EX67689

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

ME DI UM V O L TA GE SW IT CHGE A R

Date: 30 June 2021

Customer: Benmas Pty Ltd


Our Reference: EX67689
Your Reference: Kasane BDF 11KV Network Tender

RE:

We thank you for the opportunity to tender for the above enquiry and we have pleasure in submitting
our offer for your consideration.

1. SCOPE OF OFFER

This tender is for the manufacture and supply of the Ring Main Units and associated
equipment/services as requested.

2. EQUIPMENT OFFERED

ITEM 1: SUPPLY ACTOM TYPE 5 WAY RMU - INDOOR

1 x Actom Type: RMV-E: L-C-BS-L-C 12.5kV, 20KA (3Secs), 95kV BIL SF6 Insulated extensible Ring
Main Unit with 630 Amps busbars, consisting of:
• 2 x 630A Ring Feeders with Switch Disconnectors.
• 2 x 630A Transformer feeder Vacuum Circuit Breakers fitted an overcurrent and earth fault relay
WIB1-2PE and 230V AC second shunt trip coil.
• 1 x Bus-section with Switch Disconnector.

Unit to be fitted with the following:


Padlock facilities all switches, VPIDS all switches, SF6 pressure gauge, Protection CT’s, Remote Flag for
relay trip indication, Push button Trip on breaker, Arc Resistant cable covers, 400mm pedestal, Anti-reflex
switching handle, 3 Core Cable clamp, and 30 x 4 Earth bar, complete with bus section.

Price: ZAR 448 114.00 excluding VAT

ITEM 2: DELIVERY

To deliver and off-load the above unit to Kasane, Botswana.

Price: ZAR 57 750.00 excluding VAT

SPECIFIC NOTES ON OFFER

• We offered the Actom RMV RMU that is equivalent to the FBX type RMU.
A division of ACTOM (Pty) Ltd
Registration Number: 2008/001863/07
Chairman: MA Mthethwa
Group Chief Executive Officer: M Naidoo
Divisional Chief Executive Officer: F Hoosen
Directors:
Executive: M Naidoo, EA Van Wyngaardt, S Chauke
Non-Executive: SP Sepeng (M Parusel - Alternate), 2 Magnet Road P.O. Box 13024 Tel: +27 (0)11 820-5111
C Kula, N Mohamed, S Mthunywa, MM McCollum Knights Knights Fax: +27 (0)11 820-5122
(MLE Augonnet* - Alternate), *French 1413 1413 www.actom.co.za
• Installation and commission prices are as per on the attached quote reference number
20SX34.01/DN

3. PRICE BASIS

Our price is based on the following:-

1. The prices are Nett.


2. The prices exclude VAT.
3. Our price is valid for a period of 90 days from date of this letter. Should it not be possible
for you to place an order with us within this time, we would be pleased to discuss the matter
with you.
4. Prices are fixed but subject to rate of exchange variation. Please refer our attached form
0189 for details.

4. TERMS OF PAYMENT

- 100% on completion of F.A.T


- All payments within 30 days NETT from date of invoice.

Such payment method assumes that credit facilities from ACTOM MV SWITCHGEAR are
available to you at the time of receipt of your order. Should this not be the case, or should such
credit facilities have been withdrawn for whatever reason, we reserve the option to negotiate
alternative payment terms and, where applicable, payment guarantees, with you, prior to the
commencement of manufacture or supply of goods per the order.

If after FAT it is found that alterations need to be done to the completed board, based on additional
requirements of the clients, the original contract value will still be payable. The modification will be
invoiced on completion thereof.

5. COMPLIANCE WITH SPECIFICATION

Technical compliance of our offer is shown in our technical submission.

6. CONTRACT CONDITIONS

This Quotation is subject to ACTOM’s Standard Conditions of Sale and Tender (“ACT/2021”)
available at https://www.actom.co.za/legal-info/ which are the sole and exclusive terms on which the
Buyer agrees to accept the supply of the Products and/or performance of Services by ACTOM. By
accepting this Quotation, the Buyer consequently irrevocably agrees to the aforegoing and
unconditionally agrees to the binding application of ACT/2021. ACTOM accordingly hereby rejects
in their entirety any different, altered, or conflicting terms contained in any response by the Buyer to
this Quotation.
7. COMPLETION AND DESPATCH

Based on our present workshop loading, we can offer a delivery period of:

- 16-18 Working Weeks

This delivery period is based on the date your order is received. This period excludes any public
holidays or December shutdown periods. Should you wish to discuss the delivery period quoted,
please contact us immediately.

8. WARRANTY

Our standard guarantee is for 12 months from date of commissioning, or 18 months from
date of delivery – whichever should occur sooner.

9. SAFETY, HEALTH ENVIRONMENT AND QUALITY COMPLIANCE

ACTOM MV Switchgear is proud to comply with the requirements of the following internationally
recognised standards:-

ISO 9001 :- Quality Management Systems


ISO 14001 :- Environmental Management Systems
ISO 45001 :- Occupational Health & Safety Management Systems

All of our processes are compliant with these standards and are reviewed internally by our quality
department and externally by recognised approved auditors on a regular basis to ensure compliance.

ACTOM MV Switchgear is compliant to ISO14001 and OSHAS18001 relative to in house


operations.

Operations on site will be conducted in compliance with the relevant requirements of the
Construction Regulations, but costs of specialised requirements e.g. Appointment of construction
safety officer, Ircon and Aicat training, level 3 first aid training etc. are not included for in our offer
and discussions must take place to accommodate such requirements with the associated costs.
We trust that the information supplied is sufficient for you to evaluate our offer. However, should
you have any further queries, please do not hesitate to contact us immediately.

Yours faithfully
For and on behalf of
ACTOM MV Switchgear
F MSIMANGO O VAN ZYL

TENDERING ENGINEER COMMERCIAL MANAGER


FORM CPA / IMPORT 0189
TENDER REF: EX67689 CONTRACT REF :
TENDER DATE: 30 June 2021 DATE OF CLAIM :
CONTRACTUAL DELIVERY DATE:

ITEM NO EQUIPMENT VALUE SUBJECT RATE OF EXCHANGE ON WHICH


TO VARIATION TENDER IS BASED
(P)
1 RMV-E: L-C-BS-L-C ZAR 342 884.00 ZAR 14.00 = 1.00 USD

P = VALUE SUBJECT TO VARIATION IN RANDS

P1 = VARIABLE PORTION AFTER ADJUSTMENT

R1 = RATE OF EXCHANGE AT TENDER DATE

R2 = RATE OF EXCHANGE AS CHARGED BY OUR SUPPLIERS

C1 = CUSTOMS DUTY AT TENDER DATE = 5%

C2 = CUSTOMS DUTY AS CHARGED BY OUR SUPPLIERS

G1 = IMPORT SURCHARGE ON WHICH TENDER IS BASED = %

G2 = IMPORT SURCHARGE AS CHARGED BY OUR SUPPLIERS

CALCULATION

ROE P1 = ( P X R2 ) -P = ................................................................
R1

DUTY = ( C2 X P1 ) - ( C1 X P ) = .................................................................

( 100 ) ( 100 )

SURCHARGE = ( G2 X P1 ) - ( G1 X P ) = ..................................................................
( 100 ) ( 100 )

TOTAL VARIATION = ......................................................


NOTES ON TENDER

SPECIFICATIONS

The panels comply with the specifications of IEC 62271-100/200.

DRAWINGS

We have based our offer on our CAD version 2019 produced standard general arrangement and schematic
drawings. We do not produce wiring diagrams, however, our schematics are sufficient for fault tracing.

DRAWING APPROVAL

Approval of the drawings is of the utmost importance to ensure that no delays are experienced during the
manufacturing cycle.

Generally we will provide general arrangement and schematic diagrams within 6-8 working weeks of order
placement depending on the complexity and size of the project.

Approval of the drawings is required within two weeks of submittal.

Depending on the modifications requested on the drawings, we reserve the right to amend the delivery dates
agreed upon and to adjust our prices accordingly.

If no response is received within the allotted approval time, ACTOM MV SWITCHGEAR will assume that
the drawings comply with your requirements, and that manufacturing can proceed.

MANUALS

We have based our offer on our standard maintenance manual.

TESTING

Should the customer request that the testing of the switchgear at our works, be performed by an outside
contractor, this will be based on the contractor providing all of his own test equipment.

EXCLUSIONS

Unless otherwise stated in our offer, we have not included for the following:-

Cable connectors, surge arrestors, IED logic diagrams, SCADA systems, SCADA integration, LV/MV
Cabling, Cabling Kits, Lugs, Civil Work, Cable Racking, BTU’s.

SHEQ REQUIREMENTS
Unless otherwise stated in our offer, we have not included for Inductions, Medicals, Contractors pack or
Safety files.

Should any of the above be applicable, we would need a specification listing your requirements with regards
to time spans, number of copies etc.

You might also like