Bills Factory (Pakistan)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MEPCO GST No.

MULTAN ELECTRIC POWER COMPANY 04-07-2716-007-55

YOUR BETTER SERVICE - OUR PRIDE ELECTRICITY CONSUMER BILL www.mepco.com.pk

‫ دن کا اضافہ کیا گیا ہے‬10 ‫وزیراعظم کی ہدایت پر بل کی ادائیگی میں‬ 02 SEP 24


CONNECTION DATE CONNECTED LOAD ED@ BILL MONTH READING DATE ISSUE DATE DUE DATE

18 JAN 10 1.5% AUG 24 11 AUG 24 12 AUG 24 23 08 24

CONSUMER ID TARIFF LOAD OLD A/C NUMBER DIVISION KOT ADDU

1155531056 A-1a(01) 1 02157222175702 SUB DIVISION KOT ADDU-II

REFERENCE NO LOCK AGE No of ACs UN-BILL-AGE FEEDER NAME 121902 SULTAN COLONY

02 15722 0337000 R Web Generated Bill

MONTH UNITS BILL PAYMENT


NAME & ADDRESS Say No To
MUHAMMAD ARSHAD Aug23 252 9787 9787
S/O MUHAMMAD HUSSAIN Corruption
Sep23 211 8268 8268
BASTI SAEED ABAD
KOT ADDU MCO Date : 20-Apr-0018 Oct23 207 8233 8233
Nov23 109 3976 3976
Dec23 69 2695 2695
‫)دو ماہ بعد شامل‬FPA( ‫ بجلی کے بل میں ایندھن کی قیمت کا فرق‬: ‫معزز صارف‬ Jan24 50 1970 1970
‫ یونٹس کے ایندھن‬251 ‫ کے صرف شدہ‬JUN 24 ‫کیا جاتا ہے آپ کے اس بل میں‬ Feb24 48 1798 1798
‫ روپے بھی شامل ہیں‬769.89 ‫کی قیمت کے‬ Mar24 57 2102 2102
Apr24 123 4743 4743

PREVIOUS PRESENT
May24 164 2549 2549
METER NO MF UNITS STATUS
READING READING
Jun24 251 10640 10640
S-P 802560 10920 11294 1 374 Jul24 264 12094 12094

MEPCO CHARGES GOVT CHARGES TOTAL CHARGES


UNITS CONSUMED 374 ELECTRICITY DUTY 225 ARREAR/AGE 0
COST OF ELECTRICITY 14642 TV FEE 35 CURRENT BILL 19648
METER RENT
GST 2992 BILL ADJUSTMENT
Fix Charges 200
SERVICE RENT INCOME TAX INSTALLEMENT

FUEL PRICE SUBSIDIES


643.24 EXTRA TAX
ADJUSTMENT
TOTAL FPA 770
F.C SURCHARGE 1208.02 FURTHER TAX
PAYABLE WITHIN DUE DATE 20418
L.P.SURCHARGE 1640
QTR TARRIF ADJ/DMC 346.4 RETAILER STAX

TOTAL 17039.66 PAYABLE AFTER DUE DATE 22058

BILL CALCULATION GST ON FPA 117


ED ON FPA 9.65
FURTHER TAX ON FPA `
S.TAX ON FPA
GOP Tariff x Units IT ON FPA
39.1500 X 374 ET ON FPA
----------------------------- -----------------------------
TOTAL TAXES ON FPA 126.65

TOTAL 3378.65 SDO #


2243685 /03199760690
DEFFERRED AMOUNT XEN # For complaints dial: 118 /SMS:
2241911 /03199760955 8118
OUTSTANDING INST.
Fuel Price Adjustment for Jun-24 @ 2.5627/KWH SE #
AMOUNT
0669200091 /03199760700
PROG. GST PAID F-Y PROG. IT PAID F-Y

MULTAN ELECTRIC POWER COMPANY - ELECTRICITY CONSUMER BILL


BILL NO
YOUR BETTER SERVICE - OUR PRIDE CONSUMER ID 1155531056 1
www.mepco.com.pk

BANK
STAMP

AUG 24 - 02 15722 0337000 - 000020418 - 02 SEP 24 - 6


BILL MONTH DUE DATE REFERENCE NO PAYABLE WITHIN DUE DATE 20418

AUG 24 02 SEP 24 02 15722 0337000 R PAYABLE AFTER DUE DATE 22058

You might also like