Value Added Flow Analysis v3.3
Value Added Flow Analysis v3.3
Time % of total
Time % of total
Time % of total
Time % of total
Due to being an
electronic system, no
wait time is included
(no transportation for
items)
NVA &
Value Added NVA- NVA - Wait
# Process Step Step Label
Time Required Time
Work Time
Time % of total
Total Value-Added Process Time 3 9.09%
Total Non-Value-Added or NVA-r Process
Time 27 81.82%
NVA - Wait Time 3 9.09%
Total Lead Time 33 100.00%