0% found this document useful (0 votes)
36 views10 pages

Machining

Uploaded by

Ikshore Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views10 pages

Machining

Uploaded by

Ikshore Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

DISTANCE RELAY SETTINGS

Introduction
• Commonly used >33kV
• Determine whether impedance measured is within set
characteristic.
• Non-unit protection (boundaries not defined)
• During normal operation impedance is combination of line,
transformers and load ( >> line impedance)
o Determine fault location by impedance measured
o Measured impedance < line impedance  fault
o Example

A B
Z = 30 ohms LOAD
100MVA
132kV

o Load Impedance = V2 / P = 1320002/100x106=174.2Ω


o Relay Measures = 30+174 = 204 Ω
o Equivalent Circuit
B
A
30 ohms 174.24 ohms

Source

o If have fault at B load impedance shorted out and relay


measures 30ohm:
B
A
30 ohms 174.24 ohms

Source

o Above is oversimplification (no errors, angle


differences)

Time Stepped Distance


General:
• Relays have errors as do CTs and VTs – allow 5 to 10%.
• Line impedance calculation errors – allow 10%.
o  total errors 20%.
• To ensure whole line covered set to 120%  but sees past
end and could operate for fault on next line.
o Solution 1: time delay

A B C D
relay A Reach relay C reach

relay B reach

 A to grade with B which grades with C … 


similar to overcurrent end up with slowest
operation at the source.
o Solution 2: set another zone which cant see past end
o Set to 80% of line impedance, instantaneous
• Set Zone 1 to 80%, inst; Zone 2 to 120%, time delayed.
A B C
Zone 2

Zone 1

Zone 1

Zone 2

• Slowest clearance on any line is Zone 2 time.


• Zone 3 to provide backup to remote lines, time delayed to
grade with Zone 2.

Time Stepped Distance Settings


Major requirements:
• Fault detection: faulted plant is tripped
• Coordination: only faulted plant is tripped

General comment:
• Impedance generally refers to PPS impedance (covers
different fault combinations and earth return via
measurement quantities – see last week).

Zone 1 Settings:
• So can be set instantaneous (no intentional delay), set as far
as possible whilst ensuring doesn’t see remote end
o Zone 1 = 0.8xZ line .......................(1)

Zone 2 Settings
• Set to ensure whole line length covered and time delayed to
grade with next line protection.
• Time delay > Remote Zone 1 (say 50msec) + remote CB
(say 80msec) + remote trip relay (say 10msec) + local Zone
2 timing errors (say 50msec) + safety margin (say 50 to
100msec).
o 300msec is common.
• So can use 300msec, require no Z2 overlap
A B C
Zone 2

Zone 1
F

Zone 1

Zone 2

• Z2 AB ≤ Z AB + Z1 BC ignoring errors
o 1.1xZ2 AB ≤ 0.9(Z AB + Z1 BC ) including errors
o Z2 AB ≤ 0.8(Z AB + Z1 BC )
o Z2 AB ≤ 0.8(Z AB + 0.8xZ BC ) as Z1 BC = 0.8xZ BC
o Z2 AB ≤ 0.8(Z AB + 0.8xZ BC )
• Also require whole line to be covered: Z2 AB ≥ 1.2xZAB
o 1.2xZ AB ≤0.8(Z AB + 0.8xZ BC )
o Z BC ≥ 0.625xZAB
o if remote line < 62.5% of protected line impedance no
Z2 that satisfies both equations 2 and 3
o generally set Zone 2 as long as possible

Zone 3 settings
• Time delay > Remote Zone 2 (say 50msec pickup +
300msec time delay) + remote CB (say 80msec) + remote
trip relay (say 10msec) + local Zone 3 timing errors (say
50msec) + safety margin (say 50 to 100msec).
o 600msec is common.
• Assuming wanting to coordinate Z3, and set 600msec,
require no Z3 overlap:
o Z3 AB ≤ Z AB + Z2 BC ignoring errors
 1.1xZ3 AB ≤ 0.9(Z AB + Z2 BC ) with errors
 Z3 AB ≤ 0.8(Z AB + Z2 BC )
 Z3 AB ≤ 0.8(Z AB + 0.8(Z BC + 0.8xZ CD )) as
Z2 AB ≤ 0.8(Z AB + 0.8xZ BC )
 Z3 AB ≤ 0.8xZ AB + 0.64xZ BC + 0.512xZCD
• Assuming wanting to backup line B-C: Z3 AB ≥ 1.2(Z AB +
Z BC )
o 1.2(Z AB + Z BC ) ≤ 0.8xZ AB + 0.64xZ BC + 0.512xZ CD
o 0.4xZ AB + 0.56xZ BC ≤ 0.512xZ CD
o Z AB + 1.4xZ BC ≤ 1.28xZ CD
o Only satisfy if CD much longer than AB or BC.
 Not generally the case  difficult to achieve
backup and coordination. If backup preferred
Z3TD >> 600msec.

Short Line Considerations


• What if Z BC < 0.625xZ AB ie cant set Z2 to cover line and
not overlap next Z2 (on a ‘short’ line)
o Only a problem if short line protected by TSD.
• Three solutions
o Time delay Z2 BC to grade with Z2 AB (ie set 600msec)
• Slow clearance for remote end faults
o Set Z2 BC (300msec) so it doesn’t see past Z1 AB and
then set Z3 BC to protect 120% of line and to grade with
Z2 AB (ie set 600msec)
• Only worthwhile if 120% reach only just overlaps
Z1 AB
• Slow clearance for remote end faults under worse
case errors.
o Use whole line high speed protection (eg differential,
pilot, distance signalling, etc)
• Expensive as requires comms
• Short lines often protect by differential as distance
doesn’t achieve enough fault resistance coverage.
A B C D

Zone 2
Zone 1

short line with


high speed Zone 1
protection Zone 2

• Need to ensure that the zone 2 of line AB does not


see into the zone 2 of line CD.

1.1xZ2 AB ≤ 0.9(Z AB + Z BC + Z1 CD )

⇒ Z2 AB ≤ 0.8(Z AB + Z BC + Z1 CD )

This can be satisfied provided:

1.2xZ AB ≤ 0.8(Z AB + Z BC + 0.8xZ CD )

⇒ 0.4xZ AB ≤ 0.8(Z BC + 0.8xZ CD )

⇒ Z AB ≤ 2xZ BC + 1.6xZ CD )
........................(8)

• In an interconnected system this becomes easier due to


throttling (infeeds from other lines cause adjacent lines to
appear to have larger impedances).

Affects of Power Transformers


• Transformers > 33kV generally use high speed protection
 grade with Z2 OK.
o Check Z2 and Z3 don’t see through TX to plant
protected by slow protections:
Z2 ≤ Z Line + Z TX
1.1xZ2 ≤ 0.9(Z Line + Z TX ) with errors

⇒ Z2 ≤ 0.8(Z Line + Z TX )
o What TX impedance to use due to tap position
effecting impedance (nominal, worse case)
o Also consider TXs run in parallel.
o If no TX high speed protection or have to set Z2/3 so
can see through, grade Z2 and Z3 with these slower
protections.

Considerations of Load
• Load appears as an impedance to a distance relay.
• Line angle 70-80 deg, load impedance +/- 40 deg (ie pf of
0.8).
• On heavily loaded, long lines load impedance will
approach line impedance  load encroachment.
• Worse case is minimum voltage conditions and maximum
load on line (Z = V/I).
X

Load

R
Throttling
• Change in relay measured impedance due to multiple
remote infeeds to fault

I2 B

A
I1
→ Fault
ZL1 ZL2

• With no infeed Zr = ZL1 + ZL2.


• With infeed at B:
VA = I 1 Z L1 + (I 1 + I 2 )Z L2

⇒ VA Z L1 + Z L2 + I 2 Z L2
= _____
I1 I1
• Potentially large increase in measured impedance;
o need to allow for this if setting Z3 to give remote
backup, ie extend Z3 but then need to be careful with
grading if remote infeeds removed/reduced
o Can assist with grading between lines (eg short lines
‘look’ longer).
o Need to be careful of parallel paths and effects of
ends opening before others.
o Can show we can set Z2 AB so doesn’t see past Z1 BC
Z AB ≤ (1+ I 2 /I 1 )1.6xZ BC (compared with Z BC ≥
0.625xZAB or Z AB ≤ 1.6xZ BC previously)

Settings for Teed Lines


B

A C

• Throttling at tee point reduces effectiveness of distance.


• Zone 1 set to 80% of shortest distance to remote ends –
ignore throttling here as one end could be open.
o If external low impedance connection between
remote ends may need to pull back Z1.
• Zone 2 has to protect whole line and thus set to 120% of
largest distance to remote ends, plus consider throttling.
o Eg Z2 at A = 120% x Z AT + Z tee max where
Z tee max is the max of:
(1 + I CB /I AB )Z TB For the impedance from T to B
(1 + I BC /I AC )Z TC For the impedance from T to C
where I xy is the current from x to y
o When checking coordination, assume one end open
o Effected by changes to system.
o If coordination not possible, use differential or
distance signalling.
TUTORIAL – WEEK 4
1) For the following power system determine Zone 1, 2 and 3
reach and time delay settings.
B C
A G

F H I

D E

Impedances, loads
a) Generator 0.1pu, 1200A, 11kV
b) Line A-G 0.3pu, 1000A
c) Line B-C 0.4pu, 800A
d) Line D-E 0.35pu, 800A
e) Line F-H 0.2pu, 400A
f) I has impedance of 0.5pu

Assume I operates instantaneously. Allow 300msec safety


margin between relays.

2) Check reaches determined in Question 1 do not result in any


load encroachment problems. Assume all lines have a line
angle of 70 degrees and relays are mho relays.

3) Consider options for short line F-H.