1.You plan to work with network and WBS elements sturctures: What do you have to consider?
2. You intend to work with predefined project coding masks to create project definitions. What do
you have to consider?
The standard project definition must differ from the definition of the operative project.
You can create a project coding mask X even if there are project numbers beginning with X
You can use only number for a project coding mask definition
You can use an indicator to determine that only coded project numbers may be used within the
Project System
3. The system status of a WBS element is created (CRTD). No status profile is assigned to this WBS
element. Which business process is allowed for this WBS elements?
Activity allocation
4. Where do you control whether a project stock is managed as valuated or non-valuated project
stock?
5. In your project, you work a network and external activities. You have created a purchase
requisition. The corresponding purchase order is created as well. Now, you increase the quantity of
the external activity. How does the system support this scenario?
The purchase order can be updated in Goods Receipt Purchase Order (MIGO)
The purchase order is updated automatically to match the purchase requisition white saving the
project
6. You want to create a purchase requisition for the materials used in you project. However, after
releasing the project no purchase requisition has been created. What could be the reason? (2)
7. Which sales documents can update planned revenues on WBS elements? (2)
Sales order
Quotation
Billing
Inquiry
10. How can the system activate requirements (such as reservations or purchase requisitions)? (2)
Automatically, using the requirement date and the replenishment lead time
11. Which statements regarding the creation of a new work breakdown structure (WBS elements)
are true? (3)
A WBS element of the new project can be assigned to a different project definition
12. You want to plan costs. Therefore, you have defined a costing variant and a valuation variant for
your network. Which of the following objects can be calculated via the network valuation variant?
(3)
WBS elements
13. A component is assigned to a network activity. What are the prerequisites to generate project
stock reservations? (3)
The "project stock" indicator is set in the project definition (non-valuated or valuated)
The material master of the component must permit project stock management
14. A costumer uses cross-company-code projects with a top billing element and an additional billing
element underneath for each company code. Although the internal billing between the lower-level
WBS elements has been performed correctly, the results analysis summarizes all values to the
highest billing elements. How can we split the results to the different company codes?
Split the project into different projects according to each company code
Adjust the customizing of the valuation method in the expert mode of the periodic results analysis
accordingly
Settle the WBS elements to the highest billing element before you do the results analysis
Change the project structure so that it corresponds better to the company's organizational structure
15. You have saved a network and activities with assigned material components. As soon as you
release the network, you receive the error message "Business transaction cannot be carried out".
What could be the reason for this message?
16. You want to use sub-networks to detail networks during the course of the project. What do you
consider? (1)
The scheduling type of a sub-network is always copied from the superior network.
17. Float time is calculated during scheduling. Which of the following statements about float time
are correct? (3)
By default critical activities have a float time, which is less than or equal to zero.
The maximum size of a free float is as large as the total float of an activity
Activities with the time constraint "Must start on" always have a negative float time
Resource-related budgets
Workforce planning
19. The Engineering work center is assigned to the internal activity Drawings. The activity is released
as you want to confirm hours for the work centers Design, Mechanics and Quality Inspection. How
can you confirm the working hours for different work centers to a single activity? (1)
Create multiple confirmations for the activity Drawings and use the appropriate work center for each
confirmation.
You cannot confirm working hours of different work centers to a single activity .
To a network header
To a milestone
To a relationship
21. You have assigned a budget to WBS elements within your project. What budgeting function
could be used to check assigned values against the current budget? (1)
Results analysis
Cost Planning
Availability Control
22. You have a project with a network, material and milestones. You want to plan an activity to start
two days after its predecessor. How can you do that? (2)
Use an offset of two days for the requirement date of the material component
Calculate the start date of the activity and set the constraint "must start on" accordingly
23. Which of the following factors influence the scheduling of internal processing activities? (3)
The factory calendar in the work center used for the internal processing activity
The unit (for example, hour, day) of the field "normal duration" of the activity
The work for the internal activity is greater than its duration .
24. How can 2 restrict individual user authorizations for changing a project?
Activate Access Control List (ACL) for the project profile and the network profile
Activate Access Control List (ACL) for the User Master Record
25. What functions are available for period-end closing in the Project System (3)
Confirmations
Settlement
Results analysis
Progress analysis
26. You are using networks and external activities in your project. You hace already created a
purchase requisition and the bid invitation, and have entered the quotations. What is a typical
sequence for the following business transactions and documents?
Benefit check --> Acceptance of performed services --> Vendor selection --> Purchase order handling
--> Purchase order monitoring --> Good receipt --> Invoice receipt
Vendor selection --> Purchase order handling --> Purchase order monitoring --> Goods receipt -->
Invoice receipt
Vendor selection --> Purchase order handling --> Purchase order monitoring --> Benefit check -->
Acceptance of performed services
Vendor selection --> Purchse order handling --> Invoice receipt --> Purchase order monitoring -->
Goods receipt
27. You are using assembly processing. You need to determine the delivery date of a sales order item
with an account assignment to the project. What are the prerequisites? (3)
A production order
28. You want to use billing for a customer project. Which customizing object controls the billing sales
order items?
Requirement type
Requirement class
Item category
30. Your customer wants to establish costing for WBS. Costing should be easy to use and should not
refer to cost elements. What method for costing do you recommend?
31. Where can you assign the user status profile for WBS elements? (3)
In the project profile
32. Your customer wants to plan and post revenues for WBS elements. What is crucial for the
implementation of revenue planning and posting for WBS elements?
Revenue planning and billing must be activated in the corresponding network type
A sales order item has to be assigned to each WBS element used for revenue planning
33. Which orders or documents can be displayed in the Project-Oriented Procuerement (ProMan)?
(2)
Reservation
Internal orders
34. You plan to double the work on each internal activity for multiple projects. What do you
recommend?
Double the work of each internal activity, one after another, in the Project Builder
35. You want to assign milestones to WBS elements. For what can you use these milestones?
36. You want to exchange data between SAP Project System and Microsoft Project. What interface
do you use?
Project definition
WBS elements
Activities Milestones
38. You use networks and internal activities in your project. You have activated capacity
requirements and noticed that one work center is overloaded. You have no authorization to change
the work center. How can you reduce the overload of the work center? (2)
Shift activities backward or forward on the time exist where more capacities are available
Increase the capacities of the work center in the Project Planning board
39. Your customer uses Progress Tracking for network components and maintains dates of events
manually. They need to implement scheduling of events. What is the prerequisite for scheduling of
events?
40. A service company uses project management and they complain that the system does not
prevent their project managers from exceeding their budgets. What actions do you take to solve the
problem?
Activate availability control for the important WBS elements. Define the tolerance limits on each
WBS elements
Activate commitment management in the project definition. Enter the budget in the master data of
the top WBS elements
Activate availability control in the assigned budget profile. Define the tolerante limits in the
Customizing.
Activate availability control for projects in the controlling area. Enter the plan data for WBS elements
41. You have activated the "workflow to work" in the SAP Project System. Who is the receiver of this
workflow item?
42. You want to determine the planned cost for an internally process activity. Which data do you
need? (2)
Duration
Work
Profit center
Activity type
43. A customer wants to use project simulations in the quotation phase. What project simulation
characteristics do you highlight? (3)
44. You use reductions to reduce the scheduled duration of all internally-processed activities in your
project. However, the duration has not changed after overall network scheduling. What do you
check? (2)
If the appropriate Reduction Type is set in the parameters for Network Scheduling
If the Reduction Type is set in the parameters for the WBS scheduling
46. Your customer uses a tight integration between sales orders and WBS with networks to deliver
finished and semi-finished products. What benefit do they have when using Delivery from Project
(CNS0)?
With Delivery from Project you can generate purchase requisitions for sub-contractors
With Delivery form Project goods receipts are automatically posted while saving
With Delivery from Project you can deliver material components assigned to you network
With Delivery from Project you can generate goods issues for projects without creating delivery
documents .
47. Which of the following data can be maintained in a standard network? (3)
Relationships
Material components
Hierarchical report
49. Which of the following statements regarding networks are correct? (3)
Capacity requirements of a network activity are reduced when the activity is confirmed
You can assign the same work center to more than one activity on the same network
You can assign more than one activity element to a network activity
If a network activity requires more capacity than is available in the work center, the system
automatically proposes an alternative work center
During scheduling the system plan the network activities in such a way that the assigned work
centers are not overloaded in terms of capacity .
50. Your customer uses the Project Planning Board to create/update Gantt charts. Which of the
following are characteristics of the Project Planning Board? (3)
51. You used overall revenue planning (CJ42) to plan revenue for WBS elements. A colleague claims
that the cost elements report for planned revenues does not show any revenues at all. Why does the
cost element report not show up any revenues?
The overall revenue planning has no reference to cost elements
The overall revenue planning will be displayed only if Expert mode is activated
52. Your customer wants to use scheduling of networks to specify planned dates of tasks. In the Sap
Project System, there are different sets of dates that can be scheduled. Which sets of dates can be
used for scheduling od networks? (2)
Basic dates
Planned dates
Fundamental dates
Forecast dates
Project definition
WBS elements
54. Which of the following transactions can you use to post actual cost for external processing? (2)
55. You want to set up the field selection of the Cross Applications Time Sheet (CATS) in customizing.
Which influencing field do you use?
Project profile
Network profile
Network type
57. Your customer uses WBS for project management, but no networks. While saving the project,
the basic dates of subordinate WBS elements should be extrapolated without taking into account
the basic dates of higher-level WBS elements. What planning method for basic dates do you
recommend?
Strict bottom-up
Bottom-up
Top-down
Free planning
58. When you create service activity in your network, what data can be entered? (3)
Service Specifications
Vendor
59. You want to use billing for customer projects. You can assign the billing plan to a WBS element or
to a sales order item. What is the reason for assigning billing plans to WBS elements?
Billing plans for wBS elements are copied automatically to the sales order item
Billing plans for WBS elements are used for revenue planning
The billing can be carried out with a billing plan for a WBS elements
Billing plans for WBS elements are prerequisites for quotation creation
60. You want to create reservation for a material component assigned to a network activity.
However, after releasing and saving the activity, no reservation is created. What might be a reason
for the missing reservation? (2)
The indicator "reservation/purchase requisition" for the material component assigned to the
activity is set to "never"
61. You plan an activity which starts on February 1st and finishes on February 28th. For this activity
you want to define a milestone for February 10th which should NOT be changed through scheduling.
What do you recommentd for milestone definition?
62. Which organizational structures are required for network activities? (3)
Operation concern
Sales organization
Controlling area
Plant
Company code
63. An external component is assigned to a network activity. The delivery date for purchase
requisitions depends on the dates of the network activity. What controls whether the delivery date
is defined by the earliest or latest scheduled dates?
64. A customer works in a multilevel production environment with bills of materials and routings. To
avoid unnecessary stock cost, they do not want to produce their finished and semi-finished goods
before the customer orders them. Which setup would you recommend?
65. You want use a template to create a new project with networks in the Project Builder (CJ20N).
Which templates can use in the Project Builder? (3)
Project definition
Standard network
Project milestones
Project version
66. Your customer wants to make sure that certain task must start on a given date. Where can you
maintain constraints limits for start dates?
Activity
Activity element
Network header
Milestones
67. A customer project must be finished at a given due date. This project consists of WBS elements
and network. What scheduling type do you recommend?
Backwards
Current date
Forwards
Fixed date
68. Your customer uses ProMan as a reporting tool only. They want to use ProMan for business
transaction as well. What business transaction can be used with ProMan? (3)
Generate delivery
69.You want to enable user field for customer projects. Therefore, you create several field keys.
What is the benefit of assigning a field key to the Project Profile?
The field key is the default value for the WBS elements and the activities too
The field key is the default value only for the WBS element
70. Your customer has created networks with internal activities and generated capacity
requirements. Now they want to analyze the capacity requirements of their project. Which report do
you recommend?
71. You are using budgeting and active availability control. How can availability control be activated?
(2)
72. How are earliest dates and latest dates of activities scheduled?
Earliest dates are scheduled by forward scheduling, and the latest dates by backward scheduling
Earliest dates are scheduled by forward scheduling, and the latest dates by forward scheduling
Earliest dates are scheduled by forward scheduling, and the latest dates by copying the earliest
dates
73. A customer needs to analyze the capacity requirements of their network activities. Which
reports do you recommend? (2)
Materials reports
Resource reports
74. Your customer has implemented budgeting for projects. The current budget of their project has
been changed several times. Therefore, they want to get an overview of the budget updates. What
standard report do you recommend?
75. You have created an internally-processed network activity, assigned a work center, and the work.
After saving, you discover that no planned costs are displayed in the cost element report for the
activity. What could be the reason? (3)
The "Determine costs" indicator in the network header rules out planned cost calculation
The activity output price for the activity type and cost center assigned to the work center is not
maintained
76. You use a WBS Project Structure with networks and maintenance orders. You want to Schedule
both the networks and the maintenance orders. What do you consider?
The maintenance orders must be assigned to the same plant as the networks
The maintenance orders must be assigned to the budget profile as the project definition
77. Your customer's project is subject to permanent changes of date. The Assembly activity has an
earliest start date of February 10th and lasts until February 20th. The customer wants to assign a
material component so that this will be in stock 5 days in advance (by February 5th). HINT: every day
is a working day. What recommend to set up the requierement date for the component?
Set up the requirement date aligned with the activity finish date and an offset of 15 days.
Set up the requirement date alligned with the activity start date and a negative offset of 5 days
Set up the requirement date aligned with the activity start date and an offset of 5 days
78. Where can you define that a network is a "header-account assigned" or "activity-account
assigned"?
Network type
Project profile
Network profile
79. A customer wants to allocate overhead rates to a WBS alement. What must you assign to the
WBS element?
Costing sheet
Investment profile
Settlement rule