1st Seal Coat (DSD)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1/ 1

CONTRACTOR-CHICO EMPLOYER CONSULTANT

TANZANIA RURAL AND


URBAN ROADS AGENCY

Compaction Test

WORK SHEET FOR BITUMINOUS 1ST SEAL COAT(DSD)

Location : KM From: To: Checked by:


Type of Bitumen: PEN 80/100 Date: 17-Oct-2024

Temperature (˚C) (a) Density of Bitumen: 0.90


(b) Temperature Vol Corp (˚C) Truck Speed: 5.3KPH Request No: SSD-008

( c ) Air Temperature (˚C) Pump output:

Description

Layer Description Prime Coat 1 Seal


st
2nd Seal

Test No: 1 2 3 4 5 6 7 8

Position/Tested Location SIDE LHS LHS LHS CL CL RHS RHS RHS

Tray No: A B C D E A B C

1: Weight of Tray alone (g) 1021 1019 1026 1030 1041 1030 1032 1021

2: Weight of Tray + Bituminous (g) 1106 1105 1110 1116 1125 1114 1115 1105

3: Weight of Bituminous (g) 85.00 86.00 84.00 86.00 84.00 84.00 83.00 84.00

4: Area of Tray (m2) 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

5 :Rate of Spray (3/4) 0.94 0.96 0.93 0.96 0.93 0.93 0.92 0.93

6: Rate of Spray ( 5/a) (L/m2) 1.05 1.06 1.04 1.06 1.04 1.04 1.02 1.04

Average Rate of Spray (L/m2) 1.04

Remarks:

For Contractor For Consultant

Materials Technician Materials Technician

Materials Engineer Materials Engineer

Date: Date: