DESCRIPTION
CLEANING GRUBBING, LEVELING AND FENCING
CLEANING AND GRUBBING
REMOVAL OF TREES
GRUBBING
LEVELING OF SITE
LABOR COMPOSITION:
FOREMAN
UNSKILLED
FENCING
LABOR COMPOSITION:
CARPENTER
UNSKILLED
MATERIALS/EQUIPMENTS:
10 % OF LABOR
DELIVERY OF MATERIALS FOR FOUNDATION, EQUIPMENTS AND INSTALLATION OF SAFETY SIGNAGES
LABOR COMPOSITION:
FOREMAN
UNSKILLED
MATERIALS/EQUIPMENTS: (COST OF MATERIALS AND EQUIPMENTS NOT INCLUDED)
MOBILIZATION
SIGNAGES
PERSONAL PROTECTIVE EQUIPMENTS
MINOR TOOLS
CONSTRUCTION OF WORKERS BARRACKS
LABOR COMPOSITION:
FOREMAN
CARPENTER
UNSKILLED
MATERIALS:
10% OF LABOR COST
EXCAVATION
LABOR COMPOSITION:
FOREMAN
UNSKILLED
GRAVEL LAYING FOR FOOTING
LABOR COMPOSITION:
FOREMAN
UNSKILLED
MATERIALS/EQUIPMENTS:
GRAVEL
FABRICATION AND INSTALLATION OF STEEL REINFORCEMENTS FOR FOOTINGS
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D16MMX6M
GI WIRE
INSTALLATION OF PREFABRICATED DRAINAGE PIPES
LABOR COMPOSITION:
FOREMAN
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
100MM DIA. X 1M CONCRETE DRAINAGE PIPE
FABRICATION AND INSTALLATION OF COLUMN REINFORCEMENTS AND TIES FROM FOOTING TO FIRST FL
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D16MMX9M
D10MMX6M
GI WIRE
FABRICATION AND INSTALLATION OF FORMS AND SCAFOLDS FOR FOOTING AND COLUMN FROM FOOTING
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
1/4"X4'X8' WATERPROOF PLYWOOD
2"X2"X12' RO LUMBER
2"X3"X12' RO LUMBER
2" CWN
3" CWN
4" CWN
5" CWN
1-1/4" FINISHING NAILS
2" FINISHING NAILS
2-1/2" FINISHING NAILS
3" CONCRETE NAILS
POURING OF CONCRETE ON FOOTINGS AND COLUMNS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
BAGGER MIXER
CONSTRUCTION OF SEPTIC TANK
CONCRETEWORKS AND MASONRY WORKS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
6" CHB
CEMENT
SAND
GRAVEL
WATER
BAGGER MIXER
STEEL WORKS
LABOR COMPOSITION:
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D16MMX6M
D10MMX6M
GI WIRE
REMOVAL OF FOOTING AND COLUMN FORMS AND SCAFOLDS
LABOR COMPOSITION:
UNSKILLED
BACKFILLING AND COMPACTION
LABOR COMPOSITION:
FOREMAN
UNSKILLED
MATERIALS/EQUIPMENTS:
EARTH FILL
GRAVEL LAYING FOR SLAB ON FILL
LABOR COMPOSITION:
FOREMAN
UNSKILLED
MATERIALS/EQUIPMENTS:
GRAVEL
FABRICATION AND INSTALLATION OF STEEL REINFORCEMENTS FOR SLAB ON FILL
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D12MMX6M
GI WIRE
PLUMBING WORKS FOR FIRST FLOOR TOILET AND BATH
LABOR COMPOSITION:
MASTER PLUMBER
UNSKILLED
MATERIALS/EQUIPMENTS:
2" DIA PVC P-TRAP
2" DIA PVC PIPE
2" DIA PVC 1/4 BEND
2" DIA PVC TEE
DELIVERY OF MATERIALS FOR FIRST FLOOR
LABOR COMPOSITION:
UNSKILLED
MOBILIZATION (10% LABOR COST)
POURING OF CONCRETE FOR SLAB ON FILL
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
BAGGER MIXER
FABRICATION AND INSTALLATION OF COLUMN REINFORCEMENTS AND TIES FOR FIRST FLOOR
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
GI WIRE
D10MMX6M
FABRICATION AND INSTALLATION OF FORMS AND SCAFOLDS FOR FIRST FLOOR COLUMN
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
POURING OF CONCRETE FOR FIRST FLOOR COLUMNS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
BAGGER MIXER
FABRICATION AND INSTALLATION OF SECOND FLOOR BEAM REINFORCEMENTS AND STIRRUPS
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D10MMX6M
D16MMX9M
GI WIRE
REMOVAL OF FALSEWORKS OF FIRST FLOOR
LABOR COMPOSITION:
UNSKILLED
FABRICATION OF INSTALLATION FORMS AND SCAFOLDS FOR SECOND FLOOR BEAMS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
INSTALLATION OF ELECTRICAL CONDUITS + PLUMBING FOR SECOND FLOOR
LABOR COMPOSITION:
ELECTRICIAN
MASTER PLUMBER
UNSKILLED
MATERIALS/EQUIPMENTS:
4X4 JUNCTION BOX
1/2" DIA MOLDFLEX
2" DIA PVC P-TRAP
2" DIA PVC PIPE
2" DIA PVC 1/4 BEND
2" DIA PVC TEE
INSTALLATION OF FORMS AND SCAFOLDS FOR SECOND FLOOR BEAMS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
POURING OF CONCRETE FOR SECOND FLOOR BEAM
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
BAGGER MIXER
CHB LAYING(CONSTRUCTION OF INTERIOR AND EXTERIOR WALLS) FOR FIRST FLOOR
LABOR
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
6" CHB
4" CHB
CEMENT
SAND
WATER
FABRICATION AND INSTALLATION OF FORMS FOR SECOND FLOOR SLABS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
FABRICATION AND INSTALLATION OF REINFORCEMENTS FOR SECOND FLOORS LABS
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D12MMX6M
GI WIRE
DELIVERY OF MATERIALS FOR SECOND FLOOR
LABOR COMPOSITION
UNSKILLED
MOBILIZATION (10% LABOR COST)
POURING OF CONCRETE FOR SECOND FLOOR SLABS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
CONSTRUCTION OF STAIRSWAYS FROM FIRST FLOOR TO SECOND FLOOR BEAM
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
D10MMX6M
D16MMX6M
GI WIRE
CEMENT
SAND
GRAVEL
WATER
REMOVAL OF FALSEWORK OF 2ND FLOOR BEAMS AND SLABS
LABOR COMPOSITION:
UNSKILLED
FABRICATION AND INSTALLATION OF SECOND FLOOR COLUMN REINFORCEMENTS AND LATERAL TIES
LABOR COMPOSITION:(CUTTING, BENDING,FABRICATION, INSTALLATION AND OTHER MISCELLANEOUS WORKS)
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D10MMX6M
D16MMX9M
GI WIRE
INSTALLATION OF FORMS AND SCAFFOLDS FOR SECOND FLOOR COLUMNS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
POURING OF 2ND FLOOR COLUMNS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
FABRICATION OF ROOF BEAM FORMS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
FABRICATION AND INSTALLATION OF ROOF BEAM REINFORCEMENTS AND STIRRUPS
LABOR COMPOSITION:
FOREMAN
STEEL MAN
UNSKILLED
MATERIALS/EQUIPMENTS:
D16MMX6M
D16MMX9M
GI WIRE
INSTALLATION OF ROOF BEAM FORMS AND SCAFFOLDS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
INSTALLATION OF ELECTRIC CONDUITS
LABOR COMPOSITION:
ELECTRICIAN
UNSKILLED
POURING OF CONCRETE FOR ROOF BEAMS
LABOR COMPOSITION:
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
GRAVEL
WATER
CHB LAYING(CONSTRUCTION OF EXTERIOR AND INTERIOR WALLS) FOR SECOND FLOOR
LABOR
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
6" CHB
4" CHB
CEMENT
SAND
WATER
DELIVERY OF ROOFING MATERIALS
LABOR COMPOSITION:
UNSKILLED
MOBILIZATION (10% LABOR COST)
ROOF FRAMING
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
2"X8"X18' TOP CHORD
2"X8"X16' TOP CHORD
2"X5"X14' BOTTOM CHORDS
2"X5"X16' BOTTEOM CHORDS
2"X5"X8' TRUSS COLLARS
2"X4"X12' DIAGONAL AND VERTICAL TRUSS MEMBERS
2"X6"X8' RAFTERS
2"X6"X12' RAFTERS
2"X2"X10' CLEATS
2"X3"X12' PURLINS
1"X12"X16' S2S
16MM DIA. X250MM BOLTS WITH WASHERS
12MM DIA. X 175MM BOLTS WITH WASHERS
3"CWN
4"CWN
5"CWN
WOOD PRESERVATIVE
G.I. ROOFING INSTALLATION
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
PRECOATED GI SHEET: 0.4MM X 0.81MM X 2.44M
PRECOATED GI SHEET: 0.4MM X 0.81MM X 3.05M
PRECOATED GI SHEET: 0.4MM X 0.81MM X 3.66M
SELF DRILLING ROOFING SCREWS
FABRICATION AND INSTALLATION OF GUTTER, FLASHING AND RIDGE ROLL
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
PLAIN GA. 26 GI RIDGE ROLL AND HIP ROLLS: 18" X 8'
PLAIN GA 26 GI FASCIA FLASHING 18"X8'
PLAIN GA 26 GI WALL FLASHING AND STRAPS: 32"X8'
VULCASEAL SEALANT
PVC PIPES DOWNSPOUT: 32"X8'
PVC ELBOWS 3" DIA.
PVC TEES 3" DIA
PLASTERING
LABOR
MASONS
UNSKILLED
MATERIALS/EQUIPMENTS:
CEMENT
SAND
WATER
TOTAL REMOVAL OF ALL FALSEWORKS LEFT
LABOR COMPOSITION:
UNSKILLED
DELIVERY OF FINISHING MATERIALS
MOBILIZATION (1% TOTAL LABOR COST)
INSTALLATION OF WINDOW AND DOOR FRAMES
LABOR COMPOSITION:
FOREMAN
WELDER
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
MAIN DOORS
2 T&B DOORS
SLIDING DOOR
BEDROOM DOORS
T&B WINDOWS
STANDARD STEEL CASEMENT WINDOW
1/8" X10" X14' CLEAR GLASS
PLUMBING AND DRAINAGE SYSTEM
LABOR COMPOSITION:
MASTER PLUMBER
UNSKILLED
MATERIALS/EQUIPMENTS:
4" DIA X 10' SANITARY PIPES
3" DIA X 10' SANITARY PIPES
2" DIA X 10' SANITARY PIPES
4" DIA SANITARY TEE
3" DIA SANIARY TEE
2" DIA SANITARY TEE
4" DIA 90 DEGREES ELBOW
3" DIA 90 DEGREES ELBOW
2" DIA 90 DEGREES ELBOW
4" SANITARY WYE
2" DIA X 4" DIA REDUCER WYE
3"DIA X 4"DIA REDUCER WYE
2"DIA X 4"DIA REDUCER TEE
3"DIA X 4"DIA REDUCER TEE
3" DIA X 4" DIA REDUCER COUPLING
4" DIA COUPLING
3" DIA COUPLING
2" DIA COUPLING
2" DIA FLOOR DRAIN TRAP
4" DIA CLEAN OUT WITH PLUG
2" DIA CLEAN OUT WITH PLUG
WATER METER
GATE VALVE
FAUCET
HOSE BIBBS
INSTALLATION OF ELECTRICAL WIRINGS
LABOR COMPOSITION:
ELECTRICIAN
UNSKILLED
MATERIALS/EQUIPMENTS:
2X4 UTILTY BOX
2MM THHN WIRE
2 GANG SWITCH
1 GANG SWITCH
2 GANG CONVENIENCE OUTLET
PANEL BOX 5 BRANCHES
MAIN BREAKER
BREAKER
4" RECEPTACLE
BULBS
25MM RSC SERVICE ENTRANCE CAP
25MM RSC SERVICE ENTRANCE PIPE
ELECTRICAL TAPE
INSTALLATION OF PLUMBING FIXTURES
LABOR COMPOSITION:
MASTER PLUMBER
UNSKILLED
MATERIALS/EQUIPMENTS:
WATER CLOSET
LAVATORY
KITCHEN SINK
LAUNDRY TRAY
SOAP HOLDER
TOILET PAPER
TOWEL HOLDER
SHOWER HEAD
CEILING AND TILE WORKS
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
1/4" X 4" X 8" CLASS A PLYWOOD
2" X 2" X 16' CEILING JOIST AND HANGERS
UNGLAZED FLOOR TILES, 10CM X 10CM
GLAZED WALL TILES, 10CM X 10CM
TILE MOULDING
WHITE CEMENT
CEMENT
WATER
300MMX300MM UNGLAZED TILES
PAINTING
LABOR COMPOSITION:
FOREMAN
CAPENTERS
UNSKILLED
MATERIALS/EQUIPMENTS:
ACRYLIC SEMI-GLOSS LATEX PAINT
CONCRETE NEUTRALIZER
ACRYLIC CONCRETE PRIMER SEALER
LATEX PUTTY
ACRYLIC TINTING COLORS: BROWN
FLATWALL ENAMEL PAINT, WHITE
QUICK DRY ENAMEL, WHITE
SANDPAPERS(ASSORTED)
CLEANING RAGS
FINISHING WORKS AND CLEANING
LABOR COMPOSITION:
FOREMAN
UNSKILLED
MATERIALS/EQUIPMENTS:
CABINETS
REFRIGERATOR
CHAIRS
TABLES
FLOWER POTS
TV
RANGE
CURTAINS
BEDS
SOFFA
QUANTITY UNITS UNIT COST TOTALCOST, PHP
7 DURATION(DAYS) 37499
1 DURATION(DAYS)
1 DURATION(DAYS)
1 CU.M./MAN-DAY
3 DURATION(DAYS)
22 KILO 90 1980
30 PCS 365 10950
5 DURATION(DAYS) 13150
6 PCS 35 210
2 ROLLS 80 160
2 PCS 100 200
2 PCS 160 320
4 PCS 35 140
2 PCS 50 100
2 DURATION(DAYS) 5260
3 MEN 320 0
10 % LABOR COST 0
8 DURATION(DAYS) 248840
35 PCS 80 2800
11 PCS 70 770
6 SHEET 120 720
3 1-L CAN 240 720
20 PCS 80 1600
32 PCS 65 2080
4 PCS 70 280
6 DURATION(DAYS) 48298
3 DURATION(DAYS) 33734
20 PCS 30 600
1 ROLLS 2300 2300
10 SETS 180 1800
2 SETS 160 320
10 SETS 200 2000
2 SETS 2000 4000
2 SETS 500 1000
8 SETS 120 960
16 PCS 120 1920
16 PCS 120 1920
1 SETS 75 75
1 SETS 150 150
8 ROLLS 35 280
2 DURATION(DAYS) 10540
80 SHEETS 500
1067 BF 120
750 PCS 10 7500
2500 PCS 20 50000
150 PCS 180 27000
3 BAGS 240 720
7 BAGS 240 1680
42 GAL
2500 PCS 25 62500
8 DURATION(DAYS) 4330