TXX - Appx-A - System Architecture - R2
TXX - Appx-A - System Architecture - R2
This proposal contains technical and business information that is confidential and
Proposal No : QLK-2009-5162660 Rev. 2 Rev. Date 22-FEB-2021
proprietary to Schneider Electric. It is provided to Customer solely for internal review and
evaluation. The information contained herein may not be shown or disclosed in any form
to third parties without the express consent of Schneider Electric.
Scale NTS Sheet No 1 of 9
Abbreviations Notes Table of Contents
Note 1. Description Page No.
APCS Advanced Process Control System Cover Page Sheet 1
AMS Alarm Management System
Note 2. Table of Contents, Abbreviations & Legend Sheet 2
ASR Automation Server Room
ICSS Integrated Control and Safety System Block Diagram Sheet 3
CCR Central Control Room Overall System Architecture Sheet 4
Note 3.
DCS Distributed Control System
Overall System Architecture Continued Sheet 5
EWS Engineering Workstation
FDS Fire Detection System PCN Network Sheet 6
FDCP Fire Detector Control Panel SIS/GDS Network Sheet 7
FOPP Fiber Optic Patch Panel PIN Network Sheet 8
GDS Gas Detection System Legends
GPS Global Positioning System ROOT SWITCHES Remote Control Room Sheet 9
Managed layer 3 switch to connect different plant areas
HART Highway Addressable Remote Transducer
HMI Human Machine Interface EDGE SWITCHES
Managed layer 2 switches used to connect equipment to the PCN
IAMS Instrument Asset Management System
ICSS Integrated Control and Safety System DISTRIBUTION SWITCHES
Scale :
Notes Title Table of Content NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 2 of 9
PE/PP/LAO UNITS
REMOTE CONTROL
BUILDING 8200 CCB
HMI
ENGINEERING &
HMI Refer to page 8 for
further details OTS APC
DCS
PIN NETWORK
PCN NETWORK
SIS/GDS NETWORK
PIN NETWORK
PCN NETWORK
SIS/GDS NETWORK
Rev 2
NOTE ‐1
5601‐PB‐01
LOGISTIC RIE
RIE EXTRUDER
HMI
DCS -
REMOTE
IO
DCS -IO SIS – IO
GDS –
IO
Scale :
Notes (1) Only interface with main PCN network is in SE scope.
Title BLOCK DIAGRAM
NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 3 of 9
CENTRAL CONTROL ROOM (CCR) PRINTER ROOM
PIN NETWORK
TC TC TC TC
Large Screen 24" 24" 24" 24" 24" 24" Large Screen TC TC 24" 24" 24" 24" 24" 24" Large Screen TC TC 24" 24" 24" 24" 24" 24" Large Screen
TC TC
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24"
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24"
Printer Printer Printer Printer
KVM KVM KVM KVM KVM KVM KVM KVM KVM A3 Color A3 Color A3 B/W A3 B/W
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24"
OWS 1 OWS 2 OWS 3 OWS 4 OWS 5 OWS 6 OWS 1 OWS 2 OWS 3 OWS 4 OWS 5 OWS 6 OWS 1 OWS 2 OWS 3 OWS 4 OWS 5 OWS 6 OWS
SDC PEU‐1 Train 1/ SDC PEU‐1 Train 2/ SDC PEU‐1 Train 3/
PEU‐1 Train 1/ PEU‐1 Train 1/ PEU‐1 Train 1/ PEU‐1 Train 1/ PEU‐1 Train 1/ PEU‐1 Train 2/ PEU‐1 Train 2/ PEU‐1 Train 2/ PEU‐1 Train 2/ PEU‐1 Train 2/ PEU‐1 Train 3/ PEU‐1 Train 3/ PEU‐1 Train 3/ PEU‐1 Train 3/ PEU‐1 Train 3/ Supervisor (By others) (By others) (By others) (By others)
PEU‐1 Train 1 PCO PEU‐1 Train 2 PCO PEU‐1 Train 3 PCO
PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCOPEU‐1 PCO PEU‐1 Train 1
CENTRAL CONTROLO BUILDING (8200‐CCB)
NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐2 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐2 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐2 NOTE ‐1 NOTE ‐ 5
From/To From/To From/To
SIS/GDS/DCS
PCN NETWORK Cab in ASR
SIS/GDS/DCS
Cab in ASR
SIS/GDS/DCS
Cab in ASR
SIS/GDS NETWORK TC TC TC TC TC TC TC TC TC
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" Rev 1
DCS DCS DCS SIS/GDS SIS/ SIS/GDS IAMS IAMS IAMS AMADAS
PEU 1 & LAO PEU 2 PPU PEU 1 & LAO GDS PPU PEU 1 & LAO PEU 2 PPU SERVER NMS
EWS EWS EWS EWS EWS EWS EWS EWS EWS
NOTE ‐2
PCN NETWORK NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2
Portal/web Server
Terminal Server‐
Domain Server‐
OPC Server 1 –
SERVER ROOM
Server 2 –
AMADAS , UI&O
Secondary
3rd Party
3rd Party
Interface
Interface
Admin
DCS (by other),
DCS SIS/GDS SERVER SMIS, MESS, NETWORK (ASR)
LAO‐SOWS with
Crypto
OPC
LAO OWS with
SYSTEM SYSTEM CABINET PSS, PMS,
SIS/GDS EWS
with 65" LSD
PEU 1‐SOWS
with 65" LSD
with 65" LSD
IAMS Server
PEU1 & LAO
LAO OWS
DCS EWS
MARSHAL
x 2 Nos.
x 2 Nos.
x 2 Nos.
Other EPC
65" LSD
65" LSD
MARSHAL Cluster
L.CABINET L.CABINET
V91 # 9 To Admin
Building –
TIME SYNC Tape Drive
AMADAS SERVER
FDC280 (SNTP) SERVER FW Cluster Domain Server Prim.
To Admin
Building –
PACKAGE DMZ SW Tape Drive
UNITS V91 # 1 V91 # 2 V91 # 3 NOTE ‐2 DMZ NETWORK NOTE ‐ 7
NOTE ‐ 2 NOTE ‐ 1 NOTE ‐ 1 NOTE ‐ 1 NOTE ‐ 7
ICSS BACKUP SERVER FOC NOTE ‐ 2
NOTE ‐ 3
PACKAGE UNITS
FDC280 FOC
PCN NETWORK NOTE ‐ 3 BACKRUP SERVER
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24"
PACKAGE/PLC PACKAGE/PLC
UNITS UNITS
EWS/OWS EWS/OWS
DCS SIS & GDS IAMS DCS SIS & GDS IAMS
NOTE ‐ 5 EWS EWS EWS EWS EWS EWS
COLOR COLOR
PRINTER NOTE ‐ 5 PRINTER
(By others) NOTE ‐4 NOTE ‐4 NOTE ‐3 (By others) NOTE ‐4 NOTE ‐4 NOTE ‐3
PCN NETWORK PCN NETWORK
PROCESS PROCESS
SUBSTATION SUBSTATION
DCS SIS GDS PDP PDP DCS SIS GDS NETWORK FOPP PDP PDP
NETWORK FOPP
SYSTEM SYSTEM SYSTEM CABINET CABINET SYSTEM SYSTEM SYSTEM CABINET CABINET CABINET CABINET
IRP CABINET CABINET FDC280 FDC280 IRP
FDC280 FDC280 FDC280 MARSHAL MARSHAL FDC280 MARSHAL MARSHAL MARSHAL (UPS) (NON‐
MARSHAL CABINETS (UPS) (NON‐ CABINETS
L.CABINET L.CABINET L.CABINET UPS) L.CABINET L.CABINET L.CABINET UPS)
ELECTRICAL ELECTRICAL
MCC MCC
FIELD FIELD
FIELD FIELD INSTRUMENT FIELD INSTRUMENT FIELD
FIELD INSTRUMENT FIELD INSTRUMENT GAS SENSOR GAS SENSOR
Scale :
Notes (1) OWS Virtual Machines are accessible through thin clients in CCR and installed in the server cabinets.
Title
DCS EWS, SIS/GDS EWS, Historian Virtual Machines are accessible through thin clients in AEO and installed in server cabinets.
(2) All Physical Workstations and Servers are accessible through KVM Extender and installed in server cabinets.
OVERALL SYSTEM ARCHITECTURE NTS
(3) IAMS in RIE will be temporary moved from CCB for commissioning.
(4) Workstations in RIE will be installed in Operator consoles.
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units
(5) Printers not in SE scope of supply..
(6) Separate cabinets are considered for servers and workstations.
(7) Connectivity between ASR and Admin Building in others scope QLK-2009-5162660 2 4 of 9
CENTRAL CONTROL ROOM (CCR)
PIN NETWORK
TC TC TC TC TC TC
Large Screen TC TC Large Screen Large Screen Large Screen Large Screen Large Screen ADMINISTRATION BUILDING
24" 24" 24" 24" TC TC 24" 24" 24" 24" 24" 24" TC 24" 24" 24" 24"
Rev 2
24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" 24" TAPE DRIVE
24" 24" 24" 24" 24" 24" KVM KVM 24" 24" 24" 24" 24" 24" 24" 24" KVM KVM KVM 24" 24" 24" 24" 24" 24" KVM KVM 24" 24"
FOC
OWS
OWS Frrom Back-up
OWS 1 OWS 2 SDC OWS 3 OWS 4 OWS 5 OWS 1 OWS 2 SDC OWS 3 OWS 4 OWS 5 OWS 6 OWS OWS 1 OWS 2 SDC OWS 3 OWS 4 Supervisor LAO
Supervisor server in ASR-
PEU‐2/PCO PEU‐2/PCO PEU‐2 PEU‐2/PCO PEU‐2/PCO PEU‐2/PCO PPU/PCO PPU/PCO PPU PPU/PCO PPU/PCO PPU/PCO PPU/PCO Supervisor PPU LAO/PCO LAO/PCO LAO LAO/PCO LAO/PCO & Plant
PEU‐2 LOC
monitoring
NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐2 NOTE ‐1 NOTE ‐1 NOTE ‐1 NOTE ‐2 NOTE ‐2 NOTE ‐1
From/To From/To
CENTRAL CONTROLO BUILDING (CCB)
From/To
PCN NETWORK SIS/GDS/DCS
Cab in ASR SIS/GDS/DCS
Cab in ASR
SIS/GDS/DCS
Cab in ASR
Supervisory
Supervisory
PIN NETWORK
PEU 2 DCS
PEU 1 DCS
x 5 Nos.
GDS EWS
x 5 Nos.
x 5 Nos.
65" LSD
Rev 2
Nos.
EWS
TO AGCC LOC
Domain Server
‐ Secondary
Anti Virus
Server
SERVER
Crypto
V91 # 1 V91 # 2 V91 # 3 V91 # 4 V91 # 5
CABINETS Gateway
(separate Cluster
for HW
servers V91 # 7
and for
FW Cluster
PIN NETWORK
ISS) Domain Server Prim.
NOTE ‐2
PEU 2 SIS/GDS
PPU SIS/GDS
Supervisory
PEU 2 DCS
PPU DCS
DMZ NETWORK
EWS
EWS
EWS
DMZ SW
ICSS BACKUP SERVER
PCN NETWORK NOTE ‐ 3
PIN NETWORK V91 # 6
Historian Server
PEU2 APC Server
PEU 2 OWS with
Terminal Server
Primary Domain
WORKSTATION
PPU SIS/GDS
APC Interface
PEU 2‐SOWS
with 65" LSD
PPU OWS x 2
Domain Ctlr
PEU2 IAMS
Secondary
CABINET
65" LSD
65" LSD
65" LSD
Server
EWS
Nos.
EWS
Nos.
Ctlr
PCN NETWORK
PACKAGE/
NOTE ‐ 8 PLC UNITS 24" 24" 24" 24" 24" 24" NOTE ‐ 8 24" 24" 24" 24" 24" 24"
EWS/OWS PACKAGE/PLC
UNITS
EWS/OWS
COLOR
OWS OWS OWS DCS SIS & GDS IAMS OWS OWS OWS PRINTER DCS SIS & GDS IAMS
PEU 1 PEU 1 PEU 1
EWS EWS EWS PEU2 PPU PPU NOTE ‐ 5 EWS EWS EWS
EXTUDER 1 EXTUDER 2 EXTUDER 3 EXTUDER EXTUDER 1 EXTUDER 2 (By others) COLOR
PRINTER
(By others)
NOTE ‐4 NOTE ‐4 NOTE ‐3 NOTE ‐4 NOTE ‐4 NOTE ‐3
PCN NETWORK PCN NETWORK
ELECTRICAL ELECTRICAL
MCC MCC
CCB
EDGE
SWITCHES
ROOT
SWITCHES
5601‐PB‐01 LOGISTIC‐RIE
EDGE
SWITCHES DCS – REMOTE IO
Scale :
Notes (1) PCN is redundant network. Title PCN NETWORK NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 6 of 9
8820‐CCB
CCB
EDGE
SWITCHES
ROOT
SWITCHES
5601‐PB‐01
EDGE
SWITCHES
Scale :
Notes Title
(1) P2P Network is redundant network. SIS / GDS NETWORK NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 7 of 9
8820‐CCB
EDGE
SWITCHES
ROOT
SWITCHES
CENTRAL
3820‐RIE‐01 4820‐RIE‐01 9820‐RIE‐01 LABORATORY
E&I WORKSHOP
EDGE EDGE EDGE EDGE EDGE
SWITCHES SWITCHES SWITCHES SWITCHES SWITCHES
5601‐PB‐01
EDGE
SWITCHES
Scale :
Notes Title
(1) PIN Network is Simplex. PIN NETWORK NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 8 of 9
Local Control Room
6 000 km
DCS
EWS DCS OPTIONAL
Application
(Galaxy) OWS Servers
Remote Control Room(ROC)
Provider # 1 Rev 2
Supervisory
PEU 2 DCS
x 5 Nos.
x 5 Nos.
x 5 Nos.
65" LSD
Nos.
DCS
ESD V91 # 1 V91 # 2 V91 # 3 V91 # 4
PPU OWS x 5
PEU 2 SIS/GDS
PPU DCS EWS
PPU SIS/GDS
Supervisory
Supervisory
PEU 1 DCS
GDS EWS
PPU DCS
65" LSD
Nos.
EWS
EWS
EWS
PCN Network
V91 # 5 V91 # 6 V91 # 7
Scale :
Notes (1) OWS/EWS Virtual Machines are accessible through thin clients in ROC and installed in the server cabinets. Title REMOTE CONTROL ROOM NTS
Proposal No Rev Sheet No.
Project Name ICSS‐AGCC Project PE/PP/LAO Units QLK-2009-5162660 2 9 of 9