HEAD CMPHTF FUND REQUIRED

Total Current Recent


Total Value Work Progress Previous Fund
S.No AS YEar Head District Work Name AS Amt AS DT Exp. Bill Fund
of Contract Order DT Level REQUIED
Pending Required

BALODABAJAR - Construction &


2022- Baloda Foundation
1 CMPHTF Repairing of Boimedical Storage Room 2.88 24/06/2022 2.68 19/12/2022 0 0 1.5 0
2023 Bazar Level
(W6600341)

2022- Baloda BALODABAJAR - Construction of Handover


2 CMPHTF 6.96 24/06/2022 6.48 19/12/2022 4.88 0 1.6 0
2023 Bazar kitchen room (W6600342) /Completed

2022- Baloda BALODABAJAR - Drainage Repair


3 CMPHTF 24.95 24/06/2022 23.22 19/12/2022 Finishing 2.72 0 5 0
2023 Bazar Work (W6600340)

2022- UPHC Itwari Bazar - Hamar Aspatal


4 CMPHTF Dhamtari 46.91 10/01/2023 39.5 12/05/2023 Plinth Level 1 0 0 0
2023 (W5900152)

2022- DHAMTARI - Composite Building at


5 CMPHTF Dhamtari 676.83 23/01/2023 610.41 15/03/2024 Plinth Level 0 0 50 70
2023 DH Dhamtari (W5900169)

2022- BORAI (NAGARI) - Renovation & Renovation


6 CMPHTF Dhamtari 104 07/02/2023 81.68 25/07/2023 24.51 26.02 20 20
2023 Repairing Work (W5900166) Ongoing

2021- Handover
7 CMPHTF Raipur CHC Tilda - Blood Bank (W4400332) 23.58 14/01/2022 21.94 07/12/2022 16.29 6.54 5.65 1.27
2022 /Completed

2021- CHC Tilda - Construction of O.T. Handover


8 CMPHTF Raipur 22.73 14/01/2022 21.14 07/12/2022 20.23 2.03 0.91 1.23
2022 (W4400333) /Completed

2021- CHC Tilda - IPHL Hamar Lab Handover


9 CMPHTF Raipur 12 31/03/2022 11.16 07/12/2022 5.93 5.45 5.23 0.54
2022 (W4400331) /Completed
HEAD CMPHTF FUND REQUIRED

2022- UPHC Aamasivni - Hamar Aspatal


10 CMPHTF Raipur 39.93 29/12/2022 34.37 01/07/2023 Finishing 8.84 0 15 16.09
2023 (W4400465)

2022- UPHC Boriyakala - Hamar Aspatal


11 CMPHTF Raipur 38.73 29/12/2022 33.57 01/07/2023 Finishing 11.81 0 15 11.92
2023 (W4400467)

2022- UPHC Kachna - Hamar Aspatal Handover


12 CMPHTF Raipur 39.3 29/12/2022 33.46 01/07/2023 5.85 21.49 27.61 0
2023 (W4400466) /Completed

2022- UPHC Changorabhatha - Hamar Handover


13 CMPHTF Raipur 48.58 10/01/2023 40.47 07/07/2023 5.57 34.43 20 20
2023 Aspatal (W4400380) /Completed

2022- UPHC Khokhopara - Hamar Aspatal Handover


14 CMPHTF Raipur 45.51 10/01/2023 40.31 22/06/2023 16.29 20.35 24.02 0
2023 (W4400386) /Completed

2022- UPHC Mowa - Hamar Aspatal


15 CMPHTF Raipur 39.94 10/01/2023 32.36 27/05/2023 Finishing 20.35 0 10 9.59
2023 (W4400382)

2022- UPHC Urla - Hamar Aspatal


16 CMPHTF Raipur 49.92 10/01/2023 44.12 12/05/2023 Finishing 11.71 0 21.43 6.98
2023 (W4400464)

2022- PHC Champaran - Repair, Renovation


17 CMPHTF Raipur 13 07/02/2023 11.81 04/09/2023 Finishing 1.21 0 5 6.79
2023 & Electrical Work (W4400471)

2022- PHC Chandkuri - Repair, Renovation & Renovation


18 CMPHTF Raipur 30.58 07/02/2023 28.52 28/06/2023 3.82 3.61 13.62 13.14
2023 Electrical Work (W4400472) Ongoing

2022- PHC Dondekala - Repair, Renovation


19 CMPHTF Raipur 9.73 07/02/2023 9.02 27/06/2023 Finishing 6.4 0 3 0
2023 & Electrical Work (W4400469)
HEAD CMPHTF FUND REQUIRED

2022- PHC Mandhar - Repair, Renovation & Renovation


20 CMPHTF Raipur 20.2 07/02/2023 18.74 27/06/2023 13.1 0.01 5 2.1
2023 Electrical Work (W4400470) Ongoing

2023- PHC D.D. Nagar Raipur - Pavor Block Foundation


21 CMPHTF Raipur 6.26 06/10/2023 5.75 07/03/2024 0 0 2 0
2024 work (W4400571) Level

1302.5 1150.71 180.51 119.93 251.57 179.65