0% found this document useful (0 votes)
25 views1 page

Key Plan 3 2 4 5 6 7 8 9 10 11 12 13: Notes

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Key Plan 3 2 4 5 6 7 8 9 10 11 12 13: Notes

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

2 3 4 5 6
7 13
8 9
10 11 12

LEGEND

APPLICATION BOUNDARY

PROPOSED 220 kV ONSHORE CABLE ROUTE

PROPOSED FIBRE CABLE ROUTE

EXISTING HIGH VOLTAGE OVERHEAD LINE

EXISTING MEDIUM VOLTAGE OVERHEAD LINE

EXISTING LOW VOLTAGE OVERHEAD LINE

EXISTING MEDIUM VOLTAGE UNDERGROUND


CABLE

EXISTING LOW VOLTAGE UNDERGROUND CABLE

EXISTING WATER MAIN

EXISTING GRAVITY SEWER

EXISTING STORM WATER DRAIN

EXISTING HIGH PRESSURE TRANSMISSION


GAS MAIN

EXISTING TELECOMS OVERHEAD LINE

EXISTING TELECOMS UNDERGROUND CABLE


8m

SEE SHEET PE605-D027-105-003 FOR CONTINUATION


2.5 m PROPOSED JOINT BAY

PROPOSED NEW 220 kV LCIM


(LINE CABLE INTERFACE MAST) PROPOSED C2 CHAMBER

PROPOSEDT EMPORARY
EPULLNG
I
PROPOSED LINK BOX CHAMBER
00

CABL
HARDSTAND

EXISTING HV MAST

PROPOSED NEW LINE CABLE


INTERFACE MAST (LCIM)

NOTES :
100

1. FOR PLANNING PURPOSES ONLY, NOT FOR CONSTRUCTION

2. ALL DIMENSIONS IN METERS, UNLESS OTHERWISE NOTED

3. THE CABLE SHALL BE INSTALLED WITHIN THE


SITE BOUNDARY. THE FINAL ALIGNMENT WITHIN THE
PROPOSED JOINT BAY
SITE BOUNDARY SHALL BE DETERMINED FOLLOWING DETAILED
2 DESIGN, WHICH WOULD PROCEED POST-PLANNING.
PROPOSED C2
COMMUNICATIONS 4. THE SITE BOUNDARY IS THE EXTENT OF THE
CHAMBER

1400
PROPOSED PROJECT SITE. IT SHOULD BE ASSUMED TO EXTEND

1300
20
0 TO THE EDGE OF THE CARRIAGEWAY ALONG PUBLIC ROADS,

1200
PROPOSEDTEMPORARY
EXCEPT WHERE OTHERWISE INDICATED.

1100
PROPOSED JOINT BAY
CONSTRUCTONCOMPOUND
I
1

1000
2 VL
0k CIM
PROPOSEDNEW 2 5. 220 kV CABLES TO BE INSTALLED AS PER DRAWING

900
NT
EI ERFACEMAST)
(LNECABL
I O
VELACCESSTRACKT
GRA PE605-D027-083-001 (LATEST REVISION), WHICH IS A TYPICAL
ND
*

800
TEMPORARYCOMPOU SITE NOTICE
PROPOSED C2 TRENCH LAYOUT. THE OVERALL DEPTH, WIDTH AND FORMATION

700
COMMUNICATIONS
CHAMBER
OF THE TRENCH MAY CHANGE, DEPENDING ON GROUND

600
300

400

500
CONDITIONS AND DETAILED DESIGN.

6. THE UTILITIES RECORDS SHOWN ARE THE RECORDS ONLY IN


THE IMMEDIATE VICINITY OF THE SITE BOUNDARY
N33
REFERENCE DRAWINGS:

SCALE BAR:

0 50 100 150 200 250 m

002 UPDATED PLANNING BOUNDARY

001 20/02/24 UPDATED PLANNING BOUNDARY & WITH RPS COMMENTS NB NB RD MH

000 31/01/24 FIRST ISSUE NB NB RD MH

REV. DATE REVISION DESCRIPTION DRN PROD VER APP

PURPOSE OF ISSUE - PRELIMINARY UNLESS INDICATED

CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT

Client

ORIEL WINDFARM LIMITED


Graveyard
Church
(in Ruins)

Church
(in Ruins)

Project
Church
(in Ruins)

ORIEL WIND FARM PROJECT

Church
Contract
(in Ruins)

Stickillin House

Drawing Title

EXISTING UTILITIES
AND PROPOSED DEVELOPMENT
SHEET 2 OF 13

Production Unit
Civil, Environmental and Renewable Engineering

DRAWN PRODUCED VERIFIED APPROVED APPROVAL DATE

Bell_N Bell_Neil R.Doyle M.Hogan 21/02/2024

CLIENT REF No. OF SHTS SIZE SCALE

TC228657 2/13 A1 1:2500

DRAWING NUMBER SHEET REV

COPYRIGHT C ESB
All rights reserved. No part of this work may be modified or reproduced or copied in any form
or by any means - graphic, electronic or mechanical, including photocopying, recording,
ORDNANCE SURVEY IRELAND MAP SHEET 2010 Tailte Éireann Licence No. EN 0023719-24 ©Tailte Éireann/
Government of Ireland
PE605-D027-105-002-002
taping or information-and-retrieval system, or used for any purpose other than its designated
purpose, without the written permission of ESBI Engineering & Facility Management Ltd.

You might also like