05.myanmar - Logistics
05.myanmar - Logistics
• International Corridors
• Conclusion
General Information about Myanmar
31 May, 2018 3
Domestics Transport
Infrastructure
Development of Dry Ports In myanmar
Myanmar proposed eight
potential places for dry
port to ESCAP in July
2011
Mandalay
Tamu
Muse
Mawlamyine
Bago
Monywa
Pyay
Yangon
5
Airports Infrastructure
Total 69 aerodromes International Airports (3)
33 airports are operational Yangon Mandalay Naypyitaw
Domestic Airports (30)
Putao Heho Dawei
Monghsat Pathein
6
Ports Infrastructure
7
Land Plot Allocation for Development of Terminals at Thilawa Area
12
3
4
5
67
89
1. Developed 10 Plots
10
11
12
2. Under Construction 5 Plots
13
14 (GC Terminal)
15
16
17 3. Under Construction 10 1/3 Plots
18
19
20 (Tanker Berth)
21
22
23
4. Under Construction 5 2/ 3 Plots
24
25 (Grains Terminal)
5. MPA(ODA Loan) 5 Plots
6. Liquid Bulk Terminal 1 Plots
34
35
36 8
37
Inland River Ports
Ayeyarwaddy River Chindwin river
Sinkham Port Monywa Port
Mandalay Port Kalewa Port
Pakakku Port Sinkham
Magway Port Kalewa
Monywa
Mandalay
Benefits - By establishing standard Inland Ports along Pakakku
Yangon
The longest rail transport network in
ASEAN
Dawei
11
11
International Corridors
Asian Highway (32) countries ‐ 141000 km
ASEAN Highway
1
14
14
Route
14
111 3
2
14
13
3
1
1 2
12
13
11
15
1 15 131
16
1 16 16
16
12
112 1 121 132
132
19
123
19 11
1
1
112 17
123
11
1
17
18
140
18
2
- 23 Routes , Length 36,000 kms
141
142
18 - 7 Routes in Myanmar :
2 AH1, AH2 , AH3 , AH14 . AH111 , AH112 ,
AH123
GMS Economic
Corridors
GMS Location at Heart of Asia
China Korea
Afganistan
Japan
Pakistan
Thailand
South Asia Vietnam
Philippines
Cambodia
Sri Lanka
Malaysia
Brunei
Singapore
Indonesia
America Asean/Australia
Master Plans on Transport & Logistics
(2015-2040)
17
National Logistics Master Plan
Implementation
National Transport Master Plan
C
10 Major Corridors
A Central North‐South D
Corridor
A
B East ‐ West Corridor
C Northern Corridor E
K
D Mandalay ‐ Tamu Corridor
E Second East ‐ West Corridor L
G East ‐ West Bridging Corridor B
H Delta Area Network G
J Southern Area Development
Corridor
K Western North‐South H
Corridor
L Eastern North ‐ South J
Corridor
19
Projects for Sustainable Transport
20
National Transport Corridors & National Logistics Corridors
Transport Corridor
MYT Plan, 2015 Logistics Corridor
Project for the National Logistics Master Plan
Objective of the Project: is to formulate a strategic and
workable logistics development master plan by adding and
supplementing the existing national transport master plan
namely MYT Plan 2014.
Time Frame of this Project: The Project was started from June
2016 and scheduled to be completed by the end of December
2017.
Prioritization of the Projects:
Regional and International Connectivity
Domestic Connectivity
Economic Benefits
Consistency with National Economic Policy
The total of 173 projects include in the Plan
108 projects from MYT Plan
48 hard infrastructure projects
17 soft infrastructure projects
3
22
LOGISTICS DEVELOPMENT VISION
3
23
National Logistics Corridors
26
Projects for Logistics Facilties
27
Projects for Roads Development
28
Projects for Railway Development
29
Projects for Inland Water Transport Development
30
Projects for Port Development
31
Projects for Air Transport Development
32
Proposed Projects and Estimate Cost
Project List
Group A Group B Group C Group D Grand Total
Logistics 9 ‐ ‐ ‐ 9
Road 13 14 10 19 56
Railway 5 4 4 9 22
Port 8 6 ‐ ‐ 14
IWT 11 6 7 10 34
Aviation 4 11 11 ‐ 26
Total 50 41 32 38 161
Project Cost
33
NEEDED ACTIONS BY STAGES
INITIAL STAGE (2017~2020)
• Legislation of needed logistics regulations
• Preparation of capacity building program
• Development and preparation of implementation program
• Organizing regulatory body
• Funding arrangement for top priority projects
• Oversee project implementation and execution of top priority
projects
22. Almost no regular/scheduled cargo service on road, rail, water and air
45