100% found this document useful (2 votes)
6K views1 page

Help Me Billing Format, Marin Engineering

Uploaded by

danzukie3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
6K views1 page

Help Me Billing Format, Marin Engineering

Uploaded by

danzukie3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 1

its ok honey, i am doing so easy.

i had a break down of my fabrications that


was done on Monday and this will lead to explosion if tragic measure is not taken.
my sea cameras showed me that, Two sharks fought and hit each other on the newly
welded
metals and they got broken and this led to high distortion of heavy metals and a
part of
my project that is almost getting to the finish was destroyed. i simply do not
want to tell
the company i am running this project for because it makes me look stupid and
unprofessional in
this field and this may withdraw every other pending project that has be signed by
me in the other
way round, there is a solution which i don't know how to solve. i am now in the
sea and i can not
leave this sea till this project is complete and if i should leave this project and
go to dry land in
a minutes. it will end an Explosion because i don't have much qualified skilled
workers who take my
part and handle it well before my arrival. here is the bone of contention and this
requires your
Advice honey. i do not have access to my account here and i can not leave this sea
in a minute. i
needed to contact a company that can supply me some specific working project
materials that was
destroyed. how can this be done honey. advice me as soon as possible

You might also like