Production and Transportation Cost Per 1 Million Units: Decision Variables

Uploaded by

Ragil R Sentosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views3 pages

Production and Transportation Cost Per 1 Million Units: Decision Variables

Uploaded by

Ragil R Sentosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Inputs - Costs, Capacities, Demands

Production and(SunOil Company)Cost per 1


Transportation
million Units Fixed Low
Supply RegN. AmericaS. AmericaEurope Asia Africa Cost Capacity
N. America $ 81.00 $ 92.00 $ 101.00 $ 130.00 $ 115.00 $ 6,000 10
S. America $ 117.00 $ 77.00 $ 108.00 $ 98.00 $ 100.00 $ 4,500 10
Europe $ 102.00 $ 105.00 $ 95.00 $ 119.00 $ 111.00 $ 6,500 10
Asia $ 115.00 $ 125.00 $ 90.00 $ 59.00 $ 74.00 $ 4,100 10
Africa $ 142.00 $ 100.00 $ 103.00 $ 105.00 $ 71.00 $ 4,000 10
Demand 12 8 14 16 7

Decision Variables
Demand Regio - Production Allocation (Million Units) Plants Plants
Supply RegN. AmericaS. AmericaEurope Asia Africa (1=open) (1=open)
N. America 0 0 0 0 0 0 0
S. America 12 8 0 0 0 0 1
Europe 0 0 0 0 0 0 0
Asia 0 0 4 16 0 0 1
Africa 0 0 10 0 7 0 1

Constraints
Supply RegExcess Capacity
Excess Capacity
N. America 0
S. America 0 =G14*H4+H14*J4-SUM(B14:F14)
Europe 0
Asia 0
Africa 3
N. AmericaS. AmericaEurope Asia Africa
Unmet Demand
Unmet De 0 0 0 0 0
=B9-SUM(B14:B18)
Objective Function
Objective Function
Cost ###
=SUMPRODUCT(B14:F18;B4:F8)+SUMPRODUCT(G14:G18;G4:G8)+SUMPRODUCT(H14
Fixed High
Capacitated Plant Location Model
Cost Capacity
$ 9,000.00 20 n = Number of Potential Plant location / capacity (each level
$ 6,750.00 20 will count as a seperate location); n = 10 ( 5 x 2)
$ 9,750.00 20
$ 6,150.00 20 m = number of markets or demand points; m = 5 markets
Dj = annual demand from market j; Dj = B9:F9
$ 6,000.00 20
Ki = potential capacity of plant i; Ki = H4:H8 & J4:J8
fi = annualized fixed cost of keeping plant i open; fi = G4:G8 & I
cij = cost of producing and shipping one unit from plant i to marke
includes production, inventory, transportation, and tariffs); cij = B

Learning Objectives

The Capacitated plant location model can be used to obtain a


configuration that minimizes total cost or maximizes total pr
model provides optimal plant locations while ensuring that n
supplies more than its capacity and each market obtains eno
to meet demand

G4:G8)+SUMPRODUCT(H14:H18;I4:I8)
capacity (each level of capacity
0 ( 5 x 2)

ts; m = 5 markets
:F9
8 & J4:J8
i open; fi = G4:G8 & I4:I8
t from plant i to market j (cost
on, and tariffs); cij = B4:F8

n be used to obtain a regional


r maximizes total profits. The
while ensuring that no plant
market obtains enough supply

You might also like