Lab Formats
Lab Formats
50 40
40 31.5
31.5 25
25 20
20 16
16 12.5
12.5 10
10 6.3
Total A= B= C= D=
Remarks:
Asst. Executive
Submitted by Asst. Engineer Executive Engineer
Engineer
KSHIP COARSE AGGREGATE GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
40 100
20 95 - 100
10 25 - 55
4.75 0 - 10
Remarks:
Asst. Executive
Submitted by Asst. Engineer Executive Engineer
Engineer
SIEVE ANALYSIS
KSHIP (FOR FINE AGGREGATE - SAND) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Pan
Fineness Modulus
Remarks:
Remarks:
2
Maximum
3
10%
4
Remarks:
Vicats
Wt. of Cement Volume of water Apparatus Temperature
Sl. No % of Water added
(grms) Added (cc) Reading (0C)
(mm)
1
Remarks:
Vicats
Wt. of Cement % of Water Volume of water Apparatus Total Time Temperature
Sl. No
(grms) added Added (cc) Reading taken (0C)
(mm)
1
Time at which the needle an impression on the test block while attachment
falls do so after adding of water to cement
Final Setting Time
Remarks:
Batch No :
Sl. No MEASUREMENT Train - 1 Trail - 2 Average
Remarks:
S.NO DESCRIPTION 1 2 3 4 5 6
1 Chainage in KM
9 Wet.density (gm/cc)
10 Container no..
11 Container wt.(gms).
16 % Of Water Content
18 Field compaction(%)
19 Average compaction
20 Required compaction
REMARKS
MOISTURE CONTENT (% )
Remarks .
Executive
Submitted by Asst. Engineer Asst. Executive Engineer
Engineer
C. B. R. TEST
KSHIP GVR
Contract (AsTO
: REHABILITATION OF ROAD FROM NAVALGUND perRON
IS 2720 Part
- KSHIP - XVI) - M 33
PACKAGE
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location :- Date of Samping :-
Description of Materials :- Date of testing :-
Period of soaking :- Date of soaking :-
M.D.D. :- gm/cc O.M.C. :- %
C.B.R.value :
Remarks:
COARSE AGGREGATE
Location / Source : Date of Sampling :
Type of Material : Sampled by :
Proposed Use : Date of Testing :
Tested by :
Description 1 2 3 Average
1 Wt of Sample + Basket in Water (A) (g)
2 Wt of Basket in water (B) (g)
3 Wt of Weight of SSD Sample in Air (C ) (g)
4 Wt of Oven Dry sample (D) (g)
5 Bulk Specific Gravity (OD) D/[C-(A-B)]
6 Bulk Specific Gravity (SSD Basis) C/[C-(A-B)]
7 Apparent Specific Gravity D/[D-(A-B)]
8 Water Absorption % (C-D)/D x 100
Remarks
FINE AGGREGATE
Remarks
Contractor's Asst. Engineer Asst. Executive Executive Engineer
Representative Engineer
KSHIP AGGREGATE IMPACT VALUE TEST IS : 2386 (Part - 4)
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location/Source Date of Sampling
Type of material Sampled by
Proposed Use Date of Testing
Tested by
Remarks:
:
:
:
:
Trail No. 3
ecutive Engineer
KSHIP ATTERBERG LIMITS (As per IS: 2720 Part - V) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location Date of Samp:
Source
Proposed Use Date of Testi :
No. of Blows
Remarks:
26.5 55-75
4.75 10-30
75M/c 0-10
REMARKS:
REMARKS:
Grade : M -
Sl.No. 7 8 9 10 11 12
Remarks:
Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer
KSHIP WATER ABSORPTION TEST GVR
AS PER IS : 2386, (PART -3)
Contract :REHABILITATION OF ROAD FROM NAVALGUND TO RON -KSHIP, PACKAGE M33
Client :P.D., PIU, P.W.D. Government of karnataka
Engineer :Executive Engineer, KSHIP. Belgaum Division
Contractor : M/s. GVR Constructions Pvt Ltd.,
Type of Material: Date of Sampling :
Purpose : Date of Testing :
Sl
No.
DESCRIPTION TRIAL-1 TRIAL-2 TRIAL-3 AVERAGE
1 Tray Weight
2 Wt. of saturated surface Dry sample
3 Wt. of saturated surface Dry sample +
4 Wt. of Oven Dry sample + Tray
5 Dry sample Weight
6 Water Absorption
LIMIT - 2% (Maximum)
REMARKS:
Gravel Content %
Sand Content %
Silt/Clay Content %
Remarks :
Sl. No Determination of 1 2 3
Volume in Kerosene
3
after 24 hours (Vk)
Remarks :
53.00 100
45.00 95-100
22.40 60-80
11.2 40-60
4.75 25-40
2.36 50-30
0.60 8-22
0.075 0-8
Remarks:
Contractor's Asst. Engineer Asst. Executive Executive
Representative Engineer Engineer