2 CLASSROOM
QUS 413. Specification Writing and Building Measurement Project
ELEMENT NR-01
SUBSTRUCTURE
Generally
Information
SITE CLEARANCE
Clear site of bushes, schrub, undergrowth , grass
and trees not exceeding 600mm girth measured at 500 m2 100.00 50,000.00
1000mm from ground level
Excavations
Excavation of top soil to remove vegetable soil
600 m2 150.00 90,000.00
minimum depth 150mm
-
Excavate trench for foundation footing to blockwalls
commencing from stripped level ,maximum depth 75.00 M3 3,500.00 262,500.00
not exceeding 2.00m
Disposal of Water
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
Surface Treatments
-
Prepare and apply one coat of "DieIdrex 20" or
other equal and approved anti-termite solutionto 128.00 M2 150.00 19,200.00
surfaces of pit and trench excavations
Concrete Work
50mm thick plain In-situ concrete (1:10) all-in
aggregate as blinding to
Column bases 1.30 M3 92,300.00 119,990.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
Reinforcement
High yield deformed bar reinforcement to B.S -
4462 including 16SWG tying wire, distance
blocks and ordinary spacers:
Column bases and footings:
12mm diameter in straight & bent bars 0.92 tons 600,000.00 552,000.00
In Ground beam
12mm diameter 1.44 tons 600,000.00 864,000.00
8mm diameter in links and stirrups 0.63 tons 600,000.00 378,000.00
-
-
Damp-proofing
Damp proof membrane, horizontally laid on blinding 128.00 M2 400.00 51,200.00
Block Work
Hollow sandcrete blockwork in cement mortar
(1:6) as work progresses in:
225mm Thick walls in foundation 108.00 M2 10,000.00 1,080,000.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
Painting
Prepare and apply finishing coats of approved
192.00 m2 800.00 153,600.00
emulsion paint on wall external ditto
Protection:
Protect all work in this element Sum
COLLECTIONS:
Page 2 901,850.00
Page 3 2,645,990.00
Page 4 3,877,200.00
Page 5 941,600.00
SUBSTRUCTURE
Carried to summary: 8,366,640.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
ELEMENT NO -02
FRAMES
Columns
Attached / Isoated columns 2.00 m3 92,300.00 184,600.00
In beams
Attached beams to suspended slab 4.00 m3 92,300.00 369,200.00
12mm diameter in straight and bent bars 1.44 Tons 600,000.00 864,000.00
8mm diameter stirups and links 0.63 Tons 600,000.00 378,000.00
In columns
16mm diameter in straight and bent bars 1.78 Tons 600,000.00 1,068,000.00
8mm diameter stirups and links 1.10 Tons 600,000.00 660,000.00
FRAME
Carried to summary 4,682,300.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
TREATED HARDWOOD
100 X 75mm Wall Plate
ditto Rafter 188.00 M 400.00 75,200.00
ditto King Post 515.00 M 400.00 206,000.00
ditto Tie beam 120.00 M 400.00 48,000.00
ditto Ridge piece 340.00 M 400.00 136,000.00
ditto Struts 31.00 M 400.00 12,400.00
75 x 75mm Purlin 389.00 M 400.00 155,600.00
50 x 50mm bracers 433.00 M 400.00 173,200.00
ditto noggings 173.00 M 300.00 51,900.00
980.00 M 300.00 294,000.00
Carried to collection
Covering 1,152,300.00
Supply and fix 0.45mm Oven backed longspan
Aluminium roofing sheet complete fix complete with
galvanized screw with plastic packing ring and lock
every 500m
Sloping Roof
Ridge Piece 600mm girth 326.00 m2 5,500.00 1,793,000.00
Hip ditto 70.00 m 2,750.00 192,500.00
ditto Gutter ditto 31.00 m 2,750.00 85,250.00
24.00 m 2,750.00 66,000.00
2,136,750.00
COLLECTION
1,152,300.00
2,136,750.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
metals Doors
Overall Size:
900 x 2,100 high
Supply and fix single swing single leaf ballistic
resistant security steel door with decorrative -
pannels and steel frame,on mongery.
Overall Size:
10 No 102,600.00 1,026,000.00
Protection:
Protect all work in this element
item
Element No . 07 Doors
Carried to summary
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
2,026,000.00
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
-
-
-
-
-
-
-
-
-
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
Internal work:
Insitu finishings:
Tile finishings
400 x 400 x 10mm thick approved vitrified
ceramic tiles laid on cement and sand (1:3)
screeded bed (measured seperatly on)
All floor area including 75mm skirting
184.00 m2 7,500.00 1,380,000.00
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
Insitu finishings:
Tile finishings
450 x 450 x 10mm thick approved vitrified
ceramic tiles laid on cement and sand (1:3)
screeded bed (measured seperatly on)
Carried to collection
1,597,500.00
-
Carried To Collection
-
COLLECTION
PAGE 17
1,597,500.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
Walls
144.00 m2 1,500.00 216,000.00
-
INTERNAL -
12mm thick cement and sand one coat smooth
-
rendering
165.00 m" 1,500.00 247,500.00
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
-
-
-
-
-
-
-
-
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
New work;
internally
Walls
Reveals not exceeding 300mm wide 165.00 Sq.m 1,200.00 198,000.00
110.00 Sq.m 1,200.00 132,000.00
-
-
-
-
Externally:
Prepare and apply finishing coats of approved
Emulsion paint on:
Walls
Reveals not exceeding 300mm wide. 144.00 m2 1,200.00 172,800.00
2
76.00 m 1,200.00 91,200.00
BillS of Quantities.
QUS 413. Specification Writing and Building Measurement Project
SUMMARY: 594,000.00
Page Amount
Element Nr. 01 - Substructure:
8,366,640.00
FRAME
4,682,300.00
-
ROOF CONSTRUCTION
3,289,050.00
DOORS
2,026,000.00
WINDOWS
-
-
FLOOR FINISHES
1,597,500.00
WALL FINISHES
463,500.00
CEILING FINISHES
-
PAINTING AND DECORATING
594,000.00
BillS of Quantities.