0% found this document useful (0 votes)
37 views7 pages

Test Case

...

Uploaded by

Janhavi Hude
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views7 pages

Test Case

...

Uploaded by

Janhavi Hude
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

List of Practicals

1, Identify sstem specification and design test cases for purchase order Management.
V Ans. :
TC_ Id TC_Name Steps Input Data Expected Result Actual Result Status

TC 01 Item name Enter item name in alphabets "prd1" Product name should d it pass

be accepted

Enter item name in number 20 Product quantity should Accepting pass


TC_02 Quantity
be accepted
Product name should| Accepting pass
"prd1"
TC_03 Item_Cat Enter item name in alphabets
be accepted
next page pass
Click on submit button It should go to next page It is going to
TC_04 Submit
Pass
It should remain on|It is remaining on the
Cancel Click on cancel button
TC_05 same page
same page

management.
design test cases for Inventory
2. Identify system specification &
Actual Result Status
V Ans. : Expected Result
Input Data
TC_Name Steps Accepting pass
TC Id Product name should be
Enter item name
"prd1"
Item name accepted
TC_01 in alphabets pass
Accepting
1000 Product quantity should be
Enter item name
Quantity accepted
TC_02 in number pass
Accepting
Product name should be
available
Enter item name
"prd1"
ItemCat accepted
TC_03 in alphabets pass
It is going to next page
It should go to next page
Click on submit
Submit
Pass
TC_04 button remaining on the same
should remain on same|It is
It
Click on cancel |Page
Cancel page
TC_05 button
Tech-Neo

3.TC_3 No. Ans. Design


:Mtest3.
ions...here TC2 2 1
TC_1
Case-ID Software
Test

calculator n andtheinteger
digit resultdisplay
teon twmultiply
o To suberactTo
cases Testing
result
teno0 anthde
display
calculator
digit integerwo digit resultdisplay
calculator tenon theintegerand addtwTo
o
Objective
case
Test
for
(MSBTE-Sem
Authors simple
Switchedon
inspire Calculator
is1. SWitched on
Calculator
is1. Switched onPrerequisite calculator
Calculator
ianovation 5-Comp)
3. 2. 3. 2 is1. application.
3. 2.
-9999999999To
+999999999 inieger
from
operand,
valid a Key +9999999999
Key 9999999999 integer
to
-from Key
+999999999 integer
from
operand,
valid a Keyoperator
Key in
+9999999999 integer
from Key 9999999999
+999999999 integer To
-
9999999999To 9999999999 to foperand,
rom valid aKey+9999999999
Key
-9999999999 tofrom Key
integer
in in
in
operator in in in Steps
a in
operator in (BB L2
second second a a
valid second Testing)
x valid valid
+
100 135 135
x dataInput
40040000 100|35(subtraction, - 100235(addition,
+
exponential (multiplication,
form) expressed aboveten
inwillbe form) expressed
exponential in willbe
above
digitsten form) expressed
exponcntial in wil be
above
digitsten
Expected
Result
digits

A 40000
SACHIN 35 35
Remarks
StatusActual
Result /
SHAH
Pass Pass Pass
Venture

4. 4 |No.
CaseId MAns. : 6 TC_5 5
Publications.Nea TC_5 TC_4 TC_3 TC_2 TC_1 Test TC_6
Design TC
4
Case-D
Test
journey return
Dateof journey
DateofPassword
field Password
field test
Login
field
Objectives Test
case cases one
digits
oneby
deleteTo Screen clearthTo
e calculator
digit result
display the anddividetwoTo
tenoninteger
Objective Test
case 5-Comp)ng
(MSBTE-Sem
for
railway
journey
return
date Date the Date password
Invalid password
Valid (abcd
xyz) Any |switchedon
Calculator |Calculator
isPress
switchedon C switched Prerequisite
on
Calculator
current
date reservation
form
greater format valid Input
Data
login is is
than not
before name Press 3. 2. 1.
the
<- +999999999
9999999999integer
Tofrom
-operand, Key9999999999integer
valid a Key+9999999999 to- Key
It ItWrongShould
password password
acceptnotaccepted
should Valid
be login
name It (backspace) Steps
should should
accept in in
should Expected
Result in
operator
second a
accept from valid|
accept /
date 100/25
the data Input

Message Successful
Accepted Accepted login message
login The right
hand
sideleted
de frombe
shouldOne Digit
One SCreen
appearSymbol_0*
shouldon exponential
form) 40(division
expressed in ten
above40
or login digits
Actual
Result Expected
Result
wrong
displayed name will
password is be
accepted
as |
SACHIN A appear
screen on s
handside right |deletedDigit is
from SymbolPass
0* Remarks
ResultActual
Invalid| Practicals
Listof
SHAH Pass
Pass
Pass Pass Pass Pass Pass Status Status /
Venture
Tech-Neo |Ready Ready 6. V 5.
TestMAns. >
status TC_04 TC_03 TC_02 TC_01 IdTC
nameTCAns. :
Design Design
...Where Software |
test Cancel Submit Passwod
name
test
User
1838-2 ANONYMOUS
1838-1 cases cases Testing
Req.
Ref.
for for
(MSBTE-Sem
Click 2alphanumeric
1. 0-9 A-alphanumeric
Number
alphabets O-9 A-Z, Enter
Z, EnterNumber
alphabets
Web e-commerce
onClick After
password valid
Authors Pages
|Homepage
desktop | desktop cancel the the
Homepage Page/Area on
Steps 5-Comp)
inspire Testing submit (Flipkart,
button username
usernameand password
innovation button
any
4. 3. 2ActionsScenario
1 header
links.
: on Amazon)
3 2 1Scenario:
Test hero's. 5.
Web
slide.Clickrotate.Click
autorotation.
View
Conditions : (navigation ClickClick
Click
submit. Enter 1Con.Clickdropdowns. logoon in"abc123"
in
Sites "abc123" L4
: Input
data login
on on
User aon on User
arroWs Register on Scope
links
search
magnifying views form
views
links)
main
within to term link. links and th loginin It
fieldsblank
page
wiremain page
nexttogoespassword
should It the It the
should
accept It
manually carousel should username Expected
clicks result
and glass and nav
each should accept

auto-rotates
carouselverify search/resultssearchpage.register
page. registration /design.
content
user takemain verify t It
username
links.all autorotation)
verify tocarousel selecting
side refreshed content/design
user with It
blank
fields page password
represent to shows is Actual
Result
moves can takes
link those nav Expected
result going is is

marker arrow login


manually user takes
sections. and to accepted accepted
cach
location to
(page to dropdown page next
(black user
slide)
to to Status
backneedsrotate Pass Pass Pass Pass
the bar
right under to links
to be by

I
Tech-Neo #include<stdio.h>Program inC
#include<conio.h>
main()
Switch...case
: Do...While
Ans. If...else Loop 1)following Write
statement.
4) 3) 2)For...
printf("nln'"); i=l; printf("n
scanf("%d",&n);
while(i<=n) if(n<=10) i=l; n,i,kint ;
cations..... it+;
printf("t%d"i); program ere
Enter Testing
Control
a and(MSBTE-Serm
number
Where
design
and
Authors upto
10 decision
making test 5-Comp)
inspire :");
cases
innovation
for
the
L-5

do
case 2:break; case l: (k) ; number'
printf(n
switch printf("n
Invalid); else }while(i<=n);
}
printf("Invalid");default;printf("Three
eetch): break; "); case 3:printf("Two
break; "); printf(°One"); printf("\1%od"i);
i++;

Enter

number a

l
to3:");

Practicals
Listof
Venture
SACHIN
SHAH
ublications,
Tech-Neo 8
Scope1.2 1.1
Introduction 1. M
testingunderstand
which testing The Functional testing, Overview Ans. : Prepare
application test Software
Managers whole resources A
Test
scope TC_02 TC_01
aones testing est Plan TC_05 TC_04 TC_03 Testing
Manager are what process.
of Test orrequired. strategy, is
out work a plan (MSBTE-Sem
features Plan Testsprocess document
Authors
Where must of A Its
scope. projectdefinedis you
Engincers.
objectives, for
and can and main
take which an NameTC
To
functions find usedpurpose Switch_
Enter
case Do_while Else 5-Comp)
For
innovation
inspire into
determine team at here. mostly effort,
describes identified
the The
consideration beginning
theof is
should
to
the be example byschedule to
a 1-3number 10 Enter
number number
10 Enter number
10 Enter 10 Enter
number
tested guide scope Mobile Steps
scope Project
clearly and L-6
the of and of the of
References13
14
Data Input
specification,
Commonly, plan Thisrequirements.project 2 5 20 5
explained Acronyms
All
SLC QMS DDD documentation.
t design system project
requirements
he specification plan andsection
Two Print
to5 I Printto5 1 Goaccepted be Expected
Accepting
Number
should Result
acronyms can in
- - - and and among contains
SoftwareQuality Database be else
described.
Abbreviations
referred part
which them
Management the
life design
For aredocuments budget
cycle. are during Two Printing Printing else
part
Shifting
:
documentexample, ResultActual
..A used
System the which and l
SACHIN I to Listof
in testing to ir
Test 5 5
SHAH support customer's pass StatusPracticals
pass pass pass
Plan process. pass
Venture
are test

Criteria
Entry
2.1.2 2.1.1Testing
Objective Unit2.1 2.
Logging
2.1.4 Criteria
2.1.3
Exit
Tech-Neo 2.2.1Testing
Objective System2.2
Test
Developers performance all all a all testable
planning manually, method.of unit, every The Software
integrated.
been compliance
encounter
requirements. Testing.System mustdefects
reported. be unit
ublications.. theplanned functional the main Plan
testing an
single
bugs units application.
Sometimes,engineer objective Testing
Thetesting are phase but and
issues test environment unit
of related Reporting
fix Tests
and offound requirements are more
objective key cases has Strategy
During the available operates (MSBTE-Sem
which an is have been often can of
Where defects
to modules covered
been
have Unit it
integrated generally been can take unit
of other finished automated
Authors appear this System has have as
found reviewed
has been
testing even a testing
intended.
stage modules function, 5-Comp)
inspire conducted been been be
whenapplicationTesting in set is
testing can the to
engineers each tested. up. defined
nnovation the and be procedure For verify
whole
is unit. is
conducted a
system toafter units, applied.
with
evaluate If module separatewhether
usually
has Unit they these or
its L7

2.2.3.4 Usability
Testing
2.2.3.3 Interrupt
2.2.3.2 Performance
to: Testing
2.2.3.1 2.2.3 Procedure
Testing
2.2.2
thereDuring user's Usability
testing is
application bemessage, functions,
interrupted
stoppedwas warning,
without As Performing executions
reporting. test cases
bug preparation test
and uninstallation,
quickly
not launching the Types
suspended far utilization
connectivity
network power
consumption
memory
require application Installation betweenoperating
applications
switching
leakage.
memory
point
installation
are inserting other as of
much process. of is by thmobile
e testing System
correctly. any and Testing in
has and and view. easy appsvarious work the
time afterward a is Testing
been issuestesting,Launch
The updating to unsaved
losing cable,
data. notifications, devices background conducted
as applied
check to reasons, of
Closingthe
well.application use
installed,
during an and launched etc. the
have
ofengineer testing e.g.,
The application to
the understand
fromthe detect
SACHIN A an application mail, an a Practicals
Listof
application mustapplication. the from huge
engineer checks upcoming issues
whetherthe low
SHAH installation, the
be
whether placeshouldmemory may range related
Venture shouldloadedchecks Once call,
it be of
Tech-Neo
ications.
3.
helps information
provided: is
A for
Schedules
Testing Report
Test24 Conditions
PassFal2.3
test For
Regression
2.2.3.7
testing Security
2.2.3.6
testing Functional
Testing
2.2.3.5
formalRepart
Test described.and release.
existing verify been vulnerabilities
schedule
to stepslocation
bug description
bug bug each All Regression Secarityspecification.tested All
monitor thetesting
application the
status way. done the Software
to issuenumber conditions wbether
one. to
reproduce hardware Ithelps beforetesting testing functions
verify
Autbors
inspire
Where
the is (open, that
of should It Testing
elaborated name is a and
process.
testing has tests is whether
to when also new the is prevent
an fixed, been cases and andcontain conducted and(MSBTE-Sem
summarize a
issue. softwareoverview tests conducted code
functionality
re-execution features
by etc.) encountered, private they
executed/passed/failed. :
pass
changes
Project to operate
environment testing after data find of
innovation or
the 5-Comp)
Managers fail has Its of
the a losses. the according
activity are new purpose tests
affected application
following application
defined product that
and in is had to
a the to the are
L8
Criteria
Exit5.2
-

Criteria
Entry5.1 5. Assumptions42
failed the tests all test testdevelopment
requirements
application : Risks4.1 4
Entryobstacles teststesting
readyfor all testing allrelease all allsystem about cach
rate necessary The
Assumptions
Risksand
cases environment design necessary documentsbugs-blockers"the
test and schedule release schedule.
delayschanges
in inbeenavailability
requirements newdevicesof
of team
time in bugs implemented following
cases tests are for
and Exit testing plannedfeatures
executed resources have phase
equipment found is
are cases tests is are accompanied
has Criteria
not been has reviewed
activity. in and risks
passed been plan up-to-date arreceive
e features
related are defined been advance
have fixed modification exist
available. set and
is upbeen finished high by
satistactory,
to in tools before and while
cruclal
and and priority a
created
approved
case
their note
are delivered the testing
there with which
functionality provided next impact
e.g.,
information
are software have a
Veature 95% to on mobile 11Icals
any and the the not

blications...
Tech-Neo Engineer
Test8.3 Lead
Test8.2 Project8.1 8. 7. estimate 6
and Test planning Test
reporting. resources.
necessary
considerstesting Project Commonly,
defined Roles Roles TestMetrics
Test critical tests
Responsibilities and special Each
Logging
execution the Software
Engineer Lead testdesign
effort.
total effort coverage
tests theirnumbernumber cases
test
requirement
coverage metrics results
process. and found testing defects
Manager
Manager tools
process, and
is budget responsibilities
the
Tests priorities haveTesting
as is responsible and issue of of effort. are have
well
responsible He/she is
roles
divided applications. defects tests quantitative been
.Where
test and (MSBTE-Sem
andresponsible should and executed The been
as are accepted
Authors issue activity approves Reporting severities) found
time as
among on most fixed.
for follows be
reporting. for the (taking mcasures
inspire collecting
monitoring for properly common
tests terms, all project 5-Comp)
managing
test : the
nnovation into
case documentation, project must reported metrics which
requirements, provides
and consideration
preparation and the be
project whole clearly are: help
stufi. using
to L-9

editor.
basic
text V 9. Deliverables 9.
Ans.:based)Design
standardVerifynotepadVerify FollowingApplication.
keyboard. Window The
deleteVerify Verify Verify Verify
buttons. save
file.
thVerify
e notVerify Verify Verify Verify theVerifysymbolsVerify
keybaord Verity
loaded specifications. summary
report.
test results
test documents
strategy
test cases
test tests
plan list
that that that that that that that that that that that that that editor that test of
on testing
are
user user user user user and file user user user by
notepad
user
user
usershould on plan
default launching test
can can doesn'formats
t can can can deliverables
can can can can
can scenarios and
select select, select, openset save editor can
delete append the type open
corupt the
type write/type test
not any the
and cut copy font font
window. numerics with the
a text for cases usually
text delete text permitted
the exiting special notepad
..A and size size its
and in notepad
using paste to
application. a and default for
SACHIN any is alphabets contains
a paste file file. normal characters from Practicals
Listof
text. by in family. application, Notepad
backspace text. file or
SHAH text. size.
notepadnotepad. a
any
and or standard from
Venture again as other (MS
per and the
and are a
blications
Tech-Neo
TC_04|Exit|TC_03Save TC_02|Open TC_01
NewTC_Name
TC_Id|
clickingVerifywindow. Verifywindow. VerifyVerifymultipleVerify
charactersVerify option.Verify Verify file. usingVerify usingVerifySoftware
textVerify mouse
Testing
the
that that that that that that
the that that that characters that that arrow
user and
cross user user user user user userpointer. user user
user user words
Click Click 3. 2.Open 1.
application 3 2.Open 1.
application can can can can keys.
can
. icon. can can can (MSBTE-Sem
Where can can resize and can
File browsefile Select
Fileequired
Click menu Click
Select
New through redo undo edit
navigate navigate
close maximize wordsscarch scarch and
Authors on on minimize the any any
’ ’ "Open" Steps
File File the notepadthrough the latest delete through through
Exit Save and for change 5-Comp)
inspire Menu Menu file.
cditor the the single change data
menu window. the replace
ianovation notepad
undone in the the
notepad file.
and
window or done between text text
single multiple by
File File
name in in in
name
File File editor editor undo file. file
by or the file
location Input
Data L-10
location

We
and| and
menus.
SimilardyActual Expected
new, scenario
Test : Test Eg.:
case
coresponding For Bach Help 5) application.
test file menu 3) File1)

the case and of Fornmat can


Exit saved
editor
from Existing
opened
shouldbe opened New and Menu
Existing Result cursor these
Expected
Result we
notepadResult No.
hit write
blank The
can : : blinking on to :menu
selected
mnenuTXXXX
Notepad should Validating
option Validate basicnumber
file file : new,
relevant
validate if has
4Y 2)
must must file onthe submenu. concept
successfully open menu the result. the View Bdit of
file|Opening beOpening
pass
New notepad
beSaving for blank top is test
File click to
selected
File Status
Actual
Result is right Say
A
Exiting
editor File submenu
other
and
fileopened should validate cases
SACHIN opened corner. if of Practicals
List of
cursor.
and you cach on
selected| mnenu
SHAH and open
Irompass new open notepad
hit blank menu :
Venture pass file.
pass file
on

Ans. :V 10.
Publications.
Tech-Neo VAns. : 11. Prenare
software
Prepare

defect
defect Testing
report
ReleaseProject (MSBTE-Sem
report Remarks
Severity
Defect Expected
Attachments Actual StepstoSummaryDetectedModuleVersion
Description
Replicate
Results Result
.Where
Assigned
Fixed Status To Priority
Reported Defect
By after
ReleaseProject after
Actual
Result
Description
Replicate
Stepsto SummaryDetected ModuleVersion Version
Build executing
ID
Authors Build
executing 5-Comp)
Version
inspire Build D test
test cases
innovation Version Bel Management
Library
1.1
KunalMr.B.Pr-29 Must Bv.jpgShouldbeError Enter Only Book
accepted Booked
cases 1.0A Ss001 RahulMr.S. for
accept alphabetsareedition library L-11
Withdraw 1.1 ATM for alphanumeric
value
above Bank
ErrorEntered
mount Not WI Withdrawn
alphanumeric is management
accepting not
allows
accepted,
numbers
not
accepting
Lbl
upto amount of
Al amount value system.
25000 alphanumeric
10000 greater
at from
a
time than ATM
values
10000
Machine.

Listof

A Practicals
SACHIN

SHAH

Ven.
Teeh-Neo
12.
Ans.:Prepare
tions..here Software
delect
Testing
report
(MSBTESem
AtachnentsExpected Result Description
Replicate
Resalts Actual Rclcase Project
Siepsto Summary Detected ModuleVersion afler Build Status
Fixed
Version
Fixed AssignedReported
Build Status To By Priority DelectRemarks
DelectSeverity AssignedReported
To By Priority DefectRemarks
DefectSeverity Attachments
Expected
Results
Authors
executing
Build ID
5-Comp)
iaspire Version
Version test
innonation
cases
Mr. KunalMr. B.Pr-56 check ig1jpg ShouldAccepted Entered
Please blank Acoepting
value Shouid LILogin Login
Form L0A Ss001 RahulMr. S.KunalMr.B. Pr-14
10A Ss001 for MustAtml.jpgacoepted
Shouldbe
Rahul S. any L-12
not not acoept
be accept blank
login
acoeped form. value
user
blank
LI upto AL
name
value 25000
for
user
name

A
SACHIN
Practicals
List of
SIHAH

Veature

Ans. :V 14. TC_04


Exit TC_03
Save JdTC_Name
TC_01|
New TC 13.
Tech-Neo TC_02
Open |TC_01|New 02|OpenTC_
TC_04
Exit TC_03
Save TC Ans. Design
:
Design Software
Testing
Id|
Publications.
TC and and
Name run
run
Click Click 3. 2. Select3.
2. 1. test
test application
Open 1.
Where
|Click |Click 3. 2. 1. 3 2 1.
browsefileSelect Click
required application
Click Open
(MSBTE-Sem
cases
application
Click Open "New"
Select
menu application
Click Open cases File File
File requiredfile
File "Open"
andSelect
menu
Authors ’ ’ on on for
’ ’ on on Steps for "Open" "New"
menu Steps
File File
inspire Exit Save File File MS Exit Save WordPad5-Comp)
Word Menu Menu
browse Menu Menu
innovatioa menu
and File application (MS
and File Existing
location Input
Data and
File
location
Fle name
File File name
Fle File Windows
name name Input
Data
using location location L-13

Exit saved
editor
from Existing file opened beNew based).
an
should Expected
Result Automation and| and
blank Using
file editor
from
Exit Existing
Saved Existing
opened
shouldbe opened New
be
opened file an
must selectedOpening
selected
File blankExpected
Result
Automated
Tool.
must file selected
be file
Exiting
editor
from Saving Opening must
must
Actual
Resuit tool.
be file beOpening
selected New Exiting
editor from
pass Saving
File Opening
selected
File File
-A ResultStatus
Actual
File
SACHIN File
selected PracticalsListof
New
SHAH Ends..
Lab
pass pass pass Dass Status
pass pass pass
Venture

You might also like