Sap Po - Pi
Sap Po - Pi
Path: SPRO > IMG > Material Management > Purchasing > Messages > Output control
1. Condition table : in this step we will maintain group parameters in number of tables
And same I will create another table 512 with fields plant, Purchase org & Purchase
document type
2. Access Sequences : we will create one access sequence and assign condition tables which I
have created already in above steps
Maintain the two tables 511 & 512 which we have created above
Again select the table one after other and field map them
Here I am creating message as SEU and maintaining Access sequence which I have created
ASSM
After definition of message type we need to Fine-Tuned Control to the Purchase Order
We will maintain it for the operation 1 i.e. for the new print or any other output & 2 for the
any change or second time output for the same print or any other output
4. Message Determination Schemas: here we will define the message schema determination
Copy same & customize or maintain new schema with new entries, here I am going to
maintain the defined message type in the same message schema and save.
Here is our newly added message type SEU in standard message schema RMBEF1.
And last and most important step is to maintain condition record for output in NACE or
MN04 for Purchase order output
Got NACE select EF and select condition record
Here your condition tables which you have defined 511 & 512, and assigned to access
sequence ASSM and I am selecting first one and create the condition record
And here maintain output device LP01 and active the checkmark for the both print
immediately & release after output and then save.
Condition record maintained successfully the last we have test the output for the purchase
order
Save the PO and now go and check the messages in the header
So the output triggered successfully from the message type SEU for print output