Lab Formats

Uploaded by

Nitin Tumkur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views28 pages

Lab Formats

Uploaded by

Nitin Tumkur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 28

KSHIP GVR

Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33

Client : P.D., PIU, PWD, Government of Karnatake

Engineer : Executive Engineer, KSHIP, Belguam Division

Contractor : M/s. GVR Constructions Pvt. Ltd.,

LABORATORY DAILY ACTIVITY


DATE:

SLNO Location Name of Test / Work Remarks


CONTRACTOR'S REPRESENTATIVE: CLIENT'S REPRESENTATIVE:
KSHIP COMBINED FLAKINESS AND ELONGATION INDEX GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location/Source Date of Sampling :
Type of material Sampled by :
Proposed Use Date of Testing :
Tested by :
Total wt. Of Wt. agg.Passing on Wt. Agg.Retained on Wt.of agg Retained On
Sieve Size (mm)
Aggregate thickness gauge thickness gauge lenth gauge

Passing Retained Grms Grms Grms Grms


63 50

50 40

40 31.5

31.5 25

25 20

20 16

16 12.5

12.5 10

10 6.3

Total A= B= C= D=

Combined Flakiness and Elongation index =(B/A*100+D/C*100)

Remarks:

Asst. Executive
Submitted by Asst. Engineer Executive Engineer
Engineer
KSHIP COARSE AGGREGATE GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Location/Source Date of Sampling :

Type of material Sampled by :

Proposed Use Date of Testing :


Total Weight: Tested by :
Sieve Weight Cum. Wt of Cum. % of % of Spec. %
Size Retained Retained Retained Passing of Passing
( mm ) ( Gms.) (Gms) (%) (%) (%)

40 100

20 95 - 100

10 25 - 55

4.75 0 - 10

Remarks:

Asst. Executive
Submitted by Asst. Engineer Executive Engineer
Engineer
SIEVE ANALYSIS
KSHIP (FOR FINE AGGREGATE - SAND) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Location/Source Date of Sampling :

Type of material Sampled by :

Proposed Use Date of Testing :


Total Weight: Tested by :
Sieve Weight Cum. Wt of Cum. % of % of
Size Retained Retained Retained Passing Zone - I Zone - II Zone - III
( mm ) ( Gms.) (Gms) (%) (%)

10.000 100 100 100

4.750 90-100 90-100 90-100

2.360 60-95 75-100 85-100

1.180 30-70 55-90 75-100

0.600 15-34 35-59 60-79

0.300 5-20 8-30 12-40

0.150 0-10 0-10 0-10

Pan

Fineness Modulus

Remarks:

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


SLUMP REPORT
KSHIP GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Location : Date of Casting :

Structures : Date of Testing :

Grade of concrete: Grade of Cement :


Slump Required:

Batch no Time Slump(mm) cubes casted Remarks

Remarks:

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


FINENESS OF CEMENT
KSHIP (IS 4031, PART 1 - 1996) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Grade of Cement : Date of Sampling :

Batch No : Date of Testing :

Wt. of Cement Wt. Retained on 90micron


Sl. No % of Fineness Average Limit
taken Sieve
1

2
Maximum
3
10%
4

Remarks:

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


NORMAL CONSISTANCY OF CEMENT
KSHIP (IS: 4031, PART 4 - 1988) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Grade of Cement : Date of Sampling :

Batch No : Date of Testing :

Vicats
Wt. of Cement Volume of water Apparatus Temperature
Sl. No % of Water added
(grms) Added (cc) Reading (0C)
(mm)
1

Remarks:

Submitted by Asst. Engineer Asst. Executive Enginee Executive Engineer


INITIAL & FINAL SETTING TIME OF CEMENT
KSHIP (IS: 4031, PART - 5 (1978) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Grade of Cement : Date of Sampling :

Batch No : Date of Testing :

Vicats
Wt. of Cement % of Water Volume of water Apparatus Total Time Temperature
Sl. No
(grms) added Added (cc) Reading taken (0C)
(mm)
1

FINAL SETTING TIME

Time at which the needle an impression on the test block while attachment
falls do so after adding of water to cement
Final Setting Time

Remarks:

Submitted by Asst. Engineer Asst. Executive Executive Engineer


SPECIFIC GRAVITY TEST OF CEMENT
KSHIP (IS 2720 PART - 2 Section - 1) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,

Brand : Date of Sampling :

Grade : Date of Testing :

Batch No :
Sl. No MEASUREMENT Train - 1 Trail - 2 Average

1 Wt. of Density Bottle

2 Wt. of Density Bottle + Sample

3 Wt. of Density Bottle + Sample + Kerosene

4 Wt. of Density Bottle + Kerosene

5 Specific Gravity of Kerosene

Specific Gravity of Cement = { (2-3) / [(4-1)-(3-2)] x 5}

Remarks:

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


IN-SITU DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720, PART - 28)
KSHIP (SMALL POURING CYLINDER / LARCE POURING CYLINDER GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location : : Date of Sampling :
Layer : Date of Testing :
Bulk density of sand: gm/cc MDD gm/cc
Wt.of sand in cone: gm OMC %

S.NO DESCRIPTION 1 2 3 4 5 6
1 Chainage in KM

2 Offset from Centerline(m)

3 Wt. Of Soil from hole(gms)

4 Initial wt.sand & cylinder(gms)

5 Final wt.sand & cylinder(gms)

6 Wt. Of Sand in hole+cone (gms)

7 Wt. Of Sand in hole (gms)

8 Volume of hole (cc)

9 Wet.density (gm/cc)

10 Container no..

11 Container wt.(gms).

12 Container+ wet soil (gms)

13 Container+ dry soil (gms)

14 Wt. Of water (gms)

15 Wt. Of dry soil (gms)

16 % Of Water Content

17 Field dry density (gm/cc)

18 Field compaction(%)

19 Average compaction

20 Required compaction

RESULT: PASS / FAIL

REMARKS

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


MDD & OMC TEST (IS 2720 PART - 8)
KSHIP GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33

Client : P.D., PIU, PWD, Government of Karnatake

Engineer : Executive Engineer, KSHIP, Belguam Division

Contractor : M/s. GVR Constructions Pvt. Ltd.,


Location : Date of Sampling :
Material : Date of Testing :
Purpose :

No. of Blow :- 5 X Wt. Of Rammer :- 4.89 kg.


Determination No. 01 02 03 04 05
Watter added (%)
Volume of Mould (cc)
Weight. of Mould (cc)
Wt.of wet Soil+Mould (g)
Wt.of wet Soil (g)
Wet Density (g/cc)
Cup no.
Wt. of Cup (g)
Wt.of Wet soil + cup (g)
Wt.of Dry soil + cup (g)
Wt. of Water (g)
Wt. of Dry soil (g)
Moisture Content (%)
Dry Density (g/cc)
Maximum Dry Density = g/cc, Optimum Moisture Content = %
Dry Density g/cc

MOISTURE CONTENT (% )

Remarks .

Executive
Submitted by Asst. Engineer Asst. Executive Engineer
Engineer
C. B. R. TEST

KSHIP GVR
Contract (AsTO
: REHABILITATION OF ROAD FROM NAVALGUND perRON
IS 2720 Part
- KSHIP - XVI) - M 33
PACKAGE
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location :- Date of Samping :-
Description of Materials :- Date of testing :-
Period of soaking :- Date of soaking :-
M.D.D. :- gm/cc O.M.C. :- %

Description Before Soaking After Soaking


Mould No.
Wt. Wet soil + Mould (gm)
Mould Weight (gm)
Wt. Of wet Soil (gm)
Volume of Mould (cc)
Wet Density (gm/cc)
TIME ( Hrs)
DIAL READING (mm)
Cup no.
Wt. of Cup (gm)
Wt.of Wet soil + cup (gm)
Wt.of Dry soil + cup (gm)
Weight of water (gm)
Wt. of Dry soil (gm)
Moisture Content (%)
DRY DENSITY (gm/cc)
Compaction %
Proving Ring factor :- 1 division = Surcharge weight :- 5.0 kg.
Mould No.
Penetration Reading Load Kg. Load Reading Load Kg. Load Reading Load Kg. Load
in ( mm ) on PR (kgs.) kg/cm2 on PR (kgs.) kg/cm2 on PR (kgs.) kg/cm2
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
7.50

C.B.R.value :

Remarks:

Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer


SPECIFIC GRAVITY & WATER ABSORPTION OF AGGREGATE
KSHIP IS: 2386, (PART - 3) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP - PACKAGE - M 33
Client : P.D., PIU, P.W.D, Government of Karnataka
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd

COARSE AGGREGATE
Location / Source : Date of Sampling :
Type of Material : Sampled by :
Proposed Use : Date of Testing :
Tested by :
Description 1 2 3 Average
1 Wt of Sample + Basket in Water (A) (g)
2 Wt of Basket in water (B) (g)
3 Wt of Weight of SSD Sample in Air (C ) (g)
4 Wt of Oven Dry sample (D) (g)
5 Bulk Specific Gravity (OD) D/[C-(A-B)]
6 Bulk Specific Gravity (SSD Basis) C/[C-(A-B)]
7 Apparent Specific Gravity D/[D-(A-B)]
8 Water Absorption % (C-D)/D x 100

Remarks

FINE AGGREGATE

Location / Source Date of Sampling


Type of Material Sampled by
Proposed Use Date of Testing
Tested by
Determination 1 2 3 Average
1 Pycnometer Number
2 Wt of SSD sample in air (A)
3 Wt of Pyenoment + Water + Sample (B)
4 Wt of Pycnometer + Water ( C)
5 Wt of Oven Dry Sample (D)
6 Bulk Specific Gravity (OD) D/[C-(B-A)]
7 Bulk Specific Gravity (SSD Basis) A/[C-(B-A)]
8 Apparent Specific Gravity D/[C-(B-D)]
9 Water Absorption (%) (A-D)/Dx 100

Remarks
Contractor's Asst. Engineer Asst. Executive Executive Engineer
Representative Engineer
KSHIP AGGREGATE IMPACT VALUE TEST IS : 2386 (Part - 4)
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location/Source Date of Sampling
Type of material Sampled by
Proposed Use Date of Testing
Tested by

Trail No. 1 Trail No. 2


Weight of Surface dry sample passing 12.5mm and retained on
10mm IS Sieves, W1 (g)
Weight of fraction passing 2.36mm IS Sieve, after the test, W2
(g)
Weight of fraction retained on 2.36mm IS Sieve, after the test, W3
= W1 - W2 (g)
A. I. V = (W2 / W1) x 100

Average value of A. I. V (%)

Specification limit = Maximum %

Remarks:

Contractor's Asst. Engineer Asst. Executive Executive Engineer


Representative Engineer
GVR
ACKAGE - M 33

:
:
:
:

Trail No. 3

ecutive Engineer
KSHIP ATTERBERG LIMITS (As per IS: 2720 Part - V) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location Date of Samp:
Source
Proposed Use Date of Testi :

TEST: LIQUID LIMITS PLASTIC LIMITS


Particular 1 2 3 4 1 2
No. of Blows/Penetration
Container No
Wt. of soil + Cup (gms)
Wt. of dry soil + Cup (gms)
Wt. of Container (gms)
Wt. of dry soil (gms)
Water in Soil (gms)
Moisture Content (%)
LIQUID LIMIT: PLASTIC LIMIT: PLASTICITY INDEX:
Moisture
Content

No. of Blows
Remarks:

Asst. Executive Executive


Contractor's Representative Asst. Engineer
Engineer Engineer
KSHIP SIEVE ANALYSIS FOR G.S.B GVR
(Table 400- 2 Grading- 1 Of MORT & H)
Contract :REHABILITATION OF ROAD FROM NAVALGUND TO RON -KSHIP, PACKAGE M33
Client :P.D., PIU, P.W.D. Government of karnataka
Engineer :Executive Engineer, KSHIP. Belgaum Division
Contractor : M/s. GVR Constructions Pvt Ltd.,
Source of Material : Date of Sampling :
Location : Date of Testing :
Weight of Dry Matirial : gms.

Weight Cum, % of % of Spec, %


Sieve % of Retained
Retained Retained Passing of Passing
size (%)
(Gms.) (%) (%) (%)
(mm)
75 100

26.5 55-75

4.75 10-30

75M/c 0-10

REMARKS:

Contractor's Asst. Asst. Executive Executive Engineer


Representative Engineer Engineer
10% FINES VALUE
KSHIP ( BS: 812-PART 111) GVR
Contract :REHABILITATION OF ROAD FROM NAVALGUND TO RON -KSHIP, PACKAGE M33
Client :P.D., PIU, P.W.D. Government of karnataka
Engineer :Executive Engineer, KSHIP. Belgaum Division
Contractor : M/s. GVR Constructions Pvt Ltd.,

Source of Material: Date of Sampling :


Material for : Date of Testing :
Location :
Sample : 12.5 mm Passing & 10.0 mm retained.

Particulers TRIAL- I TRIAL- II TRIAL- III AVERAGE


Total Wt of Sample (g)
( 12.5 mm - 10.0 mm ) A
Wt. of Material Passing on
2.36 mm - after test (g) B
Wt. of Material Retained on
2.36 mm - after test (g) C
(%) Of Fines = (B/A)*100

Load Observed in Dial (KN)

Load for 10% fines (KN)

Load At 10% Fines = LIMIT : 50KN

REMARKS:

Submitted by Asst. Engineer Asst. Executive Enginee Executive Engineer


KSHIP CONCRETE CUBE TEST RESULTS G.V.R
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP - M 33

Client :P.D, PIU, PWD, KSHIP Belgaum Division.

Engineer : Executive Engineer, KSHIP, Belgaum Division.

Contractor : M/s. G.V.R Constructions Pvt. Ltd.,

Location : Date of Casting :

Structures : Date of Testing :

Age of Cube (Days) : Grade of Cement :

Grade : M -
Sl.No. 7 8 9 10 11 12

Weight of cube (gm)

Size of cube (mm)

Volume of Cube (cc)

Density of cube (gm/cc)

Average Density (gm/cc)

Load at Failure (KN)

Surface Area of cube (mm2)

Compressive Strength (N/mm2)

Avg. Comp. Strength (N/mm2)

Remarks:
Submitted by Asst. Engineer Asst. Executive Engineer Executive Engineer
KSHIP WATER ABSORPTION TEST GVR
AS PER IS : 2386, (PART -3)
Contract :REHABILITATION OF ROAD FROM NAVALGUND TO RON -KSHIP, PACKAGE M33
Client :P.D., PIU, P.W.D. Government of karnataka
Engineer :Executive Engineer, KSHIP. Belgaum Division
Contractor : M/s. GVR Constructions Pvt Ltd.,
Type of Material: Date of Sampling :
Purpose : Date of Testing :

WATER ABSORBTION ( AS PER IS 2386 Pt. III )

Sl
No.
DESCRIPTION TRIAL-1 TRIAL-2 TRIAL-3 AVERAGE

1 Tray Weight
2 Wt. of saturated surface Dry sample
3 Wt. of saturated surface Dry sample +
4 Wt. of Oven Dry sample + Tray
5 Dry sample Weight
6 Water Absorption

LIMIT - 2% (Maximum)

REMARKS:

Submitted By Assistant Assistant Executive Executive


Engineer Engineer Engineer
GRAIN SIZE ANALYSIS OF SIOL
KSHIP GVR
IS : 2720 (Part - 4)
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP - PACKAGE - M 33

Client : P.D., PIU, P.W.D, Government of Karnataka


Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd
Location / Source Date of Sampling :
Type of Material Date of Testing :
Weight of Dry sample (gms)

weight of retained Cumm. % of


Sieve Size (mm) % of Retained % of Passing
(gm) Retained
26.5
19
4.75
2.00
0.425
0.075

Gravel Content %
Sand Content %
Silt/Clay Content %

Remarks :

Contractor's Asst. Engineer Asst. Executive


Executive Engineer
Representative Engineer
FREE SWELL INDEX OF SOILS
KSHIP (IS : 2720 Part - 4) GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP - PACKAGE - M 33

Client : P.D., PIU, P.W.D, Government of Karnataka

Engineer : Executive Engineer, KSHIP, Belguam Division

Contractor : M/s. GVR Constructions Pvt. Ltd

Location : Date of Sampling :

Source : Date of Testing :

Mass of dry soil Passing 425 micron sieve

Sl. No Determination of 1 2 3

Mass of dry soil


1 Passing 425 micron
sieve
Volume in water after
2
24 hours (Vd)

Volume in Kerosene
3
after 24 hours (Vk)

Free Swell Index


4
(Vd - Vk) / Vk

Remarks :

Contractor's Asst. Executive Executive


Asst. Engineer
Representative Engineer Engineer
KSHIP W. M. M GRADATION GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33
Client : P.D., PIU, PWD, Government of Karnatake
Engineer : Executive Engineer, KSHIP, Belguam Division
Contractor : M/s. GVR Constructions Pvt. Ltd.,
Location :
Source : Date of Sampling :
Type of material : Date of Testing :
Proposed Use :
Total Weight: gms

Wt. of Retained % of Cum. Specification


IS SIEVE(mm) % of Retained % of Passing
(grms) Retained Limits

53.00 100
45.00 95-100
22.40 60-80
11.2 40-60
4.75 25-40
2.36 50-30
0.60 8-22
0.075 0-8

Remarks:
Contractor's Asst. Engineer Asst. Executive Executive
Representative Engineer Engineer