Revise Techno Commercial Offer For Fabricated MBBR STP 21-05-2014
Revise Techno Commercial Offer For Fabricated MBBR STP 21-05-2014
Revise Techno Commercial Offer For Fabricated MBBR STP 21-05-2014
FOR
90 KLD SEWAGE TREATMENT PLANT
FOR
JAMUNA REALTY
BY
WATENVA SOLUTION PVT. LIMTED
BHUBANESWAR
Ref : WSPL/STP/MBBR/1008R
Date : 21.05.2014
To,
M/S. JAMUNA REALTY
CUTTACK, ODISHA
Subject: Techno- commercial offer for fabricated (MBBR) Sewage treatment plant of
capacity 90KLD.
Dear Sir,
This is with the reference to your requirement, regarding your requirement of Sewage Treatment
Plant (STP) of 90 KLD; we are offering you our proposal for packaged type STP of 90 KLD
capacity based on Moving Bed Bio Reactor (MBBR) Process. For Jamuna Arcade Project at
Chandikhol, Jajpur.
Thanking you.
Best Regards,
Rashmikant Samal
Cell 09178596468
Design basis
Flow rate: 90 m3/day or 3.75 m3/hr.
Nature of wastewater: Combined Sewage
Mode of disposal of treated water: Recycling in irrigation/horticulture
Based on our experience, we have considered the above mentioned inlet conditions for
design purpose. Customer to recheck & notify in case of any changes before placement of
order.
Characteristics of inlet /outlet of STP (After tertiary treatment):
Standards to be followed:
Plain & reinforced cement concrete – IS 456: 2000 (By others)
Concrete structure for the storage of liquids – IS 3370: 1981-88 (By others)
Pressure vessels – IS2825
Pumps – IS 5120
Others – Available IS standards.
Incase of non-availability of standards, good engineering practice will be adopted.
Treatment Scheme:
BY GRAVITY
RAW SEWAGE
COLLECTION TANK
BY PUMPING
BY GRAVITY
SECONDARY TUBE
SETTLER
BY GRAVITY
BY PUMPING
DUAL MEDIA
FILTER
BY GRAVITY
PRESSURE
STP shall be compact package type, smell free and shall consume less power.
Bar Screen: The Bar Screens of SS material are considered in the scope for better life. Two
bar screens of 10 mm spacing followed by 8 mm spacing are considered in series. The
screens can be easily removed & cleaned as required.
Equalization Tank: We have proposed collection cum equalization tank in RCC below the
ground level. All other tanks of STP in MSEP can be built fully/partly above the ground as
required. The tanks can be covered from the top, if required and access manholes can be
provided. The tank is provided with air distribution piping with adequate number of Coarse
Bubble diffusers.
Moving Bed Bio Reactor (MBBR): The equalized sewage from primary collection tank will
be pumped to the aeration tank housing the Moving Bed Bio Reactors (MBBR) where
BOD/COD reduction is achieved by virtue of aerobic microbial activities. The MBBR
reactors would be running in series. The oxygen required will be supplied through air grids.
The MBBR tanks would be constructed in MSEP.
Air shall be used in MBBR tank and will also be used in collection cum equalization tank to
avoid the anaerobic conditions, smell problem and sedimentation of solids in to the tank.
Tube Deck Media Clarifier: The overflow of MBBR tank is taken in to the Tube Deck
Media Clarifier. Here Tube Deck media in PVC is arranged to facilitate solid liquid
separation. The Clarifier would be constructed in MSEP.
Clarified/Clear Water Tank: The clear water from Tube Deck Media Clarifier flows in to
this tank. A Sodium Hypochlorite solution is dosed in this tank using a metering pump. The
clear water tanks would be constructed in MSEP.
Dual Media Filtration & Carbon Filtration System: The clarified & Chlorinated water is
pumped to Media Filter followed by Carbon Filter to further polish the treated effluent. The
Carbon Filter removes color & odor.
Our offer is exclusive of civil work, which includes tanks construction, foundation of
equipments, drains & trenches, shedding/plant room for the equipment and related MS work
Sludge Dewatering System: The sludge from the Tube settler tank is removed from the
bottom of the tanks and transferred to Sludge holding tank / Sludge drying bed either by
gravity or through pump depending on site condition. Sludge can be further transferred to
Centrifuge System (Optional) for sludge reuse.
All electro-mechanical equipments are proposed with standby units. Pumps, blowers shall be
operational in auto mode through level controllers, timers etc. for easier operation.
Notes:-Finally treated water can be reuse such as Horticulture and floor washing etc.
The proposed biological treatment system is based on the advanced MBBR technology.
The design and detailing of the MBBR Waste Water Treatment plant is done In such a way that
provides maximum treatment efficiency and process stability.
This proposed MBBR technology offer distinct advantage over other technologies like
conventional activated sludge process, bio-towers, and others. The salient features of sewage
treatment technology, offered by WSPL, are as follows:
1. Biological Treatment
2. Tertiary Treatment
Large aeration tank volume is required in conventional system. The MBBR technology
requires just about 25 percent of the conventional system aeration tank volume
Conventional systems tend to go septic very quickly during power failure or the failure in
the aeration system, as all the activated biomass settles at the bottom of the aeration tank
and the dissolved oxygen in the tank water is not available to the settled biomass. Once
septic conditions are developed, the whole system becomes dead.
In MBBR technology, even during the power cut or the failure in the aeration system, the
available dissolved oxygen content in the reactor is available to the active bio-mass
uniformly, hence the system can survive for much longer periods
The energy requirements in the conventional system is higher as extra energy is required
to keep all aeration tank content in completely mixed conditions and also for sludge
recycling from secondary settling tank to aeration tank. This extra energy is not required
in MBBR technology
Unlike MBBR, conventional system requires skilled operation to maintain proper F/M
ratio, return sludge ratio etc.
Some short- circuiting of untreated waster water takes place in conventional system. No
such possibility is there in MBBR technology as plug flow conditions are maintained in
the system. This short-circuiting reduces the treatment efficiency of the MBBR
technology provides excellent process stability over conventional system.
Scope of work:
Design, Engineering, preparation & submission of drawings, supply, installation, testing and
commissioning of STP including mechanical & electrical work as per the details given in the
scope of supply.
No Civil work with related plant room work is considered in our scope. We shall provide
dimensional GA & section/elevation drawing for civil work based on your site conditions &
available space after release of purchase order. We can provide the periodic supervision of
civil work, if required.
We shall provide operation training of system for 2 to 3 days to your operational team.
Scope Of Supply:
10 Piping & fittings (Type & make) - GI Lot Tata, Jindal & equivalent
& MS pipes
11 Lot Castle
Valves – (40, 50, 65, 80 NB )
B Tertiary Treatment
12 Filter Feed Pumps Nos. 02 (1w +1s)
Make Kirloskar, Johnson & equiv.
Type Horizontal Centrifugal, monobloc
Model Suitable
Capacity M3/hr 4.5 m3/hr @ 2.5 kg/cm2
MOC CI
MOC Casing - CI
17 Filter Press No. 01
Make Welcome/Equivalent
Type Manual
MOC PP – Plates
Plate Size Inch 15x15
No of Plates 11
18 Ultraviolet (UV) dis-infection unit No. 01
Make Alfa/Hi-tech or Equivalent
Capacity m 3/hr 4.5
MOC of Housing SS 304
D MS Fabricated Tank
Equalization Tank with Bar Screen
19 No. 01
Chamber, Oil & Grease trap
Make Watenva
Size 4.6 m x 2.5 m x 2.5 m
MOC MS Fabricated with Epoxy Paint
All Shell plate thickness 5 mm
Bottom Plate thickness 8 mm
Shell Supporting Channel 75 mm
Tank Internal Surface Sand blasting to SA21/2
Internal/ External painting One coat of epoxy primer & two coats
of smoke gray epoxy paint each coat
dft-75 microns.
20 MBBR, Tube settler & CCT No. 01
Make Watenva
Size 5.25 m x 2.5 m x 2.5 m
MOC MS Fabricated with Epoxy Paint
All Shell plate thickness 5 mm
Bottom Plate thickness 8 mm
Shell Supporting Channel 75 mm
Tank Internal Surface Sand blasting to SA21/2
Internal/ External painting One coat of epoxy primer & two coats
of smoke gray epoxy paint each coat
dft-75 microns.
NOTE:
• The above sizes are indicative only based on standard practices. The sizes of
treatment units may be changed as per site conditions.
• All tanks should be provided with steel bars runs/ladders for ease of maintenance.
NOTE: All RCC work shall be preferably in M 25 grade concrete to avoid leakages &
seepages.
Chemicals: Based on our standard practices, we will require 5.64 lit/day of Sodium Hypo-
chlorite solution (8% free chlorine if dosage is 5 ppm) for disinfection purpose to treat 90 KLD
of sewage.
Security at site.
All civil work including tanks construction, foundation of equipments, plant room or
shedding for equipments.
Treated water disposal pipeline beyond STP area. We shall provide the flanges end
connection at the outlet of STP.
Electric incoming power supply with proper earthing to STP panel on continuous basis.
Price:
1. The Price for supply, for installation, testing & commissioning of all equipments with
reactor as detailed earlier, for 90 KLD MBBR Based Packaged type Prefabricated
Sewage Treatment plant shall be Rs.15,40,000 /- (Fifteen lacs forty thousand only)
2. The above Price is exclusive of all Taxes, Octroi, and Transportation.
3. Any extra work will be charged at the time of execution of STP.
Terms of payment:
30% advance along with firm Purchase Order, 60% against Proforma invoice prior to
dispatch,5% against erection & 5% against commissioning and hand over of system.
Completion period:
Supplies the electromechanical equipment/components required for the system shall be supplied
within 6-8 weeks from the date of PO/LOI and advance payment.
Warranty:
All electro-mechanical equipment of STP shall be under warranty for 12 months from the date
of commissioning or 18 months from the date of supply whichever is earlier.
Validity:
The offer shall be valid for 30 days from the date of the covering letter or mail.
Rashmikant Samal
9178596468