Sap MM Notes
Sap MM Notes
Sap MM Notes
CLIENT –
800
USER – SAPUSER
PASSWORD –
INDIA123
PATH FOR SPRO – SAP EASY ACCESS – TOOLS – CUSTOMIZING (NAVIGATIONS) – IMG –
SPRO
- DEFINE COMPANY
- SPRO – SAP REFERENCE IMG – ENTERPRISE STRUCTURE DEFINITION –
FINANCIAL ACCOUNTING
– DEFINE COMPANY
- HELF FILE AVAILABLE
- THEN CLICK ON CLOCK ICON
- CLICK ON NEW ENTRIES OR F5
- COMPANY MAXIMUM 6 DECIMALS ARE ACCEPTING EITHER NUMERIC OR ALPHA
NUMERIC
- NAME
- SECOND NAME
- SAVE OR CTRL+S
- AFTER SAV BUTTON SYSTEM WILL ASK PROMPT FOR CUSTOMIZING REQUEST
- CLICK ON CREATE REQUEST OR F8
- GIVE ANY DESCRIPTION THEN ENTER
- SELECT THE COMPANY CODE 1234 AND CLICK ON DETAILS (CTRL + SHIFT + F2)
- EDIT ON COMPANY NAME
- THEN CLICK ON ADDRESS TAB (SHIFT + F5)
- TO ENTER DETAILS OF COMPANY THEN PRESS ENTER THEN SAVE
- UPTO THIS LEVEL CREATION IN FINANCIAL
- CLICK ON CLOCK
- CLICK ON NEW ENTRIES ICON
OR F5 13TH OCTOBER –
NEW ENTRIES
CONTROLLING AREA :-
CUSTOMISE SETTINGS :
CLICK ON NEW
ENTRIES CO AREA
= CCODE
CONTROL
NEW ENTRIES
GO BACK
ELEMENT
SELECT THE GROUP AND CLICK ON ELEMENT / GROUP AND SAVE AND GO BACK
MAINTAIN VERSIONS :
AUTOMATICALLY REFERENCE :
COST ELEMENT
TO COMPANY CODE :
1234 PERIOD : 10
(MONTH)
1. MATERIAL MASTER
2. VENDOR MASTER
3. INFO RECORD
4. SOURCE LIST
5. QUOTA MANAGEMENT – NOT USING
MASTER
1. ORDERING VENDOR
2. GOODS SUPPLIER
3. INVOICE PRESENTED
TYPES OF VENDORS :
NUMBER RANGES : WE DEFINE THE NUMBER RANGES FOR EACH AND EVERY
DOCUMENT PROSTED IN THE SAP SYSTEM. THE MAXIMUM NUMBER OF DIGITS
ALLOWED IN 18.
RANGES.
2. CLICK ON INTERVALS
CLICK ON INTERALS OR
SHFIT + F1 SL NO : A1
FROM NUMBER :
300000 TO NUMBER :
300020 CURRENT NO
:0
EXTERNAL : CLICK ON CHECK BOX
CLICK ON NUMBER RANGE : SELECT THE ACCOUNT GROUP AND ASSIGN THE
NUMBER RANGE AND SAVE.
TO CREATE A VENDOR OR
XK01 : VENDOR IS
BLANK COMPANY
CODE : 1234
ADDRESS CAN FEED THEN PRESS ENTER AND AGAIN PRESS ENTER AND AGAIN
PRESS ENTER
PURCHASING DATA :
USED TERMS OF
PAYMENT : 0002
INCO TERMS : CIF AND SOME GIVEN THE TEXT MESSAGE AND ENTER
PARTNER FUNCTIONS AND AGAIN PRESS ENTER AFTER THAT SYSTEM WILL ASK
YES / NO / CANCEL. PRESS YES BUTTON.
CLICK ON DISPLAY IN THIS TIME ALL VENDORS WILL DISPLAY IN FROM COMPANY
CODE.
MATERIAL MASTER :- MATERIAL MASTER IS A MASTER FILE WHICH CONTAINS A
INFORMATION OF A PARTICULAR MATERIAL DEPENDING UPON THE VIEWS SELECTED
FROM THE USER DEPARTMENT.
MASTER EX :-
BASIC
DATA 1
SALES :
GENERAL / PLANT
DATA PURCHASING
MRP
MRP
MRP
MRP
WORK SCHEDULING
DATA / STORAGE 2
WAREHOUSE MANAGEMENT
WAREHOUSE
MANAGEMENT 2 QUALITY
MANAGEMENT
ACCOUNTING 1
MARGING PRICE
– V STANDARD
PRICE – S ROH,
PIPE, LEIH – V
FERT, HALB – S
3000,3001,3002,3003,3004,…,3010 FERT –
7920
WE DEFINE THE NUMBER RANGES FRO EACH AND EVERY DOCUMENT PSOTED IN
1. INTERNAL
2. EXTERNAL
CUSTOMIZE SETTINGS FOR CREATING NEW MATERIAL TYPES AND NUMBER RANGES
FOR EACH MATERIAL TYPE :-
ORDER – 2 INTERNAL
PURCHASE ORDER – 0
MATERIAL TYPE
CLICK ON GROUPING OR F6
MENU BAR LOCK ENTRY AND DELETE ALL AFTER THAT SYSTEM WILL DISPLAY ON
MASTER MATERIAL –
BLANK INDUSTRIAL
SECTOR – SELECT
OR F5
CLICK ON ORGANISATIONAL
BASIC DATA1
MANUALLY
- GENERAL DATA
- PURCHASING
ORDER UNIT – PURCHASING
(UOM) IN PO PURCHASING GROUP
: MB1
PLANT SP. MATL. STATUS – TO RESTRICT THE MATERIAL FOR PURCHASE –
BLOCK THE PURCHASING
QUALITY FREE GOODS DISCOUNT – MATERIAL IS ELIGIBLE
FOR DISCOUNTS AUTOMATIC PO
BATCH MANAGEMENT – SPECIFY THE MATERIAL IS HANDLING IN THE FORM OF
BATCHES. PURCHASING VALUE KEY – PURCHASING VALUE KEY IS A KEY THE
DETERMINES THE REMAINER DATES, SHIPPING INSTRUCTIONS, TOLERNACE
LIMITS AND ORDER ACKNOWLEDGEMENT REQUIRED FOR THE MATERIAL FOR
PURCHASE.
PRUCHASING VALUE KEY – 4
GR PROCESSING TIME – 4 DAYS – NUMBER OF BUSINESS WORKING DAYS
REQUIRED AFTER RECEIVING THE MATERIAL BEFORE STORAGE FOR THE
PLACEMENT.
POST TO INSPECTION STOCK – IF ACTIVATED THE STOCK
REFLECTS IN Q.A. STOCK. QUOTA ARRANGEMENT USAGE
SOURCE LIST
MATERIAL DISPLAY TRANSACTION CODE IS MM60
- GENERAL PLANT / DATA STORAGE 1
TEMPERATURE CONDITIONS – MAINTAIN THE MATERIAL IS
TEMPERATURE CONDITIONS. STORAGE CONDITIONS – REFRIGERATORS,
COLLERS
SHLEF LIFE DATA – MAX STORAGE
PERIOD – 10 MIN REM. SHLET LIFE – 1
PERIOD IND. FOR SLED (SHELF LIFE
EXPERATION DATA) D – DATE
M – MONTH
TIME – UNIT
D TOTAL SH
- GENERAL PLANT / DATA STORAGE 2
GROSS WEIGHT –
BLANK NET WEIGHT
– BLANK VOLUME
- ACCOUNTING 1
VALUATION CLASS –
3000 PRICE
CONTROL – V PRICE
UNIT – 1
MOVING PRICE – 100 THEN PRESS ENTER
TO COPY OR TO EXTEND TO ANOTHER PLANT GO TO TRANSACTION CODE
MM01 MATERIAL
COPY
FROM
MATERIAL
SELECT
VIEWS
CLICK ON ORGANISATION LEVELS
TO DISPLAY ALL MATERIALS – MM60
INFO RECORD OR PURCHASE INFO RECORD : INFO RECORD IS A MASTER DATA THAT
CONTAINS THE CENTRAL SOUCE OF INFORMATION OF CERTAIN MATERIAL OF
VENDOR RELATING TO PURCHASING DATA UNDER A PARTICULAR PLANT WITH A
SPECIFIC PURCHASING ORGANISATION CALLED AN INFO RECORD.
IF WE MAINTAIN INFO RECORD FOR THE PARTICULAR MATREIAL AND THE VENDOR
THE SYSTEM AUTOMATICALLY DETERMINES THE NET PRICE AND THE CONDITIONS
WITH RESPECTIVE TO THE VENDOR AND THE MATERIAL.
1. STANDARD
2. SUB CONTRACTING
3. PIPE LINE
4. CONSIGNMENT
VENDOR - BLANK
MARTERIAL
PURCHASING ORGANISATION
- GENERAL
DATA 1 ST
REMAINDER
2ND REMAINDER
3 RD
REMAINDER
CLICK ON TEXT
TAB
INFO RECORD NOTE – IF REQUIRED ENTER
DESCRIPTION PURCHASE ORDER TEXT – IF
REQUIRED ENTER DESRIPTION CLICK ON
CONDITIONS
PB00 – GROSS PRICE - 100
RA01 – DISCOUNT 5% ON
GROSS ZA01 – SURCHARGE
10% ON GROSS
FRA1 – FREIGHT 3 % THEN PRESS ENTER AND SAVE
- PURCHASING ORGANISATION
DATA PLANNED DELIVERY TIME –
10 DAYS PURCHASING GROUP
ACKNOWLEDGEMENT REQUIRED –
SELECT NO MATERIAL TEXT –
SELECT
TAX CODE – MAINTAIN FOR THE CONSIGNMENT AND PIPE
LINE PROCESS NET PRICE – 105
EFFECTIVE PRICE – 108.15 THEN SAVE
ME1M – TO DISPLAY THE LIST OF INFO RECORD
FOR MATERIAL ME1L – TO DISPLAY THE LIST OF
INFO RECORD FOR VENDOR
1. PURCHASE RQUISITION – PR
2. PURCHASE ORDER – PO
3. REQUEST FOR QUOTATION – RFQ
4. CONTRACTS
5. SCHEDULE AGREEMENT
PURCHASE REQUISITION :- PURCHASE REQUISITION IS A PURCHASING DOUCMENT
CREATED BY REQUISITIONER OR REQUESTOR TO THE PURCHASING DEPARTMENT
DURING THE PROCUREMENT OF MATERIALS AND SERVICES FROM VENDOR.
1. DOCUMENT OVERVIEW
2. HEADER
3. ITEM OVERVIEW
4. ITEM DETAILS
- DOCUMENT OVERVIEW – THE SYSTEM DISPLAYS THE LIST OF PURCHASING
DOCUMENTS UPON THE REQUIREMENT
- HEADER – ANY TEXT INFORMATION MAINTAIN THE HEADER LEVEL.
- ITEM OVERVIEW – HERE WE MAINTAINED MATERIAL, QUANTITY, DELIVERY DATE
AND DELIVERY ADDRESS.
- ITEM DETAILS – IT DISPLAYS THE DETAILS OF THE ABOVE
PURCHASE REQUISITION
- CLICK ON DOCUMENT
OVERVIEW CLICK ON
SELECTION VARIANT
SELECT PURCHASE REQUISITION – NEW SCREEN COME
SELECT PROGRAM SELECTIONS THEN ENTER PLANT AND EXECUTE
- HEADER – IN HEADER ANY TEST INFORMATION CAN TYPE MANUALLY
MAINTAIN. IT IS OPTIONAL.
- ITEM OVERVIEW
ITEM – SLNO
A – ACCOUNT ASSIGNMENT
CATEGORY I – ITEM CATEGORY
MATERIAL – ENTER
MATERIAL QUANTITY –
10
DELIVERY DATE –
29.10.2010 PLANT –
1234
STORAGE LOCATION –
SL1 PURCHASING
GROUP – 123
REQUISITION – EMAX
TRACKING NO – MAX 10 MIN 1 DIGITS
DES. VENDOR – RECOMMENDED
VENDOR FIXED VENDOR –
PURCHASING ORGANISATION – 1234 THEN PRESS ENTER
- ITEM
DETAILS
MATERIAL
DATA
MATERIAL
SHORT TEXT
QUANTITIES / DATES – QUANTITY,
DELIVERY DATE GR PROC. TIME – 5
IF ITS CLOSED ACTIVATE – AFTER THAT THE PURCHASE
REQUISITION IS CLOSED VALUATION – IN V RECEIPT IN ACTIVE –
IN GRN FREE OF COST
SOURCE OF
SUPPLY STATUS
BLOCK THE PURCHASE REQUISITION – PO IS HOLD WHEN WILL CREATE PO.
CONTACT PERSON – MRP CONTROLLER – PURCHASE REQUISITION FROM
PRODUCTION CAN RAISE PURCHASE REQUISITION
TEXTS – WE CAN MAINTAIN TEXT INFORMATION
DELIVERY ADDRESS – PLANT ADDRESS
AUTOMATICALLY DISPLAY THEN CLICK ON CHECK
ANY ERROR MESSAGE
RED COLOUR – ERROR
MESSAGE YELLOW COLOUR –
WARNING MESSAGE GREEN
COLOUR – NO MESSAGE
IF SYSTEM WILL SHOWN GREEN COLOUR – THE PURCHASE REQUISITION
NO 010013695 CREATED.
- DOCUMENT OVERVIEW
- SELECTION VARIANT
- SELECT PURHCASE
REQUISITION ENTER
PLANT – 1234
ENTER
MATERIAL –
THEN EXECUTE
CLICK ON MATERIAL AND CLICK ON ADOPT AFTER THAT ITEM OVERVIEW
DISPLAY AND CLICK ON CECHK ANY ERROR MESSAGE.
ME5A – TO DISPLAY THE ALL PURCHASE REQUISITIONS ARE ALL PLANTS IN SINGLE
COMPANY
PURCHASE ORDERS :- IT IS EXTERNAL CREATED DURING THE PROCUREMENT
OF MATERIALS AND SERVICES FROM VENDOR. SMILAR TO PR THE PO IS DIVIDED
INTO 4 DIVISIONS.
1. DOCUMENT OVERVIEW
2. HEADER
3. ITEM OVERVIEW
4. ITEM DETAILS
ORDER- ME23N
- PURCHASE ORGANIZATION
- PURCHASING GROUP
- COMPANY CODE
- MATERIAL
- PO QUANTITY
- DELIVERY DATE
- NET PRICE
- PLANT
- STORAGE LOCATION THEN ENTER
- PB00
- RA01
- ZA01
- FRA1
- GO TO INVOICE TAB THEN SELECT INV RECEIPT AND GR BASED IV (INVOICE
VERIFICATION)
- GO TO CONFIRMATION TAB AND CLICK ON CONFIRMATION REQUIRED
- GO TO DELIVERY ADDRESS TAB AND GIVEN PLANT ADDRESS DETAILS
- GO TO TEXTS TAB TO ENTER TEXT INFORMATION AND CLICK ON CHECK AND
SAVE.
CREATION OF PO WITH REFERENCE TO PR:-
TO CREATE THE PO –
THE REQUEST FOR QUOTATION IS ALSO CALLED A TENDER AND THE VENDOR IS
TO CHANGE RFQ –
ME42N TO DISPLAY
RFQ – ME43N
SELECT THE VENDOR AND CLICK ON THE ITEM AND SELECT THE LINE ITEM AND CLICK
ON CONDITIONS
- PBXX
- RA01
- ZA01
- FRA1
AND SAVE.
COLLECTIVE NO – ME4S
OUTLINE AGREEMENT :- THE OUTLINE AGREEMENT AND THE LONG TERM
AGREEMENTS MAINTAIN FOR THE LONG TERM RELATIONSHIP FROM VENDOR DURING
THE PROCUREMENT.
1. CONTRACT AGREEMENT
2. SCHEDULE AGREEMENT
RELEASE DOCUMENTATION).
VENDOR AGREEMENT
TYPE – LP DATE –
TODAYS DATE
PURCHASING ORGANISATION
001
PLANT – 1000
STORAGE LOCATION –
0001 REQUIRED
TRACKING NO – 1
VALIDATE END
TARGET
QUANTITY NET
PRICE
RA01 – 5
% ZA01 –
10 %
FRA1 –
3% AND
SAVE.
AGREEMENT NO AD PRESS
ENTER
AND SAVE
ITEM OVERVIEW
ITEM DETAILS
- SELECT ACCOUNT ASSIGNMENT TAB
- G/L ACCOUNT NO – 400000
- COST CENTER – 1000
- AND PRESS ENTER AND SAVE THE DOCUMENT.
1. SOURCE LIST
2. QUOTA ARRANGEMENT
THE MAIN FUNCTION OF SOURCES IS TO FIX THE VENDOR FOR A PERIOD. THE
SOURCE LIST IS MAINTAINED AT 2 LEVELS.
1. PLANT LEVEL
2. MATERIAL LEVEL
PATH -> SPRO -> IMG -> MM -> PURCHASING -> SOURCE LIST -> DEFINE SOURCE
LIST REQUIRED AT PLANT LEVEL.
PLANT –
1000
NUMBER
MATERIAL LEVEL :-
THIS SOURCE LIST MAINTAINED INDIVIDUALLY FOR THE MATERIAL IN THE MATERIAL
MASTER. – MM02
MATERIAL MASTER :-
- GO TO PURCHASE – ME21N
THE SYSTEM DISPLAYS THE SYSTEM FOLLOWING MESSAGE (IF SOURCE LIST CHECK)
- SOURCE LIST REQUIREMENT IS DEFINED FOR THIS PLANT. THIS MEANS THAT
THE SOURCE OF SUPPLY MUST BE ENTERED IN THE SOURCE LIST OF THE
MATERIAL / PLANT COMBINATION BEFORE YOU CAN PROCURE THIS MATERIAL
USING THIS SOURCE OF SUPPLY.
- TO MAINTAIN SOURCE LIST – ME010403
- MATERIAL
- PLANT – 1000
- VALID FROM – SAME DATE
- VALID TO – 30.12.2010
- VENDOR – 1000
- PURCHASING ORGANISATION – 1000 AND SAVE.
- GO TO PURCHASE ORDER
- CREATE A NEW PURCHASE ORDER WITH THE VENDOR AND SYSTEM IS
ACCEPTED.
- ENTER MATERIAL
- PURCHASING VIEW
- ACTIVATE
- AUTOMATIC PO
- GO TO CONDITIONS TAB
- CLICK ON CONDITIONS AND
ME01
- PURCHASING GROUP
- PURCHASING ORGANISATION
- VENDOR
- CONTRACT
- PLANT
- GO TO DOWN ORDER SHCEDULING
- ENTER PURCHASE REQUISITION NO AND EXECUTE.
QUOTA RATING:
QUOTA:
USE:
THIS QUOTA RATING IS CALCULATED FOR ALL SOURCES OF SUPPLY INCLUDED IN THE
QUOTA ARRANGEMENT.
THE SOURCE THEN SELECTED IS THE ONE WITH THE LOWEST RATING.
THE BASE QUANTITY IS USED TO CONTROL THE ALLOCATION FOR THE NEWLY ADDED
VENDORS. THE QUOTA ARRANGEMENT USAGE IS MAINTAINED IN PURCHASING VIEW
IN THE MATERIAL MASTER AND IT IS CONFIGURED IN
CHECK ON PURCHASE
ORDER CHECK SA
SCHEDULE LINE
PLANNED ORDER
PURCHASE
REQUISITION MRP
SELECT
MATERIAL
SELECT
PURCHASING
ENTER QUOTA
ARRANGEMENT USAGE – A
AND SAVE.
ARRANGEMENT – MEQ3
TYPE – F (EXTERNAL)
VENDOR
QUOTA 1
QUOTA IN % - SYSTEM WILL AUTOMATICALLY
MAXIMUM QUANTITY
DOCUMENT GO TO
CREATE PO – ME21N
SAVE
THE SYSTEM DISPLAY THE MESSAGE QUOTA ARRANGMENT SPECIFY THE VENDOR –
1001.
DOCUMENT TYPES:
ITEM INTERVAL –
SLNO NUMBER
RANGES FIELD
SELECTION
1. NB – STANDARD PO
2. VB: THIS DOCUMENT TYPE IS USED TO TRANSFER THE MATERIAL FROM ONE
LOCATION TO ANOTHER LOCATION.
- PURCHASE REQUISITION
- PURCHASE ORDER
- CONTRACT AGREEMENT
- SCHEDULE AGREEMENT
CLICK ON DEFINE
STANDARD ZPO
TYPE
ME21N
ENTRIES
SELECT – ZPO
PURCHASE ORDER
SELECT ZPO
CLICK ON NEW
INTERVALS
CLICK ON INTERVALS
SELECT ZPO
DOCUMENT LEVEL:
CLICK ON DETAILS
SYSTEM DISPLAYS MULTIPLE FIELD SELECTION GROUPS FOR EXAMPLE: BASIC DATA,
ITEM, IN TERMS OF DELIVERY AND PAYMENT, ETC.
SELECT ZPO
FIELD SELECTION ZPO PRESS ENTER
AND SAVE GO TO PO
CUSTOMIZE SETTINGS :
- EDIT CHARACTERISTIC
- EDIT CLASS
- CHECK RELEASE
STRATEGIES TAXATION
PROCEDURE - /NOBQ3
USAGE – A
APPLCIATE - TX
1 - BSAB
2 - MWAS
/NOBBG – COUNTRY
CHARACTERISTICS – VALUE OF
- DESCRIPTION – VALUE OF PO
- STATUS – RELEASED
- CURRENCTY – INR
TAB VALUES:
2ND CHARACTERISTIC:
- PLANT – 1000
- CLICK ON
DATA:
- DESCRIPTION – PLANT
- STATUS – RELEASED
- NUMBER OF
ASSIGNMENT:
- MULTIPLE
VALUES TAB
ADDITIONAL DATA:
3RD CHARCTERISTICS:
- CLICK ON
DATA:
- STATUS – RELEASED
- NUMBER OF CHARACTERS – 4
- CLASS – ZMM
- CLICK ON
DATA:
RELEASED TAB
CHAIR:
- VALUE OF PO1000
- PLANT1000
- RELEASE GROUPS – SS
- CLASS – ZMM
- SS - 11 - MANAGER
- SS - 22 - SR MANAGER
- SS - 33 - VP
- SS - 44 - CEO / MD AND
SAVE.
RELEASE STRATEGIES:
- RELEASE GROUP – SS
11
22
33
PRESS ENTER
11 22 33 - RELEASE INDICATOR
- BLOCKED
- BLOCKED
- BLOCKED
- RELEASED
THEN ENTER
CLICK ON CLASSIFICATION:
- RELEASE GROUPS – SS
GENERAL
- PLANT – 1000
1. INDIVIDUAL RELEASE
ORDER – ME23N
PARALLELY OPEN
- RELEASE CODE – 11
- RELEASE GROUP – SS
- EXECUTE
2. COLLECTIVE
MESSAGES
BASIC CHECKS
- RELEASE STRATEGIES
- RELEASE STRATEGIES S1 FOR RELASE GROUP SS IN CONSISTANT.
- GO TO 3RD STEP
- CLICK ON NEW ENTRIES
1. REQUIREMENT IDENTIFICATION
1. GENERAL SERVICES
3. CONSTRUCTION SERVICES
6.MACHINERY SERVIDCES
SERVICES SERVICE
CATEGORY
1. OIL LUBRICATION
4. NOZZLES REPLACEMENT
SERVICE CATEGORY: “BASIC DATA” STSORES STATUS IN INDICATING THAT YOU CAN
STORE BASIC DATA IN A SERVICE MASTER RECORD UNDER THIS SERVICE CATEGORY.
SERVICE CATEGORY: “PURCHASING DATA” STATUS INDICATING THAT YOU CAN STORE
PURCHASING DATA IN A SERVICE RECORD UNDER THIS SERVICE CATEGORY.
- AS09
- DG01
- AS09
- CLICK ON GROUPS OR F6
- TEXT – ACTIVITY 01
- ACTIVITY NUMBER -
- BASIC UOM – H
- BASIC UOM – H
- BASIC UOM – H
- BASIC UOM – H
– AC06
- MSS – DG
- CLICK ON SERVICES OR F8
- SERVICE NO
- QUANTITY
- PLANT – 1000
ACCOUNT ASSIGNMENT:
ORDER – ME21N
- PO NO TPE
- CLICK ON ACCEPT
- AFTER ACCEPTING SYSTEM DISPLAYED WILL BE ACCEPTED AND SAVE.
PO REFERENCE TAB
- NUMBER
CUSTOMIZE SETTINGS:
- THE CONDITION TABLE IS CREATED BY TAKING THE TABLE NUMBER FROM 501
TO 999
- CLICK ON GENERATE
- ACCESS NO – 10
- CLICK ON FIELDS
- MAINTAIN THE CONDITION TYPES – PB00, PBXX, RA01, ZA01, FRA1. REMAINING
CONTION TYPES SELECT AND DELETE.
- MAINTAIN THE CONDITION TYPES – PB00, PBXX, RA01, ZA01, FRA1. REMAINING
CONTION TYPES SELECT AND DELETE.
- PURCHASING ORGANISATION SELECT AND TYPE ABAB THEN PRESS ENTER AND
SAVE
- VENDOR – 400000
- MATERIAL – 100-130
- PLANT – 1000
GOODS MOVEMENT:
1. GOODS RECEIPT – GR
2. GOODS ISSUE – GI
3. TRANSFER POSTING – TP
FOR EXAMPLE :
101 – 102
122 – 123
2. TOTAL STOCK AND TOTAL VALUE UPDATED IN THE MATERIAL MASTER – MM03
2. TOTAL STOCK AND TOTAL VALUE UPDATED IN THE MATERIAL MASTER – MM03
2. THE STOCK REDUCES THE SUPPLYING AND INCREASES THE RECEIVING – MMBE
2. THE STOCK REDUCES THE SUPPLYING AND INCREASES THE RECEIVING – MMBE
STOCK TYPES: THE DIFFERENCE STOCK TYPES ARE AVAILABLE IN SAP MM ARE
3. BLOCKED STOCK
TO CREATE RESERVATION –
MB21 TO CHANGE
RESERVATION – MB22 TO
DISPLAY RESERVATION –
MB23
INITIAL ENRY OF STOCK BALANCE – MB1C
103– GOODS RECEIPT FOR PURCHASE ORDER INTO GOODS RECEIPT BLOCKED STOCK
104– GOODS RECEIPT FOR PURCHASE ORDER INTO GOODS RECEIPT BLOCKED STOCK
- REVERSAL
502 – RECEIPT W/O PURCHASE ORDER INTO UNRESTRICTED USE STOCK – REVERSAL
561 – RECEIPT PER INITIAL ENTRY OF STOCK BALANCES INTO UNRESTRICTED USE
562 – RECEIPT PER INITIAL ENTRY OF STOCK BALANCES INTO UNRESTRICTED USE –
REVERSAL
301
302
303
304
305
306
311
312
313
314
315
316
701 +
701 –
SELECT GOODS
RECEIPT ENTER
PO NO
ENTER PLANT
POSTING DATE
– MB03
MATERIAL DOCUMENT
STOCK OVERVIEW –
MATERIAL ENTER
PLANT
ENTER STORAGE
LOCATION AND
EXECUTE
SELECT GOODS
RECEIPT ENTER
PO NO
ENTER PLANT
MOVEMENT TYPE –
102 DOCUMENT
DATE
GO TO
MB03 GO
TO ME23N
GO TO
MMBE
SELECT GOODS
RECEIPT ENTER
PO NO
ENTER PLANT
MOVEMENT TYPE –
101 DOCUMENT
DATE
ENTER PLANT
DOCUMENT
DATE POSTING
DATE
SELECT GOODS
RECEIPT ENTER
PO NO
ENTER PLANT
DOCUMENT
DATE POSTING
DATE
5 – UNRESTRICTED USE
3 – QUALITY INSPECTION
2 – BLOCKED STOCK
ENTERED IN 9999
– 3 BLOCKED
STOCK – 2
POSTING DATE
ENTER PLANT
POSTING DATE
ENTER PLANT
POSTING DATE
ENTER PLANT
ENTER STORAGE LOCATION AND PRESS
MONITOR MMBE
INITIAL ENTRY OF THE STOCK BALANCE (UPLOADING LEGACY INVENTORY INTO SAP
SYSTEM) – MB1C
POSTING DATE
ENTER PLANT
DOCUMENT DATE
DATE MOVEMENT
PLANT
POSTING DATE
MOVEMENT TYPE – 201
ENTER PLANT
MONITOR MMBE
TO CREATE RESERVATION –
201
ENTER PLANT
CLICK ON TO RESERVATION
INDUSTRIAL
SECTOR
MATERIAL TYPE
STORAGE LOCATION –
PLANT – 1000
GO TO MB1B
ENTER DOCUMENT
DATE ENTER
POSTING DATE
MOVEMENT TYPE –
TWO STEP PROCESS:- IN THIS PROCESS THE BUSINESS WILL CREATE TRANSFER
POSTING FROM THE SUPPLYING PLANT DETAILS – MB1B
POSTING DATE
MOVEMENT TYPE –
1000
POSTING DATE
RECEIVING PLANT –
1000
AND SAVE
GO TO MM01
MOVEMENT TYPE –
1000
MONITOR – MMBE
MOVEMENT TYPE –
– 0001
GO TO MB1B
MOVEMENT TYPE –
AND SAVE
GO TO MM02
GO TO XK02
ENTER
VENDOR
GO TO ME11
ENTER
VENDOR
ENTER
MATERIAL
ENTER PURCHASING
GO TO ME01
GOODS RECEIPT
SELECT OTHER
DATE
QUANTITY
DOCUMENT GO TO MB03
SELECT THE
PLANT 1000 – A –
12 MONTHS
1000 – B – 6 MONTHS
1000 – C – 3 QUARTERLY
1000 – D – 1 MONTHLY
PLANT
STOCK TYPES –
SELECT 1 1 –
UNRESTRICTED
2 – QUALITY
3 – WAREHOUSE
4 –
BLOCKED
AND SAVE
ENTER THE QUANTITY – 300 (ON THE SYSTEM STOCK IN MMBE – 200) AND
SAVE.
ENTER THE
MATERIAL ENTER
THE PLANT
ITEM CLICK ON
DETAILS
PHYSICAL INVENTORY
DOCUMENT PHYSICAL
INVENTORY STATUS
MATERIAL
PLANT
STORAGE
LOCATION BOOK
QUANTITY – 200
QUANTITY COUNTED –
300 DIFFERENCE
QUANTITY – 100
DIFFERENCE AMOUNT –
FISCAL YEAR
THE SYSTEM WILL DISPLAYS DIFFERENCE QUANTITY AND DIFFERENCE AMOUNT AND
SAVE.
ON THE BASIS OF MATERIAL DOCUMENT 4900035641, THE SYSTEM HAS POSTED THE
DIFFERENCES FOR PHYSICAL INVENTORY DOCUMENT 100001170.
THE PHYSICAL INVENTORY PROCESS HAS NOW BEEN COMPLETED FOR THIS PHYSICAL
INVENTORY DOCUMENT.
MONITOR – MMBE
IF PHYSICAL STOCK IS GREATER THAN THE SYSTEM STOCK THEN THE SYSTEM
CREATES GOODS RECEIPT (GR) FOR THAT DIFFERENCE QUANTITY.
IS GAIN INVENTORY
IF SYSTEM STOCK IS GREATER THAN THE PHYSICAL STOCK THE SYSTEM CREATES
GOODS ISSUE (GI) FOR THE DIFFERENCE QUANTITY.
1. CONSIGNMENT
2. SUBCONTRACTING
4. THIRD-PARTY PROCESSING
CREATE MATERIAL
MASTER
MATERIAL – A1
MATERIAL – B1
MATERIAL – C1
DOCUMENT
DATE POSTING
DATE
M.T. –
501
PLANT
STORAGE LOCATION AND PRESS ENTER
GO TO ME11
IN ITEM OVERVIEW –
ITEM – L SELECT D1
ENTER –
QUANTITY
ENTER – PLANT
A1 100 1000
B1 100 1000
C1 100 1000
CREATE INVOICE –
MIRO
MATERIAL
PLANT
CONSIGNMENT:
MATERIAL – A1
IN ITEM –
MATERIA
QUANTIT
Y PLANT
STORAGE LOCATION
WE HAVE TO MAINTAIN INFOR RECORD IS MANDATORY AND SAVE THE
DOCUMENT.
CREATE GOODS RECEIPT (GR) – MIGO (VENDOR CONSIGNMENT STOCK)
MONITOR - MMBE
MOVEMENT TYPE –
411 – K VENDOR
MATERIAL
QUANTITY AND
SAVE MONITOR –
MMBE
COMPANY
CODE
VENDOR
PLANT
MATERI
AL
PIPE LINE HANDLING: IN PIPE LINE HANDLING, THE COMPANY DOES NOT NEED TO
ORDER OR STORE THE MATERIAL CONCERNED. IT IS READY AVAILABLE AS AND
WHEN REQUIRED VIA A PIPE LINE (FOR EXAMPLE, OIL OR WATER), OR SOME OTHER
TYPE OF CABLE (FOR EXAMPLE, ELECTRICITY). CONSUMPTION OF THE MATERIAL IS
SETTLED WITH THE VENDOR ON A REGULAR BASIS.
CREATE MATERIAL MASTER – MM01
VENDO
MATERI
AL
PURCHASING
ORGANISATION PLANT
SPECIAL STOCKS – P
CENTER
ENTER
VENDOR
ENTER
MATERIAL
ENTER
MATERIAL
SELECT PIPE LINE
LPG GAS – PO
CREATE A PO
QUANTITY – 50
(RETURNABLE) PLANT
STORAGE
LOCATION
ENTER THE
VENDOR
EA – EASH (BASIC UNIT OF MEASURE) AND SAVE.
MONITOR – MMBE FOR
CYLINDER MATERIAL
STOCK) PLANT
MATERIAL
QUANTITY AND
SAVE MONITOR –
MMBE
GO TO MM01 – LEIH
- CYLINDER
- GAS (FERT)
CREATE PO FOR
GAS CREATE GR
FOR GAS
– M GO TO MMBE – RTP
-M
CREATE MIRO
THE GOODS ARE PROCURED WITH A SPECIAL TYPE OF PURCHASE ORDER THE
STOCK TRANSPORT ORDER. YOU CAN REQUEST AND MONITOR THE TRANSFER OF
GOODS WITH A STOCK TRANSPORT ORDER. THE DELIVERY CAN BE PROCESSED IN
INVENTORY MANAGEMENT IN THE SHIPPING COMPONENT.
THE PROCESS IS PERFORM UNDER ONE COMPANY CODE BETWEEN TWO PLANTS AND
TWO STORAGE LOCATIONS ITS MANDATORY. THIS IS WITHOUT DELIVERY.
SUPPLYING PLANT –
1000 RECEIVING
PLANT – 0001
ITEM CATEGORY – U
ENTER MATERIAL
RECEIVING PLANT –
1100
THE SUPPLYING PLANT WILL CREATE TRANSFER POSTING WITH MOVEMENT TYPE –
351 – MB1B
MOVEMENT TYPE –
351 SUPPLYING
PLANT – 1000
ORDER
ENTER TWO PLANTS AND TWO STORE LOCATIONS. THE STOCK REDUCES AT
THE SUPPLYING PLANT AND DISPLAYS AS OPEN ORDERED QUANTITY AT THE
RECEIVING PLANT.
THE RECEIVING PLANT WILL CREATE A GOODS RECEIPT TO RECEIVE THE STOCK –
MIGO
ENTER PO NO
ENTER RECEIVING PLANT – 1000
THIRD PARTY PROCESSING IS INTEGRATED WITH THE SALES AND DISTRIBUTION (SD)
COMPONENT. IF THE SALES ORDER CONTAINS THIRD PARTY ITEMS, THE SYSTEM
CREATES A PURCHASE REQUISITION FROM THE ORDER.
SELECT MATERIAL –
1000
ORGANISATION – 1000
SALES ORGANISATION – 1
DIVISION – 00
DELIVERY PLANT –
00101
TAX CLASSIFICATION – 0
SALES ORGANISATION – 2
GROUP – BANS
AVAILABILITY CHECK –
01 TRANSPORT
GROUP – 0001
LOADING GROUP –
0001
PLANT DATA STOREAGE 2
GROSS WEIHT –
– 90 VOLUME – 3
VOLUME UNIT –
CC
MOVEMENT TYPE –
VA03
ORDER TYPE – OR
SALES ORGANISATION –
1000 DISTRIBUTION
CHANNEL – 10 DIVISION
– 00
(CUSTOMER) – 1400
SALES ORDER.
AUTOMATICALLY. GO TO VA02
MATERIAL
GO TO SCHEDULE LINES
NOTE PURCHASE
REQUISITION NO THEN GO
TO PURCHASE ORDER
ACCOUNT ASSIGNMENT – 1 –
PARTY
NO GRN.
BATCH MANAGEMENT:
CT04
CHARACTERISTIC – PH
SCALE CLICK ON
CREATE
CLICK ON BATCH
DATA DESCRIPTION
– PH SCALE STATUS
– RELEASED
– 20 CLICK ON
MULTIPLE VALUE
VALUES TAB:
5.0 DESCRIPTION –
ACCEPTE BATCH
CHARACTERISTIC –
APPEARANCE CLICK
ON CREATE
BASIC DATA
FORMAT CLICK ON
MULTIPLE VALUES
GO TO VALUES
01 – RED
02 – BLUE
– CL01
CLASS – BATCH MM
(BATCH) CLICK ON
CREATE
GO TO CHAR TAB
PH SCALE
THE SORT SEQUENCE TELLS YOU WHETHER OBJECTS IN THE SEARCH RESULT OF THE
FIND OBJECT FUNCTION ARE SORTED IN ASCENDING OR DESCENDING ORDER OF
CHARACTERISTICS VALUE.
CU70
RELEASED
CLICK ON
CHARACTERISTICS
CLICK ON NEW
ENTRIES
PH SCALE
1. CONDITION TABLES:-
MATERI
AL
PLANT
STORAGE
LOCATION
MOVEMENT
TYPE VENDOR
CLICKON GENERATE
CLICK ON YES / NO /
LOCAL OBJECT
AS – DESCRIPTION
CLASS – BATCH MM
SORT SEQUENCE –
NUMBER – 2000
ALLOCATE CHECK
CLASSIFICAT
ION
PURCHASIN
G1
DATA STORAGE 1
DATA STORAGE 2
1567 CLASSIFICATION
CHARACTERISTIC VALUES
GREEN PURCHASING
DATA STORAGE 1
MBC1
PLANT
STORAGE
LOCATION
MOVEMENT TYPE –
101
TO CREATE BATCH –
MSC1N TO CHANGE
BATCH – MSC2N TO
DISPLAY BATCH –
MSC3N
MSC1N
ENTER THE
MATERIAL PLANT
EXPIRATION DATA:
PRODUCTION DATE –
DATE – 06.12.2010
AVAILABLE FROM –
25.11.2010 PERIOD
INDICATOR – D
CLASSIFICATION:
VALUES PH SCALE –
ACCEPTED BATCH
SAVE
CREATE A PO
CREATE A GR – THEN THE SYSTEM AUTOMATICALLY DISPLAYS TAB BATCH. HERE THE
ENTER BATCH NO AND SELECT THE CHARACTERISTIC VALUES IN CLASSIFICATION
OPTION.
GR WITHOUT PO (MB1C)
MMBE
MATERIAL VALUATION:- IN SAP THE MATERIAL VALUATION IS CARRIED OUT THROUGH
PRICE CONTROL INDICATOR.
1. MOVING PRICE – V:- MOVING PRICE IS A CHANGE OF MATERIAL TYPE WITH THE
CONSEQUENCES OF THE GOODS MOVEMENT AND AN ENTRY OF INVOCES
ACCOUNT IS CALLED A MOVING PRICE. IF THE PRICE CONTROL – V FOR THE
PARTICULAR MATERIAL THEN ALWAYS THE PRICES TAKEN FROM THE
PURCHASE ORDER IRRESPECTIVE OF THE PRICE IN THE MATERIAL MASTER.
MOVING PRICE:-
ACCOUNTING 1:
MOVING PRICE
– 10 TOTAL
STOCK – 0
TOTAL VALUE –
QUANTITY – 10
MASTER – MM03 GO TO
ACCUOUNTING1
MOVING PRICE
CHANGE – 8 TOTAL
STOCK – 10
TOTAL VALUE – 80
IN VOUCHER:
IN GR / IR ACCOUNT – CREDIT – 80
IN INVOICE:
VENDOR ACCOUNT –
CREDIT IN GR / IR
ACCOUNT – DEBIT
QUANTITY – 10
SAVE GO TO MMBE
GO TO ACCOUNTING 1
+10)
STANDARD PRICE – S:
PRICE UNIT – 1
STANDARD PRICE
– 10 TOTAL STOCK
–0
TOTAL VALUE – 0
QUANTITY – 10
VALUE – 8 AND
SAVE
DISPLAY OF MATERIAL
MASTER GO TO
ACCOUNTING1
MOVING PRICE – 8
STANDARD PRICE
– 10 TOTAL STOCK
– 10 TOTAL VALUE
– 100
DEBIT GR / IR ACCOUNT – 10 X 8 =
80 – CREDIT
NOT CHANGE.
CLICK ON CREATE
VALUATION TYPE –
HIGH – Q EXTERNAL PO
–2
INTERNAL PO – 0
CLICK ON CREATE
VALUATION TYPE –
LOW – Q EXTERNAL PO
–2
INTERNAL PO – 0
GO BACK
CLICK ON GLOBAL
VALUATION CATEGORY – Q
DESCRIPTION – SPLIT VALUATION
HOUSE – LOW – Q
ACTIVATE
IN ACCOUNTING 1
VALUATION CATEGORY –
Q PRICE CONTROL – V
MM01
AND
3000
MATERIAL IN SELECT
VIEWS
BASIC DATA1,
MATERIAL
INVOICE IS A DOCUMENT SENT BY THE SUPPLIER TO THE BUYER (BUSINESS) FOR THE
PAYMENT. THE FOLLOWING INFORMATION IS MAINTAIN IN INVOICE DOCUMENT.
PO REFERENCE NO, INVOICE DATE AND POSTING DATE, INVOICE REFERENCE NO,
CREATE GR – MIGO
– 0I
BECOME 0
ACCOUNT CREDIT
ON PO HISTORY
TO BLOCK INVOICE –
MIRO ENTER
PO NO INVOICE
DATE POSTING
DATE
TAX CODE –
0I AMOUNT
GO TO PAYMENT TAB
TO RELEASE INVOICE –
MRBR ENTER
COMPANY CODE
ENTER FISCAL
YEAR ENTER
VENDOR
GO TO ITEM DETAILS
ENTER THE PO NO
EX:- WE RECEIVED THE INOVICE FROM THE VENDOR FOR THE DELIVERY GOODS AND
FREIGHT COST ARE TO BE CHARGED AND INVOICE QUANTITY AND REMAINS
UNCHANGED. IN SUBSEQUENT DEBIT THE VENDOR IS OVER CHARGED THAN THE
PURCHASE ORDER PRICE.
CRETE A PO –
ME21N CREATE A
MIGO CREATE A
MIRO
ENTER THE PO NO
POSTING DATE
IN TOP SELECT
SUBSEQUENT DEBIT GO TO
ITEM DETAILS
ENTER THE
AMOUNT GO TO
BASIC DATA
SAVE. GO TO ME23N – TO
EX;- WE HAVE RECEIVED A CREDIT MEMO FOR DELIVERY GOODS AND PREVIOUSLY
THE FREIGHT COST WHICH ARE CHARGED ARE TO BE CREDITED AND THE QUANTITY
IN THE ORIGINAL CREDIT MEMO REMAINS UNCHANGED.
CREATE
PO
CREATE
GR
CREATE
IR
CREATE SUBSEQUENT CREDIT – MIRO
INVOICE REDUCTION.
CREATE
PO
CREATE
GR
CREATE
IR
M.T. – 122
STATUS TAB
MEMO
1. CONSIGNMENT
2. PIPE LINE
3. ERS
01/12/2010
MASTER XK02
ENTER VENDOR
SETTLEMENT DEL
GR-BASED INV-VERIFICATION
RETURNS
VENDOR
CLICK ON AUTOMATIC PO AND THEN PRESS ENTER AND SAVE
ERS
CREATE A GR - MIGO
ENTER PO NUMBER
ENTER COMPANY
CODE PLANT
FISCAL YEAR
VENDOR
PARKING INVOICE:- PARKING INVOICE MENS TO WHICH THE INVOICE FOR THE
PAYMENT.
ORDER – ME23N
DELIVERY – MIGO
SURPLUS IN ACTIVATE GR / IR
CLEARING ACCOUNT
INVOICE FOR THE NET PRICE AND PLANNED DELIVERY COST (FREIGHT
CHARGES)
IN ITEM DETAILS – CONDITIONS – FRA1 AND GIVEN 2% AND THEN PRESS ENTER
AND SAVE
MIRO
ENTER POSTING
CODE – 01
INVOICE
ENTER INVOICE
DATE ENTER
POSTING DATE
SELECT TAX
CODE
AND PRESS ENTER ENTER PLANT AND CLICK ON CHECK AND ADOPT
1. INTRA COMPANY STOCK TRANSFR (UNDER ONE COMPANY CODE BETWEEN TWO
PLANTS)
DISTRIBUTION:- DEFINITION:-
CLICK ON COPY AS AND ENTER – 9999 THEN PRESS ENTER AND SAVE
SPRO – IMG – ENTERPRISE STRUCUTRE – DEFINITION – SALES AND DISTRIBUTION –
DEFINE COPY, DELETE, CHECK DISTRIBUTION CHANNEL – DEFINE DISTRIBUTION
CHANNEL
CLICK ON COPY AS AND ENTER – 9999 THEN PRESS ENTER AND SAVE
CLICK ON COPY AS AND ENTER – 999 THEN PRESS ENTER AND SAVE
DEFINE DIVISION
SELECT DIVISION
- 00
DEFINE SHIPPING
PLANT SELECT
DIVISION - 1000
CLICK ON COPY AS AND ENTER – 9999 THEN PRESS ENTER AND SAVE
ASSIGNMENT:-
SELECT THE SALES ORGANISATION – 9999 AND ENTER THE COMPANY CODE –
1000
CHANNEL – A1
CLICK ON NEW
ENTRIES ENTER
9999 A1 8888
9999 CLICK ON
ASSIGN
CLICK ON ASSIGN
SELECT THE SHIPPINT POINT – 8888 AND PRESS ENTER AND SAVE
SPRO – IMG – SALES AND DISTRIBUTION – MASTER DATA – DEFINE COMMON DIVISION
SHIPPING:-
– 01 LOADING GROUP
DOCUMENT
0001
SALES ORGANISATION –
9999 DISTRIBUTION
CHANNEL – A1
ADDRESS
TRANSPORTATION ZONE – ALL ZEROS LAST ONE (FOR EXAMPLE 00000…1) AND
PRESS ENTER
GO TO ACCOUNTS
ACCOUNT – 140000
GO TO SALES TAB
SALES DISTRICT –
000001 SALES
OFFICE – 1000
CUSTOMER GROUP
– 01
DELIVERY PRIORITY –
01 SHIPPING
CONDITION – 01
DELIVERY POINT –
1000
INVOICING DATES – 01
– 01
o BASIC DATA 1
o PURCHASING
LOCATION ENTER
SALES ORGANISATION
DIVISION – 00
DELIVERY PLANT –
1000
TAX CLASSIFICATION – 0
01 ACCOUNT ASSIGNMENT
GROUP – 03
PRESS ENTER
ACCOUNTING 1:
MOVEMENT TYPE –
AND MAINTAIN
1000 10 00
AND SAVE
NOTE : THE ABOVE ALL THE STEPS ARE COMMON FOR THE INTRA AND INTER CROSS
COMPANY STOCK TRANSFER.
UB 1000 NL RP - INTRA
U 1100 -- RP - INTRA
B
N 1000 NLCC B - INTER
B
N 1100 -- -- - INTER
B
PLANT – 1000
ENTER PURCHASING
ITEM – U
ENTER
MATERIAL
ENTER
QUANTITY
GO TO ITEM DETAISL THEN GO TO SHIPPING TAB AND CHECK THE DATA AND
SAVE
1000
DELIVERY CREATION
STATUS IS A – NOT
YET PICKED
B – PARTIALLY
PICKED C – FULLY
PICKED
OVERVIEW – MMBE
TO CREATE GR – MIGO
ISSUE
MONITOR – MMBE
DOCUMENT FLOW OR F7
STATUS – COMPLETED
PICKING REQUEST –
ISSUE – COMPLETED
1.
2.
3.
4.
TRANSACTION KEYS:
(M.T. – 201 P)
STOCK POSTING.
CONFIGURATION:
GO TO VALUATION CLASS
AND SAVE
1234 – VALUATION
CLASS GO TO OBYC
1234 300000
AND SAVE
AND SAVE
CREATE A GOODS RECEIPT WITH MOVEMENT
WRX –
191100 GO
TO MB03
ENTER MATERIAL
DOCUMENT ENTER
FISCAL YEAR
CLICK ON ACCOUNTING
DOCUMENTS CLICK ON
DOCUMENT NUMBER
SYSTEM DISPLAYS ACCOUNT HEAD WITH DEBIT AMOUNT AND CREDIT AMOUNT.
09/12/2010
MOVEMENT TYPE –
STORAGE LOCATION –
ENTER
GO TO OBYC
AND SAVE
MOVEMENT TYPE –
STORAGE LOCATION –
ENTER
GO TO OBYC
OF ACCOUNT INT
AND SAVE
BSX –
300000
MOVEMENT TYPE –
STORAGE LOCATION –
ENTER
GO TO OBYC
ACCOUNTS INT
AND SAVE
GO TO GOODS ISSUE
CREATE –
MI01
CREATE –
MI04
ACCOUNTS INT
AND SAVE
GO TO –
MI07 BSX –
300000
MOVEMENT TYPE –
STORAGE LOCATION –
ENTER
AND SAVE
MRP GROUP: - THE MRP GROUP CONTAINS ALL THE MATERIALS FROM THE POINT OF
VIEW OF MRP FOR ASSIGNING SPECIAL CONTROL PARAMETERS FOR THE TOTAL
PLANNING RUN. THESE CONTROL PARAMETERS INCLUDE, FOR EXAMPLE, THE
STRATEGY GROUP, THE CONSUMPTION MODE, AND THE PLANNING HORIZON.
MRP TYPE: - KEY THAT DETERMINES WHETHER AND HOW THE MATERIAL IS PLANNED.
YOU HAVE THE FOLLOWING OPTIONS:
- FORECAST-BASED PLANNING
- STATIC
- PERIOD
- OPTIMUM
SCHEDULING MARGIN KEY: - KEY THAT THE SYSTEM USES TO DETERMINE THE
FLOATS REQUIRED FOR SCHEDULING AN ORDER. WE DEFINE THE FOLLOWING
FLOATS WITH THE SCHEDULING MARGIN KEY.
- OPENING PERIOD
- FLOAT AFTER PRODUCTION (ONLY IN THE CASE OF IN-HOUSE PRODUCTION).
CONFIGURATION SETTINGS:-
CLICK ON COPY
FROM PLANT –
1000 TO PLANT –
1100 CLICK ON
COPY TAB GO
BACK
CLICK ON COPY
FROM PLANT –
1000 MRP
GROUP – 0000
TO PLANT – 1100
MRP GROUP –
1100 CLICK ON
COPY TAB GO
BACK
CLICK ON NEW
ENTRIES
PLANT MRP
MATERIAL TYPE GROUP
ROH 1100 1100
SAVE
SPRO – IMG – MM – CONSUMPTION BASED PLANNING – PLANT PARAMETERS –
NUMBER RANGES – DEFINE NUMBER RANGES FOR PLANNING PLANT – DEFINE
NUMBER RANGES FOR MANUAL PROCESSING
PD – MRP
PROCUREMENT PROPOSALS
GO BACK
ENTRIES
REQUISITION 2 NB 10
AND SAVE
AND PRESS
ENTER ENTER
PLANT – 1000
MATERIAL – STEEL
MRP1:
MRP2:
PROUCREMENT TYPE – F
(DEFAULT) PLANNED
DELIVERY TIME – 10
GR PROCESSING TIME – 5
MRP3:
PERIOD INFICATOR – M
(MONTHLY) AVAILABILITY
CHECK – 01 ACCOUNTING1:
PRICE CONTROL – V
CREATE PIR (PLANNED INDEPENDENT REQUIREMENTS) – MD61 :
VERSION – 00
PLANNING
HORIZON
ENTER DATE
PLANNED PERIOD –
ENTER
STOCK PRODUCTION)
AND PRESS
ENTER TABLE
MATERIAL –
1267 MRP
AREA – 1000
PLANT – 1000
REQUISITION – 3 DELIVERY
SCHEDULES – 3
CREATE MRP
LIST – 1
PLANNING MODE
– 1 SCHEDULING
– 1 PLANNING
DATE
MD04
ENTER MATERIAL –
DETAILS
DETAILS
ORDER GO TO GR / IR
GO TO SEPARATE SCREEN
– MIGO
MRP1:
MRP GROUP –
– VM
MRP2:
PROCUREMENT TYPE –
F PLANNED DELIVERY
TIME – 10 GR
PROCESSING TIME – 5
MRP3:
PERIOD INDICATOR –
M AVAILABILITY
CHECK – 01
FORECASTING:
CLICK ON CONSUMPTION
VALUES PERIODTOTAL
CONSUMPTION 12 2010
10
11 2010 20
3000 PRICE
CONTROL – V
MOVEMENT TYPE –
STORE LOCATION –
ENTER
MOVEMENT TYPE –
STORE LOCATION –
ENTER
MATERIAL –
1277 MRP
AREA – 1000
PLANT – 1000
CREATE PURCHASE
REQUISITION – 3 DELIVERY
SCHEDULES – 3
MODE – 1
SCHEDULING – 1
SELECT DISPLAY RESULTS ABOVE AND PRESS
MRP1:
MRP TYPE – VB
REORDER POINT
– 50
ENTER COST CENTER, ENTER MATERIAL AND ENTER QUANTITY AND SAVE
AVAILABILITY SOCK – 40
TO CREATE PLANNED
PROCEDURE ABOVE
MATERIAL MASTER
EXECUTE FORECAST –
MRP AREA –
1000 PLANT –
1000 AND
PRESS ENTER
GO TO MD04
12/12/2010
PURCHASING KZSEL04 1
ACCOUNTING 1 KZSEL17 1
PLANT WERKS 4
7. SPECIFY FILES
8. ASSIGN FILES
9. IMPORT DATA
ENTER PROJECT –
ZMMR CREATE
ENTRY CLICK
MMR
INPUT RECORDING GO TO
MENU BAR
GO TO RECORDING OVERVIEW
MATNR
NAME – MATNO
MSICHTAUSW –
KZSEL01
MSICHTAUSW –
KZSEL02
MSICHTAUSW –
KZSEL04
MSICHTAUSW –
KZSEL12
MSICHTAUSW –
KZSEL13
MSICHTAUSW –
KZSEL17
AND SAVE GO BACK AND AGAIN GO BACK
STRUCTURE SOURCE
STRUCTURE – ZMMR1234
FIELD NAME –
MATNR
DESCRIPTION –
MAT NO LENGTH –
18
AND CLICK ON RELATIONSHIP THEN PRESS ENTER AND SAVE AND GO BACK
MBRSH
KZSEL01 – CLICK ON
KZSEL04 – CLICK ON
CONSTANT ENTER KZSEL12 –
NOTE : NO NEED TO PERFORM THE SIXTH STEP. BEFORE GOING TO 7TH STEP CREATE A
FILE EXCEL SHEET
ENTRY
GO BACK
AGAIN
EXECUTE GO
BACK AGAIN
GO BACK
PRESS ENER
EXECUTE GO
BACK
PRESS ENTER
DATA GO BACK
GO BACK
EXECUTE
PRESS ENTER
CLICK ON PROCESS
PROCESS NODES:
1. PROCESS / FOREGROUND
3. BACK GROUND
WARE HOUSE NO:- WARE HOUSE NO IS A 3 DIGIT CODE WHICH PLACE ON IMPORTANT
CONTROL FUNCTION AND WM CONSISTING OF DIFFERENT ORGANISATION ELEMENTS
LIKE STORAGE TYPE, STORAGE LOCATION, STORAGE BIN, STORAGE UNIT, STORAGE
QUANITTY.
STORAGE BINS:- THE STORAGE BINS ARE USED FOR THE STOCK
STORAGE BIN TYPES:- WE CAN DIVIDE THE STORAGE BINS INTO GROUPS FOR
EXAMPLE LARGE AND SAMM BINS. A SUITABLE STORAGE BIN IS PROPOSED BY THE
SYSTEM DURING STOCK PLACEMENT IN COMBINATION WITH STORAGE UNIT TYPE.
NUMBER:
CLICK ON COPY
1000 001
KG VOLUME UNIT
– CCM
– W ACTIVITY DATA –
W SAVE
WE MAINTAIN NUMBER RANGES FOR TR, TO, QUANT, FOR POST CHANGE
HOUSE NO SAVE
CLICK ON COPY
ENTER SAVE
P1, T1 SAVE
COPY AS
STRUCTURE AA BB CC
START VALUE 03 - 01 - 01
END VALUE 03 - 10 - 10
INCREMENT 01 - 01 - 10
– STANDS FOR
CHARACTER ABC –
03 01 01
CLICK ON DETAILS