The Implementation Methodology Model - Handout

The Implementation Methodology Model_Handout
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views5 pages

The Implementation Methodology Model - Handout

The Implementation Methodology Model_Handout
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

UiPath

Automation
Implementation
Methodology
Fundamentals
The UiPath Implementation Methodology Model
Stage Roles Involved Key Task Output

• Solution • Setting up the overall • Reviewing and


Architect expectations of the project signing off the
SOW
• Project • Conducting early RPA
Manager readiness discussions • Setting up
about communication
Kickoff
• Infrastructure cadence
Engineer − Client’s environment
and infrastructure • Completing the
customer readiness
− Test and dev checklist
environments
• Initiating the Issue
− Test data/test cases Tracker

• Solution • Assessing potential • Verifying the


Architect automations for their automation use
complexity and feasibility case
• Project
Manager • Validating the estimated • Confirming use
timelines and efforts case alignment with
• Business required for successful contract
Analyst delivery expectations
Business Case
and Technical
Validation • Validating the business
case for the selected use
cases and the Cost-Benefit
part of it

• Identifying the key


complexity, technical
dependencies, and access
to key applications

• Solution • Analyzing the chosen • Defining and


Architect process in its as-is state finalizing the ‘to-be’
and drafting the PDD process
• Project
Manager • Identifying the degree of • Completing and
Process automation approving the PDD
Analysis • Business
Analyst • Streamlining the business • Creating and
flow to the ‘to-be’ process approving the UAT
plan
• Filling in the PDD with the
as-is and to-be processes

UiPath Implementation Methodology Model 2


• Solution • Designing a future state • Completing the SDD
Architect flow and mapping out the document
modules for automation
• Project development • Completing the
Manager Application Tracker
• Using the Application
• Automation Tracker to record access • Completing the
Solution Developers required by the developer to Technical Testing Plan
Design build and run automation in
UAT and Production

• Preparing the Technical


Testing plan encompassing
UAT scenarios, functional
testing, and system
integration testing

• Solution • Creating the modules • Building the automation


Architect outlined in the design
whiteboard using the PDD • Completing Unit and
• Project and SDD Integration Testing
Manager
• Reviewing and making • Completing code review
• Automation necessary changes to the
Developers code • Executing the Technical
Testing plan
• Testing and running the
modules individually in
controlled settings

• Executing the Technical


Development
and Testing Testing plan after
Development and Unit
Testing

• Creating automated tests


for functional testing to
confirm large functions work
independently

• Completing the end-to-end


test for system integration
testing

• Running all UAT test


scenarios

UiPath Implementation Methodology Model 3


• Solution • Conducting UAT in • Executing UAT Test
Architect coordination with the Cases
Implementation Team
• Business • Signing off client
Analyst • Running all the potential business team test
happy-path and business execution
• Project exception scenarios
Manager • Completing the
• Ensuring all agreed-upon Runbook document
• Automation scenarios are tested
Developers
• Logging any defects/bugs
and having them fixed

• Creating a Runbook
document template with the
following details:
User
Acceptance
Testing (UAT) − System architecture

− Production
environments

− Operating instructions
for automation

− Instructions to the
Operations, IT, and
Implementation Team

• Adjusting Runbook during


Hypercare

• Documenting the Runbook


template for every
automation

• Solution • Migrating the final process • Revising the Runbook


Architect packages, libraries, and document
assets to the production
• Project Orchestrator • Completing production
Manager bug fixes
Deployment • Identifying and addressing
and Hypercare • Automation issues quickly using
Developers Hypercare

• Running and reviewing


production cases using
Hypercare

UiPath Implementation Methodology Model 4


• Fixing issues promptly and
re-pushing to production

• Initiating knowledge transfer


during Hypercare

• Solution • Confirming conformance of • Checking and


Architect all services are made as signing off contract
per the contract completion by the
• Project client
Manager • Carrying out the handover
process for long-term • Initiating knowledge
• Business support of the developed transfer and
Project Analyst automations document handover
Closure
• Infrastructure • Checking and closing
Engineer financial loops

• Automation
Developers

• Client Team

UiPath Implementation Methodology Model 5