North Elevation Scale 1:100
North Elevation Scale 1:100
A B C D E F G H I
4 3.900 3 4.200 2 3.900 1 I 3.900 H 3.900 G 3.900 F 3.900 E 2.800 D 3.800 C 3.800 B 3.800 A
North Elevation
3,800 3,800 3,800 2,800 3,900 3,900 3,900 3,900
30,000
200 3,600 200 3,600 200 3,600 200 2,600 200 3,700 200 3,700 200 3,700 200 3,700 200
200 200 200
200 2,500 200 900 900 200 2,500 200 2,500 200 900 200 2,600 200 2,600 200 900 900 200 2,600 200 2,600 200 900 900 200 2,600 200
200
200
1 1
200
200
200
1,700
1,700
10
3,700
3,700
3,900
11
200
200
8
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH 12 CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
7
13
6
17G x 300
18R x 150
14
1,800
1,800
5
15
WC/SH WC/SH WC/SH 4 WC/SH WC/SH WC/SH
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH 16 CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
3
West Elevation
200
18
2 1
UP
DOWN 2
200
200
1,000
1,000
East Elevation
±0
12,000
11,800
4,200
4,000
2,000
2,000
4,000
4,200
-150
South Elevation
1,000
1,000
±0
UP
DOWN EAST ELEVATION SCALE 1:100
NORTH ELEVATION SCALE 1:100 NOTES
200
200
3 3
1
18
200
200
GENERAL
2
COOK COOK COOK 17 COOK COOK COOK COOK
3
16
1,800
1,800
-All dimensions are shown in mm unless otherwise specified.
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
17G x 300
18R x 150
WC/SH WC/SH WC/SH WC/SH WC/SH WC/SH
4
15
5
14
1 3,900 2 4,200 3 3,900 4 A 3,800 B 3,800 C 3,800 D 2,800 E 3,900 F 3,900 G 3,900 H 3,900 I
-Drawings are not to be scaled, only figured dimensions are to be
6
13
3,900
3,700
3,700
3,900
7
200
200
used.
12
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH 8 CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
11
UNIT 1 UNIT 1 UNIT 1 9
UNIT 1 UNIT 1 UNIT 1
10
-The contractor must check and verify all dimensions on site
1,700
1,700
before commencement on any work.
4 4
CONSTRUCTION
-All slabs concrete at ground level to be poured over 1000gauge
200
200
200
200
200
200 200 200
200 2,500 200 900 900 200 2,500 200 2,500 200 900 200 2,600 200 2,600 200 900 900 200 2,600 200 2,600 200 900 900 200 2,600 200
polythene sheeting on 50mm thick stone dust, on hardcore.
200 3,600 200 3,600 200 3,600 200 2,600 200 3,700 200 3,700 200 3,700 200 3,700 200
200 29,600 200
-All soils under slabs and all around external foundation to be
3,800 3,800 3,800 2,800 3,900 3,900 3,900 3,900 poisoned for termites.
S-04
CIVIL
A B C D E F G H I -All soils on cut embarkmentt to be stabilised.
-Slope not to exceed the natural angle repose.
GROUND FLOOR PLAN SCALE 1:100 STRUCTURAL
-All black cotton soils to be removed from below all buildings and
paved surfaces.
-Building to be clear of black cotton soils to a distance of 3m
outside the perimeter .
-All paved surfaces to be clear of black cotton soils to a distance
S-04
A B C D E F G H I
of 500mm outside the edge of the surface.
North Elevation -For all R.C work , refer to Structural Engineers details ,
3,800 3,800 3,800 2,800 3,900 3,900 3,900 3,900
WEST ELEVATION SCALE 1:100
200 3,600 200 3,600 200 3,600 200 2,600 200
30,000
3,700 200 3,700 200 3,700 200 3,700 200
SOUTH ELEVATION SCALE 1:100 -Depth of foundation to be determined on site to Structural
200 200 200
Engineers approval.
200 2,500 200 900 900 200 2,500 200 2,500 200 900 200 2,600 200 2,600 200 900 900 200 2,600 200 2,600 200 900 900 200 2,600 200 -All walls less than 200mm thick to be reinforced with hoop irons
200
200
1 1 at every alternate course .
-All adjacent R.C works and masonry walls to be tied with straps
200
200
200
ROOF DETAILS
1,700
1,700
G 30 ridge cap on irons at every course.
G 30 prepainted I.T.5 sheets on MECHANICAL
10
3,700
3,700
3,900
11
200
200
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
8
7
12 CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
50x75 mm purlins on -All plumbing and drainage works to comply with City
150X50mm rafter braced with
13
councils specifications.
6
17G x 300
18R x 150
14
1,800
1,800
5
100X50 mm struts and ties on
-All service ducts to be accessible from all floors
15
WC/SH WC/SH WC/SH 4 WC/SH WC/SH WC/SH
200
18
2 1 2
UP
pitch 5 degrees. end of the drainage . -Drains passing beneath
DOWN
200
200
1,100
1,100
East Elevation
+2,850 1 3,900 2 4,200 3 3,900 4
buildings and drive ways to be encased in 150mm
thick concrete surround.
OPEN TO SKY OPEN TO SKY
12,000
11,800
4,200
4,000
4,000
4,200
uPVC to comply with BS5255.
2,900
2,900
600
South Elevation
-All inspection chambers covers and framing shall be
+2,850 cast iron to comply with BS497 TABLE 2 GRADE A.
200
200
2,400
DOWN
-The storm drain pipes to comply with BS556 minimum
UP
3 3 Fabricated
1
18
200
2
COOK COOK COOK
3
17
16
COOK COOK COOK COOK
railing to
-No cases will be allowed in the slabs for pipes.
1,800
1,800
detail
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
17G x 300
18R x 150
450
3,900
3,700
3,700
3,900
S.E.
7
200
200
12
CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH 8 CERAMIC TILE FINISH CERAMIC TILE FINISH CERAMIC TILE FINISH
11
UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1
Staircase -No cutting of concrete will be allowed without the
9
2,400
10
1,700
1,700
150 mm raise
express approval of the Architect or S.Engineer.
600
300 mm step
-All testing of pipes must be completed before
150
4 4
Beam to plastering.
400
200
200
200
200
200
300
200 2,500 200 900 900 200 2,500 200 2,500 200 900 200 2,600 200 2,600 200 900 900 200 2,600 200 2,600 200 900 900 200 2,600 200
-All mechanical work must be co-ordinated with
200 3,600 200 3,600 200 3,600 200 2,600 200 3,700 200 3,700 200 3,700 200 3,700 200 theElectrical Engineer and any conflict must be
2,400
200 29,600 200
3,800 3,800 3,800 2,800 3,900 3,900 3,900 3,900
claimed before works begin.
S-04
200
CLIENT:
50FALL 50FALL 50FALL
3,900
3,900
2 2
9
10
PROJECT:
East Elevation
11
8
12
7
6
13
PROPOSED DEVELOPMENT ON PLOT NO.
17G x 300
18R x 150
14
5
MURANG'A MUNICIPALITY BLOCK 3/680
11,800
11,800
4,200
4,200
15
4
2
17
COOK COOK COOK COOK MURANG'A COUNTY
South Elevation 1
UP
DOWN
18
IC IC IC IC IC
IC IC IC IC
DRAWING:
12,200
3 3
TO SEWER LINE ARCHITECTURAL: FLOOR PLAN, ROOF PLAN,
IC IC IC IC
ELEVATIONS, SECTION, SITE PLAN LAYOUT, SITE
LOCATION LAYOUT & SEPTIC TANK
3,900
3,900
50FALL IC IC IC IC IC IC IC IC
50FALL 50FALL 50FALL IC
4
15
4 4 5
14
200
6
13
7
12
8
9
11 DRAWN BY: OBEDI AMOS
200 29,600 200 10
SCALE:
S-04
A B C D E F G H I AS INDICATED
GSPublisherVersion 0.19.100.100