Mino MG August 2024 Monthly Report
Mino MG August 2024 Monthly Report
Mino MG August 2024 Monthly Report
Woreda: Kumbi
Northing Easting
GPS Coordinate point: 8.037276 41.717139
Contractor CET & NR
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Off grid solar Generation power plant Mino MG Monthly Operation r
Date of comissioning:
Number of Customers
connected during
comissioning:
Actual Number of
customers
unit
Description
Total energy generated up to this month in kwh
previous energy reading kwh
Monthly generated energy kwh
Monthly customer consumption in kwh kwh
loss in kwh(generatedkwh- customer consumption kwh) kwh
Numbers of total customers on the site number
Number of monthly billed customers number
Number of customers not billed number
Monthly invoice amount number
Monthly paid invoice birr
Monthly not paid invoice birr
17.2
17.3
17.4
17.5
17..6
17.7
17.8
17.9
17.10.
17.11
17.12
Quantity/
Date Remark
amount
338,247.11 from 2020 to August-2024GC
Master energy not display reading
7203 01.08.2024 to 31.08.2024
Monthly Load1 report not record
248
16,000
390
for 350 hours Load1 opened & for
01.08.2024 to 31.08.2024 40 system Blackout
50
45 times Load1 opened & 5 times
01.08.2024 to 31.08.2024 system Blackout
1. At this time during discharge while the first BMS reached SOC of 70% & the second BMS
SOC of 72%, from SCADA it indicates alarm "overdischarged" and from BMS HMI "cell
voltage difference to high level_1" and the system blackout.
SOC of BMS and actual battery is not indicate the same value as its standard.
(As its standard while SOC reach 90% battery voltage should be 750.40V, but at this time
while SOC reaches 90% battery voltage shows 722.90V.)
Only one(1) Operator there and operating the system for 24H.
(He repeatedly asks for additional operators/workers)
Daily, Monthly and Yearly weather conditions report not display the report
After System blackout "ONE KEY BLACK" not respond to start the PSC
From SCADA under ESS Unit PCS2 shows an alarm "SMPS_Fault".
When restoration process task, to use DG as backup power source, DG not run for even 10
minutes.(At this time DG runs for 215 hours. Starting from the energized date; fuel filters, oil
filter, belt and etc maintenance task not provided yet)
In the Future when Distribution Transformers fully loaded Step up Transformer will
OVERLOADED
338,247.11