AR2019 MRCB Building System
AR2019 MRCB Building System
INNOVATION MRCB has innovated the MRCB Building System (MBS), which HOW DOES MBS WORK?
combines a Prefabricated Prefinished Volumetric Construction
@WORK (PPVC) system with our patented and unique Candle-Loc
The Candle–Loc system is MRCB’s proprietary joint
connection system, which consists of a stainless-steel
Connection System, allowing up to 90% of a project utilising ISSUES IN THE MALAYSIAN CONSTRUCTION INDUSTRY ADVANTAGES OF MRCB BUILDING SYSTEM pin and a cast iron lateral tie plate used in between
this technology to be constructed offsite, then transported each module to set and lock each module in place
and installed into position at site. both vertically and horizontally.
High Productivity & Quality High KEY DIFFERENCES BETWEEN TRADITIONAL CONSTRUCTION AND MBS
75% – 90% of works done offsite in a Significant High Quality Lower Faster
Dependency High Incidence Harsh Working High Material Delays and Cost Skilled Local Improved Lower
controlled environment, resulting in much Environmental Assurance Environmental Construction
on Foreign of Defects Conditions Waste Overrun Labour Site Safety Material Waste TRADITIONAL MBS BENEFITS OF MBS
higher productivity and lower defects Impact & Control Impact Time
Labour
Construction can only Minimal work done onsite,
Reduces Labour
begin once the site is excavated
and the foundation is completed
while modules constructed
concurrently offsite
30-50%
faster project
Reduce labour Challenges Advantages Onsite development Only the foundations, lift core delivery
requirements by 30% must be completed before and central core is built onsite
construction of building begins. following conventional
construction methods.
3D work is Dependence on Extended Conventional Inefficient Managing Less Higher quality More conducive Less noise, dust, Shift towards Fabrication of
unappealing for manual work exposure to construction material extensive dependency control at the working truck and other manufacturing building
Currency outflow High costs to Increases the Risks of Higher project Extended project Higher Good reputation Lower worker Minimal Improved Faster cash
to origin resolve product probability of HSE compliance costs duration with participation for higher turnover disruption to accuracy generation and
and improved quality products the public and of material reduced funding
POSITIVE IMPACT TO STAKEHOLDERS countries defects related incidents related costs high risk of
and delays Higher waste financial loss wages for local Lower costs due community planning and costs MBS Prototype at
workforce Lower cost and to reduced fines usage our Kwasa site The living room The kitchen
Low productivity Extensive fines disposal costs i.e Liquidated
and stop work Reputational Ascertained higher margins and stop work Improved HSE
PUBLIC & SOCIETY
Minimal/no skill orders for HSE risk Higher risks of Damages (LAD), Higher resulting from orders standards Lower costs due
• Enhances socio
economic growth retention within violations breach in additional workforce skill lower defects to energy and THE MBS PROCESS
GOVERNMENT the local environmental resource levels facilitate Aligned to resource
WORKFORCE • Faster speed of construction,
resolving affordable economy laws deployment continuous sustainable efficiency
• Provides faster delivery • Enlarges pool of local
housing supply issues technology practices
times for home buyers talent with improved 2 CONSTRUCTION
wages and quality of life • Enhances labour productivity High industry adoption and Reduced risk of Onsite
• Offers higher quality and choice
of homes for the public and creates a new supply
defect rate innovation pilferage • Site clearing/earthworks 4
• Reduces dependency 3
chain within the 1 • Foundation works which INSTALLATION
• Provides design flexibility on foreign labour
construction industry includes piling TRANSPORTATION Installation
to meet consumers’ • Higher degree of technology DESIGN MODULE • Build lift cores and lift lobbies Prefabricated of modules using
requirements and Design the
integration eliminates the Offsite and prefinished Candle-Loc
demands modules
perception of “dangerous, depending on • Fabricate and assemble 2D 3D modules System, i.e. set
dirty and difficult” (3D) jobs, sheets of materials, panels and are transported and lock the
requirements
elevating the status of the frames into 3D modules to site modules into place
construction sector • Install mechanical, electrical with precision
and plumbing
• Install furniture, fittings
and fixtures
12 13 14 15