0% found this document useful (0 votes)
53 views2 pages

Calculator Webservice Has Two Operations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

Calculator Webservice Has Two Operations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Calculator Webservice has two operations ..

Webservice means we need wsdl

Sender xyz system will push the data to cpi and from cpi it will to go receiver system that is calculator
wsdl will send the data back to postman

Runtime lo xml edi hold chestadi – xsd

 Tenant management Node


 Runtime Node/worker Node

IDOC structure – we prepare -xsd

Mapping sheet document – which source field belongs to target field

Simulation is important - you can test each and every pallete function

Simulation is different from simulate

https://www.youtube.com/watch?v=Y2O5_OHNkeQ-- debug and trace

delta load refers to the process of transferring only the data that has changed (i.e., new, updated, or
deleted records) since the last successful data load or transfer, rather than transferring the entire
dataset. This is especially important in scenarios where large volumes of data are involved, as it helps
optimize the data transfer process by reducing the amount of data that needs to be processed and
transmitted.

delta query of the odata using the last successful run

based on error description we would take necessary action :


we have tested the interface using postman with endpoint ..we have to share the end point with
webservice team

remove context –will take all the values from source side and put them into single context

collapse context- only will take the first value from source side and put them into single context

 data issues
 Reconnectivity issues

Decommissioned

Team size -8

Cut over activities :

After production smoke testing

Mapping sheet –

Reprocessing of messages –

FS document- functional specification

Sender application

You might also like