ABSTRACT
In recent years, the application of cable structures in buildings has gained huge popularities.
Although cable technology has been established since the 1950s, there is suddenly a surge in the
number of its building application starting in the late 90s. This phenomenon is attributed to the
recent advances in computational form finding, analysis and construction simulation, which
make the design and construction of cable structures simpler and more economical.
Although cable structures have been employed for different building applications, this thesis will
concentrate only on the use of cable structures in wide span system. Five cable systems: simply
suspended cables, pretensioned cable beams, pretensioned cable nets, tensioned straight cable
nets and tensegric shells are studied for their mechanical properties and suitability for wide span
uses. A case study is presented at the end of each system's description to illustrate its possible
application. The paper will then conclude with a presentation of a general design methodology of
a cable structure.
Table of Contents
1. Introduction ...................................................................................... 8
2. Simply Suspended Cable Structures ....................................................... 12
2.1 Structural Behavior ...................................................................... 12
2.2 A pplications .............................................................................. 14
2.3 Case Study -- Dulles International Airport, Chantilly, Virginia .................. 14
3. Pretensioned Cable Beams.................................................................16
3.1 Structural Behavior........................................................................16
3.2 A pplications...............................................................................18
3.3 Case Study --David L. Lawrence Convention Center, Pittsburg, PA..............19
3.3.1 StructuralSystem ................................................................... 20
3.3.2 Construction Process............................................................22
4. Traditional Pretensioned Cable Net Structures........................................24
4.1 Structural Behavior.....................................................................24
4.2 Applications.............................................................................25
4.3 Cladding Material..........................................................................26
4.3.1 Fabric...............................................................................27
4.3.2 Glass............................................................................... 28
4.4 Case Study -- Rh6n Clinic, Bad Neustadt, Germany..................................29
5. Tensioned Straight Cables....................................................................32
5.1 Structural Behavior.....................................................................32
5.2 A pplications.................................................................................33
5.3 Case Study -- Millennium Dome.........................................................34
5.3.1 StructuralSystem....................................................................35
5.3.2 CladdingMaterial................................................................37
5.3.3 ConstructionProcess...............................................................38
6. Tensegric Shell...............................................................................40
6.1 Structural Behavior.....................................................................40
6.2 Advantages and Disadvantages of Tensegric Shell Structure.....................41
6.3 A pplications.................................................................................42
6.4 Case Study -- The Gymnastic Arena for the Korean Olympics......................43
6.4.1 StructuralSystem....................................................................44
6.4.2 CladdingMaterial................................................................44
6.4.3 ConstructionProcess...............................................................45
7. Design of a Wide-Span Cable Structure...................................................48
7.1 Choice of Cable System................................................................48
7.1.1 Physicalform.....................................................................49
7.1.2 Sp an ................................................................................. 50
7.1.3 Availability of Skilled Labor....................................................50
7.1.4 Cost................................................................................. 51
7.2 D esign .................................................................................... 51
7.3 Form Finding............................................................................52
7.3.1 Force-DensityMethod...........................................................54
7.4.2 Natural Shape FindingMethod...................................................55
7.3.3 Dynamic Relaxation Method....................................................56
5
7 .4 A nalysis................................................................................. . ..58
7.5 Design of Element Size and Connections...........................................59
7.5.1 Element Size...................................................................... 59
7.5.2 Connection........................................................................59
7.5.2.1 Cable-to-cableconnection (clamps)............................................... 60
7.5.2.2 Cable-to-frame connection..................................................62
7.5.2.3 Cable-to-groundconnection (tension anchors)........................64
7.6 C onstruction............................................................................. 66
8. Conclusion....................................................................................67
6
Table of Figures
Figure 1: Bending diagram in rectangular beam............................8
Figure 2: Simply suspended cable roof with rectangular plan.................................13
Figure 3: Simply suspended cable roof with circular plan.................................13
Figure 4: suspended cable roof with ellipsoidal plan ....................................... 13
Figure 5: Dulles International Airport, Chantilly, Virginia.................................14
Figure 6: Oakland-Alameda Coliseum, Oakland, California...............................14
Figure 7: Columns as cable anchors in Dulles International Airport ..................... 15
Figure 8: Possible cable combinations in cable beams......................................16
Figure 9: Structural behavior of prestressed cable beam....................................17
Figure 10: Cable truss developed by David Jawerth...........................................18
Figure 11: Cable beam arrangement in a circular plan......................................18
Figure 12: David L. Lawrence Convention Center, Pittsburg, Pennsylvania..............19
Figure 13: Chonju World Cup Stadium, Korea.................................................19
Figure 14: An exhibition hall at the Hanover Fair, Germany..................................19
Figure 15: Structural elements of David L. Lawrence Convention Center..................20
Figure 16: Artist rendering and construction photograph of cable beams in David L.
Lawrence Convention Center.....................................................21
Figure 17: Cable net with edge cables and a center mast...................................24
Figure 18: Cable net with stiff boundary conditions...........................................25
Figure 19: Youde Aviary, Hong Kong.......................................................26
Figure 20: Munich Olympics Stadium, Germany...........................................26
Figure 21: Roof of the Sony Center in Berlin, Germany.......................................26
Figure 22: Cable net wall of Columbus Circle, New York.................................28
Figure 23: Glass clad cable roof over Rhon Clinic in Bad Neustadt......................28
Figure 24: Connection between net and truss in roof over Rhon Clinic.....................30
Figure 25: Overlapping glass panels of roof over Rhon Clinic............................30
Figure 26: Eastleigh Tennis Center, United Kingdom......................................34
Figure 27: Demountable RSSB tent, United Kingdom....................................34
Figure 28: Millennium Dome, Greenwich, United Kingdom.................................34
Figure 29: Diagram showing the key structural members of the Millennium Dome.......36
Figure 30: Wishbone to raise circumference cable in Millennium Dome................37
Figure 31: Fabric attachment detail in Millennium Dome..................................37
Figure 32: Erection process of a mast for Millennium Dome.................................39
Figure 33: Erection of cable net for Millennium Dome.......................................39
Figure 34: Spherical tensegric shell............................................................41
Figure 35: Various tensegric net arrangement................................................41
Figure 36: Shallow tensegric shell............................................................41
Figure 37: Gymnastic arena for the Korean Olympic...........................................43
Figure 38: The Amagi dome in Suzenji, Japan..................................................43
Figure 39: A comparison between Fuller's tensegric system and David Geiger's
tensegric dom e....................................................................... 44
Figure 40: Structural members of the roof for the Korean gymnastic arena.............45
Figure 41: Erection process of a tensegric dome.............................................46
7
Figure 42: Flowchart illustrating general approach to cable structure design and
engineering .............................................................................. 53
Figure 43: Element and node in a cable net...................................................54
Figure 44: Detail of cable nets with dual-strand cable system.............................61
Figure 45: Fit-on-site cable clamp connection................................................61
Figure 46: Prefabricated and factory installed clamp..........................................61
Figure 47: Single U bolt connection for cable net...........................................61
Figure 48: Double U bolt connection for cable net...........................................61
Figure 49: Detail showing clamp for connection of interior net cable to edge cable......62
Figure 50(a): Socket terminal with pin connector...........................................63
Figure 50(b): Socket terminal with screw terminal.........................................63
Figure 51: Attachment of cable with socket terminal to top of steel column..............64
Figure 52: Attachment of cable with socket terminal to top of concrete column...........64
Figure 53(a): Gravity anchor...................................................................65
Figure 53(b): Plate anchor.........................................................................65
Figure 53(c): Mushroom anchor.................................................................65
Figure 53(d): Retaining wall anchor..............................................................65
Figure 53(e): Tension piles. ................................................................... 65
Figure 53(f): Ground anchor...................................................................65
8
1. Introduction
Wide span structures can be loosely defined as buildings which enclose large areas
without any intermediate support. Its application is very desirable in specific architectural
programs such as convention halls and sports arenas, where large spaces uninterrupted by
structural members are needed to accommodate for certain activities. Wide span is also
suitable for use in concert halls and religious facilities, where it is important for visual
For such structures, traditional beam-column system is not very effective. The bending
moment in beams increases quadratically with the beam's span, thus requiring the beam's
cross section to increase in the same order of magnitude. This can be easily illustrated
8
Figure 1: Bending in rectangular beam
2
M = pbdL
8
Schlaich, Jorg and Bergermann, Rudolf. "Conceptual Design of Long Span Roofs." IABSE Symposium
Birmingham, 1994. p 14 .
9
My d bd 3
a- = where y = -- , d=
1 2 12
pbdL3 d 12 (2)
8 2 bd'
6pL2
8d
For design,
P= U-. (3)
d 6pL2 (4)
8,8
Equation (4) shows that the depth of the beam, d varies with the square of the span length,
L. With this increase in depth, the dead load of the beam increases accordingly, applying
on itself a proportional increase in bending moment, thus requiring an even deeper beam
to resist the moment. This illustrates that with increasing span, solid beams become more
and more clumsy, with their dead load eating away their strength, making it unsuitable to
The failure of the beam for wide span use demonstrates the ineffectiveness of flexure to
resist load in this particular application. Therefore, many of the solutions devised for
wide-span system explore the different ways of supporting loads without the need of
bending. Some of these solutions include the truss system, whose elements are only
subjected to axial stresses, shell structure, which if designed well could carry forces by
10
pure compression and cable system, that resists load only through tension. In addition to
the absence of bending, cables are light and have a high strength to weight ratio. Small
members could therefore be used even in very large span. This property gives cable an
Cable structures are also desirable not only for their mechanical properties. From the
provides an expanded impression of space and the smoothly curving cables which create
structures with soft outline provide a desirable alternative to the traditional orthogonal
buildings. Cable has also proven to be an economical proposition for large structures.
With the continuing rise on the cost of steel, cable is becoming an even more attractive
space frame.
Cable roof structures can be divided into categories based on whether the roof cladding is
supported by:2
In this thesis, the structural behavior of each of the cable systems will be explored on a
conceptual basis, with a case study following each description. These case studies are
aimed to illustrate practical application of each system and are chosen to provide
Where there is sufficient documentation of the project, construction process will also be
briefly described. Following this, a general design methodology of cable structures will
be presented. This section would discuss factors to be considered when deciding on the
choice of cable systems, outline form finding and analysis methods used in the design of
cable nets and highlight design considerations for the various components of a cable
structure.
12
Simply suspended cable structures refer to roofs whose cladding is supported by a single
layer of non-pretensioned cables. The cables in these structures could be seen as beams
on which the roof claddings, which can be perceived as girders, are resting on. It is a
simple load transferring mechanism where force acting on the roof is first carried by the
roof cladding, and then transferred to the cables. In a self balancing structure, that is one
in which the structure supporting the cables has a geometry which permits the forces in
the cables to be balanced internally, this force is passed on to a rigid frame before it
continues on its way to the floor. In a non self-balancing building, where the geometry of
the building supporting the roof is unable to resist the cable forces without the aid of
ground anchor, the force is carried by the cables directly to the ground to which they are
anchored.
Since simply suspended cable structures behave very similarly to the beam column
system (with the "beam" supporting loads through tension instead of bending),
architectural shape formed by this system look like conventional buildings, but with an
exaggeratedly pronounced deflected roof. For roofs with rectangular or trapezoidal plan,
cables hanging in vertical planes may be arranged parallel to each other (Fig. 2). In roofs
which are circular or elliptical in plan, the cables may be suspended radially and attached
at the perimeter to a compression ring and at the center to a tension ring (Fig. 3). For
13
roofs of other shapes, combinations of cable arrangements may be utilized. For example,
in ellipsoidal shaped plan, radial cable arrangements are used at the two half ends, while
regular parallel arrangements are used for the center rectangular portion (Fig. 4).
Figure 2: Simply suspended cable roof in rectangular plan Figure 3. Cable arrangement in circular plan
An important characteristic which set the simply suspended cable system from the other
cable systems is that the cables in this system are not pretensioned. This makes the use of
the system cheaper and simpler. However, since the cables are not prestressed, they do
not offer any stiffness. This results in considerable deflections under loading and
drainage of such roofs has to be thought of during the design process. The lack of
stiffness of the cables also results in much movements of structure under wind loading.
Stiffness of the system must thus be supplemented through the stiffness of the cladding
material. Concrete is therefore often the material of choice for the roofing material in
2.2 Applications
The simply suspended cable roof system was widely used in the 1950s, before the cost of
cable pre-tensioning fell, making the pre-tensioned cable systems more popular today.
Examples of roofs built with the system include that of Dulles International Airport at
Dulles International Airport at Chantilly Virginia was built in the 1960s by architect Eero
cable roof system to form a signature sweeping curved roof. The building has a
rectangular floor plan measuring 590 feet by 164 feet. Steel suspension cables span
across the 164 feet width and are anchored to slanted reinforced concrete piers which are
spaced at 10 feet interval. Precast concrete slabs are used to form the cladding for the
roof. Due to the catenary shape of the canopy, an ocarina-shaped drain is incorporated in
the center of the span, running longitudinally along the roof, to prevent water from
15
Structurally, vertical forces acting on the roof is supported by the cables in tension. As
the cables are stressed, they exert vertical and horizontal forces on the concrete columns
to which they are connected. These columns, which are standing at an angle, balance the
moment created by the horizontal pull of the cables through its dead load, while vertical
forces from the cables are transferred to the ground through compression in the piers.
Since bending moment acting on these columns increases with distance away from the
cable connection, the piers are designed to have a thicker base (Fig. 7). While vertical
loads are carried by the cable-column system, horizontal forces are resisted by the stiff
concrete cladding. Stiffness of the concrete slabs prevents horizontal deflection of the
structure.
Figure 7: Columns which act as cable anchors, exterior view and interior view
In this project, the cable roof system has proven to be extremely appropriate. The
catenaries-cum-slanted concrete column system leaves the inside space of the terminal
free of columns to accommodate the program of the structure. The cable system also
projects an aesthetically pleasing form which suggests flight and lightness, appropriate
adding a second set of cables with reverse curvature, to the existing suspension cables.
This second set of cables can be added in various manners forming three possible
combinations - convex, concave and convex-concave beams, shown in Figs 8(a), (b) and
(c) respectively. This double cable arrangement works more efficiently as a load bearing
system, resulting in an overall lighter structure. Pre-tensioning of the cables also makes
the structure stiffer (vertically, lateral stiffness is still provided by the cladding material),
if cables are correctly tensioned such that they remain stretched under any combination of
applied loading.
(b)(c)
Figure 8: Possible cable combination in cable beams.
With two sets of cables having opposite curvature to each other, cable beam is able to
carry vertical load in both upward and downward direction with equal effectiveness. Each
set of cable is essentially "in charge" of carrying vertical load in one particular direction.
The set of cable with convex curvature carries the downward force while that with
cable beam works. When a downward force acts on the structure, the pre-tensioned force
in cable A is increased while the tension in cable B is reduced. Force is therefore in effect
17
resisted by cable A. When the structure is subjected to an upward force, this force
increases the tension in cable B and reduces the prestressing force in cable A, with cable
B resisting the bulk of the uplift. As a convention, the set of cables whose pretension is
increased by the load is known as the pretension cables while the other set is termed
suspension cables.
Downward Load
B - Cable A: tension Increased
/P - Cable B: tension reduced
Uplift
- Cable A: tension reduced
- Cable B: tension increased
Cable truss is a special form of cable beam that is developed by a Swedish Engineer,
David Jawerth 4 in the 1960s (Fig. 10). While the ties connecting the two oppositely
curved cables in cable beams have little structural significance, those in a cable truss act
as load bearing elements. In cable trusses, the ties are inclined and connected in such a
way that they, together with the suspension and pretensioning cables, form pretensioned
triangles. As such, this system works exactly like the space truss system, only that the
cables act purely in tension. For economic reason, in the design practice, the level of
pretensioning are set such that the ties remain in tension when subjected to dead load
only. With the application of an increasing live load, some of the diagonals will become
slack, resulting in only part of the ties remaining in tension. At the instant when one of
the ties goes slack, the truss changes its structural mechanism to a cable beam.
3.2 Applications
Cable beams are most popular among the different cable systems, because they are
efficient, easy to erect and can be employed to cover plans of different shapes
conveniently. For roofs which are circular or elliptical in plan, cable beams may be
arranged in geometrical patterns similar to those described for simply suspended cable
structures. Examples of such arrangements can be seen in Figs. 11(a), (b) and (c). Among
the numerous structures employing the cable beam system are David L. Lawrence
Convention Center (Fig12) in Pittsburgh, PA, the 260m x 160m roof of the 2002 Chonju
World Cup Stadium in Korea (Fig 13) and an exhibition hall for the Hanover Fair (Fig
14).
Figure 13: Chonju World Cup Stadium Figure 14: An exhibition hall at the Hanover Fair
David L. Lawrence Convention Center is the largest column-free space in the United
States. The newly completed center encloses 1.5 million sq ft of area, which includes an
exhibit hall, meeting rooms, lecture halls, a ballroom and a garage. Design inspiration for
the convention center is obtained from the Sixth Street, Seventh Street and Ninth Street
suspension bridges in Pittsburg which are located at closed proximity to the site. The
three bridges are the only example in the world where three suspension bridges are
positioned side by side along a river. Drawing inspirations from the bridges, the
architects, Rafael Vinoly Architects, envision a cable structure for the convention center,
5 O'Callaghan, James. "An Unconventional Approach" Civil Engineering Magazine. November 2003.
<http://w ww.pubs.asce.org/ceonline/ceonline03/1 103feat.html>
20
3.3.1 StructuralSystem
This two-story building is made up of two main structural elements-the steel frames and
the cable beam roof structure (Fig. 15). The steel frames run along the north and south
end of the structure. The north and south frames are referred to respectively as bow and
stern trusses - so named because of their resemblance to those parts of a ship. The
configuration of the steel frame is such that it supports the main floors and serves as
anchorage mechanism for one end of the cable roof (the cables in the opposite side are
anchored directly to the ground). Conventional space trusses are laid between the bow
and stem frames to form the floor of the second story. Cable beams span at the top of the
ego.
nseemana
T Ow"nntaran
Figure 15: Structural drawing of the exhibition hall showing the key structural elements
Cable beam system is chosen over truss structure for the clear span roof of the second
floor exhibition hall because of economic reason. For this large roof span, cables proved
to be more efficient and economical. That, as well as the intention to weave suspension
21
bridge technology into the design, was a driving factor for choosing the cable beam
system.
In the structure, each cable beam is slung from the anchorage weldment on the bow frame,
over a central mast, and down to an anchorage weldment at the top of the stem frame.
This span varies between 300 and 400 feet along the length of the roof. The beam
consists of a convex upper cable, which resist the downward force, and a concave lower
cable that prevents uplift (Fig. 16). Each cable is comprised of 7 no 3" strands, designed
to carry a maximum tension of 3600 kips. Connecting the upper cables and the lower
cables are the vertical ties. Stainless steel sheet lies above the upper cables to form the
Figure 16: Cable beam and side cable stayed glass fagade; an artist rendering and a construction photograph
At the gabled end of the roof is a cable stayed glass fagade which is not only aesthetically
appealing but also structurally significant. This glass fagade is conceived, architecturally,
to provide natural day lighting to the exhibition hall. The incorporation of this nice
architectural feature, however, poses a difficult engineering problem. The large deflection
of the roof, which is initially acceptable if there is no glass fagade, is now deemed
excessive and will exert strain large enough to break the glass. A stiffening system thus
needs to be added to reduce the roof's deflection. To tackle this stiffness problem,
stayed glass fagade. By dropping cables at every proposed mullion position and
tensioning them between the flexible roof structure and the rigid building frames, the live
load deflections of the roof structure was reduced from 3 feet to less than 6 inches. These
cables do not only reduce the roof's deflection, they also act as a support for the glass
3.3.2 ConstructionProcess
The complexity in building this cable structure does not stop in the design phase. Due to
the intricacy in the interaction between the cable beams and the steel frame, erection of
the structure is a challenge on its own. During construction, pre-stressing of the cables
will cause a considerable deflection and rotation on the frames. This deformation needs to
be considered when erecting the frame, to ensure that the final configuration of the frame
would only be obtained after the cables are pretensioned. To predict the effect of cable
tensioning on the frame, a time history computer analysis program is used for this project.
Engineers used this analysis tool to model each stage of the roof tensioning process and
analyze its effect on the frame deflections. By observing the predicted deflections of the
anchorage frames at various stages of cable pretensioning, it was possible to plan the
frame installation such that the frame will assume its final desired configurations only
The design of the David L. Lawrence Convention Center has indeed successfully
integrated innovative engineering system into the architecture. The cable beam system
not only performs efficiently as long span structure, it also projects an elegant roof shape
which echoes the arching forms and the engineering triumphs of Pittsburgh bridges.
24
Cable net is obtained when the suspension and pretension cables of the cable beams are
laid in space to form a single surface. The behavior of cable net is thus similar to that of a
cable beam, with one set of a curved cable resisting the downward force and another set
of oppositely curving cable resisting the upward lift. Since the surface must incorporate
cables of opposing curvature, it follows that the net must be anticlastic or saddle shaped.
The net must not accommodate the crossing of cables of the same curvature because in
such areas, a local "basket" will be formed and the cables will not be properly tensioned.
As such, the roof in the region will be soft and is subjected to large movements which
will damage the cladding. In large roofs, flat areas should also be avoided because such
parts are not very stiff and may be subjected to flutter. While this structural requirement
poses as a restriction in the architectural design of cable net structure, it has established a
Figure 17: Cable net with edge cables and a center mast.
25
The supports of the cable net can be provided in the form of a central mast and edge
cables, as shown in Fig. 17, or with stiff boundary members such as frames or arches as
shown in Fig. 18(a) and (b). Cable net with masts and edge cables tend to be less stiff and
require more complicated details than nets with stiff boundaries. It is therefore always
encouraged to employ cable net with fixed boundaries for structure with very large span.
The mast system, with its tent-like form, is however architecturally more appealing. This
system is widely used in the Middle Eastern region for its cultural suitability. Cable net
suspended from a mast is also more suitable for use in temporary structures because its
(a) b
Fig. 2.26 Geometrical shapes of carrying cable nets being stretched between arches and frames,
4.2 Applications
Cable nets' appeal comes primarily from its unique architectural form. Some examples of
these phenomenal structures are the Youde Aviary, a classic anticlastic cable net
suspended by 3 tubular arches (Fig. 19), the cable net roof of the Munich Olympics
Stadium (Fig 20), and the canopy at Sony Center in Berlin, where cable net is span
Although most of the cladding material in a cable net does not function as a structural
element, the choice of material used may affect the overall performance of the structure.
And since roof cladding forms a significant part of a net structure, it is important that
designers understand the intrinsic qualities of the cladding material and their implications
to the structure.
27
4.3.1 Fabric
The most widely used cladding material for cable net structure is fabric. This is only
natural as the inspiration for cable net structures first comes from traditional tents.
Besides historical reasons, fabric does indeed have the material properties which are
suitable for use with cable nets. Like cables, fabrics have strength when placed in tension.
This additional strength is negligible and will not contribute to the strength of the cable
net. This characteristic, however, ensures that the cladding will not fail when subjected to
tensile action in instances of excessive deflection. Fabric is also valued because it is light,
The choice of fabric to be used is usually driven by lifespan and cost. The least expensive
fabric material for architectural applications is the woven polyolefin such as polyethylene
and polypropylene. These polymers are flame retardant and UV resistant. Their lifespan
however is relatively short (5 years and less). Thus, they are used only in temporary
structures. The most common architectural fabric used today is the PVC coated polyester
based fabrics. This fabric is more long-lasting, with the heavy-coated ones having a 15
year replacement cycle. The fabric is fire resistive and comes in numerous colors (making
it very popular very architects). It is also flexible and makes an ideal material for
deployable or retractable roofs. The most permanent architectural fabric is Teflon (PTFE)
Coated fiberglass fabric. This fabric is non-combustible and meets the most stringent
building code worldwide. Off the roll, this translucent material has an oatmeal
appearance which bleaches out to white in the sun after a couple of months. PTFE fiber
28
glass fabric is also chemically resistant and UV resistant. It is however costly, and is used
only when the quality and durability of the fabric is important, such as in the case of
Georgia Dome in Atlanta and the new Millennium Dome in Greenwich, England.
4.3.2 Glass
Another cladding material which is becoming more popular for cable structures is glass
panels. Glazed cable net structure is preferred by many architects today for its
transparency and modem look. Glass also has a longer life span than most fabric. Glass,
however, has not been used very widely as a cladding material in cable net structure
because it is very sensitive to deflection and breaks when subjected to excessive stress.
To date, many of the glazed cable net structures are flat, vertical cable wall fagade (Fig.
22). The only anticlastic glazed cable net structure built in the world is the canopy over
Figure 22: Cable net wall of Columbus Circle, NY Figure 23: Roof over Rhon Clinic in Bad Neustadt
7 Goldsmith, Nick. "Material for the New millennium". Widespan Roof Structures. London : T.
Telford ; Reston, VA: Distributors for USA, ASCE Press, 2000. p2 13 -2 17 .
29
Glass has a theoretical tensile strength of 10,000 N/mm2 , but experience shows that the
effective tensile strength reaches a maximum of only 8ON/mm2 . This steep reduction is
due to the fact that glass is not a homogeneous material, but instead contains flaw and
weak points. Glass is also brittle, such that when it is stressed beyond its elastic limit, it
will suddenly break. This poses as a potential hazard, especially if glass is used as a
roofing material. With recent technology, tensile strength of glass can be improved up to
Thermally toughened plane of glass also, on breakage, disintegrates into many small
connection between glass panels and cables also contribute to the increased used of glass
as a cladding material. The increased use of glass can also be attributed to a new form-
finding method with which cables in nets can be arranged such that flat glasses can be
used for cladding. The use of flat glasses, instead of the currently used curved glasses,
would substantially decrease the cost, making glass a more popular choice.
The world's first glazed cable net structure was designed by Werner Sobek Ingenieure, a
Stuttgart based structural engineering company, in 1997. The structure was created to
provide a covered link between medical clinic buildings in Bad Neustadt, Germany.
15
8 Campagno, Andrea. Intelligent Glass Facades Basel ; Boston : Birkhauser, 1999. p 14 - .
9 Rhon Clinic. Werner Sobek Ingenieure company website. 28 April 2004.
<http://www.wernersobek.com/englishweb/frameset.html>
30
Architecturally, the goal was to create a spacious, light filled space which is unobtrusive
to the existing buildings and surrounding areas. Cable nets hung from wooden masts and
glazed with silicate glass was an ideal solution. This structure is almost transparent with
The galvanized steel cable net is edged with ring cables which are connected to a wooden
compression at the center (Fig 24) and guy cables, which are anchored to the ground, at
the periphery. This curved shape of the net is defined using CAD-based form-finding
methods to ensure that every parts of the cable member is in tension under loading.
Figure 24: Connection between net and truss Figure 25: overlapping of glass panels
The cable net is clad with glass panels. The use of glass in this structure was made
feasible by a newly developed system in which overlapped glass panels of uniform size
are fixed to a cable net of varying mesh geometry using standardized stainless steel clips
(Fig. 25). This innovative system does not only make the use of glass possible, but also
31
economical as flat glasses of standard sizes are used. This connection method also eases
the green-house effect associated with glass enclosures. The overlapping of glass leaves
openings small enough for an exchange of fresh air and yet still effective in providing
protection against the rain. This structure is sufficiently stiff and stable, with the glass
plates strong enough, such that they may be walked on for cleaning. The roof is also well
designed to carry the huge loads of snow which envelops this mountainous region in the
winter.
Although this structure may not be the best case study for long span cable nets (as each
net spans only a diameter of 100 feet), it is however sited for the innovative use of glass
as a cladding system, which I foresee to be the next trend in cable net architecture.
32
In 1994, Buro Happold presented an idea which defied the now traditional cable net
concept where anticlastic shape employing two sets of oppositely curved cable is
essential. Buro Happold suggested the use of straight cables with flat fabrics as a new net
system for wide span. They pointed out that there are considerable advantages in using
straight tensioned cables which can carry both the downward force and upward lift in one
set of cables. They cited the advantages of this new system aso:
(1) The elimination of one set of cables brings with it the removal of cross clamps
(2) Whether the load is acting downwards or upwards, the cable is tensioned in
the same direction, which can be a great advantage if this tension is taken by a
(3) With just one set of cable, connections between the fabric cladding and cable
Straight cable net system works by having a very high pre-tensioning on the cables to
stiffen it sufficiently against any deflection. The flexible fabric which acts as cladding
material also needs to be pre-tensioned in the same direction of the cables. Despite the
high cost of pre-tensioning, Buro Happold claimed that with the benefit from removing
10 Gill, Colin, Lidell, Ian and Schwitter, Craig. "Straight Tensioned Cable Roof Structures" IABSE
Symposium Birmingham, 1994. p2 2 1-2 2 6 .
33
one set of cables, this system would still result in a more economical large span roof
Buro Happold also indicated the advantage that this system has in the structural analysis
and form-finding aspect. The structural behavior of a straight cable system is very much
simpler than that of two-way cable nets. While the calculation of forces and deflection of
an anticlastic net need the aid of a computer analysis software, that of a single cable
system can be calculated manually using the nonlinear cable equation. In form finding
aspect, the iterative process to develop an optimum shape for single net system is also
much quicker.
There is however a possible downside of this system. The pre-stressed fabric in between
the cable elements does not carry concentrated load as well as the cables. Under local
loading, large deflection may be developed in the fabric, which may in turn cause the
failure of the structure. When adopting this concept, it is therefore important to provide
adequate drainage for rain and snow. Possible large deflection in the fabric must also be
5.2 Applications
Since 1994, when this idea was first presented, there have been three structures designed
with the pre-tensioned straight cable net system. They are the Eastleigh tennis center
which covers 6000 square meters of space (Fig. 26), a very large demountable tent of
34
20,000 square meters for a religious community, RSSB, in Bedfordshire (Fig. 27) and the
famous millennium dome in Greenwich (Fig. 28). All structures are located in the United
Kingdom.
The Millennium Dome is a fabric clad tensioned cable structure which acts as a giant
umbrella providing a protected environment for exhibition pavilions and a central show
areas. The dome has a diameter of 320 m and a central height of 48m. It encloses an area
of 80,000 square meters (20 acres) and has a capacity of 40,000 people.
35
The roof of the Millennium Dome utilizes the pre-tensioned straight cable system. In this
system, 72 tensioned steel stringer cables are arranged radially on the dome surface,
stretching between a central cable ring and edge cables which are anchored to the ground.
and lower tie-down cables which are attached to the steel masts. 1
The cables and the mast work very effectively as a self-balancing structure. Forces acting
on the roof are carried by radial stringer cables, and transferred to the circumferential
cables. These forces exert tensional stress on the circumferential cables, which in turn
pull the lower tie down cables to which they are connected. The tension in the lower tie
down cables equilibrates each other and ensures that the mast, to which they are
connected, stays upright. This upright mast in turn ensures that the tension in every upper
hanger cable is maintained, so that they can hold the circumferential cables in position
(Fig. 29).
" Liddell, Ian. "Large Environmental Enclosures, the Roof of the Millennium Dome" Widespan Roof
Structure: London : T. Telford ; Reston, VA : Distributors for USA, ASCE Press, 2000. p 14 9 - 15 8 .
36
Figure 29: Diagram showing the key structural members of the Millennium Dome.
The stiffness in the cables is provided by highly pre-tensioning these cables. In fact, the
pretension of each radial cable is about 400kN, which is 2/3 of the tension capacity of the
material. This incredibly high tension is needed due to the long span of the radial cable
(150m). It is also a result of the load carrying mechanism of the pre-tensioned straight
cable system, in which one set of cable carry both downward loading and upward force.
Between the cables, tensioned fabric is used as cladding. As mentioned earlier, the
reduced stiffness in the cladding makes this system prone to dangers associated with
excessive deflection under rain and snow loads. This possibility must therefore be
carefully studied and prevented. The roof of the Millennium Dome, with its tapering
segments, is less prone to this problem because its slope increases with the span of the
fabric panels. As such, water will be able to flow off the dome and is less likely to
designed, would catch water on its upper part and would cause a dam above each
37
circumferential line. The circumferential lines therefore need to be lifted off the fabric,
and this is done using rigid steel members, termed as the wishbones (Fig. 30)2.
5.3.2 CladdingMaterial
The fabric used for the cladding of the roof is PTFE coated glass fiber. PTFE is selected
primarily for its durability as the new government especially specified in their review of
the project that all options should be kept open regarding the long term usage of the
Dome. PTFE is also chosen for all its desirable properties mentioned earlier - flame
resistant, unaffected by UV light, water proof and dirt resistant. This fabric is attached to
the radial cables through a carefully detailed connection. Each fabric's is lined with a
12mm edge cable, which would hook into special clamps fixed to the radial cables. For a
clean look, fabric sealing flaps were closed over the top of the joints and sealed together
Figure 30: Wishbones to raise circumference cables. Figure 31: Fabric attachment detail.
12Liddell, Ian. "Creating the Dome" The 1997 Royal Academy of Engineering, Hinton Lecture. 29 April
2004. < http://www-g.eng.cam.ac.uk/mmg/newsandfeatures/liddell/domelecture.html>
38
Although the construction of straight cable domes is hailed to be simpler than other cable
domes, for a large structure such as Millennium Dome, it still involves a certain degree of
process is roughly described here. It need to be stressed that however vivid the
description is, it hardly paints the complexity in the coordination involved during the real
erection.
First, each of the 12 masts and the pyramids that support the masts were assembled and
welded in an area adjacent to the permanent site. The assembled pyramid were then
carried to the site and placed on the concrete piled foundation with a crawler crane. The
masts were also carried using the same crane and placed adjacent to its final position (Fig.
32). The masts were then guyed off with four restraining cables before the crane was
released. The front two cables were temporary but the other two were permanent back-
stay cables. In order to restrict the movement of the masthead under wind loads, the four
restraining cables were post tensioned before the crane was released.
Once all the masts are placed in their respective positions, the cable net is next to be
erected. The net, which consisted of over 2600 cables were assembled on the ground and
lifted in four main sections. Each section formed a large concentric circle which when
pulled simultaneously at 36 positions was elevated to its final height (Fig. 33). The
missing infill cables between the circular sections were installed individually using a
39
combination of abseiling techniques for the higher locations and powered access
equipment where practical. When all cables had been installed, they were tensioned to
their final design stress by progressively jacking the anchor points of the radial cables.
The stressing operation was carried out progressively around the dome in three stages.
MW Now,
tw
4W moo#
VIOW
6. Tensegric Shell
A tensegric shell is a hybrid shell which is made up of cable net and compression bars
(Fig. 34). The structure of the tensegric net is derived from the tensegrity system, which
was first discovered by Buckminister Fuller in the 1962. This system is defined as a state
structure is self equilibrating, with the "pull" in the compressive structures balancing the
"push" from the tensile elements. Although the system is stable on its own, to support
loads, the members of a tensegeric shell needs to be pre-stressed against each other. Pre-
stressing can take place by lengthening some of the compression bars or by shortening
In tensegeric shells, the bars are arranged such that they join the cables at the nodes and
that they are not connected to each other. Typical bar arrangement in various
configurations of cable nets can be seen in Fig. 3514. The exact placement of the bars
could be generated through computer form finding methods which ensures that the forces
in the structure is equilibrated internally. For easy construction, forms can also be
designed such that all the struts and cable elements have identical length.
13 Burkhardt, Robert. "A Technology for Designing Tensegrity Domes and Spheres" 29 April 2004.
<http://www.channel I.com/users/bobwb/prospect/prospect.htm#sec:intro>
14 Vilnay, Oren. Cable Nets and Tensegric Shells, Analysis and Applications. New
York: Ellis
Horwood, 1990. p 12 - 19 .
41
-"BARS
- -- CABLES
CABLES
Figure 35: Various tensegric net arrangmenets. Figure 36: A shallow tensegric shell.
Tensegric shell, which works through both tension and compression, is a very effective
system for wide span. In fact, tensegric shell has some advantageous properties, which
are not found in any other cable net structures. The incorporation of rigid compression
bars has made tensegric dome much stiffer than if it were to consist of only cables. This
system is therefore less susceptible to large deflection problems which are commonly
found in other net structures. Since tensegric net is self equilibrating, the design of the
boundary condition at the base of the dome can be relatively simple. The stability of the
tensegric dome also enables it to have low-profile curve, resulting in a shallower dome
(Fig. 36). Space confined by shallow tensegric shell is more suitable for practical usage
42
than that confined by conventional cable nets, in which much awkward space is wasted
along the edges. Shallower dome also brings with it the advantages of lower wind lift and
less drifting snow, resulting in the use of smaller structural members. Being shallow, the
canopy also has a smaller surface area, thus reducing fabric cost.
Design and construction of tensegric shell is however more complicated than typical
cable net structures. The structural concept of tensegric shell, which is based on
The presence of both compressive and tensile force in the system also makes the
diagrammatic visualization of force flow in the structure non instinctive. The construction
of tensegric shell is more messy than ordinary cable nets because the compression bars
need to be fitted into the system individually. The connection of the bar to the cables also
6.3 Applications
Despite the potential of tensegric dome as a wide span structure, there are only a handful
of built structures which employ this structural system. The first tensegric structure every
built in the world is the Gymnastic Arena for the 1988 Korean Olympic (Fig. 37).
Another structure which uses the trangerity system is the The Amagi Dome in Suzenzji,
Japan which encloses a relatively small area of 3000 square meters (Fig. 38).
43
Figure 37: Gymnastic Arena for the Korean Olympic Figure 38: The Amagi Dome in Suzenzji, Japan
6.4 Case Study -- The Gymnastic Arena for the Korean Olympics 15
The Gymnastic Arenas for the Korean Olympics is a circular tensegric dome of radius
393 feet. The tensegric system of this arena roof is a simplification of Fuller's tensegrity
dome. David Geiger, a Pennsylavania based engineer simplified Fuller's dome by getting
rid of the redundancies inherent in Fuller's triangulated configuration (Fig. 39). By doing
this, he is able to make the adopted dome system statically determinant, and much
This arena cable dome roof is formed by continuous tension cables and discontinuous
compression posts. Forces on the roof are carried by radial ridge cables (which span
between the central tension ring and the perimeter compression ring), hoop cables,
intermediate cables and the compression struts (Fig. 40). The cables and the struts behave
very much like cantiliver trusses, which converge but not quite touch at the center tension
ring.
6.4.2 CladdingMaterial
The dome is clad using four layers of fabric. The outermost layer is a high-strength
fiberglass fabric with a silicone coating on both sides. Beneath it is an insulating layer of
silky fiber glass, followed by a Mylar insulation barrier and a silicone coated ascoustic
liner. This cladding is designed to provide adequate thermal resistance for Korea's winter
and yet transulecent enough to allow light transmission to meet most daytime needs. The
fabric is not tensioned and are simply connected to the radial ridge cables.
45
Figure 40: Details of the structural members of the roof for the gymnastic arena.
6.4.3 ConstructionProcess
The construction of the dome starts after the walls of the arena are completed. 16 radial
ridge cables are threaded to the steel central ring on the ground, before they are hoisted
up by a temporary crane to their position (Fig 41(a)). The other ends of the ridge cables
are then threaded to the reinforced concrete compression ring. As the ridge cables are
being erected, tension hoop cables are laid on the ground with the compression posts
attached in position. The hoop and posts were then lifted and attached to the connection
castings which are already in the erected ridge cables (Fig. 41(b)). Diagonal cables which
run from the top of the compression ring to the bottom of the compression struts were
then tensioned, pulling the hoop into the final position. This process is repeated for all
four sets of hoops and struts (Fig. 41 (c)). This pre-tensioning of diagonal cables is a
complex process in which sixteen group of workers were stationed in baskets at the
bottom of the compression posts to jack each of the diagonal cable simulataneously (Fig.
46
41(d)). After the cables are all pre-tensioned to a desired force, the fabric are laid and
bolted to the castings on the ridge cables with stainless-steel nut (Fig. 41(e)).
:4-
-">4
iSNN~~
The design of a wide span cable structure is a complex process. It requires, not only a
good understanding of the behavior of cable systems, familiarity with computer programs
is also essential. Due to the non-linearity of the cable behavior, classical methods of
design and analysis cannot be employed. In this section, a design methodology specific to
The design of a wide span cable structures can be typically divided into the following
stages:
(3) Analysis
(5) Construction
Although cables are generally efficient for long-span roof structures, some systems are
more suitable than others when used for particular architectural programs or requirements.
In deciding which cable system is to be employed for a particular structure, the following
7.1.1 Physicalform
Each cable system carries with it a characteristic profile. Simply suspended cable system
assumes the natural catenary shape, cable beams form gently curved roof, cable net has
its signature anticlastic double curvature and tensioned straight cables form a stretched
flat roof. Tensegric shells can take on different forms, but is generally dome-like. Due to
this reason, the structural system of a building is indirectly controlled by the architectural
design. As a general guide, if a prominent canopy is desired, cable net systems which
include traditional net, tension straight cables and tensegric shell, may be considered.
When a simple gesture is preferred, simply suspended cables and cable beams are more
suitable.
The shape of the area to be enclosed may also affect the choice of the system. If a
unidirectional cable girders or hanging roofs suit better than doubly-curved cable net
system. While cable beams and singly suspended cables are suitable for orthogonal sites,
Associated to the issue of physical form, the need for anchorage in certain cable systems
must also be considered. When spatial conditions do not permit, only systems which need
no anchor support such as simply suspended cables, tensegric shell and nets with fixed
7.1.2 Span
All of the above mentioned systems are structurally efficient for long span. However,
there is a limit to the maximum span that each system can support effectively. In general,
cable nets are able to span a greater width than single cable systems. With stiffness acting
in both directions (as opposed to one in single cable systems), cable nets form stiffer
structure and thus able to span to a greater width with relatively smaller deflection.
Between the two single cable systems, cable beam is able to span a greater width because
the pre-tensioned cables help arrests excessive deflection. Simply suspended cable
systems fail beyond a certain span as deflection in the non-tensioned cables grow
exponentially with span. Among the cable nets, tensegric shell is most effective, followed
by nets with anticlastic double curvature and the straight cable system.
In tensegric domes, where forces are balanced internally, an increase in the dome's
diameter involve the replication of the existing system with little increase in expense or
weight per square foot. In other cable net systems, where stiffness is provided primarily
by the pretensioning in the cables, an increase in span requires a greater increase in the
group of skilled labor. In places where skilled labor is not available, simply suspended
51
cable structures are recommended. In simply suspended cable structures, the cables are
simply supported and require no pre-tensioning Most of the skills needed in the
construction of these structures are in the casting of concrete for cladding. This is a pretty
ordinary process which can be done by regular construction workers. Cable beam
construction is also relatively simple and may be considered if the service for simple
The erection of cable net requires good coordination among workers during cable pre-
tensioning, and mistakes made during the process may affect the stability of existing
7.1.4 Cost
In building a cable structure, most of the cost goes into design and construction. Material
cost is not significant. Thus, the simpler the cable system, the cheaper it is. For regular
span, simply suspended cables would be the cheapest to employ, followed by cable
7.2 Design
Once a specific system has been decided, design of the structure commences. Due to non-
linear behavior of cables, classical methods of design and analysis are not applicable to
cable structures. There is also no available building code to aid in the design process. The
52
process of obtaining the most optimum cable structure therefore involves analyzing a
structural form using basic analysis method and updating the shape of the structure to
improve structural performance. The general methodology pursued in the design and
construction of a cable structure is illustrated in the attached flowchart16 (Fig. 42). Due
to the complexity of the process, many procedures are done with the aid of computers.
Processes which are typically automated are highlighted in the chart. This design process,
as with most design methodologies, is iterative, with the results of the analysis examined
and used to redesign the shape of the cable structure. With computers, this iterative
process can be done very effectively. Although there are many algorithms presently used
with success for each of the computer process, the general methodology illustrated is
The form finding process that is about to be described are applicable only for cable net
systems. There is little form-finding involved in the design of simply suspended cable
structures and cable beams because the arrangement of cables in these single cable
systems are governed primarily by the shape of the area to be enclosed. The ways in these
16Campbell, David M. "The Unique Role of Computing in the Design and Construction of Tensile
Membrane Structures" American Society of Civil Engineers, New York. 1 May 2004
<http://www.geigerengineers.com/techpaper.cfm?RecordlD=2>
53
no Shape
4 Architecture
Evaluation Pattern Boundary
Definition
no Prestress
Evaluation
S upp o rt Stru ctu re
Model
AN ALY SI 8 d
Initial Elernent
S izes
qu en ce)
F a b ri cal on
Co nstru cti on
Typically Non-
auto mate d
P ro cess I
Figure 42: Flowchart illustrating general approach to cable structure design and engineering.
The objective in form finding method is to create a model of the intended structure from
which a geometry that satisfies the requirements of form and equilibrium can be found.
This is an inherently non-linear problem since form and equilibrium are inextricably
54
linked and adjustment made to either one will affect the other. Thus, as mentioned earlier,
algorithms can be used to determine suitable forms, ranging from purely geometric
approaches to the force-density method. A few of the methods discussed in this section
include' 7 :
iteration
7.3.1 Force-DensityMethod
The idea of force-density method is to obtain a unique shape of equilibrium state given a
prescribed selection of force density in each net element. Force-density refers to the force
to length ratio of an element. An element is defined as the cable member between two
nodes while a node is the connection at which two cables intersect (Fig. 43).
17Meek, John L. and Xia Xiaoyan. "Computer Shape Finding of Form Structures" International Journal of
54
Space Structures Vol. 14. No. 1, 1999. p35 - .
55
In force-density method, an initial geometry of the cable net is obtained from sketches (as
prescribing coordinate values to the positions of free nodes and fixed nodes of the cable.
Loading conditions and a desired force-density distribution is then input into the
computer. With the given loading vector and force-density distribution, the computer
program will determine new co-ordinates for the free nodes using linear equilibrium
equation.
An extension of this simple linear shape finding method is developed for conditions
where certain restrictions result in the force density equation to be non-linear. This
extended force density method would have to use non-linear equilibrium equation to
prestressed net where the lengths of the cables in the restrained net are defined to be
constant and yet uniform pre-stressed forces in all the cables are desired. Since
restrictions are placed in both force and length of the cable element, the force-density
equation is non-linear.
Natural shape finding method is a shape finding method used specifically in modeling
cable network, as proposed by Argyris, Angelopoulus and Bichat' 18. This method is
1 Argyris, J., Angelopoulos, J. and Bichat, B. "A General method for the shape finding of lightweight
tension structures." Computer Methods in Applied Mechanics and Engineering, 3: 1974. p 13 5 - 14 9 .
56
programmed to find the length of the unstressed cables for a pre-determined applied load,
In this method, a flat net is first established within the projected plan boundary of the
structural support points, are then given in small increments until these nodal points reach
configuration. For each iteration, the stiffness matrix of the structure and the load is
updated with results from the previous analysis. When the selected nodal points reach
their predetermined position, large elastic strains would have been accumulated in
displacing the net from the flat configuration, resulting in high stresses in the structure.
From this analysis, the unstressed length of the individual cable element, Lo, can be
obtained as:
L+ AL
- + EA
Pd
Where L the original unstressed length, AL is the increased in length from the original
unstressed length (strain at final configuration x Lo) and Pd is the desired prestressing
shape of the structure is approximated, as well as its mass and stiffness. A prescribed
loading and pre-stress in all the cables must also be determined. Through a pseudo-
In this method, the net membrane is first discretised by finite elements and the element's
mass is lumped at its node. Prescribed external load, P is then applied, which excites a
stable and forces within the structure equilibrate themselves, under this free vibration, the
oscillations will die down due to viscous damping induced by the stiffness. In this
method however, initially, the nodal points of the structure oscillate with increasing
residual forces. Residual force is calculated as the difference between the applied external
load, P, and the internal forces in the structure. This force arises because in the crudely
chosen initial geometry, static equilibrium of the surface under the assumed value of pre-
During this dynamic process, the kinetic energy of the system is monitored. When the
peak energy is detected, the process is interrupted. The computation is again restarted
from a rested configuration using the updated geometry (which incorporates the
accumulated displacements). This process is reiterated until the residual forces are
reduced to a minimum. At that, a new configured shape is obtained such that oscillations
A final shape, which satisfies static equilibrium given a prescribed loading and pre-
stressing force, can be obtained using any of the above algorithms. In general, however,
the force density approach is becoming the most accepted method in the industry. Its
conditions such as the restriction of having uniform length for every element.
7.4 Analysis
The key advantage of using computer shape finding program is that the shape results can
be utilized directly for analysis. General analysis of cable net structure requires geometric
This analysis is similar to the analysis method employed in some of the form-finding
techniques.
In this analysis process, it is important that the structure is tested under the different
possible loading combinations. Analysis of the structure under dynamic loading should
also be performed. Dynamic impact of wind (earthquake is usually not an issue in cable
system because of the light weight of the structure) on cable stresses, fatigue and
deflections of the individual cable and the entire structure shall be studied and considered
in design.
59
Cable size is chosen to satisfy the mass and stiffness requirement that is prescribed during
form finding and analysis of a structure. Check must also be done to ensure that the cable
is able to resist the maximum axial stress developed in the structure under the most
severe loading condition. It also needs to be decided whether different cables sizes shall
be used for the different cables according to the maximum stresses experienced, or one
maximum size shall be employed for all cables. Very often, the cost saved in varying the
element sizes is not worth the added complication experienced during the construction
process.
7.5.2 Connection
Three types of connections are to be discussed in this section' . They are cable-to-cable
19 Buchholdt, H. A. An Introduction to Cable Roof Structures. Cambridge: Press Syndicate, 1999. p269-
272.
60
Cable-to-cable connections are used to hold two criss-crossing cables so that they do not
slide against each other. This connection simulates a pin joint which prevent relative
vertical and horizontal displacement between two cables, but does not provide any
rotational restrain.
In order to design roofs with minimum cable dimensions and clamps that are simple to fit,
nets have often been designed with two small-size cables in place of a larger one, as
indicated in Fig. 44. Clamps can generally be classified into two types, one which can be
fitted on site (Fig. 45), and the other which has to be fitted to the cable strands in the
factory (Fig. 46). The prefabricated system is suitable in nets where the lengths of the
individual cable links are fixed. This system has the advantage of being relatively easy to
assemble and erect. An error in the manufacture or assembly of the connections, however,
cannot be remedied on site and will result in difficult pre-tensioning of the structure. This
problem can be avoided by including a number of turnbuckles in the design to enable the
length of the cables to be adjusted. With the addition of turnbuckles into the design,
prefabricated connections tend to be more expensive than connections that are fitted on
site. In cable net where cables are free to assume their positions under the prestressing
force, cable to cable connections need to be fitted on site, after all the cables have been
pretensioned.
61
Figure 45: Fit-on-site cable clamp connection. Figure 46: Prefabricated and factory installed clamp.
For nets in which only two cables intersect at each joint, clamps of the types shown in Fig.
47 and Fig. 48 can be used. Where the cables are attached to edge cables, special clamps
Figure 47: Single U bolt connection for cable net Figure 48: Double U bolt connection for cable net
62
Figure 49: Detail showing clamp for connection of interior net cable to edge cable
Cable-to-frame connection is employed in cable beams and cable nets with self-balancing
structures. As the name suggests, it forms the connection between a cable and a rigid
connections, both cable termination sockets and connection between the cable and the
Cable termination sockets are steel casting fitted near the end of a cable to hold the
strands in a cable together (Fig. 50). The external shape of sockets can be varied to suit
individual design requirement, but for each shape variation, the basic dimensions of the
socket cone or basket will remain the same for a given size cable. Generally, the length of
the conical basket is approximately 5.5 to 6 times the cable diameter and the diameter of
The clamp connections between cables and frames need to be well designed to ensure
that the value of the pretension in the cables is maintained. These clamps may come in
many forms, but irregardless of their physical look, they must satisfy the following
requirements. The clamps must provide sufficient frictional resistance to ensure that the
cables will not slide out. Any slight sliding of the cable will result in the loss of
pretension and lead to floppy structures. If the cables are protected by sleeving, the
connection should be designed so as to prevent moisture from penetrating into the cable
should the sleeve be damaged by the clamping. In cases where the cladding is supported
directly on the cables, connections should also be designed in a manner as not to interfere
with the cladding. Figure 51 shows a typical clamp connection between cable and steel
frame while Figure 52 shows that between cable and a concrete column.
(a)
Figure 50: (a) Socket terminal with pin connector (b) socket terminal with screw terminal.
64
Figure 51: Attachment of cable with socket Figure 52: Attachment of cable with socket terminal
terminal to top of steel column. to top of concrete column.
Tension anchors are used to hold cables to the floor when forces from the cables need to
be transmitted directly to the ground. Anchors may be adopted in both cable beams and
nets.
There are many different types of tension anchors, each of which is suitable for a given
ground condition. The commonly used anchors are gravity anchors, plate and mushroom
anchors, ground anchors and tension piles. Gravity anchors work by using the dead
weight of the anchor to balance the vertical component of the cable forces while the
ground balances the horizontal components (Fig. 53a). Gravity anchors are therefore
bulky, but they may be used in soil with poor force resisting properties such as gravel and
sand or fine sand. Plate, mushroom and other footings rely primarily on the weight of the
soil to resist the force from the cable (Fig. 53 (b), (c) and (d)). Compact soil condition,
such as that in clay, is thus necessary to provide the necessary weight. Ground anchors
65
equilibrate the upward thrust from the cable through shear frictional forces between the
anchor and the soil while the horizontal pull is resisted by the weight of the soil (Fig. 53
(e)). This anchor is thus suitable for use in soil which provide good amount of frictional
resistance such as earth which contains much granular material or clay soil. Tension pile
resists vertical force in the same way as ground anchors. However, the horizontal thrust
in this system is resisted by the friction between soil and another tensile pile which is
EI
W (a) (b)
(C)
(d)
Ce) C'4
Figure 53: (a) Gravity anchor, (b) Plate anchor, (c) Mushroom anchor, (d) Retaining wall anchor,
(e) Tension piles and (f) Ground anchor.
66
7.6 Construction
Construction is viewed as the most difficult process in the building of a cable structure.
Since detailed construction process of each cable system has been described earlier, this
section shall highlight the reason behind the complexity in the construction process -- the
intricate prestressing procedure of the cables. This intricacy does not lie in the physical
prestressing of the cable but in figuring out the prestressing sequence of the structure. In
fact, the pretensioning of a single cable can be simply done by pulling its ends using a
special jack. Figuring out which cables to be prestressed first is not so easy. The
prestressing of one cable may affect the tension in another cable. It is thus important that
the correct sequence of stressing is carried out if the structure were to have the desired
prestressed state. In a complex cable net system, analysis of stressing sequence using
computer software needs to be carried out, to assure that various components of the
8. Conclusion
Cable indeed makes for an effective wide span system. Not only does it carry loads
through axial stresses, which utilizes all of the cable's cross section, the high strength to
weight ratio of cable also means that its strength is fully utilized to carry applied loading
rather than its own dead weight. Beside its mechanical properties, cable is equally desired
for its aesthetic appeal. The lightness of the cable gives an expanded impression of space
and its characteristic curvilinear form provides a fresh alternative from the orthogonal
box buildings.
Although all cable systems are effective for wide span, each system has its own distinct
characteristic which may make it attractive for certain conditions or more suitable for
particular architectural applications. Simply suspended cables, though rarely used today,
may still be employed if budget is tight and the restriction on the roof deflection is not
stringent. Cable beams are attractive for its simplicity, low cost and ease of construction.
It is also best suited to sites which are orthogonal in plan. Pre-tensioned cable net is loved
for its anticlastic shape. Net hung from masts is also especially popular in Middle Eastern
countries because of its similarity in form to the native vernacular tent structures. Straight
cable net system, which has the same spanning capability as traditional cable nets, may
be favored for its relatively simple erection. And tensegric shell is the best system to be
The method for designing each of these cable systems is different, but the approach is
very similar. A general procedure in the design of a cable structure would be to first
desired results are obtained from the analysis process, elements and connections of the
cables can then be designed and constructed as suggested by the analysis results.
69
Bibliography
Argyris, J., Angelopoulos, J. and Bichat, B. "A General method for the shape finding of
lightweight tension structures." Computer Methods in Applied Mechanics and
Engineering, 3: 1974. p1 35 - 14 9 .
Burkhardt, Robert. "A Technology for Designing Tensegrity Domes and Spheres" 29
April 2004.
<http://www.channell .com/users/bobwb/prospect/prospect.htm#sec:intro>
Campbell, David M. "The Unique Role of Computing in the Design and Construction of
Tensile Membrane Structures" American Society of Civil Engineers, New York. I
May 2004 <http://www.geigerengineers.com/techpaper.cfm?RecordlD=2>
Gill, Colin, Lidell, Ian and Schwitter, Craig. "Straight Tensioned Cable Roof Structures"
IABSE Symposium Birmingham, 1994. p2 2 1 -2 2 6 .
Goldsmith, Nick. "Material for the New millennium". Widespan Roof Structures.
London : T. Telford ; Reston, VA : Distributors for USA, ASCE Press, 2000.
Liddell, Ian. "Creating the Dome" The 1997 Royal Academy of Engineering, Hinton
Lecture. 29 April 2004. < http://www-
g.eng.cam.ac.uk/mmg/newsandfeatures/liddell/domelecture.html>
Liddell, Ian. "Large Environmental Enclosures, the Roof of the Millennium Dome"
Widespan Roof Structure: London : T. Telford ; Reston, VA : Distributors for
USA, ASCE Press, 2000. p14 9 - 158 .
Meek, John L. and Xia Xiaoyan. "Computer Shape Finding of Form Structures"
International Journal of Space Structures Vol. 14. No. 1, 1999. p3 5 - 54 .
Schlaich, Jorg and Bergermann, Rudolf. "Conceptual Design of Long Span Roofs."
IABSE Symposium Birmingham, 1994. p1 3 -2 4 .
Vilnay, Oren. Cable Nets and Tensegric Shells, Analysis and Applications. New
York: Ellis Horwood, 1990.