Off grid solar Generatio

Name of MG site: Mino


EEU Region: Oromia

Zone: East Harerge

Woreda: Kumbi
Northing Easting
GPS Coordinate point: 8.037276 41.717139
Contractor CET & NR

No
1
2
3
4
5
6
7
8
9
10
11

12
13
14

15
16

17
Off grid solar Generation power plant Mino MG Monthly Operation r

Date of comissioning:

Mini Grid site


Generation Capacity:

Number of Customers
connected during
comissioning:

Actual Number of
customers

unit
Description
Total energy generated up to this month in kwh
previous energy reading kwh
Monthly generated energy kwh
Monthly customer consumption in kwh kwh
loss in kwh(generatedkwh- customer consumption kwh) kwh
Numbers of total customers on the site number
Number of monthly billed customers number
Number of customers not billed number
Monthly invoice amount number
Monthly paid invoice birr
Monthly not paid invoice birr

Numbers of customers who paid out of billed customers each


Numbers of customers who did not paid out of billed customers each
Total monthly expense birr

Monthly Power interuppted Duration


number
Monthly Power interuppted frequency
number

Any challenge 17.1

17.2

17.3

17.4

17.5

17..6

17.7

17.8

17.9
17.10.

17.11

17.12

Notice:- Date will be filled for generated energy in kwh

Prepared by:- Bahilu Alemayehu Date: 07/10/2024

Approved by :- Hora Magarsa Date: 07/10/2024


G Monthly Operation report

Date of comissioning: 18.08.2020


Solar PV ESS DG
Mini Grid site
Generation Capacity: 225KW 450KWH 70KVA

Number of Customers Residential Comercial Industrial


connected during
comissioning: 168 22 0
Residential Comercial Industrial
Actual Number of
customers 225 23 0

Quantity/
Date Remark
amount
338,247.11 from 2020 to August-2024GC
Master energy not display reading
7203 01.08.2024 to 31.08.2024
Monthly Load1 report not record

248

16,000

390
for 350 hours Load1 opened & for
01.08.2024 to 31.08.2024 40 system Blackout
50
45 times Load1 opened & 5 times
01.08.2024 to 31.08.2024 system Blackout
1. At this time during discharge while the first BMS reached SOC of 70% & the second BMS
SOC of 72%, from SCADA it indicates alarm "overdischarged" and from BMS HMI "cell
voltage difference to high level_1" and the system blackout.

SOC of BMS and actual battery is not indicate the same value as its standard.
(As its standard while SOC reach 90% battery voltage should be 750.40V, but at this time
while SOC reaches 90% battery voltage shows 722.90V.)

The UPS battery not store charge for even a minute


.(To prevent UPS battery from damage DC input hasn't DC breaker.)
Due to compressor and evaporator failure, the Integrated AC Machine in the BMS room
not working properly as expected at this time.
When SOC reachs 100% Charge controller not disconnect charging
and BMS display "OVERCHARGED"

Only one(1) Operator there and operating the system for 24H.
(He repeatedly asks for additional operators/workers)

Daily, Monthly and Yearly weather conditions report not display the report

Monthly and Yearly Report not display under report tree


(Energy generated up this month and monthly generated
energy recorded manually from daily report)

After System blackout "ONE KEY BLACK" not respond to start the PSC
From SCADA under ESS Unit PCS2 shows an alarm "SMPS_Fault".
When restoration process task, to use DG as backup power source, DG not run for even 10
minutes.(At this time DG runs for 215 hours. Starting from the energized date; fuel filters, oil
filter, belt and etc maintenance task not provided yet)

In the Future when Distribution Transformers fully loaded Step up Transformer will
OVERLOADED

Date: 07/10/2024 Sig:

Date: 07/10/2024 Sig:


Previous 331,044.11
1 0
2 1262
3 1437
4 1704
5 1229
6 1205
7 366
7203

338,247.11