Summary From Imo State

Doc

Uploaded by

EluscoSololo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

SUMMARY OF CONDITION OF SOME SELECTED FEDERAL ROADS IN IMO STATE PHASE 1 (2024)

CURRENT STATE OUTCOME


TRUNK/ PROPOSED COST (EXECUTED
DESCRIPTION MAINTENANCE
ROUTE ACTIVITY ESTIMATE (N) SERVICE
NO. LEVEL)
SEGMENT/SECTION CONDITION

PATCHING OF POTHOLE,
CARRIAGEWAY AND
OWERRI - OMANELU - CARRIAGEWAY AND FAILED SECTIONS,
SHOULDER IMPROVEMENT
PORT HARCOURT SHOULDER (KM.4+000 - POTHOLES,ERODED
R70 REINSTATEMENT,CONSTRU 1,010,272,101.15 ON TRAFFIC
ROAD KM.23+000 & KM.32+000 SHOULDER AND
CTION OF CONCRETE CONDITIONS
-KM.35+525) BLOCKED DRAINS
LINED DRAIN AND
DESILTING OF LINED DRAIN

FAILED SECTIONS, OVERLAYS, PATCHING OF


OWERRI - ONITSHA CARRIAGEWAY AND IMPROVEMENT
POTHOLES,ROUGH POTHOLE, REPAIR OF
R25A DUAL CARRIAGEWAY SHOULDER(KM.11+000 - 500,536,432.39 ON TRAFFIC
DRIVING SURFACE AND FAILED SECTIONS, AND
KM.34+130) CONDITIONS
BLOCKED LINED DRAIN DESILTING OF LINED DRAIN

OVERLAYS, PATCHING OF
POTHOLE, REPAIR OF
FAILED SECTIONS,
CARRIAGEWAY AND FAILED SECTIONS, IMPROVEMENT
OWERRI - ABA ROAD POTHOLES,ERODED
R25A SHOULDER(KM.30+000 - DESILTING AND 1,187,998,070.55 ON TRAFFIC
SHOULDER AND ROUGH
KM.36+000) CONSTRUCTION OF LINED CONDITIONS
DRIVING SURFACE
DRAIN AND SHOULDER
REINSTATEMENT

AMANZE - MILE71/2 - CARRIAGEWAY AND FAILED SECTIONS, OVERLAYS, PATCHING OF


IMPROVEMENT
R70 UMUELEMAI - UMUNA SHOULDER(KM.1+800 - POTHOLES,ROUGH POTHOLE, REPAIR OF
1,226,366,572.96 ON TRAFFIC
ROAD KM.28+050 & KM.34+415 DRIVING SURFACE AND FAILED SECTIONS, AND
CONDITIONS
- KM.40+000) BLOCKED DRAINS DESILTING OF LINED DRAIN

IHIALA - ORLU - FAILED SECTIONS, OVERLAYS, PATCHING OF ROAD WILL BE


CARRIAGEWAY
R429 UMUDURU ROAD POTHOLES AND ROUGH POTHOLE AND REPAIR OF 517,667,784.07 MADE
(KM.43+055 - KM.50+000)
DRIVING SURFACE FAILED SECTIONS MOTORABLE
OVERLAYS, PATCHING OF
AFOR ENYIOGUGU - FAILED SECTIONS, POTHOLE, REPAIR OF
IMPROVEMENT
SAM MBAKWE CARRIAGEWAY(KM.0+45 POTHOLES,ROUGH FAILED SECTIONS AND
R417 296,299,831.11 ON TRAFFIC
AIRPORT ROAD 0 -KM.6+000) DRIVING SURFACE AND DESILTING AND
CONDITIONS
BLOCKED DRAINS CONSTRUCTION OF
CONCRETE LINED DRAINS

PATCHING OF POTHOLE,
REPAIR OF FAILED
OLD OWERRI - CARRIAGEWAY AND DEPLORABLE FAILED ROAD WILL BE
SECTIONS AND SHOULDER
R414 UMUAKA - ORLU ROAD SHOULDER(KM.0+000 - SECTIONS, POTHOLES 2,576,098,743.99 MADE
REINSTATEMENT,DESILTIN
KM.6+000) AND BLOCKED DRAINS MOTORABLE
G AND CONSTRUCTION OF
CONCRETE LINED DRAINS

ATTA JUNCTION - FAILED OVERLAYS, PATCHING OF


UMUEZEALA(SPUR TO SECTIONS,POTHOLES,RO POTHOLE, REPAIR OF IMPROVEMENT
CARRIAGEWAY
R70 OWERRI - OKIGWE UGH DRIVING SURFACE FAILED SECTIONS, AND 274,977,645.65 ON TRAFFIC
(KM.0+000 - KM.2+850)
ROAD) AND BLOCKED DESILTING OF CONCRETE CONDITIONS
CONCRETE LINED DRAIN. LINED DRAIN
E 1 (2024)

REMARK

SOME SECTIONS ARE


IN CRITICAL
CONDITIONS

ROAD IN FAIR
CONDITION

ROAD IN FAIR
CONDITION

SOME SECTIONS ARE


IN CRITICAL
CONDITIONS

SOME SECTIONS OF
THE ROAD IS
INACCESSIBLE DUE
TO SECURITY RISKS
ROAD IN FAIR
CONDITION

ROAD IN CRITICAL
CONDITION

ROAD IN FAIR
CONDITION