CCM CP03 ARC SDW TW1 B06 00011 - Ver2.

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

These drawings shall be coordinated with

DCI Comments:
Structural, Electrical, Mechanical, Sanitary & Fire
Protection plans. Refer to Architects and
Structural Engineers' drawings for building
details. Dimensions are to be checked on site
before any work is put in hand or prefabricated.

1. Always refer on the responded SD of SY2 for STP with reference no. SY2_BDOM-CP08a-
This drawing is to be read in conjunction with the
technical specification and sub-contractors'
working drawings.

SUT-SD-001a (Civil works drawing for T1)


2. This must be confirmed and verified by Ecosystem in compliance with the required
REVIEWED:
dimension of walls and partitions of STP. This document has been reviewed by the relevant Consultant(s) and is accorded the
3. Coordinate with Ecosystem for the location of maintenance access of STP. following status referred in Document Control Management Procedure for action by
the Contractor.

4. No other concerns, for further review, comments and approval of MACE and trade design A B C

consultant. Consultant review of this Document does not relieve the Contractor of its
responsibilities under the Contracts.

NOTES:

ROHLGDOJR/LBCXOR6%9DOHQ]XHOD.5=DSDULWD(0&DJXLDW
18October24

D D
CP03: STP SECTION THRU "3" & STP SECTION THRU "4"

REV. DATE DESCRIPTION DWN.


CLIENT:

BDO Unibank Inc.


7899 Makati Avenue Makati City 0726, Philippines

PROJECT MANAGEMENT CONSULTANT:

Unit 805 - 808, The One Executive Office Building


#5 West Avenue, Quezon City
T: +63 (2) 8683 7569 | W: macegroup.com

ARCHITECTURAL CONSULTANT:

DESIGN CONSULTANT:

Riverside, 22 Hester Road


London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com

STRUCTURAL CONSULTANT:

MEPF, VTS ENGINEER, AND FLS CONSULTANT:

FACADE CONSULTANT:

ALT Cladding, Inc.


12th Floor HHIC (Hanjin) Building1128, University Parkway,
North Bonaficio Bonaficio Global City, Taguig City, 1636 Metro Manila

T: (02)659-0381 | @: [email protected]

LANDSCAPE CONSULTANT:

CONTRACTOR:

PROJECT NAME:

STP STP BDO Corporate Center


Makati (CCM) Project
SECTION THRU "4" SECTION THRU "3" PROJECT STAGE: CONSTRUCTION
1:100 MTS 1:100 MTS DISCIPLINE: ARCHITECTURAL
KEY PLAN:

N
DRAWING TITLE:

CP03: STP SECTION THRU "3" & STP SECTION THRU "4"

DRAWING STATUS: ISSUED FOR APPROVAL

SCALE: 1:200MTS CHECKED: PSC


DESIGN/DRAWN: PSC APPROVED: RENE OLAP

FILE PATH:

PROJECT NO: CP03 ISSUE DATE: 10-16-24


SHEET NO: SDW-3 REV: 00

DOCS REF.: CCM-CP03-ARC-SDW-TW1-B06-00011