EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
EDMS 15-302-1
Page 1 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
CONTENTS
2 APPLICABLE STANDARDS 4
3 ENVIRONMENTAL CONDITIONS 5
4 SYSTEM PARAMETERS 5
8 TESTS 11
9 SUBMITTALS 11
11 WARRANTEE 13
13 ANEX.1 DRAWING 16
Page 2 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
1. SCOPE
- This specification covers the Busbar Trunking System (BTS) for which the rated voltage doesn’t exceed
1000 v in case of a.c. or 1500 v in case of d.c.
- BTS used to distribute and control electrical energy for all types of loads, intended for industrial,
commercial and similar applications, in the form of a conductor system comprising bus bars which are
spaced and supported by insulating material in a duct, through or similar enclosure.B.T.S and their
accessories may be installed, according to the design, inindoor and outdoor locations, in various
altitudes,and in different mounting conditions.
- This document specifies the minimum technical requirements for design, manufacturing, testing, inspection
&supply and delivery of BTS of 3 phases and 4wires (bus bars).
2. APPLICABLE STANDARDS
Unless otherwise specified in this specification, the offered insulators shall comply with all the latest relevant
applicable standards Issued by “International Electro Technical Commission (IEC)’’
Page 3 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
In case of any deviation from the listed standard, it should be indicated in the list of deviations list submitted by
the supplier.
3. ENVIRONMENTAL CONDITIONS:
The performance of BTSshould be guaranteed for following environmental conditions, any differences
in the guaranteed performance should be clearly set out in the offer.
Indoor: -5°C
Ambient air temperature – Lower limit
outdoor :-25°C
Ambient temperature – Upper limit 45 °C (50°C as option)
Page 4 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Temperature rise
Parts of ASSEMBLIES
K
Terminals for external insulated conductors 70
Accessible external enclosures and covers:
– metal surfaces 30 1)
– insulating surfaces 401)
Manual operating means:
– of metal 15 2)
– of insulating material 25 2)
1) In the case of external surfaces of enclosures of BTS which areaccessible but do not need to be touched
during normal operation, an increase in the temperature-rise limits by 25 K is permissible for metal surfaces
and by 15 K for insulating surfaces.
2) Manual operating means within ASSEMBLIES which are only accessible after the ASSEMBLY has been
opened, for example draw-out handles which are operated infrequently, are allowed to assume a 25 K
increase on these temperature-rise limits.
A maximum temperature rise of 105K for bare copper busbars and conductors shall not be exceeded
5.1.1. Feeder Trunking Run: Used for the interconnection between switchboards or switchboard and
transformer as shown in Anex.1 (drawing).
5.1.2. Tab off unit: is one of two types, either plug-in or fixed.
4.1.2.1 Plug-in units are designed to be accommodatedat tap-off outlets at
intervals along the distribution busbartrunking.
4.1.2.2 Fixed tap-off outlets are engineered and positioned during manufacture to
suit the specified installation
5.1.3. The system may consist of many BTU Feeder unit,tab off unit,Reducer,Flange end unit,
flexible BTU (fittings) [elbow (Horizontal / Vertical/offset, combination), Tees,and flanges
for passing through roof, wall, ceiling and floor], Expansion,and Support system (Hanger).
5.1.4. Creepage distances of supplementary insulation shall be not less than those specified for basic
insulation according to IEC 60439-1.Creepage distances of reinforced insulation shall be
Page 5 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
twice those specified for basic insulation. Creepage distances of double insulation are the sum
of the basic and supplementary insulation which compose the double insulation system
5.1.5. Short Circuit withstand capacity level for 1 sec shall be at least as the values mentioned
in the following table :
Page 6 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
5.2. CONSTRUCTION
5.2.1. Enclosure
The metal enclosure of the BTS shall be hot dip galvanized steel painted or powder coated extrude
aluminum with thickness mentioned according to type test certificate to provide high protection and
mechanical resistance for the phase conductors along the entire length. The BTS shall be totally enclosed,
non-ventilated for protection against mechanical damage and dust accumulation. Resistance to corrosion
is carried out according to IEC 61439-6
Where the trunking enclosure is used as the protective conductor, provided that they do not impair the
electrical continuity and provided adjacent flammable parts are not ignited
Removal of the cover for access facility should necessitate the use of tool.
5.2.2. Bus Bar
Bus Bar shall be hard drawn highly conductive electrical grade aluminum or 99.9% purity highly
conductive electrical grade copper.
Bus Bar shall be in the form of rectangular bars with rounded corners, and their length shall be
according to the connection used in them.
Live conductor shall be insulated as minimum class B material. The insulation shall be Certified as
"Flammability Grad – V0" by the manufacturer.
Junctions and tap off positions conductors shall be fitted with Tin or silver- plated for copper and
aluminum conductors (not less than 5 μ m), or bimetal copper / aluminum for aluminum conductors.
Junctions and tap off positions conductors shall be fitted with Tin or silver- plated copper for copper
conductors (not less than 5 μ m ) and, silver plated aluminum (not less than 5 μ m ) or bimetal
copper / aluminum for aluminum conductors.
BTU installation of 3-phase- 4 wire system, the associated neutral busbar should have the same cross
section area CSA of the phase busbar, except for higher rating BTU above than 630A,the neutral
busbar may have CSA less than the CSA of the phase busbar according to ..EDC and manufacturer
design (optional).
5.2.3. Tap off unit box :
The tap-off unit box contains the overcurrent protection device at the outgoing circuit terminated at the
unit to distribute power to the required load. The protection device shall be Low voltage Circuit breaker
according to EDMS 19-303-1.
Tap off box door with interlock that prevents opening of door except when protection device is in off
position. The interlock will prevent also the insertion or removal of tap-off box from BTS when it is
Page 7 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
in “ON” position, as well as interlock to prevent closing of circuit breaker with door open shall be
provided.
Tap off unit jaws shall be fitted with Tin or silver- plated for copper and aluminum conductors (not
less than 5μ m) or bimetal copper / aluminum for aluminum conductors.
Tap off unit jaws shall be fitted with Tin or silver- plated copper for copper conductors (not less than
5 μ m ) and, silver plated aluminum (not less than 5 μ m ) or bimetal copper / aluminum for
aluminum conductors.
The earthing contact of the tap-off unit shall always be made before that of the live conductors and
the last to break during removal.
The tab off box should be guaranteed for Ingress protection as per requirement for indoor/outdoor
application
5.2.4. Flanged end box:
a) Flanged end box shall be provided to accommodate flange end for connecting the bus trunking with
the flanges of panels, transformers etc. through flexible braided connections or as recommended by
manufacturer as example shown in Anex.1 (Drawing).
b) The flange end termination on panel should be guaranteed for Ingress protection as per requirement
for indoor/outdoor application and should be backed by a type test report from the manufacturer.
c) Phase matching of bus trunking with equipment shall be done prior to installation.
d) Minimum clearance between two phases after braid termination installed should be as per standards
5.2.5. Joints :
The BTS joint shall be of the one-bolt or two bolts type (according to manufacturer design)
which utilizes a high strength steel bolt and to maintain proper pressure over a large contact
surface area. The bolt shall be torque indicating and at earth potential. The bolt shall be two-
headed design to indicate when proper torque has been applied and require only a standard
long handle wrench to be properly activated. It should be possible to remove any joint
connection assembly to allow electrical isolation or physical removal of a BTS length without
disturbing adjacent BTS lengths. There shall be no bolts passing through the bus bars of the
bus way as a part of safety.
5.2.6. Support system:
Both horizontal and vertical spacing between support structures (hanger) shall be as per the
recommendations of the manufacturer.
Vertical spring hangers are used on subsequent floors to absorb any vibration and expansion of the
busduct.
Installation shall be done with all the required hot dipped galvanized iron/steel supports as per the
manufacturer’s recommendations as shown in Annex.1.
5.2.7. 4.2.7 End of Runs
End pieces and end caps will be provided to install at the ends of each run.
Page 8 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Page 9 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
c) The manufacturer shall indicate his overall system design configuration and the Electricity
Distribution Company (..EDC) shall have the right to ask for and require any explanations.
d) All BTS Parts, fittings, and joints shall be supplied from the same manufacture.
8. TESTS
BTS shall be tested in accordance to the latest relevant all relevant applicable IEC standards and this
specification. It shall be the responsibility of the manufacture to perform or to have performed all the tests
specified. All type tests had to be performed by accredited laboratories. The test required will be as
mentioned in Table.1.
All tests should be carried out by the manufacturer and at his expense and under control.
9. SUBMITTALS
The tenderer shall submit with his offer the following items for review, evaluation and approval:
a) Single copies of detail drawings of BTS construction, instructions illustrating and explaining the design
criteria and design bases.(Such as MCB, ratings and data sheets, the rating of each BTU, etc)
b) Reference standards applied to the BTS and instructions for erection, operation, quality control procedure
and maintenance.
c) Applicant's proposal for product sample test and routine test
d) Certified copies of all Type Test Reports
e) List of all component used and its rating and ID No. corresponding to the drawing:
Busway ratings including:
Short-circuit rating
Voltage
Continuous current
Insulation material and class
Cross section for the 3phase and neutral conductors
Average Weight in kg for each BTS unit
Major component ratings (Such as MCB)including:
Voltage
Continuous current
Interrupting ratings
f) The tenderer shall fill in thoroughly in type-writing the attached guarantee data for the offered BTS as
sample table 2
g) In addition the tenderer shall indicate in his offer the proposed implementation time schedule
Page 10 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Table1. BTS Routine Test and Type Test according to IEC Specification
Visual inspection X X
Page 11 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Page 12 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Guarantee Table: Sample of at least data will be informed by tenderer in Guarantee Table
Description /Parameter EDC Requirement Tenderer Design
Page 13 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Page 14 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Anex.1 .Drawing
Page 15 of 19
The drawings for clarification only, and do not belong to a specific manufacturer
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Page 16 of 19
The drawings for clarification only, and do not belong to a specific manufacturer
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
The drawings for clarification only and do not belong to a specific manufacturer
Page 17 of 19
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
Page 18 of 19
The drawings for clarification only, and do not belong to a specific manufacturer
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 15 - 302 - 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 22-3-2022
The drawings for clarification only, and do not belong to a specific manufacturer
Page 19 of 19