15,000/- (Rupees
(Or) cum holder 1No. per Fifteen
Diploma Planning/Q (or) month Thousand
Engineer uality/Site/
5 Yrs for only) per
Billing Diploma Month
Engineer holder
respectivel
yyy
Retired Engineer AssistantEngineers retired from Government services, who are holding
Diploma will be treated at par with Graduate Engineers. Diploma holders with minimum 10
year relevant experience with a reputed construction company can be treated at par with
Graduate Engineers for the purpose of such deployment subject to the condition that such
diploma holders should not exceed 50% of requirement of degree engineers.
The contractor shall submit a certificate of employment of the technical representative(s) (in
the form of copy of Form -16 or CPF deduction issued to the Engineers employed by him)
along with every running account bill/final bill and shall produce evidence if at any time so
required by the Engineer-in-charge.
Clause 36 The contractor shall not be permitted to tender for work in CPWD
Zones/Circles (Division in case of horticulture/nursery categories)
responsible for award and execution of contracts in which his near relative is
posted as Divisional Accountant or as an officer in any capacity between the
grades of Chief Engineer and Junior Engineer” both inclusive.
Clause 38
(i) (a) Schedule / statement for determining theoretical quantity of cement & bitumen on the
basis of Delhi Schedule of Rates 2023 issued by C.P.W.D. with correction Slips up to the last
date of submission of bids.
(ii) Variations permissible on theoretical quantities.
(a) Cement for works with estimated cost put to:2% plus/minus
tender more than 25 lakhs
35
36
37
1. Name of Contractor :
2. Name of work as given in the agreement :
3. Agreement No. :
4. Estimated amount put tender :
5. Date of commencement of works as per agreement :
6. Period allowed for completion of work as per agreement :
7. Date of completion stipulated in agreement :
8. Period for which extension of time if has been given by :
authority in Schedule ‘F “Previously
EE’s Letter No. and Extension granted
Months Days
date
1 Extension
st
2nd Extension
(c) 3rd Extension
Total extension
previously given
38
Signature of Contractor
Dated
39
1. Name of Contractor :
2. Name of work as given in the agreement :
3. Agreement No. :
4. Estimated amount put tender :
5. Date of commencement of works as per agreement :
6. Period allowed for completion of work as per agreement :
7. Date of completion stipulated in agreement :
8. Rescheduling of milestones done previously :
2ndMilestone
--------------
Rescheduling of Milestone applied for
Milestone Original/Reschedule Details Comment Proposed
No.for d Date and Period s of Reschedule
which of Executive d Date of
Reschedulin Hindrance Engineer
g is applied s
(A)1st
Milestone
(B)2nd
Milestone
--------------
---
Submitted to the Sub Divisional Officer
Signature of Contractor
Dated
40
Contractor shall endeavour to obtain test reports for tests conducted from outside
laboratory in a reasonable time.
41
42
6. The contractor shall render all help and assistance in documenting the total
sequence of this project by way of photography, slides, audio-video recording etc.
Nothing extra shall be payable to the contractor on this account.
7. The contractor shall be fully responsible for the safe custody of materials brought
by him and issued to him even though the materials are under double lock key
system.
8. Separate cement registers showing the receipt of the OPC and PPC shall be
maintained at site. The contractor shall construct separate godowns for storage of
OPC & PPC at site and nothing extra on this account shall be payable.
9. Cement issued shall be for consumption at site only. No cement for factory made
items and those not manufactured at site shall be issued.
10. In case there is any discrepancy in frequency of testing as given in the list of
mandatory tests and that in the individual sub-head of work as per CPWD
Specification 2019 Vol. 1 & 2 the higher of the two frequencies of testing shall be
adopted.
11. Samples of such other materials the Engineer-in-charge may review and approvals
in accordance with clause 10A of GCC before actual use
43
44
1 A. The order of preference in case of any discrepancy may be read as the following:
45
46
12.1 Defects of serious nature causing inconvenience such as leakage, reverse floor
slopes affecting the drainage (ponding of water), warping and opening of joints in
doors and window shutters etc shall be undertaken by the contractor immediately
on receipt of the complaint but not exceeding one week time, failing which the
defects will be got removed at his risk and cost plus 25% as supervision and
establishment charges.
12.2 All other defects notified to the contractor during the DLP shall be rectified to the
entire satisfaction of Engineer-in-Charge or item replaced as soon as possible but
not later than one month in any case. Failure to do so in a reasonable period the
Engineer-in-Charge shall get it done at his cost plus 25% as supervision and
establishment charges after final notice of 10 days. The decision of Engineer-in-
Charge regarding a defect being of serious nature or otherwise shall be final and
binding.
Note: The above list is illustrative for civil work and not exhaustive. The rectification will
include all civil works including internal and external services without any exclusion.
13 Safety measures:
All workers of contractor and associate agencies, invariably and at all the times,
must follow all safety norms, adopt safe construction practices and use all required
safety gadgets in their working throughout the project duration. The contractor has
to engage one safety officer who will ensure that above safety measures is being
implemented in letter and spirit. Moreover, he will also check the temporary
arrangement made by the contractor during construction work and ensure that it is
safe and stable. He will also guide all the workers for adopting safety measures
every morning i.e before start of the work.
For the safety of all labour directly or indirectly employed in the work for the
performance of the contractor's part of this agreement, the contractors shall, in
addition to the provisions of CPWD safety code and directions of the Engineer-in-
Charge make all arrangements to provide facility as per the provisions of
47
14 Existing drains, pipes, cables, over-head wires, sewer lines, water lines and similar
services encountered in the course of the execution of work shall be protected
against the damage by the contractor at his own expense. Also any trenching and
digging for laying sewer lines/water lines/cables etc. shall be commenced by the
contractor only when all men, machinery’s and materials have been arranged and
closing of the trench(s) thereafter shall be ensured within the least possible time. In
case of damage of any such services the same shall be repaired promptly by the
contractor at his own cost and also keep the department indemnified at all times
against any claim whatsoever generated by a third party on above account .The
contractor shall not store materials or otherwise occupy any part of the site in a
manner likely to hinder the operation of such services.
15 The contractor shall be responsible for the watch and ward/guard of the buildings,
safety of all fittings and fixtures including sanitary and water supply fittings and
fixtures provided by him against pilferage and breakage during the period of
installations and thereafter till the building is physically handed over to the
department. No extra payment shall be made on this account.
16 The contractor shall take instructions from the Engineer-in-Charge for stacking of
materials. No excavated earth or building materials etc. shall be stacked / collected
in areas where other buildings, roads, services, compound walls etc. are to be
constructed.
48
2.The contractor shall at his own expense and risk arrange land for accommodation of
labour, setting up of office, the storage of materials, erection of temporary workshops, and
erection of temporary barricade and construction of approach roads to the site of the work
including land required for carrying out of all jobs connected with the completion of the
work. However, the departmental land, to the extent available may be allowed to be used for
the purpose free of rent without accepting any responsibility for the delay, if any, on this
account. The contractor shall have to abide by the regulations of the authorities concerned
and the directions of the Engineer-in-charge for the use of the land available at the site of
work. If during construction it becomes necessary to remove or shift the stored materials
shed workshop, access roads, etc. to facilitate execution of any other work by any other
agency, the contractor shall do as directed by the Engineer-in-charge and no claim
whatsoever, shall be entertained on this account.
3.It shall be deemed that the contractor shall satisfied himself as to the nature and location of
the work, transport facilities, availability of land for setting up of camp etc. The department
will bear no responsibility for lack of such knowledge and the consequences thereof.
4.The contractor shall have to make approaches to the site, if so required and keep them in
good condition for transportation of labour and materials as well as inspection of works by
the Engineer-in-charge. Nothing extra shall be paid on this account.
5.The contractor shall be responsible for the true and proper setting out of the work in
coordination with the Engineer-in-charge or his authorized representatives and for the
correctness of the positions, levels, dimensions and alignments of all parts of the structure
and for the provisions of all necessary instruments appliances and labour in connection
therewith. If at any time, during the progress of work, any error appears or arises in the
position, levels, dimensions or alignment of any part of the work, the contractor on being
asked to do so by the Engineer-in-charge, shall rectify such error to the entire satisfaction of
Engineer-in-charge. The checking by the Engineer-in-charge or his authorized representative
shall not relieve the contractor of his responsibility for the correctness of any setting out of
any line or level. The contractor shall carefully protect and preserve all bench marks pegs
and pillars provided for the setting out of works.
7.The contractor shall at his own cost submit samples of all materials sufficiently in advance
and obtain approval of the Engineer-in-charge. Subsequently, the materials to be used in the
49
8.The contractor shall at his cost, make all arrangements and shall provide necessary
facilities as the Engineer-in-charge may require for collecting, preparing, packing forwarding
and transportation of the required number of samples for tests & for analysis at such time
and to such places as directed by the Engineer-in-charge, and bear all charges and cost of
testing unless specifically provided for otherwise elsewhere in the contract or specifications.
9.The necessary tests shall be conducted in the laboratory approved by the Engineer-in-
charge. The samples for carrying out all or any of the tests shall be collected by the Engineer-
in-charge or on his behalf by any other officer of CPWD. The contractor or his authorized
representative shall associate himself in collection, preparation, packing and forwarding of
such samples for the prescribed tests and analysis. In case he or his authorized representative
is not present or does not associate himself, the results of such tests and consequences
thereon shall be binding on the contractor.
10.Materials used on work without prior inspection and testing (where testing is necessary)
and without approval of Engineer-in-charge are liable to be considered unauthorized,
defective and not acceptable. The Engineer-in-charge shall have full powers to require
removal of any or all of the materials brought to site by contractor which are not in
accordance with the contract, specifications or do not conform in character or quality to the
samples approved by the Engineer-in-charge. In case of default on the part of the contractor
in removing rejected materials, the Engineer-in-charge shall be at liberty to have them
removed at the risk and cost of the contractor.
11.The contractor shall make his own arrangement for the water required for execution of
work and get the water tested at his own cost with regard to its suitability for use in the
works and get written approval from the Engineer-in-charge before he proceeds with the use
of same for execution of work. Nothing extra shall be paid to the contractor on this account.
12.The work shall be carried out in such a manner so as not to interfere/or effect or disturb
other works being executed by other agencies, if any.
13.Any damages done by the contractor to any existing work or work being executed by
other agencies shall be made good by him at his own cost.
14.The work shall be carried out in the manner complying in all respects with the
requirement of relevant rules and regulations of the local bodies under the jurisdiction of
which the work is to be executed and nothing extra shall be paid on this account.
15.For completing the work in time, the contractor might be required to work in two or more
shifts and no claims whatsoever shall be entertained on this account, notwithstanding the
Fact that the contractor will have to pay to the labourers and other staff engaged directly or
indirectly on the work according to the provisions of the labour regulations and the
agreement entered upon and/or extra amount for any other reasons.
16.There is no electric power supply at the site of work. The contractor will have to make his
own arrangement for obtaining electric connection from the state electricity board and make
50
17.The contractor shall maintain in good condition all work executed till the completion of
the entire work entrusted to the contractor under this contract and nothing extra shall be paid
on this account.
18.No payment will be made to the contractor for damage caused by rain, floods and other
natural calamities whatsoever during the execution of the works and any damage to the
work on this account shall have to be made good by the contractor at his own cost and
nothing whatsoever ' shall be paid on this account.
19.The rates for all items of work, unless clearly specified otherwise, shall include the cost of
all labour materials, de-watering and other inputs involved in the execution of the items.
20.Unless otherwise provided in the schedule of quantities or CPWD specifications the rates
tendered by the contractor shall be all-inclusive and shall apply to all heights, depths, leads
and lifts.
21.No claim whatsoever for idle labour, additional establishments, costs of hire and labour charges
for tools and plants etc. would be entertained under any circumstances.
22.For the safety of all labour directly or indirectly employed in the work for the
performance of the contractor's part of this agreement, the contractors shall, in addition to
the provisions of CPWD safety code and directions of the Engineer-in-charge make all
arrangements to provide facility as per the provisions of Indian Standard Specifications
(Codes) listed below and nothing extra shall be paid on this account.
23.The contractor shall take all precautions to avoid all accidents by exhibiting necessary
caution boards and by providing red flags, red lights and barriers. The contractor shall be
responsible for any accident at the site of work and consequences thereof.
24.Royalty/ Seignior age charges at the prevalent rates and all other incidental expenditure
shall have to be paid by the contractor, on all the boulders, metal stone aggregate, sludge,
earth, sand, bajri, Brick bats etc. collected by him for the execution of the work direct to the
concerned Revenue Authority of the State or Central Government and the amount paid shall
not be reimbursed in any form whatsoever. The proof of making payment of the royalty/
seignorage charges shall be produced to the EE-CCD/CPWD/COIMBATORE along with
each bill.
51
26.All Stone aggregates, sand, stone dust, etc shall be obtained only from the quarry or other
source approved by the Engineer in charge before they are actually procured and used in the
work. The rate for the items mentioned in the schedule of quantities includes all charges and
nothing-extra payable on any account.
27.All GST as applicable, Labour Cess @ 1% etc., shall be borne by the contractor himself.
The contractor shall quote his rates considering all such taxes and the same shall be
recoverable from the bills and necessary TDS Certificate shall be issued. Any change in the
rate of recovery towards GST is notified by the competent authority, the same shall be
effected and no claim what so ever shall be entertained by CPWD. The contractor shall
quote his rates accordingly.
28.The work shall be carried out without causing inconvenience to the officials working
in the office during office hours.
29.The construction materials like bricks, sand & steel bar required for the work shall be
stacked neatly on the location identified by the Engineer-in-charge to avoid any
inconveniences to the people using the premises.
30.Necessary barricading shall be provided to avoid the direct vision of materials from
the main road
31.Crushed Stone Sand conforming to coarse sand / fine sand as that of CPWD
specification 2019 Vol. I/II with up to date correction slips shall be allowed in the work
in place of River sand/ Pit sand. The bidders shall quote their rate accordingly.
32.Main agencies including associated agencies which are doing works related with this
project will also simultaneously execute the works and thus the agency shall have to
cooperate for the same. The agency may sometime have to wait until for completion of main
work at some work location or have to bear interferences of main agency during the midst of
his work at some locations. The agency shall have to leave necessary holes, openings etc.
The agency may sometime have to do their finishing works after the other agencies
completed their work at some location as required. Nothing extra over the agreement rates
shall be paid for the same.
52
Use of personal protective equipment and safety devices relevant to site activities
Awareness and Training Programs
Motivational schemes and programs
Access, Egress and workstation safety
Safe use of construction power supply and upkeep / maintenance of installations
Work permit systems
Use, maintenance and inspection of Plant & machinery
Scaffold & formwork norms
Use, maintenance and inspection of Lifting Tools
Fire Protection and prevention
Emergency preparedness
Status of Safety implementation at site shall be discussed in the Weekly Review meeting.
Contractor must submit the safety statistics every month in the enclosed format.
The General Guidelines governing the safety implementation shall include the following
Rules, while preparing the safety plan.
34.3.1 No child labor shall be employed in the work. A display board depicting “NO
CHILD LABOUR UNDER THE AGE OF 18 IS ENGAGED AS LABOUR AT THIS
SITE” is to be kept in the construction site.
34.3.2 All the workmen shall undergo Safety Induction, screening before engaging them
on the job. Physical fitness of the person to certain critical jobs like working at height or
other dangerous locations should be ensured before engaging the person on work.
34.3.4 Nobody is allowed to work without wearing safety helmet. Chinstrap of safety
helmet shall be always on. Drivers, helpers and operators are no exception.
34.3.5 No one is allowed to work at or more than three meters height without wearing
safety belt and anchoring the lanyard of safety belt to firm support preferably at shoulder
level.
53
34.3.7 Usage of eye protection equipment shall be ensured when workmen are engaged
for grinding, chipping, welding and gas-cutting. For other jobs as and when site safety co-
coordinator insists eye protection has to be provided.
34.3.8 All PPE like Safety shoes, Safety helmet, Safety belt, Safety goggles etc. shall be
arranged before starting the job.
34.3.9 All excavated pits shall be barricaded & barricading to be maintained till the
backfilling is done. Safe approach to be ensured into every excavation.
34.3.10 Adequate illumination at workplace shall be ensured before starting the job at
night.
34.3.11 All the dangerous moving parts of the portable / fixed machinery being used
shall be adequately guarded.
34.3.12 Ladders being used at site shall be adequately secured at bottom and top. Ladders
shall not be used as work platforms.
34.3.13 Erection zone and dismantling zone shall be barricaded and nobody will be
allowed to stand under suspended loads.
34.3.14 Contractors should spray water using Water browser periodically in the site to
reduce the dust rising due to wind.
34.3.16 Material shall not be thrown from the height. If required, the area shall be
barricaded and one person shall be posted outside the barricading for preventing the
trespassers from entering the area.
34.3.17 Other than electricians, with red helmet, no one is allowed to carry out
electrical connections, repairs on electrical equipment or other jobs related thereto.
34.3.18 All electrical connections shall be made using 3 or 4 core cables, having an earth
wire.
34.3.19 Proper Earthing pits at site to be constructed and the sensitivity must be
maintained at less than 1 ohm
34.3.20 Main panel boards should have MCBs and RCCB / ELCBs ( 30 mA sensitivity).
34.3.21 Inserting of bare wires for tapping the power from electrical sockets is completely
prohibited.
34.3.22 All major, minor accidents and near misses to be recorded and reported to the E-
in-C and the contractor must take necessary steps to avoid the recurrence.
54
34.3.24 All tools and tackles shall be inspected before use. Defects to be rectified
immediately. No lifting tackle to be used unless it is certified by the competent authority.
34.3.25 All tools and tackles shall be tested and have a Identification no., SWL and date
of next test marked on them.
34.3.26 A tools and tackles inspection register must be maintained and updated regularly.
34.3.28 All the Earth moving vehicles and Equipments used at site should have reverse
horn.
34.3.29 Debris, scrap and other materials to be cleared from time to time from the
workplace and at the time of closing of work every day.
34.3.31 All unsafe conditions, unsafe acts identified by contractors, reported by site
supervisors and / or safety personnel to be corrected on priority basis.
34.3.33 Other than the Driver / operator, no one shall travel in a tractor / tough rider
etc.
34.3.34 All the lifting tools and tackles shall be stored properly when not in use.
34.3.35 Clamps shall be used on Return cables to ensure proper earthing for welding
works.
34.3.37 All the pressure gauges used in gas cutting apparatus shall be in good working
condition.
34.3.38 Proper eye washing facilities shall be made in areas where chemicals are handled.
34.3.39 Connectors and hose clamps shall be used for making welding hose connections.
34.3.40 Proper warning boards and caution notices to be displayed at required areas
inside the site.
34.3.41 All cranes must have a trained signal man for signaling.
55
34.3.43 Spill trays shall be used to contain the oil spills while transferring / storing them.
34.3.44 Tapping of power by cutting electric cables in between must be avoided. Proper
junction boxes must be used.
34.3.45 A monthly site safety statistic shall be submitted by the contractor on the first week
of Succeeding month to the Engineer in charge, in the required Performa.
34.3.46 In case, the night work is inevitable, the contractor concerned shall intimate in
advance to the Engineer-in-Charge and security-in-charge of the National Insurance
Company, regarding the purpose of night work, the total number and category of labour
and required to be employed in the night work along with material vehicle if any to be used
in detail. Having furnishing the details the contractor shall obtain necessary permission for
the above work from security wing.
34.3.47 The contractor shall ensure that, the material vehicles received by them shall be
permitted to use only the designated routs identified by the authorities of National Insurance
Company, further they must ensure that the vehicles while returning after unloading the
materials, not to dump or washout or through any surplus / waste materials inside the
campus. If any notices, the necessary penalty will be imposed and the contractor.
34.3.48.1 The contractor shall give prior cautionary advice to the drivers of the vehicles
carrying men and materials required for the project regarding plying the vehicles with safety
speed limit prescribed by the authorities of National Insurance Company to avoid any
mishaps as the complex is habitat for deer’s, monkeys and other animals.
34.3.48.2 Batching plant meant for production of reinforced cement concrete in larger
quantity will not be permitted to setup inside the campus.
Due to the limited space available an account of environmental protection reasoning, mass
storage of steel shall be avoided, the quantity required may be procured in phase wise as per
the agreement condition and prior approval of Engineer-in-Charge.
Workmen’s Insurance
CPWD shall not be liable for any payment in respect of any damage or compensation
payable according to law in respect or in consequence of any accident or injury or loss of life
to any workman other person in the employment of the contractor or his agent /
representative. The contractor shall insure against such liability with an insurer approved by
the Engineer-in-Charge for sum as per established norms during the entire period till
completion including maintenance period.
56
1. The contractor shall not store / dump construction material or debris on metalled road.
2. The contractor shall get prior approval from Engineer-in-charge for the area where the
Construction material or debris can be stored beyond the metalled road. This area shall not
cause any obstruction to the free flow of traffic / inconvenience to the pedestrians. It should
be ensured by the contractor that no accidents occur on account of such Permissible storage.
3. The contractor shall ensure that all the trucks or vehicle of any kind which are used for
construction purposes / or are carrying construction material like cement, sand and other
allied material are fully covered. The contractor shall take every necessary precaution that
the vehicles are properly cleaned and dust free to ensure that en-route their destination, the
dust, sand or any other particles are not released in air /Contaminate air.
4. The contractor shall provide mask to every worker working on the construction site and
involved in loading, unloading and carriage of construction material and Construction debris
to prevent inhalation of dust particles.
5. The contractor shall provide all medical help, investigation and treatment to the Workers
involved in the construction of building and carry of construction material and debris
relatable to dust emission.
6. The contractor shall ensure that C&D waste is transported to the C&D Waste site only
and due record shall be maintained by the contractor.
7. The contractor shall compulsory use of wet jet in grinding and stone cutting.
8.The contractor shall comply all the preventive and protective environmental steps as Stated
in the MOEF guidelines, 2010.
9.The contractor shall carry out on-Road-Inspection for black smoke generating Machinery.
The contractor shall use cleaner fuel.
10. The contractor shall ensure that all DG sets comply emission norms notified by MOEF.
11. The contactor shall use vehicles having pollution under control certificate. The Emissions
can be reduced by a large extent by reducing the speed of a vehicle to 20kmph. Speed bumps
shall be used to ensure speed reduction. In cases where speed reduction cannot effectively
reduce fugitive dust, the contractor shall divert traffic to nearby paved areas.
12. The contractor shall ensure that the construction material is covered by tarpaulin. The
Contractor shall take all other precaution to ensure that no dust particles are permitted to
pollute air quality as a result of such storage.
57
*****************
58
59
In case of EMB, the contractor shall record measurement online on ERP Portal and shall raise RFI
(Request for Inspection) online for approval by Engineer-in-Charge or his/her authorised
representative. The contractor shall create EMB for the approved RFIs and take printout of
EMB having pages of A-4 size duly bound with its pages machine numbered. This online
printed EMB shall be submitted in triplicate through letter of transmittal to the Engineer-in-Charge
giving details of number of EMB and there number of pages by 20th day of every calendar month.
All such monthly measurements and levels recorded by the contractor or his authorized
representative from time to time, during the progress of the work, shall be got checked by the
contractor from the Engineer-in-Charge or his/her authorized representative as per interval or program
fixed in consultation with Engineer-in-Charge or his/her authorized representative.
The contractor shall, without extra charge, provide all assistance with every appliance, labour and
other things necessary for checking of measurements/levels by the Engineer-in- Charge or his/her
representative.
Except where any general or detailed description of the work expressly shows to the contrary,
measurements shall be taken in accordance with the procedure set forth in the specifications
notwithstanding any provision in the relevant Standard Method of measurement or any general or
local custom. In the case of items which are not covered by specifications, measurements shall
be taken in accordance with the relevant standard method of measurement issued by the
Bureau of Indian Standards and if for any item no such standard is available then a mutually agreed
method shall be followed.
Mode of Measurements: -
The measurements shall be recorded and entered in Electronic format in ERP the first instance by the
contractor, and a hard copy shall be submitted to the Department. All entries shall be made exactly as per
the existing procedure laid down in ERP portal. Contract shall register themselves in the ERP portal and
get familiarize with it for recording measurements.
These measurements shall then be 100% checked by the Junior Engineer, and test checked by the Assistant
Engineer and the Executive Engineer as per the procedure. If Junior Engineer is not available, the
Assistant Engineer shall perform 100% check of the measurements.
60
It is also a term of this contract that checking and/or test checking the measurements / levels of any
item of work in the measurement book and/or its payment in the interim, on account of final bill shall not
be considered as conclusive evidence as to the sufficiency of any work or material to which it relates nor
shall it relieve the contractor from liabilities from any over measurement or defects noticed till completion
of the defects liability period.
The Electronic Measurement Book shall be allotted a serial number as per the Register of Electronic
Measurement Books by Engineer-in-charge.
10. Cutting or over-writing in the Electronic M.B. not allowed.
Computerized Bill to be submitted by the contractor
i) The Electronic Measurement Book is to be initiate by the contractor in ERP and initiate Request
For Inspection (RFI) by JE/AE/EE.
It is the responsibility of the Junior Engineer, Assistant Engineer and the Executive Engineer to ensure that
the checks and test checks done by them in the initial draft measurements are correctly incorporated in the
Electronic Measurement Book before they record their certificates. In case of any error, the Electronic
Measurement Book shall be cancelled, and the contractor shall resubmit a fresh Electronic Measurement
Book.
This should be done before the corresponding Electronic bill is submitted to the Division for payment.
The contractor shall submit as many copies (minimum of 2 Nos.) of Electronic Measurement Books as
may be required, and as are specified in the NIT/contractor, for the purpose of reference and record in the
various offices of the department.
v) The contractor shall submit his running and final bills in a computerized form in the same format as the
existing conventional bills, with all the pages machine numbered, and hard bound, and with all the entries
made as per the existing procedure.
61
(vii) Financial statement, indicating the broad details of all the running account
payments received up to date, such as gross value of work done, advances taken,
recoveries effected, amounts withheld, net payments, details of cheque payments
received, etc.
(viii) A statement showing the extra and substituted items submitted by the contractor,
and the payment received against them, items pending for sanction/decision by the
Department, broad details of the bank guarantees, indicating clearly their validity
periods, broad details of the insurance policies taken by the contractor, if any, the
advances received and adjusted from the department, etc.
(ix) Progress photographs, in colour, of the various items/components of the work done
up to date, to indicate visually the actual progress of the work.
(x) Quality assurance and quality control tests conducted during the month, with the
results thereof.
62
B. Financial
The contractor has to submit the progress report to the Sub Division office in quadruplicate
by 10th day of every month as per the above proforma along with photographs of the work
done during that month.The contractor shall be charged at Rs.2500/- (Rupees Two
thousand Five Hundred only) in the event of non-receipt of monthly progress report on due
date (i.e. on 10th day of every month) to the Sub Division office in the manner prescribed
above. In case 10th day happens to be a closed holiday then the progress report will be
submitted on the next working day.
63
1.0.CEMENT
1.1.The contractor shall procure Pozzolana Portland Cement , as required in the work, from
reputed manufacturers of having a production capacity of one million tonnes per annum or
more, such as ACC, Ultra Tech, J.P.Rewa, Vikram, Shree Cement, Birla Jute and Cement
Corporation of India, Coromondal, Chettinad etc., as approved by the Ministry of Industry,
Government of India, and holding license to use ISI certification mark for their product
whose name shall be got approved from the Engineer-in-Charge. Supply of cement shall be
taken in 50 kg bags bearing manufacturer’s name and ISI marking. Samples of cement
arranged by the contractor shall be got tested in accordance with provisions of relevant BIS
codes. In case, test results indicate that the cement arranged by the contractor do not
conform to the relevant BIS codes, the same shall stand rejected and shall be removed from
the site by the contractor at his own cost within a week’s time of written order from the
Engineer-in-Charge to do so.
1.3.The cement go-down of the capacity to store a minimum of 2000 bags of cement shall be
constructed by the contractor at site or work for which no extra payment shall be made.
Double lock provision shall be made to the door of the cement go-down. The keys of one
lock shall remain with the Engineer-in-Charge or his authorized representative and the key
of the other lock shall remain with the contractor. The contractor shall be responsible for the
watch and ward and safety of the cement go-down. The contractor shall facilitate the
inspection of the cement godown by the Engineer-in-Charge at any time.
1.4.The contractor shall supply free of charge the cement required for testing. The frequency
and the details of the tests shall be decided by the Engineer-in-Charge depending on the
quantum of supply in each batch.
1.5.The actual issue and consumption of cement on work shall be regulated and proper
accounts maintained as provided in the contract. The theoretical consumption of cement
shall be worked out as per procedure prescribed in the contract and shall be governed by
conditions laid therein. Items for which standard coefficients for cement consumption are
not available in DSR 2023, the same shall be decided by the Engineer-in-Charge.
1.6.Cement brought to site and cement remaining unused after completion of work shall not
be removed from site without written permission of the Engineer-in-Charge.
1.7.The cement bags shall be stacked on proper floors consisting of two layers of dry bricks
laid on well-consolidated earth at a level of at least one foot above ground level. The stacks
shall be in rows of 2 and 10 bags high with minimum of 0.60 m clear space alround. The
bags should be placed horizontally continuous in each line. Actual size/shape of godown
shall be as per site requirements and nothing shall be paid on this account. The decision of
Engineer-in-Charge regarding capacity shall be final.
1.8.Cement register for the cement shall be maintained at site. The account of daily receipts
and issues of cement shall be maintained in register in the pro forma prescribed and signed
daily by contractor or his authorized agent.
1.9.The actual issue and consumption of cement on work shall be regulated and proper
accounts maintained as provided in Clause 10 of the contract. The theoretical consumption
64
2.STEEL
2.1.The contractor shall procure steel from primary manufacture only. i.e. RINL, SAIL,
TISCO & JSW steel Ltd., JINDAL Steel & Power Ltd. conforming to the manufacturer’s
specification from main producers only as approved by the Ministry of steel for TMT ( Fe
500-D) bars, conforming to relevant BIS code. Procurement shall be made from main
producers. The contractor shall have to obtain and furnish test certificates to the Engineer- in
–charge in respect of all supplies of steel brought by him to the site of work. Samples shall
also be taken and got tested by the Engineer-in-charge as per the provisions in this regard in
relevant BIS codes. In case the test results indicate that the steel arranged by the contractor
does not conform to BIS Codes, the same shall stand rejected and shall be removed from the
site of work by the contractor at his cost within a week’s time from written orders from the
Engineer-in-charge to do so.
2.2. The steel reinforcement shall be brought to the site in bulk supply of 10 tonnes or more
or as decided by the Engineer-in-Charge.
2.3. The steel reinforcement shall be stored by the contractor at site of work in such a way as
to prevent distortion and corrosion and nothing extra shall be paid on this account. Bars of
different sizes and lengths shall be stored separately to facilitate easy counting and checking.
2.4 For checking nominal mass, tensile strength, bend test, re-bend test, etc. specimen of
sufficient length shall be cut from each size of the bar at random at frequency not less than
specified below:
2.5 The Actual issue and consumption of steel on work shall be regulated and proper
accounts maintained as provided in the contract. The theoretical consumption of steel shall
be worked out as per procedure prescribed in the contract and shall be governed by
conditions laid therein.
65
The guidelines for use of reinforcement bars in structures will be dealt as per(Modification is
made vide circular OM No.DG/SOP/24 dt: 03.09.2021)
67
68
69
Executive Engineer
85
(SCHEDULE OF QUANTITIES)
86
Name of work : Repair and painting works for overhead water tank in RAF campus,
Coimbatore.
S No Description Qty Unit Rate Amount
1 Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on
plan), including dressing of sides and
ramming of bottoms, for all lift, including
getting out the excavated soil and disposal
of surplus excavated soil as directed, within
a lead of 50 m.
1.1 All kinds of soil. 2.80 cum 294.14 824
2 Excavating trenches by mechanical /
manual means of required width for pipes,
cables, etc including excavation for sockets,
and dressing of sides, ramming of bottoms,
for all depth, including getting out the
excavated soil, and then returning the soil
as required, in layers not exceeding 20 cm
in depth, including consolidating each
deposited layer by ramming, watering, etc.
and disposing of surplus excavated soil as
directed, within a lead of 50 m:
2.1 All kinds of soil.
2.1.1 Pipes, cables etc. exceeding 80 mm dia. but
32.00 metre 397.93 12734
not exceeding 300 mm dia
3 Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work up
to plinth level :
3.1 1:5:10 (1 cement : 5 coarse sand (zone-III)
derived from natural sources : 10 graded
0.40 cum 7366.02 2946
stone aggregate 40 mm nominal size
derived from natural sources)
4 Brick work with common burnt clay F.P.S.
(non modular) bricks of class designation
7.5 in foundation and plinth in:
4.1 Cement mortar 1:6 (1 cement : 6 coarse
0.75 cum 8059.44 6045
sand)
5 Steel work welded in built up sections/
framed work, including cutting, hoisting,
fixing in position and applying a priming coat
of approved steel primer using structural
steel etc. as required.
5.1 In gratings, frames, guard bar, ladder,
65.00 kg 195.04 12678
railings, brackets, gates and similar works
87
89
90
91
IMPORTANT NOTE:
1. The Column No.4 is mandatory to be filled by the bidders. If this column is left
as blank, then the bid will become invalid.
2. The amount in figure in column No.5 shall appear automatically corresponding
to the percentage quoted in Column No.4.
3. The bidder needs to quote the percentage only either above or below or at par
ECPT to cover the rate of all the items under the respective package.
4. The percentage shall be quoted (written) upto 2 (two) places of decimal only.
5. If the percentage selection in column No 4 is “at par", by default the percentage
will be considered as “Zero" only.
92