IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
Abstract: The first impounding process in the foundation pit of an arch dam will lead to stress
redistribution, and the working state of the dam needs to be reanalyzed. Taking the Wudongde
Arch Dam under construction in China as the engineering background, ABAQUS finite element
analysis software simulates the dam stress distribution and transverse seam opening of
Wudongde Dam under four different impounding elevations. According to stress distribution
and the opening degree of transverse seams, the optimal impounding elevation with the most
negligible influence on the joint grouting process is determined. The simulation results indicate
that the pressure generated by impounding will increase the dam deformation to the downstream
river and banks. The maximum compressive stress of the upstream dam heel and the maximum
tensile stress of the left and right arch abutments would decrease to some extent after impounding.
The transverse seams have a tight compression tendency after impounding, and this tendency
increases as the water level rises. According to the simulation results, the working performance
of the dam is the best when the elevation difference between the impounding elevation and the
joint grouting elevation is 36 m. Timely impounding is beneficial to the stress state of the dam
and joint grouting process during the construction period.
Keywords: Impounding; Dam deformation; Stress distribution; Transverse seam opening
1. Introduction
Developing hydropower is of great significance for reducing carbon emissions and promoting
sustainable energy development. There are abundant hydropower resources in Southwest China, and
several super-high arch dams are under construction. The first impounding process has a negligible
impact on the stability of dams (Akhtarpour and Salari, 2018). Whether the dam can keep a stable
working state and the dam construction process can be fully controlled are closely related to the
construction quality and safety of the dam. Therefore, the research on the actual working state of the
dam during the impounding process of the foundation pit has essential engineering significance (Zhang
et al., 2019). Many scholars have studied the working behavior of the dam during the first impounding
period.
During the impounding process of the dam foundation pit, the upstream and downstream water levels
vary frequently. The gravity effect, hydrostatic pressure effect and uplift pressure effect caused by the
additional reservoir water load would affect the horizontal and vertical deformation of the dam body
and foundation. The research on specific effects has achieved preliminary results. Monitoring methods
are used in most of these studies. In terms of the deformation of dams, the displacement of Xiluodu Dam
(Zhang et al., 2015), Xiaowan Dam (Han et al., 2010), Lijiaxia Dam (Yang et al., 2006), Goupitan Dam
(Wang et al., 2010) during the first impounding period are analyzed. The analysis results show that the
displacement of the dam body during the impounding process is mainly affected by the reservoir water
level and temperature. Guan et al. (2006) pointed out that the deformation of the dam top is affected by
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
the temperature. The effect of impounding on the stress distribution of dams cannot be ignored. Scholars
mainly use field monitoring and finite element analysis to study this problem. Fu et al. (1998) used the
strain gauges, non-stress gauges and thermometers embedded to monitor the stress of the dam body
during the first storage period of Tiantangshan Arch Dam, and pointed out that the stress was mainly
controlled by the external temperature and water storage level. Sun et al. (2006) used the data from the
gravity monitoring network of Three Gorges Dam to analyze the gravity effect of the dam area before
and after impounding process.
The impounding process also affects the opening and closing of the transverse joint. When the
foundation pit is filled with water, the concrete grouting process on the upper part of the dam is still
ongoing, and the pressure of the reservoir water compacts the cross-section surface. Exploring the effect
of water storage on the opening of the upper transverse joint is of great significance for the reasonable
control of impounding to ensure the grouting effect. Han (2003) proposed a formula for calculating the
change in width of transverse joints under hydraulic pressure based on the arch beam splitting method.
Li et al. (2008) also researched arch sealing and grouting during the impounding process in Jinping Dam
and obtained similar conclusions.
Wudongde Dam is located on the Jinsha River at the junction of Luquan County, Yunnan Province, and
Huidong County, Sichuan Province, China. The dam is currently in the critical period of initial
impounding, and the choice of impounding elevation is crucial. Wudongde Dam is a double-curved arch
dam with a design elevation of 718 m at the base level, a 988 m elevation at the top of the dam, and a
maximum 270 m dam height. Studying the actual working state of the dam during the impounding
process of the dam foundation pit is of great significance to ensure the standard construction progress
and control the construction quality.
3tgϕ
α=
9 + 12tg 2ϕ (2)
3c
H=
9 + 12tg 2ϕ
(3)
where c is the cohesion and φ is the friction angle.
The D-P criterion is consistent with the Mohr-Coulomb (M-C) yield criterion under plane strain
conditions. It represents the D-P circle that takes the middle value of the circumscribed and
inscribed M-C hexagon. Non-linear iteration is performed according to the elastoplastic fracture
method, and the contours of the unbalanced force upstream and downstream of the dam such
as plastic yield, subcritical fracture, buckling expansion, and point safety and overload are
calculated.
2
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
of evaluating the initial stress, deformation and overall stability of the storage dam. The contact surface
theory and Newton-Raphason method are used to define the transverse joint. In the Newton-Raphason
method, the first few terms of the Taylor series of the function f (x) are used to find the root of the
equation f (x) = 0. The advantage of this method is that the square converges near the single root of the
equation f (x) = 0. It can also be used to find multiple roots and complex roots of equations.
During the simulation process, the contact is defined by surface-surface, the contact attribute is taken as
the friction type of the penalty function. The grouted transverse joint surface is set as non-contact in the
calculation. The non-grouted transverse joint surface is set as the contact surface, and the initial state of
the transverse joint opening is simplified to zero. This study focuses on examining the law of the
influence of water impounding and increasing water load on the opening of transverse joints.
Ⅱ1
Ⅲ1
Ⅲ2 Fault F
F4242
Dam
Ⅱ2 Dam
大坝
厂房
Power house
(a) Dam and surrounding rock masses (b) Internal fault and powerhouse
Figure 1 Analytical model of a dam
Table 1 Mechanical parameters of various materials
Deformation Poisson's friction cohesion
Materials Density(g/cm3)
modulus(GPa) ratio coefficient (MPa)
Dam 2.4 43.2 0.170 1.7 5.0
Power house 2.4 43.2 0.170 1.7 5.0
Ⅱ1 2.69 35 0.22 1.5 1.9
Ⅱ2 2.69 20 0.24 1.3 1.6
Ⅲ1 2.70 18 0.25 1.1 1.3
Ⅲ2 2.70 10 0.28 0.95 1.0
F42 Fault 2.4 0.4 0.3 0.4 0.07
Various rock masses and faults are simulated in the model. In the simulation process, the ABAQUS
built-in life and death unit technology simulates the image at different time nodes. The parameter values
of the materials in the model are shown in Table 1. All the mechanical parameters of the materials are
obtained based on the on-site geological survey. The materials have been marked in Figure 1. As Fault
F42 and powerhouse are inside the model, the fault and powerhouse are listed separately in Figure 1(b).
3
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
(a) Case 1
(b) Case 2
(c) Case 3
(d) Case 4
Figure 2 Opening degree of transverse joints in all dam sections (unit: m)
4
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
The first and third characteristic stress distribution of the foundation surface under each case condition
is shown in Figs. 3~6.
(1) The upstream dam heel is under pressure no matter under what conditions. Under the impact of
impounding conditions, the maximum compressive stress of the upstream dam heel in each case
decreases with the increase of the impounding height. The maximum compressive stress is 4.32 MPa,
4.19 MPa, 4.05 MPa.
(2) As the difference between the impounding elevation and the grouting elevation increases, the
decrease in the maximum compressive stress of the upstream dam heel gradually increases. In cases 1-
4, the difference between the impounding elevation and the grouting elevation is 27 m, 36 m, and 45 m,
the compressive stress reductions of upstream dam heel are 0.60 MPa, 0.73 MPa, and 0.87 MPa,
respectively.
(3) The downstream toe is under pressure in all cases. Under the impact of impounding, the maximum
compressive stress downstream of the dam toe in each case increases with the increase of the
impounding elevation; from cases 2 to 4, the maximum compressive stress is 2.84 MPa, 2.97 MPa, 3.10
MPa, respectively.
(4) As the elevation difference between impounding and grouting increases, the maximum compressive
stress at the downstream dam toe gradually increases. When the filling water elevation and grouting
elevation differ by 27 m, 36 m, and 45 m, respectively, the increase in compressive stress at the
downstream dam toe is 0.60 MPa, 0.73 MPa, and 0.86 MPa.
5
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
6
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
4. Conclusions
By carrying out the overall working performance of Wudongde Arch Dam at different impounding
elevations, the following conclusions were obtained:
(1) The upstream impounding has a restraining effect on the transverse joints, which causes the
transverse joints to have a tight closing tendency. This constraint increases as the water level rises. After
reaching a certain height, the hydraulic pressure has a significant effect on the joint width. The lower
the impounding elevation, the more conducive to the grouting work.
(2) The maximum compressive stress of the upstream dam heel decreases with the increase of the
impounding height under each working case, and the maximum compressive stress of the downstream
dam toe increases with the increase of the impounding elevation. After impounding, the maximum
tensile stress at the left and right arch ends decreases under the water pressure, and the decreased value
increases with the filling height. The increase of impounding elevation is beneficial to the improvement
of the dam body’s tensile performance.
(3) To facilitate the smooth implementation of joint grouting, while considering the improvement of the
stress state of the dam, case 3 is regarded as the best impounding scheme, and the difference between
the filling water elevation and the grouting elevation is 36 m.
Acknowledgments
The authors acknowledge the assistance from Wudongde Construction Department.
References
[1] Akhtarpour, A., Salari, M. (2018). The Deformation Mechanism of a High Rockfill Dam during the
Construction and First Impounding. Scientia Iranica, 27(2): 566-587.
[2] Zhang G., Liu Y., Zhang L., Liu, Y., Li, S. (2019). The true working performance inversion
simulation analysis of Jinping level-I arch dam. IOP Conference Series Materials Science and
Engineering, 657:012001.
[3] Zhang, C., Wang, R., Tang, X. (2016). Safety evaluation of Xiluodu ultra-high arch dam during the
initial impoundment period. Journal of Hydraulic Engineering, 47(1): 85-93.
[4] Han, S., Zhao, B., Liao, Z., Xia, J. (2010). On monitoring data by plumb lines in early impoundment
period of Xiaowan dam. Dam and Safety, 03:38-41.
[5] Yang, J., Chen, D., Wang, J. (2006). Analysis of deflection displacement of Lijiaxia arch dam and
abutment during water storage period. Yellow River, 05: 67-68+70.
[6] Wang, Z., Hu, Q., Yu, X., Duan, G. (2010). Analysis of operation condition of Goupitan Hydropower
Station arch dam in initial impoundment period. Yangtze River,41(22):29-31.
7
11th Conference of Asian Rock Mechanics Society IOP Publishing
IOP Conf. Series: Earth and Environmental Science 861 (2021) 062100 doi:10.1088/1755-1315/861/6/062100
[7] Guan, W. (2006). Study and application of safety monitoring models on concrete arch dam
deformation analysis (Thesis). Xi’an University of Technology.
[8] Fu, W., Huang, P. (1998). Monitoring and stress analysis of the Tiantang Mountain Arch Dam during
its water storage term. Journal of South China University of Technology, 06:103-109.
[9] Sun, S., Xiang, A., Zhu, P., Shen, C. (2006). Gravity change and its mechanism after the first water
impoundment in Three Gorges Project. Acta Seismologica Sinica, 2006, 19(5): 522-529.
[10] Chen, Y. (1987). Effects of staged construction and staged water storage on dam body stress of
Baishan Arch Dam. Northeast Water Resources and Hydropower, 02:17-22.
[11] Han, X. (2003). Study on working condition during construction period and integral degree of
safety on Jinping Arch Dam (thesis). Guangxi University.
[12] Li, Z., Gu, Y., Zhang, L. (2008). MSC.Mar-based deformation analysis of high arch dam in water
storage period. Advances in science and technology of water resources, 04:15-19.
8