Key Plan 3 2 4 5 6 7 8 9 10 11 12 13: Notes
Key Plan 3 2 4 5 6 7 8 9 10 11 12 13: Notes
2 3 4 5 6
7 13
8 9
10 11 12
LEGEND
APPLICATION BOUNDARY
PROPOSEDT EMPORARY
EPULLNG
I
PROPOSED LINK BOX CHAMBER
00
CABL
HARDSTAND
EXISTING HV MAST
NOTES :
100
1400
PROPOSED PROJECT SITE. IT SHOULD BE ASSUMED TO EXTEND
1300
20
0 TO THE EDGE OF THE CARRIAGEWAY ALONG PUBLIC ROADS,
1200
PROPOSEDTEMPORARY
EXCEPT WHERE OTHERWISE INDICATED.
1100
PROPOSED JOINT BAY
CONSTRUCTONCOMPOUND
I
1
1000
2 VL
0k CIM
PROPOSEDNEW 2 5. 220 kV CABLES TO BE INSTALLED AS PER DRAWING
900
NT
EI ERFACEMAST)
(LNECABL
I O
VELACCESSTRACKT
GRA PE605-D027-083-001 (LATEST REVISION), WHICH IS A TYPICAL
ND
*
800
TEMPORARYCOMPOU SITE NOTICE
PROPOSED C2 TRENCH LAYOUT. THE OVERALL DEPTH, WIDTH AND FORMATION
700
COMMUNICATIONS
CHAMBER
OF THE TRENCH MAY CHANGE, DEPENDING ON GROUND
600
300
400
500
CONDITIONS AND DETAILED DESIGN.
SCALE BAR:
CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT
Client
Church
(in Ruins)
Project
Church
(in Ruins)
Church
Contract
(in Ruins)
Stickillin House
Drawing Title
EXISTING UTILITIES
AND PROPOSED DEVELOPMENT
SHEET 2 OF 13
Production Unit
Civil, Environmental and Renewable Engineering
COPYRIGHT C ESB
All rights reserved. No part of this work may be modified or reproduced or copied in any form
or by any means - graphic, electronic or mechanical, including photocopying, recording,
ORDNANCE SURVEY IRELAND MAP SHEET 2010 Tailte Éireann Licence No. EN 0023719-24 ©Tailte Éireann/
Government of Ireland
PE605-D027-105-002-002
taping or information-and-retrieval system, or used for any purpose other than its designated
purpose, without the written permission of ESBI Engineering & Facility Management Ltd.