0% found this document useful (0 votes)
70 views12 pages

Color Coding

Uploaded by

syedhussnain11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views12 pages

Color Coding

Uploaded by

syedhussnain11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

SNAMPROGETTI ENGINEERING & CONTRACTING CO.

LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 1 of 8 REV. A

TABLE OF CONTENTS

1. SCOPE
2. PURPOSE
3. REFERENCES
4. DEFINITIONS
5. UNITS AND CONVERSIONS
6. RESPONSIBILITIES
7. COLOR CODING
8. WEATHER CONDITION
9. METHODE & REQUIERMENTS
10. SAFTETY
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 2 of 8 REV. A

1. PURPOSE
The purpose of this document is to outline the COLOR COADING & STENCLINIG, highlight quality control
procedures that will be applied to the Jafurah Upstream Pipeline & Well Tie-In Project. Color Coating and
Stenciling shall be executed in compliance with all related Saudi Aramco Engineering Standards (SAES),
Procedures, and IFC drawings.

2. Scope of Work
The scope of this document describes the COLOR COADING & STENCLINIG requirements for
the following Facilitates that will be carried out at worksites Installation.
Pipe Line & Piping
Structure
Skids
Equipment’s etc.

3. REFERENCES

SAEP-316 Performance Qualification of coating Personnel


SAES-H-001 Coating Selection and Application Requirements for Industrial Plants
SAES-B-067 Safety Identification and Safety Colors
SAES-L-310 Design of Plant Piping
SAES-L-350 Construction of Plant Piping
SAES-H-102 Safety Requirements for Coating
ANSI-Z-535.1 Safety Color Code
ANSI-Z-535.2 Environmental and Facility Safety Signs
ANSI-Z-535.3 Standard for Criteria for Safety Symbols
ANSI-Z-535.4 Product Safety Signs and Labels
ANSI-Z-535.5 Standard for Accident Prevention Tags (for Temporary Hazards)
ASME-A-13.1 Standard for the Identification of Pipes

4. DEFINITIONS

SAES Saudi Aramco Engineering Standards


SATIP Saudi Aramco Typical Inspection Plan
SAIC Saudi Aramco Inspection Checklist

5. UNITS AND CONVERSIONS


1 MICRON = 1/1000 MM
1 MILLS = 25.4 MICRONS
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 3 of 8 REV. A

1. RESPONSIBILITIES
Construction Department Perform the work as per the requirements of Contract
Documents, IFC Drawings, Saudi Aramco Standards, SATIP, SAIC
and Project Quality Plan.

Assign the appropriate and approved personnel for the


Painting Crew Supervisor
coating activity and monitor their performance in terms of
productivity and Quality; coordinate guidelines with the QC
inspector for proper quality performance; ensure the
implementation of approved methodology stipulated through
this and any construction method statement; implement the
corrective action when there is any violation found and the
corrective action request initiated.
Perform all Inspections as per approved SATIP to verify the
QC Coating Inspector
requirements as per specification and Aramco Standards;
prepare Inspection Reports; issue non-conformance report when
procedure or Company quality requirement is violated and
coordinate for appropriate corrective action; Discuss with QC
Supervisor on this compliance and implement preventive action
measures at construction site.
Coordinate the Inspection activities and verify the QC report for
QC Supervisor
completion and sign the document; closely monitor the
construction activities through the implemented procedures and
assigned QC inspectors; guide QC inspectors for effective way of
quality system implementation by preventive action reports;
discuss with Project Quality Manager for continuous
improvement with regards to site quality system
implementation.
Safety Officer Implement Aramco and contractor safety requirements.
Inspect workplace, site condition, ensure a safe working
environment.

2. MATERIAL STORAGE REQUIERMENT


Each paint container should be marked in accordance with 09-SAMSS- 060
 Manufacturer’s Name
 Product Identification
 Shelf life or expiry date
 Date of manufacture
 Batch Number
 Paint containers are free of damage and show no sign of leakage
 Paints exceeding shelf life are removed from the stock.
 Paints and thinners shall be stored in well-ventilated buildings and storage temperatures as
recommended in the Manufacturer’s Data Sheet.
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 4 of 8 REV. A

 Paint Materials used at construction sites must be covered with appropriate canvas, tarpaulins,
or equivalent for a temporary storage period not to exceed 14 days and/or as recommended by
paint manufacturer.
 Temperature sensitive polymerization paint materials must be stored in air conditioned storage
area to maintain the temperature as recommended in the Manufacturer’s Data Sheet.

8. WEATHER CONDITION
 Painting shall not be applied when wind is strong enough to blow sand, salt spray or other foreign matter
onto the surface being painted.
 Painting shall not be applied if the substrate temperature is less than 10 ͦC or limit given in the Saudi
Aramco data sheet
 Relative humidity should be less than 90%
 Surface temperature is less than 3 ͦC above the dew point.

9. Method & Requirements


Pipes, vessels, valves, and related structural supports shall be painted a neutral background color such as
aluminum, gray, or black, which will not detract from the high visibility of the safety colors set out in this
specification. Coating Selection Shall be As Per SAES-H-001.
9.1.Lines Marking:
All lines shall be clearly marked to easily identify the following as a minimum:
a) Flow direction and service.
b) Line designation number, size, class and specification
c) Color coding as per SAES-B-067 shall be Applied as mention Table # 2.
d) Process equipment connected to the line as applicable and practical.
e) Color coding to the lines as applicable and detailed in the design drawings.
 A label in English shall be used as the primary and explicit means of identification for the contents of all above-
ground piping. A lettered label shall give the name of the contents in full or abbreviated form. Arrows shall be
used to indicate direction of flow.
 Additional details such as temperature or pressure shall be added as necessary to highlight the degree of
hazard.
 Labels shall be applied close to valves or flanges and adjacent to changes in direction, branches, and where
pipes pass over or through walls, floors, fences, or roads, and on straight pipe runs, sufficient for identification.

9.2. Fire water system:


Safety red shall be used as the color indicator for fire protection equipment and piping, as well as emergency stop
push button devices. Specific requirements are as follows:
Fire water piping: all exposed above-ground fire water piping and fittings shall be painted red.
Sprinkler and deluge piping may be painted an aluminum color. However, in the header/riser piping all valves, tees,
elbows, strainers, and their connected piping within 3 meters shall be painted red.
Fire protection equipment: fire water pumps, fire water pump control panels, portable and fixed fire protection
systems, the mounting background for fire extinguishers, Portable fire-fighting equipment, and shelters for portable
fire-fighting equipment shall be safety red.
Safety red shall be used for the background of "DANGER" and "STOP" signs, "EMERGENCY ROOM" signs and arrows,
and "EMERGENCY SHUTDOWN" signs. The Lettering shall be safety white.
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 5 of 8 REV. A

Fire water system sectionalizing block valves shall be identified by their fire water system identification number.
9.3.Potable Water
 Safety blue shall be used as the color indicator for potable water (sweet water and domestic raw water).
Specific requirements: Above-ground potable water piping in plant areas shall be painted blue.

9.4.Physical Hazardous Locations (i.e. Handrails, Ladders Foundations, Bollard,Guard post)


 Safety yellow or yellow and black shall be the color indicator for physical and
 radioactive hazards.
 Physical hazards such as stumbling and tripping hazards shall be painted safety yellow.
 Where additional caution is required, such as concrete supports at the base of stairways or ladders, passageway
pinch points, unguarded edges, tripping hazards, barricades including access road overpass railings in plant
areas, and obstructions that present bump hazards, safety yellow-and-black stripes shall be used. The stripes
shall be 100mm wide.
"Warning" and "Caution" signs shall have black lettering on safety yellow background.

9.5.Letter & Marking for Plant (General) Piping


 The size of the label letters shall not be less than 13 mm, nor greater than 89 mm, varying in size depending on
the outside diameter of the pipe as mentioned table no.1 & table B1.
 For pipes 52 mm and smaller, use stamped metal tags or signs clamped to the pipe.
 For piping 52 mm and smaller running between equipment where the total length is less than 15 meters, no
labeling is necessary. For piping on pipe racks, labels shall be oriented so as to be visible from grade level as well
as from any nearby platform.
 Unless otherwise specified herein, the color of the label letters shall be safety black or white, whichever
provides the greater contrast to the background color.
 Markings should be as close as possible to the points of product transfer.
 Background colors shall be indicated by a 300 mm wide band per Table 2.
 The identifying color shall be indicated by a 50/100 mm wide stripe over the band per Table 2.
 spaced 25 mm apart when two stripes are applied.
 The color-coding bands shall be placed at 10 m intervals.
 The background color band represents groups of materials with similar volatility.The identifying color stripe
identifies the specific material as listed in Table 2 below.
 Primary Language is English and Giving Clear Identification of the Content.
 Content on the lettered label shall be in full or abbreviated form, any abbreviation to be clear agreed by
Proponent.
 Arrow Shall be used for Flow Direction.
 Line Size (Diameter) Shall be Included.
 Line Number from the Line List.
 Line Class.
 Additional Details Such as Temperature or Pressure to Highlight the Degree of Hazard to be Added on
Proponents request.
 Color Coding to the Lines as Per SAES-B-067 Shall Apply.
 TO Indicate “Where From” and “Where To” the Lines Go, Entering and Exiting
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 6 of 8 REV. A

Labeling and Letter Size on the Base of Pipe Diameter: (ANSI/ASME A13.1-
2007) Table No.1

Pipe Diameter Minimum Length of Label Field color Minimum Height of Letters
(Inch) / (mm) (Inch) / (mm) (Inch) / (mm)

 8”/ 203mm  .75”/ 19mm


 1.75” – 2” / 45mm – 51mm
 12”/305mm  1.25”/32mm
 2.5”-6” /64mm-152mm
 24”/610mm  2.5”/64mm
 8”-10”/203mm-254mm
 32”/813mm  3.5”/89mm
 Over 10”/ over 254mm

Color Coding Requirements (Table No. 2).


Main Fluid Background RAL Identifying RAL
color (300
(100 mm Strip)
mm Band)

Demineralize Water
Sky Blue 5015 1-Traffic White 9016

Utility Water
Sky Blue 5015 1-Jet Black 9005

Drinking Water
Sky Blue 5015 1-Aluminium 9006

Condensate Water
Sky Blue 5015 1-Pebble Grey 7032
Sky Blue 5015 1-Traffic Red 3020
Seal Flash Water
Sky Blue 5015 1-Opal Green 6026
Cooling water
Sky Blue 5015 1-Blue Lilac 4005
Blowdown Water
Sky Blue 5015 1-Light Ivory 1015
Boiler Feed
Water
Opal Green 6026 1-Jet Black 9005
Instrument Air
Opal Green 6026 1-Pebble Grey 7032
Plant Air
Traffic White 9016 1-Traffic Red 3020
HP Steam
Traffic White 9016 1-Traffic Orange 2009
MP Steam
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 7 of 8 REV. A

Traffic White 9016 1-Opal Green 6026


LP Steam
Traffic Green 6024 1-Traffic Orange 2009
Nitrogen
Light Grey 7035 1-Opal Green 6026
Lube Oils

Light Grey 7035 1-Traffic Red 3020


Hydraulic Oil
Traffic Orange 2009 1-Sky Blue 5015
HP Fuel Gas
Traffic Orange 2009 1-Jet Black 9005
MP Fuel Gas
Traffic Orange 2009 1-Oxide Red 3009
LP Fuel Gas
1- Jet Black 9005
Oily Water

9.6. Lifting Equipment


 Lifting equipment and devices such as davits, monorails, and lifting beams (whether permanent or used
only for construction) shall be painted safety yellow.
 All lifting equipment and devices shall be clearly marked with the rated capacity of the equipment in Arabic
and English in metric tons to meet SAES-M-008. All lifting equipment and devices shall be safety yellow to
meet the as above mentioned Physical
9.7. Tanks & Equipment
Tankage and equipment shall be identified in Arabic and English as follows:
 Letters shall be at least 150 mm high.
 Labels or signs shall be painted at 90-degree intervals around the tanks or equipment at an elevation (line-
of-sight and visible from outside the diked area).
 Letters shall be a size easy to read from normal approach directions and distance Refer to ANSI Z535.2.
Table B1.
 For the Color Identification OF equipment’s see the Table No. 3 shown as below.

Table B1 – Examples of word message letter heights and minimum safe viewing distances
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 8 of 8 REV. A

In addition to the color coding specified in SAES-B-067, following are the


required color codes for Equipment’s.
EXTERNAL SURFACE BASE COLOR RAL

ALL FIRE PROTECTION EQUIPMENT (INCLUDING PIPING, VALVES, TEES,


ELBOWS, SPRINKELS, PUMPS, PANELS, DETECTION SYSTEM SAFTEY RED 3000

PRE-ENGINEERING BUILDINGS (SUB STATION, SHELTERS, PIP)


BEIGE 1000

FOUNDATION & SUPPORTS


TRAFFIC GREY 7042

STRUCTURE STEEL & SUPPORTS


ALUMINIUM 9006

STRUCTRES STEEL & SUPPORTS UNDER 1M


YELLOW/BLACK 9005/1018
STRIPES
HAND RAILS, GUARD RAILS, LADDERS, LADDER CAGE
YELLOW 1018

YELLOW/BLACK 1018/9005
STAIRWAYS, TOE PLATES, LADDER UNDER 1M
STRIPES
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 9 of 8 REV. A

TRAFFIC GREY 7042


EQUIPMENT ENCLOSURES AND/OR PROTECTION COVERS LOCATED
OUT DOOR AT AMBIENT TEMPRATUERE

ALUMINIUM 9006
PLANT PIPING, INCLUDING PACKAGE EQUIPMENT
ALUMINIUM 9006
VESSELS, TANKS, DRUMS, AIR COOLERS
ALUMINIUM 9006
DEAERATOR AND AUXILIARY
ALUMINIUM 9006
BOILERS STACKS AND SILEANCERS
ALUMINIUM 9006
CONDENSATE TRIM COOLER
ALUMINIUM 9006
BOILER BELOWDOWN COOLER
ALUMINIUM 9006
EXCESS LP CONDENSER
ALUMINIUM 9006
MAIN AIR COOLER CONDENSER
ALUMINIUM 9006
HP TO MP LETDOWN DE-SUPER HEATER
ALUMINIUM 9006
MP TO LP LETDOWN DE-SUPER HEATER
YELLOW 1021
LIFTING LUGS
TRAFFIC GREY 7042
HEAT RECOVERY STEAM GENERATOR/AUXILIRY BOILER CASING AND
DUCTING

ALUMINIUM 9006
CONTROL VALVES AND ACTUATORS
BLACK 9005
VALVES HAND WHEEL (FIRE WATER SYSTEM IS EXCLUDED)
YELLOW 1021
MOV ACLUATOR
GREEN(BONNET) 6016
PRESSURE RELIEF VALVES (BELLOWS TYPE)
ORANGE 2000
(BLOCK)
GREEN 6016
BONNET OF BELLOWS TYPE PRESSURE RELIEF VALVES
ORANGE 2000
MAINTENANCE BLOCKS VALVES FOR PRESSURE VALVES
ORANGE 2000
CAR-SEALED VALVES
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 10 of 8 REV. A

ORANGE 2000
LOW-TEMPRATURE VALVES (-10 C TO -45 C)
GREEN 6005
STEAM TRAPS

TRAFFIC GREY 7042


PUMPS, COMPRESSORS AND TURBINE CASING, AIR DUCTS
ALUMINIUM 9006
PUMPS, COMPRESSORS AND TURBINE CASING, AIR
DUCTS (in case of high temperature greater than 70
°C)
TRAFFIC GREY 7042
BASE-PLATE INCLUDING PADESTALS
TRAFFIC GREY 7042
FAN CASING
ORANGE 2000
COUPLING GUARDS, INCLUDING GUARDS AROUND OIL COOLER DRIVING
BELT
ORANGE 2000
GEAR BOX CASING
LIGHT GREY 7035
LUBE OIL EQUIPMENT AND AUXILIARY (INCLUDING OIL COOLER DRIVING
BELL)
GREEN 6005
CHEMICAL INJECTION PACKAGE

YELLOW 1021
LIFTING EQUIPMENT DEVICES SUCH AS DAVITS, MONORAILS, & LIFTING
BEAMS (WHETHER PERMANENT OR USED ONLY FOR CONSTRUCTION).
MAXIMUM WEIGHT SHOULD BE LABLED.
RED 3000
EMERGENCY FIRE PROTECTION EQUIPMENTS BACKGROUND AND
100MM BORDER (EXTINGUSHERS, FIRE BLANCKETS, ETC.)
GREEN 6016
EMERGANCY SAFETY EQUIPMENT BACKGROUND AND 100MM BORDER
(FIRST AID, BREATHING APPRATUS, ETC)
GREEN AND WHITE 6016/9016
FIXED SAFETY EQUIPMENTS BACKGROUND (APPR 2M × 1M)
GREEN 6016
LOCATION OF SAFETY INSTRUCTION SHALL BE MARKED BY A SAFETY
GREEN BORDER OR BACKGROUND.
YELLOW 1021
EMERGENCY EXIT GATES THROUGH FENCE
YELLOW 1021
OWS CATCH BASINS BORDER OF 200MM
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 11 of 8 REV. A

GREEN 6021
ELECTRICAL MOTORS
GREEN 6021
GENERATORS
LIGHT GREY 7035
VFD
LIGHT GREY 7035
TRANSFORMERS
TRAFFIC GREY 7042
ELECTRICAL CABINETS AND MISCELLANEOUS ELECTRICAL EQUIPMENT
(INSIDE & OUT SIDE)
LIGHT GREY 7035
INSTRUMENTS CABINETS IN PCS (INSIDE & OUT SIDE)
TRAFFIC GREY 7042
PLINTH FOR INSTRUMENTS CABINETS
GREY ANSI-61
METAL-ENCLOSED LOW-VOLTAGE SWITCH GEAR ASSEMBLIESS
GREY ANSI-61
INDOOR CONTROL GEAR- LOW VOLTAGE
GREY ANSI-61
INDOOR METAL-CLAD SWITCH GEA: 1 TO 38 KV
LIGHT GREY 7035
HIGH VOLTAGE SWITCHGEAR-OUT DOOR
TRAFFIC GREY 7042
TAP CHANGER CONTROL PANEL
LIGHT GREY 7035
DC SYSTEM
LIGHT GREY 7035
AC UPS
LIGHT GREY 7035
HVAC CONTROL PANEL
LIGHT GREY 7035
INTERPOSING RELAY PANEL

DRY TYPE DISTRIBUTION TRANSFORMER MENUFACTURER


STANDARD COLOR
POWER AND LIGHTING DISTRIBUTION PANEL BOARDS MENUFACTURER
STANDARD COLOR
NOTES:
Tanks logo type and identification shall be painted as follow:
1. Labels or sign shall be painted at 90-degree intervals around the tanks and at a visible elevation. Letters shall be
a size easy to read from normal approach direction and distance.
2. Equipment’s color mentioned in above table are base color equipment. Auxiliary piping, supporting structure,
covers, enclosures, instrument, electrical equipment, ETC, must comply with its material color identification.
3. The connectors and color coding for utility stations shall be in accordance to SAES-L- 310 and SAES-L-350.
4. For components not listed in the tables above, vendor shall purpose a color, subject to approval by COMPANY.
SNAMPROGETTI ENGINEERING & CONTRACTING CO.
LTD.
JAFURAH UPSTREAM PIPELINES AND WELLS TIE-IN PROJECT
REPAIR PROCEDURE FOR GALVANIZED
STEEL
BI-11-19034-
CONTRACTOR NO.6600050464 (IK) JOB No. 4003
240812 BI-11-20034-
4002

CUSTOMER: SAUDI ARAMCO OIL COMPANY DOC NO.


PLANT LOCATION: JAFURAH - KINGDOM OF SAUDI ARABIA Sh. 12 of 8 REV. A

9.8. Identification color label size is mentioned in Table No. 4 as Per Pipe Diameter.
Diameter of Pipe A B C D E
(mm) (mm) (mm) (mm) (mm) (mm)
350 50 25 30 20
Up to 100
680 200 40 50 35
From 100 to 250
820 250 50 60 45
Greater than 250

Table no.4