0% found this document useful (0 votes)
110 views54 pages

02-Client Boq

Uploaded by

Heart Anchor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views54 pages

02-Client Boq

Uploaded by

Heart Anchor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 54

BOQ UNIT QTY

NO. RATE AMOUNT


ITEM
EGY EGY

2 SITE CONSTRUCTION
2.1 Excavation
2.1.1 Excavation in ordinary soil to the required levels as per structure drawings and engineer m3 2,143
instructions.

2.2 Backfilling
2.2.1 Backfilling and compaction using the suitable excavated materials, around the foundations, m3 2,178
and to reach the required levels.

3 CONCRETE
3.1 Plain Concrete
3.1.1 Supply and cast in place plain concrete, for footings, as per dwgs. m3 351

3.2 Reinforced Concrete


3.2.1 Supply and cast in place reinforced concrete for footings & ground beams, as per dwgs. m3 210

3.2.2 Supply and cast in place reinforced concrete for columns, as per dwgs. m3 95

3.2.3 Supply and cast in place reinforced concrete for slabs & beams, as per dwgs. m3 470

3.2.4 Supply and cast in place reinforced concrete for walls of elevator in foundations, as per m3 6
dwgs.

3.2.5 Supply and cast in place 15 cm thick reinforced concrete with wire mesh, slab on grade, as m2 650
per dwgs.

3.3 G.R.C Cornice


3.3.1 Supply and install G.R.C cornice, for façades Type 1, item no. (5) in exterior finish schedule. m 267

3.4 Lightweight Concrete Roof Insulation:


3.4.1 Supply and cast in place 70/100 mm light weight concrete for slope at roof, as per dwgs. m2 2,352

4 MASONRY
4.1 Hollow Bricks
4.1.1 Supply and build 25 cm thick or more brick wall, made of 40x20x25 cm cement hollow m3 685
bricks, as per dwgs.

4.1.2 Supply and build 12 cm thick brick wall, made of 40x20x12 cm cement hollow bricks, as per m2 1,492
dwgs.

4.2 Solid Bricks


4.2.1 Supply and build 25 cm thick or more brick wall, made of 25x12x6 cm cement solid bricks, as m3 475
per dwgs.

5 METALS
5.1 Signage
5.1.1 Supply and install 1.6 mm stainless steel sinage on doors, as per dwgs. l.s 12

5.2 Steel Ladder


5.2.1 Supply and install galvanized cat steel ladder, price includes paint one coat of Jotun l.s 1
Jotamastic 80 with thickness of 100 microns, surmounted by one coat of Jotun Fotora with
thickness of 50 microns, as per dwg. For elevator room.

5.3 Handrail
5.3.1 Supply and install wrought steel handrail for stairs, as per dwgs. m 30

7 THERMAL AND MOISTURE PROTECTION


7.1 Bituminous Dampproofing:
7.1.1 2 coats For foundations. m2 4,259

7.2 Bituminous Sheet Membrane Water Proofing With Protection Layer


7.2.1 Supply and install ( below slab on grade ), 4 mm modified bitumen water proofing m2 2,530
membrane, reinforced with polyester. Price includes protection layer of 20 mm cement
screed, as per dwg.

7.3 Thermal Insulation


7.3.1 Supply and install ( for final roof ) 50 mm extruded polystyrene thermal insulation, 35 kg / m2 2,352
m3 density. Price includes protection layer of 200 micron polyethylene sheet, as per dwg.

7.4 Expansion Joints


7.4.1 Supply and inject permenant elasticity flexible material, as Sika Flex 1 A or similar, for m 48
expansion joints inside & outside building. Price includes flexible backer rod. For horizontal
& vertical expansion joints, as per dwgs.

7.5 Section 07320 – Clay Roof Tiles:


7.5.1 Furnish and install Barrel Shape clay roof tiles lays on softwood strips and fixed by mortar to m2 175
the metal lath fixed to steel framing fixed to the waterproofed concrete roof, as shown on
the drawing.

8 OPENINGS
8.1 Metal Doors and Frames:
8.1.1 Hinged steel door w./ louvered below (Type: D2) w./ dimension (2000 mm x 2500 mm). No. 1

8.1.2 Galvanized steel louvered grill with mesh (400x400 mm). No. 1

8.1.3 Supply and install 45 mm thick hollow metal hinged doors - Type (D1). No. 10

8.1.4 Supply and install metal roller shutter door, Type (D3). No. 2

8.2 Wood Doors:


8.2.1 Supply and install hinged hollow core flush wooden Door (Type: DG-05) w./ dimension (900 No. 1
mm x 2200 mm), w./ steamed beech veneer on one side and formaica sheet on other side to
match veneer.

8.3 Aluminum Doors & Frames:


8.3.1 Furnish and install aluminum doors, construed of aluminum sections - Door (Type: D1) w./ No. 1
dimension (1800 mm x 2200 mm).

8.4 Aluminum Windows:


8.4.1 Supply and install aluminium windows, with 6 mm thick tempered glass panel, as per dwgs.- No. 82
Type (W1).

8.5 Mirrors
8.5.1 Supply and install mirror with 6 mm thickness, for toilets - 50 x 70 cm. No. 13

8.6 Curtain Wall


8.6.1 Supply and install curtain wall elevation, price includes double glass with total thickness 36 m2 90
mm (6mm clear glass for internal panel and 6mm glass for external panel, coloures & types
as shown on drawings). Void between the two panels is 24mm. Price also includes
aluminium sections, electrostatic painted with required colour, rock wool, sealants & all
necessary accessories needed for fixation, and submitting shop drawings for approval, type
CW1, as per dwgs.

9 FINISHES:
9.1 Lath and Plaster:
9.1.1 For walls. m2 10,795
9.1.2 For ceilings. m2 3,690

9.2 Marble & Granite


9.2.1 Supply & install 20 mm thick riser & 40 mm thick going, polished Verdi-Ghazal granite (F01) m 125
For internal stairs.

9.2.2 Supply and install 50x50 cm polished Verdi-Ghazal granite tiles (F02), for floors, as per dwgs. m2 50

9.3 Stone Cladding


9.3.1 Supply and install hashma stone cladding with mechanical fixation, for façades, m2 360

9.4 Ceramic Tiles


9.4.1 Supply and install 42x42 cm anti-slip ceramic tiles, color (1) (F06), for floors, as per dwgs. m2 50

9.5 Terrazo Tiles


9.5.1 Supply and install 25x25 cm terrazzo tiles (F09), below woven carpet, for floors, as per dwgs. m2 2,790

9.6 Cement Tiles


9.6.1 Supply and install 20x20 cm cement tiles (F10), including skirting, for roof floors, with m2 1,677
thickness 2 cm, as per dwgs.

9.7 Carpet
9.7.1 Supply and install woven carpet cut to room size (F09), for floors, as per dwgs. m2 1,200

9.8 Wood Cladding


9.8.1 Supply and install 10 cm height, wooden skirting (B04), for walls, as per dwgs. m 720

9.9 Painting
9.9.1 Supply and paint acrylic paint for external walls, with smooth texture, as per dwgs. m2 2,000

9.9.2 Supply and paint acrylic paint for internal walls (W01), as per dwgs. m2 9,716

9.10 Epoxy Paint


9.10.1 Supply and apply epoxy paint on fair face concrete (F05), for floors of GR-10,11, 12, 13, 14 & m2 214
stair 02, as per dwgs.

9.11 False Ceiling


9.11.1 Supply and install gypsum boards false ceiling (water resistance) (C03), for toilets, price m2 110
includes vertical sides (if any), as per dwgs.

9.11.2 Supply and install gypsum boards false ceiling (C04), price includes vertical sides (if any), as m2 825
per dwgs.

9.11.3 Supply and install 95 mm thick gypsum board partitions, including 12.5 mm thick gypsum m2 285
boards from two sides, & 2 inch thick rockwool insulation, 70 kg/m³ denisty, product of
Lapinus co., as per dwgs.

10 SPECIALITIES
10.1 Toilet Accessories
10.1.1 Supply & fix soap dish, code (T-AC-02), as per dwgs. no. 18

10.2 H.P.L Partitions


10.2.1 Supply & fix compact (H.P.L) partitions for toilets, price includes doors and P.V.C accesories, m2 101
as per dwgs.

10.3 Access Flooring:


10.3.1 Supply and install 600x600x30 mm thick. anti-static tiles for raised flooring w./ PVC finish, m2 43
(Type: F2), along with understructure, as shown on drawings.

11 FURNISHINGS
11.1 Supply & fix ablution seats, consist of 40 mm polished triesta marble, circular shape, fixed on ls 7
stainless steel base, as per dwgs.

12 MECHANICAL WORKS
12.1 Fire Fighting Works
12.1.1 Sprinkler Pipe Fire Suppression System No. 156
12.1.2 Supplying, installing, connecting, testing and commissioning Foam System (1) for generator No. 1
with foam tank 11 gallon capacity

12.1.3 Supplying, installing, connecting and testing of seamless galvanized black steel fire M 75
protection piping system complete
- 150 mm Dia Piping.

12.1.4 Supplying, installing, connecting and testing of seamless galvanized black steel fire M 175
protection piping system complete
- 100 mm Dia Piping.

12.1.5 Supplying, installing, connecting and testing of seamless galvanized black steel fire M 30
protection piping system complete
- 80 mm Dia Piping.

12.1.6 Supply, erect, test & hand-over valve box complete No. 1
- OS&Y valve 4'' with tamper swich

12.1.7 Fire Hose Cabinet Complete with 6 kg CO2 Extinguisher, 6 kg Dry Powder Extinguisher, No. 11
65mm Dia. Landing valve with PRV, 25mm Dia. X 30m long hose, 65mm Dia., Fireman hose
reel, nozzle. Complete as per specification and drawings.

12.1.8 Portable fire extinguishers Type FE-1, multi purpose dry chemical, 4.5 Kg. capacity, wall EA 7
mounted manual type.

12.1.9 Automatic Air Vent & Roof Vent Cap No. 3


- Dia 25 mm

12.2 Plumbing Works


12.2.1 Supplying, installing, connecting and testing PPR-PN 16 pipes for cold and soft water pipes M. 54
- 15 mm dia . Piping

12.2.2 Supply, install, test, commission and hand over of UPVC 6bar pipe for drainage system M 121
- diam. 50 mm

12.2.3 Lavatory IDEAL STANDARD Lavatory WITH WALL PEDESTAL. SOPHIACODE:G855, E7492 No. 35

12.2.4 Supply, install, UPVC connect and test cleanouts types as per specifications and as detailed No. 8
on drawings.
- 75 mm Dia

12.2.5 Floor Drain - 50 mm Diam. No. 4


12.2.6 Side Roof Drain - 75 mm Diam. No. 21
12.2.7 Gallary Trap (UPVC) - 30 x 30cm Ø 50mm No. 2
12.2.8 Gate valve for Cold & Hot Water System (built-in wall type): - diam. 25 mm No. 14
12.2.9 Supply and install electric water heater 20L.T with all fitting and valves . No. 4

12.3 HVAC Works


12.3.1 Supply, Installation, testing and commissioning Dx. Package unit air conditioning . No. 2

12.3.2 Supply & Install Galvanized sheet metal for Duct Works Kg 13,000
12.3.3 Supply and install Fiber glass insulation for Ducts M2 1,250
12.3.4 Supply and Install of the air outlets complete with bolts and hangers and volume dampers. No. 2
- Neck Size 22" x 22"

12.3.5 Supply, installation, testing and commissioning of Inline Centrifugal Exhaust fans No. 1
EX.F 01
12.3.6 Supply, installation, testing and commissioning of Air Handling Unit No. 1
AHU 01

13 ELECTRICAL WORKS
13.1 POWER WORKS
13.1.1 Supply, install, connect, test and put into operation 22 KV medium voltage ring main unit 22 Nr. 1
KV R.M.U

13.1.2 Supply, install, connect, test and put into operation power dry type cast resin transformer Nr. 1
22 /0.4-0.22 KV complete
- 1000 KVA, Dry type cast resin transformer

13.1.3 Supply, install, connect, test and put into operation from ring main unit to transformer Mt. 15
single core Aluminium conductor XLPE insulated and PVC sheathed medium voltage cables
- 3(1*240mm2)

13.1.4 Supply, installation, testing, commissioning, start up for Grounding and Bonding System Item 1

13.1.5 Supply, install, connect, test and put into operation the main low voltage distribution board Nr. 1
- MDB
13.1.6 Supply, install, connect, test and put into operation the distribution, lighting and power No.. 1
panel boards - PP-G
13.1.7 Supply and install power cables 600/1000 volt copper conductor, XLPE / PVC / STA L.S 1
- ( 3 x 70 ) + ( 1 x 35 ) + ( 1 x 35 ) mm2
13.1.8 Supply, install, connect, test and put into operation Hot dip galvanized cable trays Mt. 40
- Cable Tray (400*50) mm
13.1.9 Supply, Install, connect, test and put into operation indoor and outdoor lighting fixtures Nr. 275
- Type (F1) LED

13.1.10 Supply, Install, connectsocket outlets No.. 207


- 16 Amp, 220V, Single Socket

13.1.11 Furnish, install, and testing Generator 1500 rpm. 380/220 V. 50Hz, 3 phase.4 wire, 150 KVA item 1

13.2 FIRE ALARM SYSTEM:


13.2.1 Intelligent addressable Fire Alarm Control panel Item 1
13.2.2 Supply and install fire alarm outlet. No. 108
13.2.3 Intelligent addressable manual alarm station. No. 16
13.2.4 Ditto as above weather proof type. No. 1
13.2.5 Fire alarm Manual station No. 2
13.2.6 Smoke detector No. 8

13.3 ACCESS CONTROL AND TIME


13.3.1 Standalone proximity card reader controller. No. 3
13.3.2 Finger print reader (for time attendance). No. 1
13.3.3 Magnetic door contact/balanced magnetic switches. No. 3

14 SPECIAL WORKS
14.1 ELEVATORS
14.1.1 Supply, install, connect, test and put into operation passenger elevators (P1) Passenger No. 1
elevator 4 stops Simplex control 1000 Kg, 1 m/ sec

TOTAL
PROJECT
CODE
OWNER
DUR.

BOQ CSI
WBS TRADE
NO. CODE

CIVIL & CONCRETE WORKS


2.1.1 31 23 16

2.2.1 31 23 23

3.1.1 03 30 00
3.2.1 03 30 00
3.2.2 03 30 00
3.2.3 03 30 00
3.2.4 03 30 00
3.2.5 03 30 00
3.3.1 03 49 43
3.4.1 03 52 16

ARCHICTURE WORKS
4.1.1 04 22 00
4.1.2 04 22 00
4.2.1 04 22 00
5.1.1 10 14 00

5.2.1 05 51 33

5.3.1 05 52 00
7.1.1 07 11 13

7.2.1 07 13 13

7.3.1 07 22 16
7.4.1 07 92 13

7.5.1 07 32 13

8.1.1 08 91 26
8.1.2 10 82 00
8.1.3 08 13 13
8.1.4 10 71 13.19

8.2.1 08 14 16

8.3.1 08 13 16

8.4.1 08 51 13
8.5.1 08 83 13

8.6.1 08 44 12

9.1.1 09 24 33
9.1.2 09 24 33

9.2.1 09 30 33

9.2.2 09 30 33
9.3.1 04 42 00
9.4.1 09 30 13
9.5.1 09 66 16

9.6.1 09 30 36

9.7.1 09 68 16
9.8.1 09 74 13
9.9.1 09 91 13
9.9.2 09 91 23

9.10.1 09 96 56

9.11.1 09 21 16

9.11.2 09 21 16

9.11.3 09 21 16

10.1.1 10 28 13
10.2.1 10 21 13

10.3.1 09 69 00

11.1 12 52 00

MECHANICAL WORKS

12.2.1 22 11 16

12.2.2 22 13 16

12.2.3 22 41 16

12.2.4 22 05 76

12.2.5 22 13 19
12.2.6 22 13 19
12.2.7 22 13 19
12.2.8 40 05 61
12.2.9 22 33 00

12.1.1 21 13 00

12.1.2 21 13 39

12.1.3 21 13 00

12.1.4 21 13 00

12.1.5 21 13 00

12.1.6 21 05 23

12.1.7 21 12 00

12.1.8 21 24 00
12.1.9 08 95 00

12.3.1 23 37 00
12.3.2 23 31 13
12.3.3 23 07 13

12.3.4 23 37 00

12.3.5 23 34 16

12.3.6 23 74 13

ELECTRICAL WORKS

13.1.1 26 11 00

13.1.2 26 12 16

13.1.3 26 05 13

13.1.4 26 05 26
13.1.5 26 27 00

13.1.6 26 24 16

13.1.7 26 05 23

13.1.8 26 05 36

13.1.9 26 50 00

13.1.10 26 27 19

13.1.11 26 32 13

13.2.1 28 46 20
13.2.2 28 46 23
13.2.3 28 46 12
13.2.4 28 46 12
13.2.5 28 46 12.11
13.2.6 28 46 11

13.3.1 28 15 11

13.3.2 28 15 11

13.3.3 28 15 15

SPECIAL WORKS
14.1.1 14 20 00

TOTAL CONTRACT (Excluding VO, CLAIMS, & ESCALATION)

VARIATION ORDERS
VO # 001 ( VO - Description?????????????)

VO # 002 ( VO - Description?????????????)

CLAIMS
CL # 001 ( CL - Description?????????????)

CL # 002 ( CL - Description?????????????)
ESCALATION
ES # 001 ( ES - Description?????????????)

ES # 002 ( ES - Description?????????????)

OTHERS
OT # 001 ( OT - Description?????????????)

OT # 002 ( OT - Description?????????????)

TOTAL CONTRACT
CSI CODE

DESCRIPTION

Excavation

Fill

Cast-in-Place Concrete
Cast-in-Place Concrete
Cast-in-Place Concrete
Cast-in-Place Concrete
Cast-in-Place Concrete
Cast-in-Place Concrete
Glass-Fiber-Reinforced Concrete Trim
Lightweight Insulating Concrete

Concrete Unit Masonry


Concrete Unit Masonry
Concrete Unit Masonry
Signage

Metal Ladders

Metal Railings
Bituminous Dampproofing

Bituminous Sheet Waterproofing

Roof Board Insulation


Elastomeric Joint Sealants

Clay Roof Tiles

Door Louvers
Grilles and Screens
Hollow Metal Doors
Rolling Exterior Shutters

Flush Wood Doors

Aluminum Doors

Aluminum Windows
Mirrored Glass Glazing

Glazed Composite Curtain Wall

Cement Parging
Cement Parging

Stone Tiling

Stone Tiling
Exterior Stone Cladding
Ceramic Tiling
Terrazzo Floor Tile

Concrete Tiling

Sheet Carpeting
Wood Wall Coverings
Exterior Painting
Interior Painting

Epoxy Coatings

Gypsum Board Assemblies

Gypsum Board Assemblies

Gypsum Board Assemblies

Toilet Accessories
Toilet Compartments

Access Flooring

Seating

Domestic Water Piping

Sanitary Waste and Vent Piping

Residential Lavatories and Sinks

Facility Drainage Piping Cleanouts

Sanitary Waste Piping Specialties


Sanitary Waste Piping Specialties
Sanitary Waste Piping Specialties
Gate Valves
Electric Domestic Water Heaters

Fire-Suppression Sprinkler Systems

Foam-Water Systems

Fire-Suppression Sprinkler Systems

Fire-Suppression Sprinkler Systems

Fire-Suppression Sprinkler Systems

General-Duty Valves for Water-Based


Fire-Suppression Piping

Fire-Suppression Standpipes

Dry-Chemical Fire-Extinguishing Systems


Vents

Air Outlets and Inlets


Metal Ducts
Duct Insulation

Air Outlets and Inlets

Centrifugal HVAC Fans

Packaged, Outdoor, Central-Station


Air-Handling Units

Substations

Dry-Type, Medium-Voltage Transformers

Medium-Voltage Cables

Grounding and Bonding for Electrical Systems


Low-Voltage Distribution Equipment

Panelboards

Control-Voltage Electrical Power Cables

Cable Trays for Electrical Systems

Lighting

Multi-Outlet Assemblies

Engine Generators

Fire Alarm
Fire Alarm Notification Appliances
Other Initiating Devices
Other Initiating Devices
Fire Alarm Pull Stations
Fire Sensors and Detectors

Integrated Credential Readers and


Field Entry Management
Integrated Credential Readers and
Field Entry Management
Electrified Locking Devices & Accessories

Elevators

(Excluding VO, CLAIMS, & ESCALATION)

( VO - Description?????????????)

( VO - Description?????????????)

( CL - Description?????????????)

( CL - Description?????????????)
( ES - Description?????????????)

( ES - Description?????????????)

( OT - Description?????????????)

( OT - Description?????????????)
ITEM

Excavation in ordinary soil to the required levels as per structure drawings and engineer instructions.
Backfilling and compaction using the suitable excavated materials, around the foundations, and to reach the required
levels.
Supply and cast in place plain concrete, for footings, as per dwgs.
Supply and cast in place reinforced concrete for footings & ground beams, as per dwgs.
Supply and cast in place reinforced concrete for columns, as per dwgs.
Supply and cast in place reinforced concrete for slabs & beams, as per dwgs.
Supply and cast in place reinforced concrete for walls of elevator in foundations, as per dwgs.
Supply and cast in place 15 cm thick reinforced concrete with wire mesh, slab on grade, as per dwgs.
Supply and install G.R.C cornice, for façades Type 1, item no. (5) in exterior finish schedule.
Supply and cast in place 70/100 mm light weight concrete for slope at roof, as per dwgs.

Supply and build 25 cm thick or more brick wall, made of 40x20x25 cm cement hollow bricks, as per dwgs.
Supply and build 12 cm thick brick wall, made of 40x20x12 cm cement hollow bricks, as per dwgs.
Supply and build 25 cm thick or more brick wall, made of 25x12x6 cm cement solid bricks, as per dwgs.
Supply and install 1.6 mm stainless steel sinage on doors, as per dwgs.
Supply and install galvanized cat steel ladder, price includes paint one coat of Jotun Jotamastic 80 with thickness of 100

microns, surmounted by one coat of Jotun Fotora with thickness of 50 microns, as per dwg. For elevator room.
Supply and install wrought steel handrail for stairs, as per dwgs.
Bituminous Dampproofing:2 coats For foundations.
Supply and install ( below slab on grade ), 4 mm modified bitumen water proofing membrane, reinforced with
polyester. Price includes protection layer of 20 mm cement screed, as per dwg.
Supply and install ( for final roof ) 50 mm extruded polystyrene thermal insulation, 35 kg / m3 density. Price includes
protection layer of 200 micron polyethylene sheet, as per dwg.
Supply and inject permenant elasticity flexible material, as Sika Flex 1 A or similar, for expansion joints inside & outside

building. Price includes flexible backer rod. For horizontal & vertical expansion joints, as per dwgs.
Furnish and install Barrel Shape clay roof tiles lays on softwood strips and fixed by mortar to the metal lath fixed to
steel framing fixed to the waterproofed concrete roof, as shown on the drawing.
Hinged steel door w./ louvered below (Type: D2) w./ dimension (2000 mm x 2500 mm).
Galvanized steel louvered grill with mesh (400x400 mm).
Supply and install 45 mm thick hollow metal hinged doors - Type (D1).
Supply and install metal roller shutter door, Type (D3).
Supply and install hinged hollow core flush wooden Door (Type: DG-05) w./ dimension (900 mm x 2200 mm), w./
steamed beech veneer on one side and formaica sheet on other side to match veneer.
Furnish and install aluminum doors, construed of aluminum sections - Door (Type: D1) w./ dimension (1800 mm x
2200 mm).
Supply and install aluminium windows, with 6 mm thick tempered glass panel, as per dwgs.-Type (W1).
Supply and install mirror with 6 mm thickness, for toilets - 50 x 70 cm.
Supply and install curtain wall elevation, price includes double glass with total thickness 36 mm (6mm clear glass for
internal panel and 6mm glass for external panel, coloures & types as shown on drawings). Void between the two
panels is 24mm. Price also includes aluminium sections, electrostatic painted with required colour, rock wool, sealants
& all necessary accessories needed for fixation, and submitting shop drawings for approval, type CW1, as per dwgs.
Lath and Plaster: for walls
Lath and Plaster: for ceilings
Supply & install 20 mm thick riser & 40 mm thick going, polished Verdi-Ghazal granite (F01) For internal stairs.

Supply and install 50x50 cm polished Verdi-Ghazal granite tiles (F02), for floors, as per dwgs.
Supply and install hashma stone cladding with mechanical fixation, for façades,
Supply and install 42x42 cm anti-slip ceramic tiles, color (1) (F06), for floors, as per dwgs.
Supply and install 25x25 cm terrazzo tiles (F09), below woven carpet, for floors, as per dwgs.
Supply and install 20x20 cm cement tiles (F10), including skirting, for roof floors, with thickness 2 cm, as per dwgs.

Supply and install woven carpet cut to room size (F09), for floors, as per dwgs.
Supply and install 10 cm height, wooden skirting (B04), for walls, as per dwgs.
Supply and paint acrylic paint for external walls, with smooth texture, as per dwgs.
Supply and paint acrylic paint for internal walls (W01), as per dwgs.
Supply and apply epoxy paint on fair face concrete (F05), for floors of GR-10,11, 12, 13, 14 & stair 02, as per dwgs.

Supply and install gypsum boards false ceiling (water resistance) (C03), for toilets, price includes vertical sides (if any),
as per dwgs.
Supply and install gypsum boards false ceiling (C04), price includes vertical sides (if any), as per dwgs.
Supply and install 95 mm thick gypsum board partitions, including 12.5 mm thick gypsum boards from two sides, & 2
inch thick rockwool insulation, 70 kg/m³ denisty, product of Lapinus co., as per dwgs.
Supply & fix soap dish, code (T-AC-02), as per dwgs.
Supply & fix compact (H.P.L) partitions for toilets, price includes doors and P.V.C accesories, as per dwgs.
Supply and install 600x600x30 mm thick. anti-static tiles for raised flooring w./ PVC finish, (Type: F2), along with
understructure, as shown on drawings.
Supply & fix ablution seats, consist of 40 mm polished triesta marble, circular shape, fixed on stainless steel base, as
per dwgs.

PLUMBING WORKS

Supplying, installing, connecting and testing PPR-PN 16 pipes for cold and soft water pipes
- 15 mm dia . Piping
Supply, install, test, commission and hand over of UPVC 6bar pipe for drainage system
- diam. 50 mm
Lavatory IDEAL STANDARD Lavatory WITH WALL PEDESTAL. SOPHIACODE:G855, E7492
Supply, install, UPVC connect and test cleanouts types as per specifications and as detailed on drawings.
- 75 mm Dia
Floor Drain - 50 mm Diam.
Side Roof Drain - 75 mm Diam.
Gallary Trap (UPVC) - 30 x 30cm Ø 50mm
Gate valve for Cold & Hot Water System (built-in wall type): - diam. 25 mm
Supply and install electric water heater 20L.T with all fitting and valves .

FIRE FIGHTING WORKS


Sprinkler Pipe Fire Suppression System
Supplying, installing, connecting, testing and commissioning Foam System (1) for generator with foam tank 11 gallon
capacity

Supplying, installing, connecting and testing of seamless galvanized black steel fire protection piping system complete
- 150 mm Dia Piping.

Supplying, installing, connecting and testing of seamless galvanized black steel fire protection piping system complete
- 100 mm Dia Piping.

Supplying, installing, connecting and testing of seamless galvanized black steel fire protection piping system complete
- 80 mm Dia Piping.

Supply, erect, test & hand-over valve box complete


- OS&Y valve 4'' with tamper swich

Fire Hose Cabinet Complete with 6 kg CO2 Extinguisher, 6 kg Dry Powder Extinguisher, 65mm Dia. Landing valve with
PRV, 25mm Dia. X 30m long hose, 65mm Dia., Fireman hose reel, nozzle. Complete as per specification and drawings.

Portable fire extinguishers Type FE-1, multi purpose dry chemical, 4.5 Kg. capacity, wall mounted manual type.
Automatic Air Vent & Roof Vent Cap
- Dia 25 mm

HVAC WORKS
Supply, Installation, testing and commissioning Dx. Package unit air conditioning .
Supply & Install Galvanized sheet metal for Duct Works
Supply and install Fiber glass insulation for Ducts
Supply and Install of the air outlets complete with bolts and hangers and volume dampers.
- Neck Size 22" x 22"
Supply, installation, testing and commissioning of Inline Centrifugal Exhaust fans
EX.F 01
Supply, installation, testing and commissioning of Air Handling Unit
AHU 01

POWER WORKS

Supply, install, connect, test and put into operation 22 KV medium voltage ring main unit 22 KV R.M.U

Supply, install, connect, test and put into operation power dry type cast resin transformer 22 /0.4-0.22 KV complete
- 1000 KVA, Dry type cast resin transformer

Supply, install, connect, test and put into operation from ring main unit to transformer single core Aluminium
conductor XLPE insulated and PVC sheathed medium voltage cables
- 3(1*240mm2)
Supply, installation, testing, commissioning, start up for Grounding and Bonding System
Supply, install, connect, test and put into operation the main low voltage distribution board - MDB

Supply, install, connect, test and put into operation the distribution, lighting and power panel boards - PP-G

Supply and install power cables 600/1000 volt copper conductor, XLPE / PVC / STA
- ( 3 x 70 ) + ( 1 x 35 ) + ( 1 x 35 ) mm2
Supply, install, connect, test and put into operation Hot dip galvanized cable trays
- Cable Tray (400*50) mm
Supply, Install, connect, test and put into operation indoor and outdoor lighting fixtures
- Type (F1) LED
Supply, Install, connectsocket outlets
- 16 Amp, 220V, Single Socket
Furnish, install, and testing Generator 1500 rpm. 380/220 V. 50Hz, 3 phase.4 wire, 150 KVA

Fire Alarm System


Intelligent addressable Fire Alarm Control panel
Supply and install fire alarm outlet.
Intelligent addressable manual alarm station.
Ditto as above weather proof type.
Fire alarm Manual station
Smoke detector

Access Control and Time

Standalone proximity card reader controller.

Finger print reader (for time attendance).

Magnetic door contact/balanced magnetic switches.

Supply, install, connect, test and put into operation passenger elevators (P1) Passenger elevator 4 stops Simplex
control 1000 Kg, 1 m/ sec
WORKING BOQ SHEET

TAKE-OFF SELLING PRICE


TOTAL RATE
ORIGINAL
UNIT FINAL Without
QTY ORIGINAL
QTY QTY VAT VALUE

m3 2,143 2,143 -

m3 2,178 2,178 -

m3 351 351 -
m3 210 210 -
m3 95 95 -
m3 470 470 -
m3 6 6 -
m2 650 650 -
m 267 267 -
m2 2,352 2,352 -

m3 685 685 -
m2 1,492 1,492 -
m3 475 475 -
l.s 12 12 -

l.s 1 1 -

m 30 30 -
m2 4,259 4,259 -

m2 2,530 2,530 -

m2 2,352 2,352 -
m 48 48 -

m2 175 175 -

No. 1 1 -
No. 1 1 -
No. 10 10 -
No. 2 2 -

No. 1 1 -

No. 1 1 -

No. 82 82 -
No. 13 13 -

m2 90 90 -

m2 10,795 10,795 -
m2 3,690 3,690 -

m 125 125 -

m2 50 50 -
m2 360 360 -
m2 50 50 -
m2 2,790 2,790 -

m2 1,677 1,677 -

m2 1,200 1,200 -
m 720 720 -
m2 2,000 2,000 -
m2 9,716 9,716 -

m2 214 214 -

m2 110 110 -

m2 825 825 -

m2 285 285 -

no. 18 18 -
m2 101 101 -

m2 43 43 -

ls 7 7 -

M. 54 54 -

M 121 121 -

No. 35 35 -

No. 8 8 -

No. 4 4 -
No. 21 21 -
No. 2 2 -
No. 14 14 -
No. 4 4 -

-
No. 156 156 -

No. 1 1 -

M 75 75 -

M 175 175 -

M 30 30 -

No. 1 1 -

No. 11 11 -

EA 7 7 -
No. 3 3 -

-
No. 2 2 -
Kg 13,000 13,000 -
M2 1,250 1,250 -

No. 2 2 -

No. 1 1 -

No. 1 1 -

Nr. 1 1 -

Nr. 1 1 -

Mt. 15 15 -

Item 1 1 -
Nr. 1 1 -

No.. 1 1 -

L.S 1 1 -

Mt. 40 40 -

Nr. 275 275 -

No.. 207 207 -

item 1 1 -

-
Item 1 1 -
No. 108 108 -
No. 16 16 -
No. 1 1 -
No. 2 2 -
No. 8 8 -

No. 3 3 -

No. 1 1 -

No. 3 3 -

No. 1 1 -

-
-
-

-
-
-

-
-
-

-
-
-
-
-
-

-
-
-

-
-
-

-
-
-

-
SHEET

SELLING PRICE BUDGET PRICE RATE

REVISED FINAL
LAB. MAT. EQUIP. SUBC.
VALUE VALUE

- -

- -

- -

- -
- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

- -

- -
- -

- -

- -
- -

- -

- -
- -
- -
- -

- -

- -

- -
- -

- -

- -
- -

- -

- -
- -
- -
- -

- -

- -
- -
- -
- -

- -

- -

- -

- -

- -
- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
- -
- -
- -
- -

- -
- -

- -

- -

- -

- -

- -

- -

- -
- -

- -
- -
- -
- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
- -

- -

- -

- -

- -

- -

- -

- -
- -
- -
- -
- -
- -
- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
CURRENCY : EGP
EXCH. RATE : ---------- L.E./US$
ENGINEER : ----------
REV. & DATE : Rev. 01 - 00/00/0000

E BUDGET PRICE TOTAL


TOTAL
SUP. LAB. MAT. EQUIP. SUBC. SUP.

- - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - -

- - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - -

- - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - -

- - - - - -

- - - - -

- - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -

- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - -
---------- L.E./US$

Rev. 01 - 00/00/0000

TOTAL

-
-
-
-
-
-
-
-

-
-
-
-

-
-

-
-

-
-
-
-

-
-

-
-

-
-
-
-

-
-
-
-

-
-

-
-
-
-
-

-
-

-
-

-
-
-
-

-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
<< PROJECT NAME >>
QTY RATE COST RATE
UNIT UNIT
PER WASTE PER
MEAS. PRICE
UNIT MEASURE UNIT MEASURE

CIVIL & CONCRETE B.O.Q

BOQ ITEM # 4.1.1


QTY 685
UNIT m3
ACTIVITY DESC. Supply and build 25 cm thick or more brick wall, made of 40x20x25 cm cement hollow bricks, as per dwgs.

LABOR 41.82
Mason Hr. 37.50 0.727 1.00 27.27
Helper Hr. 12.50 0.727 1.00 9.09
Labor Hr. 7.50 0.727 1.00 5.45
0.00
0.00
0.00
MATERIALS 1,033.20
Block 40x20x25 Nr. 7.1 50.000 0.95 337.25
Cement Ton 850 0.390 0.90 298.35
Sand M3 65.00 1.300 0.90 76.05
Water Litre 2.00 175.550 0.90 315.99
Galvanized Angel Nr. 5.00 1.111 1.00 5.56
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 48.13
Mortar Mixer Hr. 62.50 0.770 1.00 48.13
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 19.25
Mortar Mixing Crew M3 25.00 0.770 1.00 19.25
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,142.39
782,536.29
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
B01029900 0.00
A02001000 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
B09012500 0.00
B02000200 0.00
B06000200 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
B06000200 0.00
B02000100 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
B06000200 0.00
B02000100 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 3,464.94
F03027480 3,464.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,464.94
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
F03012960 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
E08000232 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

BOQ ITEM #
QTY
UNIT
ACTIVITY DESC.

LABOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIALS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENTS 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBCONTRACTOR 0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUPPLIES 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

You might also like