Commissioning Process
Commissioning Process
Page 1 of 20
Table of Contents
Page 2 of 20
INTRODUCTION
The purpose of this document is to describe the commissioning process of Grid mounted
solar photovoltaic plant. The commissioning procedure starts from the Commissioning
team deployment at site to the switching ON of the inverters. The entire workflow will be
as per the below sequence:
Rectification
work
Equipment Testing
Service Engg/Repair/
Replace
*Detailed below
#Stability is observed for 12 hours post charging
Page 3 of 20
CHARGING SEQUENCE
Please note that charging of the plant will be done over a period of time with different stages which
is mentioned below in accordance with the SLD. It involves charging of Switchyard with power
transformer, then Switchgears of MCR first, subsequent LCR with inverter transformer and
later the switching ON of the inverters. The total plant is kept in OFF position; the charging
starts from GSS end.
All Transformers will be kept for no load soaking period after charging as per the directions of
manufacturer/service engineer.
Client
Commissioning-in-charge
Commissioning Engineers
Page 4 of 20
PROPOSED CHARGING SEQUENCE
GSS
1ST DAY
POWER TRAFO
POWER TRAFO POWER TRAFO
1ST DAY 1ST DAY
Page 5 of 20
• Sequence flow may change based on readiness & actual site constraints.
Steps of charging:
1. After receipt of permission for charging from concerned authority, the process for charging
shall be started. Only supervisors/wireman license holders shall be present inside
switchyard. All other persons are kept out of vicinity of the switchyard
2. Some observers are kept at safe distance out of the fence of switchyard for observing any
abnormality during the charging process.
3. All the test reports shall be present for verification. The commissioning in-charges of client shall
verify the test reports and give go-ahead for the charging process.
4. After fulfilling all the check points of “Hot commissioning Process-1”, the team will proceed
towards “Hot commissioning process-2”
5. After charging of each block, the measurement sheet is filled up.
INVERTER CHARGING
All the inverters shall be charged as per the electrical installation manual provided by the vendor,
the pre-requisites those are needed for the same should be referred to from the manual. Each
inverter is charged in a crescendo. Every SCB is put into function one by one and the inverters are
charged accordingly in the steps.
The plant is first charged at 25%, then 50%, 75% and then at 100% of its full load.
Page 6 of 20
HOT COMMISSIONING PROCESS-1
KV side conductor
Phase seq of 33KV Should be same as I/C line
side cable
Radiator valve open
Buchhloz In service & direction of arrow
towards conservator
Air release of No air inside
bucchholz
Air release from Check ok
220/33 KV Transformer radiator
WTI CT Link close in TR MB
WTI setting Put value
OTI setting Put value
Tap position Put value
WTI, NCT & Should not be open & star point
Bushing CT link at to be ensured
Marshalling box
Bushing CT Tan Properly ground
delta point
Conservator oil >=1/2 & <=3/4
level
NIFPS Panel No active alarm/warning
Earthing-body, Tightness ok
neutral
Page 7 of 20
Operation of Check ok
cooling fan
Page 8 of 20
After getting all the check points to (✔), proceed to “Hot commissioning process-2”
Page 9 of 20
HOT COMMISSIONING MEASUREMENT SHEET
VOLTAGE & PHASE SEQ MEASUREMENT-MCR
LOCATION EQUIPMENTS TESTING KIT TEST RESULT(VOLTAGE)
R-Y Y-B B-R R-N Y-N B-N N-E REMARKS
MCR LPT- PT MCB MULTIMETER
1 MFM METER DISPLAY
PT MCB PHASE
SEQUENCE
METER
MCR LPT- PT MCB MULTIMETER
2 MFM METER DISPLAY
PT MCB PHASE
SEQUENCE
METER
MCR LPT- PT MCB MULTIMETER
3 MFM METER DISPLAY
PT MCB PHASE
SEQUENCE
METER
MCR BPT- PT MCB MULTIMETER
1 MFM METER DISPLAY
PT MCB PHASE
SEQUENCE
METER
MCR BPT- PT MCB MULTIMETER
2 MFM METER DISPLAY
PT MCB PHASE SEQ
METER
MCR BPT- PT MCB MULTIMETER
3 MFM METER DISPLAY
PT MCB PHASE SEQ
METER
VOLTAGE & PHASE SEQ MEASUREMENT-MCR
LOCATION EQUIPMENTS TESTING KIT TEST RESULT(VOLTAGE)
Page 10 of 20
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
7
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
8
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
9
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
10
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
11
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
12
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
13
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
14
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
15
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
16
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
17
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
18
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
19
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
20
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
21
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
22
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
23
MCR PT MCB MULTIMETER
INCOMER- MFM METER DISPLAY
24
Page 11 of 20
FCBC TERMINAL MULTIMETER
MCR UPS DISPLAY
UPS TERMINAL MULTIMETER
Page 12 of 20
*SAME SHEET TO BE FILLED FOR ALL LCR’S.
OUT GOING-1
LOCATION TESTING KIT MFM RELAY REMARKS
R Y B N R Y B N
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
OUT GOING-2
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
OUT GOING-3
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-1
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-2
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-3
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-4
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
Page 13 of 20
HOT COMMISSIONING MEASUREMENT SHEET
INCOMER-5
LOCATION TESTING KIT MFM RELAY REMARKS
R Y B N R Y B N
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-6
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-7
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-8
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-9
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-10
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-11
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-12
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
Page 14 of 20
HOT COMMISSIONING MEASUREMENT SHEET
INCOMER-13
LOCATION TESTING KIT MFM RELAY REMARKS
R Y B N R Y B N
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-14
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-15
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-16
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-17
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-18
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-19
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-20
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
Page 15 of 20
HOT COMMISSIONING MEASUREMENT SHEET
INCOMER-21
LOCATION TESTING KIT MFM RELAY REMARKS
R Y B N R Y B N
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-22
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-23
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
INCOMER-24
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
AUX-TRANSFORMER-1 FEEDER
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
AUX-TRANSFORMER-2 FEEDER
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
Page 16 of 20
HOT COMMISSIONING MEASUREMENT SHEET
LCR-1
LOCATION TESTING KIT MFM RELAY REMARKS
R Y B N R Y B N
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-2
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-3
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-4
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-5
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-6
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-7
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-8
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
HOT COMMISSIONING MEASUREMENT SHEET
Page 17 of 20
LCR-9
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-10
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-11
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-12
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-13
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-14
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-15
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-16
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-17
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-18
CT MILLI TONGTESTER
Page 18 of 20
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-19
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-20
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-21
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-22
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-23
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
LCR-24
CT MILLI TONGTESTER
DISPLAY
CT MILLI TONGTESTER
RELAY
Page 19 of 20
HOT COMMISSIONING MEASUREMENT SHEET
Page 20 of 20