Location of work
Description of work
Name of operative
Make room for earth spoils If ladders are placed, secure them (Ramp)
Arrange proper accesses and
Inspect excavation before use and every 7 days
egresses
SECTION III (Permit Requested by):
I request for a permit for the above-mentioned work at the location specified above. I have personally inspected the workplace
to ensure that requirements needed as precautionary measures as mentioned above have been complied with.
Site Engineer: e
SECTION V Safety Officer/ Engineer Recommendation (Applicable for both day and
Night shift)
Recommendation:
The work is not completed and the renewal of permit requested for additional hour.
To be returned to HSE Office after the completion of the work and duly closing of the
Permit
Engineer In-charge
NAME DESIGNATION
SIGNATURE DATE
National Innovative General Maintenance
Doc. No. NIGM-HSE-PTW-02
LLC
Rev./
Integrated Management System 00
Issue
ISO 9001:2015 – ISO 45001:2018 -
Date 30-05-2019
ISO 14001:2015
Page 3
Permit To Work – Excavation Work
NOTE: PTW can be cancelled anytime without notice if site condition is unsafe or legal and
contractual obligations are disregarded.
COPY OF THIS PERMIT SHALL BE HELD WITH THE “ENGINEER / FOREMAN” AT ALL TIMES