CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
PROJECT NO. : F903 DATE :
PROJECT Name : EL-AYAT STATION
Marakez Type - Civil BOQ - ARCH.
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
EGP. EGP.
Total to Summary #REF!
SECTION (03)
Damp And Waterproofing
N.B.: Rates comprise the supply and installation of
waterproofing layers, surface prepartation, applications of
السعر شامل
coatings, screeds, water tests, Membrane Skirting, Silicon and
طبقة لياسة
protective boards as required all in accordance with
تحت العزل
Specifications, Section (03).
وطبقة
حماية فوق
العزل
Bituminous Waterproofing Membrane
3.01 Two layers of torch applied bituminous waterproofing
membrane of 4mm thick each, Including one coat of Nirol-W غي
السعر ر
as primer, and Galvanized Steel Metal Flashing 0.7 mm Thick شامل
two times bend, in accordance with Specifications. الميتال فالش
a. For Roof M2 3,400 370 1,258,037
3.02 Two layers of torch applied bituminous waterproofing
membrane of 4mm thick each, Including one coat of Nirol-W
as primer, in accordance with Specifications, for Toilets.
a. For Wet Areas M2 193 370 71,410
3.03 Fabricated Gutters and Downspouts
Supply and Install Fabricated Gutters and Downspouts,
Aluminum; Item includes cleaning the surface, fixation and
sealing end caps, splices, drop outlets and miters, in
accordance with Specifications,
a. For Bridge, Aluminum Rain Gutter, 3 mm Thick. L.M 75 0
Total to Summary 1,329,447
SECTION (04)
THERMAL INSULATION
4.01 Supply and installation of thermal insulation for roofing
consisting of extruded polystyrene board 50mm thick and a
M2 3,400 150 510,000
polyethylene sheet 400 micron thick, in accordance with
Specifications, Section (04), Refer to det. (1/AE5225).
4.02 Thermal Insulation Board 50 mm thick Mineral Wool behind
spandrel panels, External stone claddings, and/or inbetween
M2 8,875 250 2,218,750
External cavity walls where required and as specified in
drawings and Tech. specifications
Total to Summary 2,728,750