Module 8-9 (Session 17-18) Project Resource Management Using MS Project
Module 8-9 (Session 17-18) Project Resource Management Using MS Project
using MS Project
Sunil K Jauhar, IIM Kashipur
What is Resource Allocation?
8-12
Time Use and Resource Use
8-13
Resource Loading
8-14
Resource Usage Calendar 1
8-15
Resource Usage Calencar 2
Resource Leveling
8-18
Resource Leveling Function
What is MS-Project
What is MS-Project
❑It also helps prioritize the tasks as per the urgency and
other conditions, making the process transparent and
smooth.
❑Which lets you track down the project progress at every step.
Entire project data is accumulated, analyzed and different
reports are then generated as per the requirement.
8-37
Steps for Generating Activity on Node Network Diagram
Steps for Generating Activity on Node Network Diagram
The network diagram is displayed with level one and two tasks indicated by parallelograms and level three tasks indicated by rectangles. The
critical path of the project is highlighted by tasks shown in red. You can roll-up level two tasks which do not lie upon the critical path of the
project by clicking the “-“ sign at the top left corner of the task to improve the readability of the network diagram.
Steps for Generating Activity on Node Network Diagram
Steps for Generating Activity on Node Network Diagram
Network Diagram - Rochester Assembly Upgrade
Some important Links
• MS Project 2019
• https://www.youtube.com/watch?v=A-yPSJGY-_Y