Letter of Intent

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

LETTER OF INTENT

October 17, 2024

ERIZA B. ZARASPE
BIDS AND AWARDS COMMITTTEE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BATANGAS 2ND DISTRICT ENGINEERING OFFICE
Batangas City, Batangas, Region IV-A

Dear Sir/Madame:

This is to formally express our intention to participate for the incoming bidding projects as follows:

Contract ID : 25DE0037
Contract Name : ORGANIZATIONAL OUTCOME 2: Protect Lives
and Properties Against Major Floods, Flood Management Program, Construction/
Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Seawall
Structure, Phase 2, Barangay Mainit, Mabini, Batangas
Location : Mabini, Batangas
Scope of Work : Construction of Flood Mitigation Structure (Seawall)
Approved Budget for the Contract : Php 82,025,000.00
Contract Duration : 216 calendar days

Contract ID : 25DE0036
Contract Name : ORGANIZATIONAL OUTCOME 2 : Protect Lives
and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of
Flood Mitigation Structures and Drainage Systems, Construction of Seawall Structure, Phase 1,
Barangay Mainit, Mabini, Batangas
Location : Mabini, Batangas
Scope of Work : Construction of Flood Mitigation Structure (Seawall)
Approved Budget for the Contract : Php 96,500,000.00
Contract Duration : 237 calendar days

Contract ID : 25DE0035
Contract Name : ORGANIZATIONAL OUTCOME 2 : Protect Lives
and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of
Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure, Section
1, Barangay Dela Paz Proper, Batangas City, Batangas
Location : Batangas City, Batangas
Scope of Work : Construction of Flood Control Structure
Approved Budget for the Contract : Php 96,500,000.00
Contract Duration : 231 calendar days

Contract ID : 25DE0033
Contract Name : ORGANIZATIONAL OUTCOME 1 : Ensure Safe
and Reliable National Road System, Asset Preservation Program, Preventive Maintenance-Secondary
Road, Batangas-Lobo Rd - K0135+000 - K0136+585
Location : Lobo, Batangas
Scope of Work : Preventive Maintenance of Road: Asphalt Overlay
Approved Budget for the Contract : Php 106,150,000.00
Contract Duration : 132 calendar days
Contract ID : 25DE0032
Contract Name : ORGANIZATIONAL OUTCOME 1 : Ensure Safe
and Reliable National Road System, Asset Preservation Program, Preventive Maintenance–Secondary
Road, Batangas–Lobo Rd – K0133+150 – K0135+000
Location : Lobo, Batangas
Scope of Work : Preventive Maintenance of Road: Asphalt Overlay
Approved Budget for the Contract : Php 135,100,000.00
Contract Duration : 141 calendar days

Contract ID : 25DE0031
Contract Name : ORGANIZATIONAL OUTCOME 2 : Protect Lives
and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of
Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood
Control Structures along Calumpang River, Section 10, Batangas City
Location : Batangas City, Batangas
Scope of Work : Construction of Flood Mitigation Structure
Approved Budget for the Contract : Php 96,500,000.00
Contract Duration : 306 calendar days

Contract ID : 25DE0030
Contract Name : ORGANIZATIONAL OUTCOME 2 : Protect Lives
and Properties Against Major Flood, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers,
Construction of Flood Control Structure along Calumpang River, Section 9, Batangas City
Location : Batangas City, Batangas
Scope of Work : Construction of Flood Mitigation Structure
Approved Budget for the Contract : Php 96,500,000.00
Contract Duration : 306 calendar days

Contract ID : 25DE0029
Contract Name : ORGANIZATIONAL OUTCOME 1 : Ensure Safe
and Reliable National Road System, Asset Preservation Program, Preventive Maintenance-Secondary
Road, Batangas-Tabangao-Lobo Rd - K0115+343 - K0117+093, K0122+000 - K0122+600
Location : Batangas City, Batangas
Scope of Work : Preventive Maintenance of Road: Asphalt Overlay
Approved Budget for the Contract : Php 96,500,000.00
Contract Duration : 129 calendar days

Contract ID : 25DE0028
Contract Name : ORGANIZATIONAL OUTCOME 1: Ensure Safe
and Reliable National Road System, Asset Preservation Program, Preventive Maintenance -
Secondary Road, Batangas - Tabangao - Lobo Rd - K0126+600 - K0129+000, K0140+176 -
K0141+455
Location : Batangas City, Batangas
Scope of Work : Preventive Maintenace of Road: Asphalt Overlay
Approved Budget for the Contract : Php 139,925,000.00
Contract Duration : 150 calendar days
Contract ID : 25DE0027
Contract Name : ORGANIZATIONAL OUTCOME 1: Ensure Safe
and Reliable National Road System, Asset Preservation Program, Preventive Maintenance -
Secondary Road, Batangas - Tabangao - Lobo Rd - K0123+000 - K0125+600
Location : Batangas City, Batangas
Scope of Work : Preventive Maintenace of Road: Asphalt Overlay
Approved Budget for the Contract : Php 135,100,000.00
Contract Duration : 144 calendar days

We expect to abide with the requirements of the projects as outlined in the Invitation to Bid and advertised in
Philgeps. We trust to be in service to you in this regard.

JOSELITO C. DIO
Authorized Managing Officer