RFP101
RFP101
Tender Disclaimer
1. The information contained in this RFP or subsequently provided to Bidder(s), whether verbally
or in documentary or in any other form by or on behalf of JVVNL or any of its employees,
Bidders or associates, is provided to Bidder(s) on the terms and conditions set out in this RFP
and such other terms and conditions subject to which such information is provided.
2. This RFP is not an agreement and is neither an offer nor invitation by JVVNL to the prospective
Bidders or any other party. The purpose of this RFP is to provide interested parties with
information that may be useful to making their Bid. This RFP includes statements, which reflect
various assumptions and assessments arrived at by JVVNL in relation to the Project. Such
assumptions, assessments and statements do not support to contain all the information that
each Bidder may require. This RFP may not be appropriate for all persons, and it is not possible
for JVVNL to consider the technical capabilities, investment objectives, financial situation and
needs of each party who reads or uses this RFP. The assumptions, assessments, statements and
information could check the accuracy, adequacy, correctness, re obtained in this RFP may not
be complete, accurate, adequate or correct. Each Bidder should, therefore, conduct its own
investigations and analysis and liability and completeness of the assumptions, assessments,
statements and information contained in this RFP and obtain independent advice from
appropriate sources.
3. Information provided in this RFP to the Bidder(s) is on a wide range of matters, some of which
depends upon interpretation of law. The information given is not an exhaustive account of
statutory requirements and should not be regarded as a complete or authoritative statement of
law. JVVNL accepts no responsibility for the accuracy or otherwise for any interpretation or
opinion on law expressed herein.
4. JVVNL or any of its employees, Bidders or associates make no representation or warranty and
shall have no liability to any person including any Bidder under any law, statute, rules or
regulations, principles of restitution or unjust enrichment or otherwise for any loss, damages,
cost or expense which may arise from or be incurred or suffered on account of anything
contained in this RFP or otherwise including the accuracy, adequacy, correctness, completeness
or reliability of the RFP and any assessment, assumption, statement or information contained
therein or deemed to form part of this RFP or arising in any way in this Bid stage.
5. JVVNL or any of its employees, Bidders or associates also accept no liability of any nature
whether resulting from negligence or otherwise howsoever caused arising from reliance of any
Bidder upon the statements contained in this RFP.
6. JVVNL may in its absolute discretion, but without being under any obligation to do so, update,
amend or supplement the information, assessment or assumptions contained in this RFP.The
issue of this RFP does not imply that JVVNL is bound to select a Bidder for the Project and
JVVNL reserves the right to reject all or any of the Bidders or Bids or discontinue or cancel the
bidding process without assigning any reason whatsoever
7. The Bidder shall bear all its costs associated with or relating to the preparation and submission
of its Bid including but not limited to preparation, copying, postage, delivery fees, traveling,
food, lodging, expenses associated with any demonstrations or presentations which may be
required by JVVNL or any other costs incurred in connection with or relating to its Bid. All
such costs and expenses will remain with the Bidder and JVVNL shall not be liable in any
manner whatsoever for the same or for any other costs or other expenses incurred by a Bidder
in preparation for submission of the Bid, regardless of the conduct or outcome of the Bidding
Process.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |3
TABLE OF CONTENTS
About Rajasthan Discoms………………………….…………………………………..…4
Summary ..................................................................................................................................5
PART I ......................................................................................................................................9
Section 1. Request for Proposal Notice ..............................................................................10
Section 2. Eligibility and Qualification Requirements ....................................................14
Section 3. Instructions to Bidders and Bid Data Sheet .....................................................30
Section 4. Bidding Forms- Technical Proposal ................................................................61
Section 5. Financial Proposal - Forms ...............................................................................88
Section 6. ERP System Requirements and Service Level.................................................99
Agreement 99
PART II ................................................................................................................................328
Section 7. Conditions of Contract .....................................................................................329
PART III ...............................................................................................................................360
Section 8. Contract Related Forms ....................................................................................361
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |4
Jaipur Discom manages the power supply in 18 districts of Rajastan namely Jaipur, Jaipur
Rural, Dausa, Alwar, Khairthal, Kotputli, Dudu, Tonk, Kota, Bundi, Baran, Jhalawar, Baratpur,
Deeg, Sawai Madhopur, Gangapur City, Karauli and Dholupur.
Jodhpur Discom manages the power supply 15 districts of Rajasthan namely Jodhpur East,
Jodhpur West, Pali, Sirohi, Barmer, Jaisalmer, Jalore, Bikaner, Hanumangarh, Sri-ganganagar,
Churu, Balotra, Anupgarh, Phalodi and Sanchore.
Ajmer Discom manages the power supply in 17 districts of Rajasthan namely Ajmer, Bhilwara,
Nagaur, Sikar, Jhunjhunu, Udaipur, Banswara, Chittorgarh, Rajsamand, Dungarpur,
Pratapgarh, Deedwana-Kuchaman, Kekari, Beawar, Neem ka Thana, Shahpura and Salumber.
All three discoms are engaged in Distribution & Supply of Electricity in Rajasthan State and
together represented as RAJASTHAN DISCOMS.
Day by day, the business area, key personnel & engagement with customers are increasing,
therefore, Rajasthan Discoms intend to implement an Enterprise Resource Planning (ERP)
solution for an integrated data collection, analysis and sharing platform to address the key
business challenges and share the data across various functional areas which can make its
business processes efficient, more robust and reliable to meet the present and future challenges.
On the behalf of Rajasthan Discoms, Jaipur Discom as Nodal Agency is floating this Request for
Proposal (RFP) to implement ERP System in all three discoms. During the implementation till
Go-Live, project shall be dealt by Jaipur Discom and post Go-Live, Facility Management
Services (FMS), Annual Technical Support (ATS) & other services shall be dealt by each discom
separately for their jurisdiction.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |5
Summary
PART I – BIDDING PROCEDURES AND REQUIREMENTS
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |6
ABBREVIATIONS
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |7
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Summary, Abbreviations & Table of Content Page |8
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Part I. Bidding Procedures and Requirements Page |9
PART I
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 1. Request for Proposal Notice P a g e | 10
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 1. Request for Proposal Notice P a g e | 11
Date Time
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 1. Request for Proposal Notice P a g e | 12
f) Evaluation of Technical Bid and Opening of : Shall be informed after the opening
Financial Bid of technical bid
g) Issue of Letter of Award (LOA) : Shall be informed later
a) Tender Fee to be submitted with the RFP : INR 29,500 In the form of DD/
(Non- Refundable) (25,000 + GST Banker-Cheque / Online
@ 18%) in the favour of Accounts
Officer (IT&RE), Jaipur
Discom, Payable at
Jaipur.
b) Bid Security/EMD (Refundable) : 2% of In the Name SE (IT),
(To be stamped in accordance with estimated JVVNL. Payable at Jaipur
Rajasthan Stamp Act in the name of SE Tender Value
i.e., INR 1.8
(IT) JVVNL, on Non-Judicial Stamp
Cr.
Paper of Rajasthan should be of 0.25%
of BG amount or maximum upto Rs.
25,000/- and the same should be duly
notarized and issued from
nationalized/scheduled Bank).
c) Other Payments or Bank Guarantees for the ERP System Integrator (ERPSI) shall be as
per the terms and conditions defined in this RFP
Bank Guarantees for the ERP System Integrator (ERPSI) shall be as per the terms and
conditions defined in this RFP. (Tender E Processing Fee INR 2,950 (2500 + 18%GST) in
the form of Demand Draft in the favour of MD RISL payable at Jaipur)
Other Details
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 1. Request for Proposal Notice P a g e | 13
c) Other Payments or Bank Guarantees for the RFP/ Contract shall be as per the terms and
conditions defined in this RFP Document
Accounts Officer (IT&RE), Jaipur Discom, Jaipur
Bank Name- State Bank of India
Account Number- 51093320466
IFSC Code - SBIN0031026
Branch Name – State Bank of India, Collectorate Branch, Jaipur (Rajasthan)
Phone No of AO (IT&RE), JVVNL, JAIPUR – 0141 2207507
Mob - 9414029447
Email Id of AO(IT&RE), JVVNL, JAIPUR - [email protected]
GSTIN of JAIPUR DISCOM – 08AABCJ6373K1Z7
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 14
2. If at any stage of the bidding, any order/ ruling is found to have been passed in the last 1
(one) year preceding the Bid submission deadline by a competent Court of Law or any
appropriate Commission or any Arbitral Tribunal against the Sole Bidder/ Lead Bidder/
any Consortium Members or its Affiliates for breach of any Contract awarded by any
Government agency/department, then Bids from such Bidders shall be liable to be rejected.
All Bidders shall confirm in accordance to Form 7 given in Section 4 that no such order(s)/
ruling(s) have been passed by a competent Court of Law or an appropriate Commission
against it or its Affiliates. In case of any such order/ ruling, it is the duty of the Bidder to
inform Utility for the same during the Bid submission.
3. Technically qualified Bidders shall continue to maintain compliance with the Eligibility and
Qualification Requirements specified herein. Failure to comply with the aforesaid
requirements shall make the Bid from such Bidders liable for rejection at any stage of the
bidding process.
4. To be eligible to bid, the Bidders must ensure compliance to the following, failing which
they shall not be eligible:
Restrictions under Rule 144 (xi) of GFR 2017: Restrictions on procurement from a bidder
of a country which shares a land border with India
a) Any bidder from a country which shares a land border with India will be eligible to
bid only if the bidder is registered with the Competent Authority.
b) “Bidder” (Seller / Service Provider) means any person or firm or company including
any member of a consortium or joint venture (that is an association of several
persons, or firms or companies), every artificial juridical person not falling in any of
the descriptions of bidders stated hereinbefore, including any agency branch or
office controlled by such person, participating in a procurement process.
c) “Bidder from a country which shares a land border with India” for the purpose of
this Order/ Rule means: -
a. An entity incorporated, established, or registered in such a country; or
b. A subsidiary of an entity incorporated, established, or registered in such
country; or
c. An entity substantially controlled through entities incorporated, established
registered in such a country; or
d. An entity whose beneficial owner is situated in such a country; or
e. An Indian (or other) agent of such an entity; or
f. A natural person who is a citizen of such a country; or
g. A consortium or joint venture where any member of the consortium or venture
falls under any of the above
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 15
d) The bidders are required to ensure compliance to the directions issued by Ministry
of Power, Government of India vide OM No: A-1/2021-FSC-Part (5) dated
November 16, 2021 pertaining to “Public Procurement (Preference to Make in India)
to provide for purchase preference (Linked with local content) in respect of Power
Sector” and other OM’s/directions/circulars issued by appropriate Ministries’ in
this regard and subsequent amendments thereof.
e) The beneficial owner for the purpose of (III) above will be as under:
1. In case of a company or Limited Liability Partnership, the beneficial owner, or
the natural person(s), who, whether acting alone or together, or through one or
more juridical person, has a controlling ownership interest or who exercise
control through other means. Explanation—
a. “Controlling ownership interest” means ownership of or entitlement to more
than twenty-five percent of shares or capital or profits of the company;
b. “Control” shall include the right to appoint majority of the directors to
control the management or policy decisions including by virtue of the
shareholding or management rights or shareholders agreements or voting
agreements;
2. In case of a partnership firm, the beneficial owner is the natural person(s), who,
whether acting alone or together, or through one or more juridical person, has
ownership of entitlement to more than fifteen percent of capital or profits of the
partnership;
3. In case of an unincorporated association or body of individuals, the beneficial
owner is the natural person(s), who, whether acting alone or together, through
one or more juridical person, has ownership of or entitlement to more than
fifteen percent of the property or capital or profits of such association or body of
individuals;
4. Where no natural person is identified under (1) or (2) or (3) above, beneficial
owner is the relevant natural person who holds the position of serving managing
official;
5. In case of a trust, the identification of beneficial owner(s) shall include the
identification of the author of the trust, the trustee, the beneficiaries with fifteen
percent or more interest in the trust and any other natural person exercise
ultimate effective control over the trust through a chain of control or ownership;
f) An Agent is a person employed to do any act for another, or to represent another in
dealings with third person.
g) The successful bidder shall not be allowed to sub-contract works to any contractor
from a country which shares a land border with India unless such contractor
registered with the Competent Authority.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 16
(b) Clearly outline the proposed roles and responsibilities, if any, of each member.
5.2. Every Consortium Member shall provide consent to the Lead System Integrator
(ERPSI-Lead) and make itself aware of all the proceedings of the bidding process and
Project implementation through legally enforceable Consortium Agreement, power of
attorneys, legal undertakings, etc. (if applicable) entered amongst all members of that
Bidding Consortium including but not limited to those as prescribed in Form 8, Form
9 and Form 11 given in Section 4. In the absence of duly executed formats, the Bid shall
not be considered for evaluation and shall be rejected.
5.3. The ERPSI-Lead shall be liable for the execution of the entire obligation in the ERP
System Integrator (ERPSI) Contract in accordance with the terms and conditions
thereof. Only the Lead Consortium Member, who must be a System Integrator
(ERPSI), shall have the authority to conduct all businesses for and on behalf of the
Consortium during the bidding process.
6. The Bidder, participating in the bid as a Sole Bidder, or as a Consortium Member or as Lead
Consortium Member of a Bidding Consortium, and its Sub-Contractor(s) should not be
blacklisted/ debarred/ banned/ suspended as on date of bid submission:
(a) due to conviction of an offence
i. under the Prevention of Corruption Act. 1988; or,
ii. the Indian Penal Code or any other law for the time being in force, for causing
any loss of life or property or causing threat to public health as part of
execution of a public procurement contract.
(b) through any order/ list Issued by Department of Expenditure (DoE), Ministry of
Finance (MoF)
(c) due to breach of code of integrity as per Rule 175 of GFRs 2017 in any Govt.
Organization or regulatory agencies or Govt. undertaking.
(d) by any Ministry/ Department/ Organization under the State Govt. of Rajasthan.
This clause shall be interpreted in-line with Rule 151 of GFRs, 2017 along with any
guidelines/ amendment issued by DoE, MoF.
Bidder should submit a self- undertaking signed by its authorized signatories for the same
as per the format prescribed in Form 7 given in Section 4.
7. The ERPSI-Lead/ Sole Bidder shall submit the Bid after submitting the Tender Fees and Bid
Security as per the various terms, schedules and formats prescribed in this RFP. Further, The
ERPSI-Lead shall be the point of contact for the Consortium during the Bid process before
award of the Project to the ERPSI for the ERP implementation, and Utility shall
communicate directly to the contact person appointed through the Power of Attorney as per
Form 10 given in Section 4.
8. The Technically Evaluated Entity may be the Sole Bidder or the ERPSI-Lead/2nd Member
of a Consortium, as the case may be. The Consortium may consist of 2 members at the
maximum (i.e., the ERPSI-Lead and the ERPSI-2nd). The ERP OEM, CSP and DDA are all
sub-contracted.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 17
evaluation criteria will be allowed during any stage of the project implementation without
prior consent of Rajasthan Discoms.
10. Post successful onboarding, the bidder shall assist the Rajasthan Discoms in procurement
of SD-WAN Services Provider (SD-WANSP). After selection of competent service providers
for Network Services, the Rajasthan Discoms will sign a tripartite agreement with ERPSI
and respective service providers i.e., SD-WANSP. <Necessary only in the case of Cloud
Implementation only>
Sl.
Requirements Supporting Documents
No
1. GENERAL
The Sole Bidder should be a company registered
under the provisions of the Indian Companies Certificate of incorporation /
Act, 1956 / 2013 or a partnership firm under the Partnership deed
Indian Partnership Act, 1932 or the Limited
GST Registration
Liability Partnerships Act, 2008.
1.1 In case of consortium, the consortium members Certificate of commencement of
should be a company registered under the business (if applicable)
provisions of the Indian Companies Act, 1956 /
(Such supporting documents should be
2013 or a partnership firm under the Indian
submitted for Bidder/ all the consortium
Partnership Act, 1932 or the Limited Liability members, as applicable)
Partnerships Act, 2008.
The ERPSI-Lead should have at least
CMM/CMMI level 5 valid certification. In case of
a consortium, this requirement needs to be met Copy of certification from authorized
1.2
either by the ERPSI-Lead or ERPSI-2nd Member certification body valid as on date
and 2nd Member must be ISO/ IEC-9001:
2008/2015 or above certified.
Bidder should be authorized system
integrator/implementation partner of the offered
ERP OEM Product for sale, support, and services Letter from OEM of offered ERP OEM
1.3
of the offered ERP OEM Product. In case of Product
Consortium, either ERPSI-Lead/ERPSI-2nd may
met the requirement.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 18
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 19
OR
Two projects each costing not less than the
amount equal to INR. 13 Cr. or 50% of the
estimated cost, whichever is Lower
OR
Three projects each costing not less than the
amount equal to INR. 10 Cr. or 40% of the
estimated cost, whichever is Lower
The bidder should have successfully implemented
2 (two) ERP Projects of the ERP OEM Product in
India in last 10 year. Out of two (2) eligible ERP For Completed projects: Bidders
projects one must have been implemented in must provide the Necessary
Central/State PSU or Govt. Organization. Purchase Order/ LOI/ Contract
Agreement. Further, the bidder
(In case of a consortium, this requirement needs must provide the successful
to be met by either of the Member) completion letter from the client.
Further, in both projects mentioned above- The successful completion shall
The offered ERP OEM Product shall have include at least one year FMS
cumulatively 500 transactional user-base in subsequent to Go-Live.
two eligible ERP projects
At least 3 modules out of following functions For ongoing Projects: Bidders
3.1 / modules of the offered ERP OEM Product must provide the Necessary
must have been implemented– Purchase Order/ LOI/ Contract
o Finance and Accounting Agreement. Further, the bidder
o Purchasing/Contract Management must provide a letter from the client
o Inventory Management explicitly mentioning that the
o Governance, Risk and Compliance (GRC) project has successfully achieved
o Human Resource Management, Payroll
Go-Live status.
and ESS
o Business Intelligence Reporting
Out of the two (2) implemented projects, at least (*Completion Certificate for completed projects
one (1) should be successfully completed (Go-live shall be issued after the Go-Live and at least one
year FMS period is over)
achieved followed by completion of at least one
year FMS) and second (2nd) project must have
achieved Go-live status.
11.2. The technical and financial requirements of qualification for the ERP OEM are as
follows:
Sl.
Requirements Supporting Documents
No
GENERAL
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 20
Certificate of incorporation /
Partnership deed
The ERP OEM should be incorporated in India
1 GST Registration
under the Companies Act 1956.
Certificate of commencement of
business (if applicable)
The offered ERP OEM product should have
been implemented on a Cloud based IT
Purchase Order / Client Certificate along
2 Infrastructure for at least One customer.
with user certificate
<Applicable only in case Cloud Infrastructure is
being procured>
FINANCIAL
Copy of Annual Audited Financial
Minimum Average Annual Turnover (MAAT)
Statements certified by Chartered
for best three years out of last five financial
Accountant for the preceding five years.
3 years of the ERP OEM should not be less than
All the financial documents like Balance
INR Five Hundred (500) Crore. ERP OEM must
Sheet, P&L shall have valid UDIN
have positive net worth.
number.
CREDENTIALS AND EXPERIENCE
The OEM of the ERP OEM Product should have
at least Five (5) Implementation Partners /
System Integrators who must have experience Self-certificate by the ERP OEM with the
in implementation of the proposed ERP OEM list of five (5) implementation Partners /
4 product in enterprises. System Integrators with details of the
Partners must have implemented at least One projects
(1) ERP System not more than ten (10) years
earlier from the date of submission of bid.
The ERP OEM product should have been
Bidders must provide the Necessary
successfully implemented at least 3 (three) ERP
Purchase Order/ LOI/ Contract
Projects of the offered ERP OEM Product in
Agreement along with a cover letter
India in last 10 years with at least 500 ERP
from the ERP OEM. Further, the
5 licenses in each project.
bidder must provide the successful
Out of the 3 (three) projects at least 1 (one) completion letter from the client.
project must have been implemented in Power
Sector (Generation, Transmission or (*Completion Certificate is issued after the Go-
Distribution) Live and FMS period is over)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 21
11.3. The technical and financial requirements of qualification for the CSP Vendor are as
follows:
Sl.
Requirements Supporting Documents
No
GENERAL
Certificate of incorporation /
The Cloud Service Provider (CSP) should be Partnership deed
1 incorporated and registered in India under the GST Registration
Indian Companies Act 1956. Certificate of commencement of
business (if applicable)
The Cloud Service Provider (CSP) must be
a) Valid STQC Audit Compliant
empanelled with the Ministry of Electronics &
certificate.
Information and Technology, Government of
2 b) Proof of valid Empanelment by
India (MEITY). The CSP must follow all the
MEITY (reference on MEITY website or
Guidelines issued by MeITY/appropriate
Empanelment Certificate).
Government from time to time.
The proposed Cloud Service Provider (CSP)’s Self-certificate singed by authorized
3 Data Centres /DRC Centres shall be in India signatory and duly attested by the
Bidder.
Proposed Cloud Service Provider (CSP) should Copy of relevant certification or self-
4
be SOC – 2 Type II compliant. certification
FINANCIAL
The CSP should have a turnover of INR Fifty Certificate by a Chartered Accountant for
5
(50) Crores in the last three (3) of five (5) the preceding five years
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 22
11.4. The technical and financial requirements of qualification for the Data Digitization
Agency (DDA) are as follows:
<APPLICABLE ONLY WHERE DDA IS SUB-CONTRACTED BY THE ERPSI>
This criterion is applicable if the ERPSI decides to sub-contract the data digitization
part of the scope of work to a third-party.
Sl.
Requirements Supporting Documents
No
GENERAL
The Data Digitization agency should have
executed or completed at least two (2) projects
Work order / Purchase Order directly
for providing the workforce and carrying out
placed on Data Digitization Agency
1 data entry and data digitization service of not
/through ERPSI along with Agreement
less than INR 25 Lakh per annum for each
copy
project and handling of at least 50 Lakh
physical record digitization.
The Data Digitization agency should have
Incorporation Certificate, And Work
experience of minimum three (3) years of
order / Purchase Order directly placed
2 providing Data Digitization services as
on Data Digitization Agency /through
mentioned in the scope of work (Section 6 Sub-
ERPSI along with Agreement copy
Section 4).
11.5. For the purposes of satisfaction of Technical Requirement, the following shall apply:
a) Eligible Projects, as referred in Technical Requirement, shall mean works
contracts for developing asset/ facility in India or abroad which involve
building/ installing, and commissioning/ go-live such asset/ facility but shall
not include any assignment where the scope is limited to only (i) supply of
goods or (ii) supply of manpower;
b) Projects that have achieved completion/ or have achieved commissioning/ go-
live as identified in the Project document(s) at least 7 (seven) Days prior to the
Bid Submission Deadline shall be considered.
c) For the purpose of clause, a and b above the Eligible Project(s) in the Power
sector shall mean projects relating to generation or transmission or distribution
of electricity;
Note: All the required supporting documents shall be self-attested by the Bidder.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 23
1
No sub-contracting for resource deployment allowed
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 24
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 25
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 26
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 27
The bidder has to provide the details of TQR supporting documents for evaluation in the format
as per Form 14 (Table of Compliance) – Section 5
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 28
Note:
A. In addition , Minimum criteria of each sub-section shall be met i.e. 12.1 ( 1.1, 2.1 to
2.5, 3.1,, 4.1, 4.1a, 5.1,6.1) & 12.2 (1,2) to get qualified.
B. Minimum education qualification & experience required for Human Resource/
Manpower are mentioned in Clause 11.4 of Section 6 of this RFP.
13.1 Stage 1
13.1.1 Verification of Pre-Qualification Criteria
Envelope 1 containing the Pre-Qualification Criteria (PQC) Compliance Format &
supporting documentary evidence will be opened. The bids qualifying the PQC
will then be taken forward to next step. Those bids which do not meet the PQC
will be summarily rejected.
The bidder has to provide the details of PQR supporting documents for
evaluation in the format as per the Pre-Qualification Compliance Format as per
Form 14 in Section 4.
Envelope 3 containing the Financial Bid Letter and Financial Breakup of Components
of the bidders qualified in the technical Evaluation (Stage 2) will be opened next
(bidders scoring minimum 70 out of 100 in technical evaluation). The Financial Bid
Submission Letter template is the Form 1 in Section 5.
1. Financial bids shall be evaluated by the Purchaser for completeness and accuracy.
Arithmetical errors will be rectified on the following basis. If there is a discrepancy
between the unit price and the total price that is obtained by multiplying the unit
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 2. Eligibility Requirements P a g e | 29
price and quantity, the unit price shall prevail, and the total price shall be
corrected. If there is a discrepancy between words and figures, the amount in
words will prevail.
2. The bidder must provide the details of financial bid and supporting documents for
evaluation in the format as per the Form 2 of Section 5. There will be no post-tender
negotiation related to the financial bids.
3. The Financial evaluation of bidder shall be carried out based on the Total cost of
ERP System = ERP System Implementation Phase Cost + ERP System Operation
and Maintenance Phase cost for 5 Years as detailed in the Form 2 of Section 5. After
the standard ATS and FMS period of 5 years, the Rajasthan Discoms can choose to
extend the service for additional 2.5 years at the same rates as quoted in the
Financial Breakup of Cost Components (Form 2 - Section 5).
4. The evaluation of the financial bids will be done based on Least Cost Selection
(L1). The lowest quote shall be considered as L1. The corresponding bidder shall be
declared as a successful bidder and will be eligible for the award of Work.
Note: The price quoted by bidders shall be in INR. Bidders shall quote base price and GST separately as per
BoQ. If the bidders have quoted the GST price against any item as per BoQ, which is not correct and not
matching the actual GST price, their offer shall be loaded by the actual rate as per applicable GST norms to
tendered item/items and the same will be used to calculate L1 bidder.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 30
TABLE OF CONTENTS
Section 3. Instructions to Bidders and Bid Data Sheet .....................................................30
Instructions to Bidder ....................................................................................................31
A. General Provisions..................................................................................... 31
1. Definitions ........................................................................................... 31
2. Introduction ........................................................................................ 33
3. Conflict of Interest.............................................................................. 35
4. Bidders to Inform Itself Fully ........................................................... 36
5. Fraud and Corruption ....................................................................... 36
6. Eligibility and Qualification Requirements.................................... 36
B. Preparation of Proposals ........................................................................... 36
7. General Considerations and Instructions ....................................... 36
8. Cost of Bidding / Preparation of Proposal .................................... 38
9. Language ............................................................................................. 38
10. Documents Comprising the Proposal and List of Forms ............. 38
11. Only One Proposal ............................................................................. 38
12. Proposal / Bid Validity & Bid Security .......................................... 39
13. Extension of Proposal Validity ......................................................... 40
14. Clarification and Amendment of RFP............................................. 40
15. Preparation of Bid/ Proposal and Bid Formats ............................. 41
16. Technical Bid/ Proposal Format and Content ............................... 42
17. Financial Bid/ Proposal Format and Content ............................... 44
C. Submission, Opening and Evaluation .................................................... 45
18. Submission of Bids/ Proposals and Bid Submission Deadline ... 45
19. Confidentiality .................................................................................... 47
20. Opening of Technical Bids/ Proposals ........................................... 47
21. Bid/ Proposals Evaluation Overview and Verification/
Clarifications..................................................................................................... 48
22. Evaluation of Technical Bids/ Proposals ....................................... 49
23. Opening of Financial Proposals ....................................................... 50
24. Evaluation of Financial Bids/ Proposals ........................................ 50
25. Deviations, Reservations and Omissions ....................................... 50
26. Successful / Selected Bidder ............................................................ 51
D. Award of Contract ..................................................................................... 51
27. Award Criteria.................................................................................... 51
28. Utility’s Right to Vary Quantities at the time of Award .............. 52
29. Letter of Award .................................................................................. 52
30. Signing of Contract and Contract Performance Security ............. 52
Bid Data Sheet ................................................................................................................53
Annexure (BDS) .............................................................................................................60
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 31
Instructions to Bidder
A. General Provisions
1. Definitions 1.1 Definitions
(a) “ERP System Integrator (ERPSI) Contract” or “ERPSI
Contract” or “Contract” shall mean the Contract to be entered
into between the Selected Bidder in the event the Selected
Bidder is an individual entity, Lead Bidder in the event the
Selected Bidder is a Consortium1 and the Utility, for
undertaking the Project;
(b) “Bid” shall mean the bid submitted by a Bidder(s) in response
to this RFP and shall include the Technical Bid and the
Financial Bid;
(c) “Bidder(s)” shall mean individual entity or Consortium of
entities bidding in response to this RFP. The Bidder can either
be a company incorporated under the applicable laws of their
relevant jurisdiction;
(d) “Bidding Consortium” shall mean the Consortium of entities
bidding for Project after executing Consortium Agreement as
per the terms and conditions of this RFP;
(e) “Bid Data Sheet (BDS)” means an integral part of the
Instructions to Bidders (ITB) Section 3, that is used to reflect
issues, details, and conditions specific to the procurement, to
supplement and/or modify the provisions of ITB.
(f) “Bid Submission Deadline” shall have the meaning as
ascribed thereto in ITB 18.10;
(g) “Conflict of Interest” shall have the meaning as ascribed
thereto in ITB 3;
(h) “ERPSI 2nd” shall mean the Member of the Bidding
Consortium other than the ERPSI-Lead;
(i) “Contractor” shall mean the same as “ERPSI”;
(j) “Contract Price” shall have the meaning as ascribed thereto in
Section 7;
(k) “Financial Bid” shall have the meaning as ascribed thereto in
ITB 17;
(l) “Financially Evaluated Entity” shall mean the company
which has been evaluated for the satisfaction of the financial
requirement set forth in Clause 11 of Section 2;
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 32
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 33
(dd) “Tender Fee” shall mean the fees submitted with the RFP;
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 34
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 35
2.7 The purpose of the meeting will be to clarify any issues regarding
this RFP in general and the scope of work in particular.
2.8 The Bidder may submit any question or query to Utility in
writing, to reach Utility not later than one week before the
meeting as per the format given in BDS. It may not be practicable
at the meeting to answer questions received late, but questions
and responses will be transmitted as indicated hereafter.
2.9 Minutes of the meeting, including the text of the questions raised
and the responses given, together with any responses prepared
after the meeting, will be transmitted through the e-Procurement
System mentioned in ITB 2.2 without delay to all prospective
Bidders who have downloaded the RFP.
2.10 Non-attendance at the pre-bid meeting (online/at the Utility
specified venue) will not be a cause for disqualification of a
Bidder
3. Conflict of 3.1 A Bidder shall not have a conflict of interest that affects the
Interest Bidding process (the “Conflict of Interest”). In the event a Bidder
is found to have a Conflict of Interest, the Utility may choose to
reject the Bid, terminate the ERPSI Contract (in the event it has
been awarded) as per termination clause in the ERPSI Contract.
Any Bidder found to have a Conflict of Interest shall be
disqualified.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 36
B. Preparation of Proposals
7. General 7.1 In preparing the Proposal, the Bidder is expected to examine the
Considerations RFP Document in detail. Material deficiencies in providing the
and Instructions information or documentation requested in the RFP Document
may result in rejection of the Proposal.
7.2 All Bidders shall comply with the dates and amounts indicated
in Section 1 of this RFP.
7.3 The Bidders shall comply with and agree to all the provisions of
this RFP for various bidding considerations including but not
limited to eligibility, costs, payments, information regarding
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 37
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 38
7.14 The cost of all stamp duties payable for executing the RFP, Bid
Documents or Project shall be borne by the Bidders.
10. Documents 10.1 The Proposal shall comprise the documents and forms
Comprising the mentioned in this Section in general and listed in Section 4 and
Proposal and Section 5 in particular. A Document Checklist for the same as
List of Forms well as the list of forms referred to in this RFP Document is
provided in BDS.
11. Only One 11.1 A Bidder shall submit only one Bid in the same bidding process,
Proposal either individually as a Sole Bidder or as a Member of a Bidding
Consortium (including the ERPSI-Lead). It is further clarified
that any of the Parent/ Affiliate/Ultimate Parent of the Bidder/
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 39
12.2 The Bidder shall furnish as part of its Technical Bid, a Bid
security in original form, and in the amount specified in the
BDS.
12.5 If the Bid Security from any Bidder is forfeited or lapsed either
partly or wholly during the Bid process, then such Bidders and
Consortium are liable for rejection.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 40
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 41
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 42
16.2 The Technical Bid shall contain the list of all participating
Consortium Members and Sub-contractor(s) (if applicable)
participating in the Bid as per the format prescribed in Form 1
given in Section 4. Furthermore, the Technical Bid shall contain a
covering letter by the Lead Consortium Member/ Sole Bidder
duly designated and signed by all Members of that Bidding
Consortium as per the format prescribed in Form 8 given in
Section 4.
16.4 The Technical Bid shall contain Power of Attorney from each
Consortium Member in favour of the Lead Consortium Member
as per the format prescribed in Form 9 given in Section 4. All
submissions and representations by the Lead Member shall be
deemed to be on-behalf of the entire consortium and shall be
binding all the members of the Consortium.
16.5 The Lead Consortium Member/ Sole Bidder shall designate one
person to represent the Bidding Consortium/ Bidder in its
dealings with Utility. The person designated by the Lead
Consortium Member/ Sole Bidder (registered Company) shall
be authorized through a Power of Attorney as per Form 10
given in Section 4 to perform all tasks including, but not limited
to, providing information, responding to inquiries, signing of
Bid on behalf of the Consortium, etc. and attach the same in the
Technical Bid.
16.6 The Technical Bid shall contain signed Letter of Consent as per
Form 11 given in Section 4 from each Consortium Member that
the Bid has been reviewed and each element of the Bid is agreed
to by them including but not limited to any commitment in the
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 43
Project.
16.7 The Technical Bid shall contain the Tender Fees and the Bid
Security as per the format prescribed in Form 6 given in Section
4.
16.11 The Technical Bid of the Bidder shall contain the indicative List
of Material and Services in the format prescribed in Form 14 as
given in Section 4 without any mention of costs/ prices.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 44
16.13 The Technical Bid of the Bidder shall contain the names and
details of the suitably qualified Bidder’s representative and Key
Personnel to perform the ERPSI Contract as per the format
provided in Form 4 given in Section 4. The data on their
experience should be supplied using the Form 5 given in Section
4 for each candidate proposed.
17.3 Unit prices (exclusive of all taxes/ duties/ levies/ cess etc.) (as
provided in Form 1 given in Section 5) quoted by the Bidder
shall be firm and final and shall remain constant throughout
the Contract Period and shall not be subject to any
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 45
modifications.
17.6 All prices in the Financial Bid shall be quoted in Indian Rupees.
The Bidder shall bear the risk related to foreign exchange
variations during the Contract Period. The variation in the
statutory taxes will be in accordance with the ERPSI Contract.
18.2 Requisite Tender Fee and Bid Security in the specified form/
instrument shall be submitted in original so as reach before the
Bid Submission Deadline, failing which the Bid shall be
deemed non-responsive.
18.5 The hard copy of the document as per ITB 18.2 and ITB 18.4
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 46
18.6 The sealed envelope shall be clearly marked on the top with
details mentioned in BDS. The sealed envelope shall be
addressed to the Utility as specified in BDS. The sealed
envelope shall also clearly mention the name of the Lead
Consortium Member/ Sole Bidder submitting the Bid.
18.7 The sealed envelope shall not contain the Financial Bid. The
Financial Bid shall only be submitted electronically.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 47
extended.
19.3 If any Bidder, from the time of opening the Technical Bids to
the time of ERPSI Contract award, wishes to contact Utility on
any matter related to the bidding process, it should do so in
writing.
20. Opening of 20.1 The Technical Bids shall be opened online or at the date and
Technical Bids/ time, and the address indicated BDS. In case hard copy
Proposals submission of Technical Bid or certain document is requested
by the Utility as per ITB 18 the physically submitted Technical
Bids/ documents in the sealed envelope shall be opened
simultaneously to check inter alia requisite submissions and
for the Tender Fees and the Bid Security.
20.3 Utility shall then separately evaluate the Bids with respect to
the Eligibility and Qualification Requirements, sufficiency of
the submission, conformation/ compliance/ responsiveness to
all the mandatory requirements, terms, conditions, and
specifications of the RFP Document without any deviation,
reservation, or omission, and other parameters outlined in this
RFP.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 48
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 49
ITB 25.
21.5 The Contract, if awarded, shall be executed in accordance with
RFP document and any other conditions.
21.6 Notwithstanding anything stated in the RFP Document, Utility
reserves the right to verify the authenticity of the documents
submitted for meeting the eligibility, qualification and/or
other specified requirements and may request for clarifications
any additional information/ documents from the Bidder.
However, the Bidder shall not be permitted to alter the
substance of the Proposal or the price under any circumstances
whatsoever
21.7 Utility reserves the right at its sole discretion to contact the
Bidder’s bank, lenders, financing institutions and any other
persons as necessary to verify the Bidder’s
information/documents for the purpose of eligibility,
qualification and/ or other specified requirements.
21.8 Utility may verify the Bidder’s technical and financial data by
checking with the Bidder’s clients/ lenders/ bankers/
financing institutions/ any other person as necessary.
21.9 To assist in the examination, evaluation, comparison and post-
qualification of the Bids, Utility may, at its discretion, ask any
Bidder for a clarification of its Bid. Any clarification submitted
by a Bidder that is not in response to a request by Utility shall
not be considered. Utility’s request for clarification and the
response shall be in writing. No change in the prices shall be
sought, offered, or permitted by Utility in the evaluation of the
Financial Bids.
22. Evaluation of 22.1 All Bids will first be evaluated for ‘Clause by Clause’
Technical Bids/ compliance to the RFP document and the ERPSI Contract
Proposals including the technical specifications and functional
requirements (with amendments, if any) as per the format
prescribed in Form 14 given in Section 4. The Bidders fulfilling
the Eligibility and Qualification Requirement and having
submitted substantially responsive Bids conforming to and
meeting all the mandatory requirements, terms, conditions,
and specifications of the RFP Document without any material
deviation, reservation, or omission, as defined in ITB 25, shall
qualify for the opening of Financial Bid.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 50
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 51
26.3 If the Successful Bidder/ Selected Bidder does not accept the
correction of errors as per ITB 23.1, its Bid shall be
disqualified, and its Bid Security shall be forfeited.
D. Award of Contract
27. Award Criteria 27.1 Subject to ITB 26, the Utility shall award the Contract to the
Successful Bidder/ Selected Bidder.
27.2 Utility shall present the Letter of Award (as per the format
prescribed in Form 2 given in Section 8) to the Successful
Bidder and invite the Performance Security in order to sign the
ERPSI Contract to implement the Project.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 52
27.4 If for any reason the Bid of the Successful Bidder is rejected or
Letter of Award issued to the Successful Bidder is cancelled,
Utility is empowered to take decisions for any of the
following:
a) Consider the next lowest evaluated Bid from eligible and
qualified Bidder whose bid is determined substantially
responsive; or
b) Annul the Bid process; or
c) Take any such measure as may be deemed fit in the sole
discretion of Utility, as applicable.
28. Utility’s Right 28.1 Utility reserves the right to increase or decrease the number of
to Vary items as per BoQ under the ERPSI Contract subject to the limit
Quantities at of - 20% (twenty percent) up to +30% (thirty percent) of the
the time of existing number of items as per BoQ (as provided in Form 1
Award
given in Section 5), covered under the ERPSI Contract, without
any change in the unit prices or other terms and conditions of
the ERPSI Contract and the Bid.
29. Letter of Award 29.1 Prior to the expiry of the period of Bid validity, Utility shall
notify the successful Bidder, in writing, by issuing the Letter of
Award, that its Bid has been accepted.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 53
ITB
Reference
A. General Provisions
1.1 (v) Jaipur Vidyut Vitran Nigam Limited on behalf of all three Discoms (JVVNL,
AVVNL & JdVVNL) invites Bid for “Selection of System Integrator (ERPSI) for
Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System in Rajasthan Discoms (JVVNL,
AVVNL & JdVVNL)” against Tender No. JVVNL/SE/IT/RDSS/ERPSI/TN-101
1.1 (ee) Jaipur Vidyut Vitran Nigam Limited (Jaipur Discom), Ajmer Vidyut Vitran
Nigam Limited (Ajmer Discom) and Jodhpur Vidyut Vitran Nigam Limited
(Jodhpur Discom) have been established under the Companies Act, 1956 by
Government of Rajasthan. All three discoms are engaged in Distribution &
Supply of Electricity in Rajasthan State and together represented as
RAJASTHAN DISCOMS.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 54
Website: - energy.rajasthan.gov.in/jvvnl
2.3 The name of the Contract is: “Selection of System Integrator (ERPSI) for Supply,
Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System in Rajasthan Discoms (JVVNL, AVVNL &
JdVVNL)” against Tender No. JVVNL/SE/IT/RDSS/ERPSI/TN-101
2.4 Standard brief regarding detail of existing systems relevant to the ERP
System implementation Project:
At present, all three Discoms are using the ERP developed by M/s RISL for
HRMS, F&A and MM modules. This application is using SSO ID based login
feature. Application data is hosted in Rajasthan State Data Centre (RSDC), Jaipur.
Existing Data need to be migrated in new ERP.
From:
[Address of the Bidder]
[Telephone No., Fax No., Email]
[Date]
To:
Superintending Engineer (IT),
JAIPUR VIDYUT VITRAN NIGAM LTD,
3rd Floor, Data Center Building,
Old Power House, Near Ram Mandir, Bani Park, Jaipur- 302006
Sub: Query.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 55
Referenc
S. No. Page No. Query
e Clause
No.
1.
2.
3.
Thanking you,
Yours Sincerely,
[Insert Signature here] [Insert Name here] [Insert Designation here]
B. Preparation of Proposals
S. RFP
Document
Section
No. Reference
1. Tender Fee 1, 3
2. List of Consortium Members and Subcontractor(s) (as
applicable) as per the format prescribed in Form 1 4
given in Section 4
3. Bidder Information as per the format prescribed in 4
Form 2 given in Section 4
4. Project Implementation Plan as per format provided 4
in Form 3 given in Section 4
5. Curriculum Vitae of key personnel as per format 4
provided in Form 4 and Form 5 given in Section 4
6. Bid Security in the form of Demand Draft or Bank 4
Guarantee as per format prescribed in Form 6 given in
Section 4
7. Covering Letter for Submission of Bid by Sole Bidder
/ Lead Consortium Member as per format prescribed 4
in Form 7 given in Section 4
8. Consortium Agreement Format entered amongst both
Members of the Bidding Consortium as per format 4
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 56
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 57
12.1 The Bid shall remain valid until i.e. up to and including 180 days reckoned from
the Bid Submission Deadline specified in ITB 18, as may be extended by the
Utility.
12.2 Currency and the amount of Bid Security to be furnished by the Bidder is:
Currency: INR
Amount: 1.8 Crores (2% of estimated Tender Value)
16.12 Number of years: Fifteen (15) months implementation phase + Five (5) years
Operation & Maintenance Phase + Two & half (2.5) years extendable.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 58
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 59
Date: 28.03.2024
Time: 03:00 PM
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 3. Instructions to Bidders and Bid Data Sheet P a g e | 60
Annexure (BDS)
Bidder Help Manual for E-Bidding
1. Bidding will be conducted through the global open competitive bidding procedures as per
the provisions of ITB/BDS and the contract shall be executed as per the provisions of the
Contract.
2. The detailed Qualifying Requirements (QR) are given in the Bidding Document.
3. The complete Bidding Documents including technical specifications are available at JVVNL
website www.energy.rajasthan.gov.in/jvvnl. Bidders who wish to participate in this
bidding process must register on https://eproc.rajasthan.gov.in (bidders who registered on
http://eproc.rajasthan.gov.in before 30.09.2011 must register again). Interested bidders can
download the bid documents through e-tendering portal
http://www.eproc.rajasthan.gov.in and commence preparation of bids to gain time.
4. The bid document provides detailed terms and conditions and technical details.
5. Interested eligible bidders may obtain further information from the office of S.E.(IT), Jaipur
Vidyut Vitran Nigam Limited, between 11:00 AM to 02:00 PM on all working days.
6. The bid shall only be submitted through online procurement system of
https://eproc.rajasthan.gov.in The bid document will be downloaded by the said online
portal www.eproc.rajasthan.gov.in and Interested Bidder who wish to participate have to
pay the bid cost and copy of receipt is to be enclosed along with the E-bid in pdf file & shall
be deposited in the office of S.E.(IT), JVVNL, JAIPUR as mentioned in Salient Details of RFP
Notice.
7. The bids without having the bid cost will not be opened.
8. Participate in this online bid, bidders will have to procure Digital Signature Certificate
(Type-II or III) as per Information Technology Act-2000 using which they can sign their
electronic bids. Bidders can procure the same from any CCA approved certifying agency
i.e. TCS, Safecrypt, Ncode etc. Or they may contact e-procurement cell, Department of IT &
C, Govt. of Rajasthan for future assistance, bidders who already have a valid digital
Certificate need not to procure a new Digital Certificate.
9. Contact No. 0141-4022688 (Help desk of RISL-10.00 AM to 6.00 PM)
10. E-mail: [email protected]
11. Address: e-procurement cell, RISL, Yojana Bhawan, Tilak Marg, C-Scheme, Jaipur. Bidders
should go through the website https://www.eproc.rajasthan.gov.in, should refer to the
website and go through the link “Help for Contractors”, “Information about DSC”, “FAQ”
and “Bidders Manual Kit” to know the process for submitting the electronic bids at the
website.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 61
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 62
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 63
[The Bidder shall identify below the Consortium Members/ Sub-contractor(s) for major
Project items. For sub-contractor a Letter of Intent must be provided.]
Proposed Consortium
Major Project Item Member / Sub- Nationality
Contractor(s)
System Integrator (Lead)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 64
S.
Information Requirement Details
No.
1 Company Name and Details
2 Address of its place of business in India
3 List of board of directors or regulating/controlling body
4 Attested copy of Certificate of Registration/ Incorporation
issued by the Registrar of Companies
6 Certificate of Commencement of Business issued by the
Registrar of Companies
7 Copy of the Goods and Services Tax (GST) Registration
Certificate
8 Provident Fund (PF) Certificate indicating PF Code
9 Copy of Permanent Account Number (PAN) Card
11 CA certified audited annual financial statements and positive
financial Net worth for the last three years
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 65
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 66
Name of candidate:
Duration of [insert the whole period (start and end dates) for which this position will
appointment: be engaged]
Time commitment: [insert the number of days/week/months/ that has been scheduled for this
for this position: position]
Expected time [insert the expected time schedule for this position (e.g., attach high level
schedule for this Gantt chart]
position:
2. Title of position: [System Integration Specialist]
Name of candidate:
Duration of [insert the whole period (start and end dates) for which this position will
appointment: be engaged]
Time commitment: [insert the number of days/week/months/ that has been scheduled for this
for this position: position]
Expected time [insert the expected time schedule for this position (e.g., attach high level
schedule for this Gantt chart]
position:
3. Title of position: [Cyber Security Specialist]
Name of candidate:
Duration of [insert the whole period (start and end dates) for which this position will
appointment: be engaged]
Time commitment: [insert the number of days/week/months/ that has been scheduled for this
for this position: position]
Expected time [insert the expected time schedule for this position (e.g., attach high level
schedule for this Gantt chart]
position:
4. Title of position: [ERP Specialist]
Name of candidate:
Duration of [insert the whole period (start and end dates) for which this position will
appointment: be engaged]
Time commitment: [insert the number of days/week/months/ that has been scheduled for this
for this position: position]
Expected time [insert the expected time schedule for this position (e.g., attach high level
schedule for this Gantt chart]
position:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 67
Professional qualifications:
Academic qualifications:
Language proficiency: [language and levels of speaking, reading, and writing skills]
Details
Address of employer:
Fax:
Declaration
I, the undersigned [ insert either “Contractor’s Representative” or “Key Personnel” as applicable],
certify that to the best of my knowledge and belief, the information contained in this Form 5
correctly describes myself, my qualifications, and my experience.
I confirm that I am available as certified in the following table and throughout the expected
time schedule for this position as provided in the Bid:
Commitment Details
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 68
Commitment to duration of [insert period (start and end dates) for which this Contractor’s
contract: Representative or Key Personnel is available to work on this contract]
Time commitment: [insert period (start and end dates) for which this Contractor’s
Representative or Key Personnel is available to work on this contract]
Signature: __________________________________________________________
Signature: ________________________________________________________
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 69
[To be stamped in accordance with Stamp Act in the name of SE (IT) JVVNL, on Non-Judicial Stamp
Paper of Govt of Rajasthan should be of 0.25% of BG amount or maximum upto Rs. 25,000/- from
Commercial Scheduled / Nationalized Bank]
To:
THE SUPERINTENDING ENGINEER(IT),
JAIPUR VIDYUT VITRAN NIGAM LTD.,
3rd Floor, Data Center Building,
Old Power House, Near Ram Mandir, Bani Park,
Jaipur- 302006
And WHEREAS a Bank Guarantee for [Amount] valid [Date] is required to be submitted by
the Bidder along with the RFP.
In consideration of the [details of the Bidder] agreeing to undertake the obligations under the
[insert details of the bid document], we, …………….[Insert name of the Bank and address of
the B r a n c h giving the Bank Guarantee] having our registered office at …………….[Insert
address of the registered office of the Bank] (“Guarantor Bank”) hereby give this Bank
Guarantee No. …………….[Insert Bank Guarantee number] dated …………….[Insert the date
of the Bank Guarantee], and hereby agree unequivocally, irrevocably and unconditionally to
pay immediately on demand in writing from the Utility any officer authorized by it in this
behalf any amount not exceeding [Amount] to the said Utility on behalf of the Bidder.
We, [Insert name of issuing bank] do hereby undertake to pay the amounts due and payable
under this bank guarantee without any demur, protest, dispute or any inquiry. Any such
demand made on the Guarantor Bank, shall be conclusive as regards the amount due and
payable by the Guarantor Bank under this bank guarantee. Our liability under this present
being absolute and unequivocal. The Guarantor Bank hereby expressly agrees that it shall not
require any proof of the terms of the [bid documents] or the occurrence of any event specified
thereunder and shall make the payment to the Utility immediately on the written demand from
the Utility, made in any format, raised at the above-mentioned address of the Guarantor Bank.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 70
We ……………. [Insert name of the Bank] also agree that withdrawal of the Bid or part thereof
by the Bidder within its validity or non-submission of Performance Security by the Bidder
within the stipulated time of the Letter of Award to the Bidder or any violation to the relevant
terms stipulated in the RFP would constitute a default on the part of the Bidder and that this
Bank Guarantee is liable to be invoked and encashed within its validity by the Utility in
case of any occurrence of a default on the part of the Bidder and that the amount is liable
to be forfeited by the Utility.
This Guarantee shall be valid and binding on this Bank up to and inclusive of …………….
[Insert the date of validity of the Bank] and shall not be terminable by notice or by Guarantor by
reason of merger, amalgamation, restructuring, liquidation, winding up, dissolution or change
in the constitution of the Bank or the firm of the Bidder Or by any reason whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or variations or
alternations made, given, conceded with or without our knowledge or consent by or between
the Bidder and the Utility.
[Insert the address of the Bank with complete [Insert signature of the Bank’s Authorized
postal branch code, telephone and fax numbers, Signatory]
and official round seal of the Bank]
Attested
……………………………. [Signature]
(Notary Public)
Place: …………………………. Date: …………………………….
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 71
[Covering Letter shall be on the official letterhead of the ERPSI-Lead of the Bidding Consortium/ Sole
Bidder]
[Reference No.]
From:
[Address of the ERPSI-Lead/ Sole Bidder]
[Telephone No., Fax No., Email]
[Date]
To:
THE SUPERINTENDING ENGINEER(IT),
JAIPUR VIDYUT VITRAN NIGAM LTD.,
3rd Floor, Data Center Building,
Old Power House, Near Ram Mandir, Bani Park,
Jaipur- 302006
Sub: Bid for Selection of System Integrator for Supply, Installation, Commissioning,
Implementation and Support for Enterprise Resource Planning (ERP) System
Ref: TN-101
We, the undersigned ……………. [Insert name of the ERPSI-Lead/ Sole Bidder] having read,
examined, and understood in detail the RFP for Selection of System Integrator for Supply,
Installation, Commissioning, Implementation and Support for Enterprise Resource Planning
(ERP) System hereby submit our Bid comprising of Technical and Financial Bids.
1. We give our unconditional acceptance to the RFP including but not limited to all its
instructions, terms and conditions, and formats attached thereto, issued by Utility, as
amended. In token of our acceptance to the RFP, the same have been initialed by us and
enclosed to the Bid. We shall ensure that our Consortium shall execute such requirements
as per the provisions of the RFP and provisions of such RFP shall be binding on us.
2. Fulfilment of Eligibility
We undertake that we fulfil the Eligibility Criteria stipulated in the RFP and fulfil all the
eligibility requirements as the Lead Consortium Member/ Sole Bidder as outlined in the
RFP.
3. Bid Security
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 72
We have enclosed a Bid Security of [Amount] in the form of a Bank Guarantee No.
……………. [Insert Bank Guarantee Number] (OR Demand Draft) dated ……………. [Insert
date of the Bank Guarantee] as per Form 6 given in Section 4 from ……………. [Insert name of
Bank providing Bid Bond] and valid up to [Date].
4. No Deviation
We have submitted our Financial Bid strictly as per terms and formats of the RFP, without
any deviations, conditions and without mentioning any assumptions or notes for the
Financial Bid in the said format.
5. Acceptance
We hereby unconditionally and irrevocably agree and accept that the decision made by
Utility in respect of any matter regarding or arising out of the RFP shall be binding on us.
We hereby expressly waive any and all claims in respect of Bid process.
We confirm that there are no litigations or disputes against us, which materially affect our
ability to fulfil our obligations with regard to fulfilling our obligations as per the RFP.
7. Contact Person
Details of the contact person representing our Bidding Consortium/ Sole Bidder (registered
Company) supported by the Power of Attorney prescribed in Form 10 given in Section 4 of
the RFP are furnished as under:
Name: ………………………………………………….
Designation: ………………………………………………….
Company: ………………………………………………….
Address: ………………………………………………….
Mobile: ………………………………………………….
Phone: ………………………………………………….
Fax: ………………………………………………….
Email: ………………………………………………….
1. We are submitting herewith the Technical Bid containing duly signed formats, both
in electronic and physical forms, (duly attested) as desired by you in the RFP for
your consideration.
2. We are also submitting herewith the Financial Bid in electronic form only, as per the
terms and conditions in the RFP.
8. It is confirmed that our Bid is consistent with all the requirements of submission as stated in
the RFP and subsequent communications from Utility.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 73
9. The information submitted in our Bid is complete, strictly as per the requirements stipulated
in the RFP and is correct to the best of our knowledge and understanding. We would be
solely responsible for any errors or omissions in our Bid.
10. We confirm that all the terms and conditions of our Bid are valid for acceptance for a period
of 1 (one) year from the Bid Submission Deadline.
11. We confirm that we have not taken any material deviation so as to be deemed non-
responsive with respect to the provisions stipulated in the RFP.
12. We confirm that no order/ ruling/ judgment has been passed by any Competent Court or
Appropriate Commission against us or any of our Consortium Members or in the preceding
1 (one) year from the Bid Submission Deadline for breach of any contract and that the Bid
Security submitted by the us or any of our Consortium Members has not been forfeited,
either partly or wholly, in any bid process in the preceding 1 (one) year from the Bid
Submission Deadline.
13. We confirm that we are not currently blacklisted/ debarred/ banned/ suspended as per
Clause 6 under Section 2 of this RFP.
14. We are registered/ exempt from registering in accordance with applicable laws
Dated the ……………. [Insert date of the month] day of ……………. [Insert month, year] at
……………. [Insert place].
Thanking you,
Yours Sincerely,
[Insert Signature here]
[Insert Name here]
[Insert Designation here]
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 74
[To be on Rajasthan non-judicial stamp paper of Rupees Five Hundred Only (INR 500/-) duly notarized
and signed by each member on each page]
[The Bidding Consortium should list the name, address of its registered office and other details of all the
Consortium Members above.]
WHEREAS the Parties abovenamed are entering into this Consortium Agreement for the
purpose of submitting the Bid in response to the RFP and in the event of selection as Selected
Bidder to comply with the requirements as specified in the RFP and ensure execution of the
System Integrator Contract as may be required to be entered into with Utility.
Party 1, Party 2 are hereinafter collectively referred to as the “Parties” and individually as a
“Party.
WHEREAS the RFP stipulates that the Bidders applying as a Bidding Consortium shall submit
a legally enforceable Consortium Agreement in a format specified in the RFP, whereby each
Consortium Member undertakes to be liable for its Roles and Responsibilities, provide
necessary guarantees and pay required fees as required as per the provisions of the RFP, as
specified herein.
WHEREAS any capitalized term in this Agreement shall have the meaning ascribed to such
term in the RFP document.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 75
2. The Lead Consortium Member is hereby authorized by the Members of Consortium and
Parties to the Consortium Agreement to bind the Consortium and receive instructions for
and on behalf of all Members. The Roles and Responsibilities of all other members shall be
as per Clause 11.7 in Section 6 of to this Agreement.
3. Both Consortium Members undertake to be jointly and severally liable for the performance
of its part of the Roles and Responsibilities without in any way limiting the scope of
collective liability envisaged in this Agreement in order to meet the requirements and
obligations of the RFP. The ERPSI-Lead shall be liable and responsible for ensuring the
individual and collective commitment of each of the Members of the Consortium in
discharging all their respective Roles and Responsibilities.
4. In case of any breach of any of the commitment as specified under this Agreement by any of
the Consortium Members, the Lead Consortium Member of the Consortium shall be liable
to meet the obligations as defined under the RFP.
6. The Members expressly agree to adhere to all the terms and conditions of the RFP and
confirm that we don’t have any Conflict of Interest (as defined in the RFP).
7. This Consortium Agreement shall be construed and interpreted in accordance with the
Laws of India and Courts at [Place] shall have the exclusive jurisdiction in all matters
relating thereto and arising there under.
8. It is hereby agreed that the Lead Consortium Member shall furnish the Bid Security, as
stipulated in the RFP, on behalf of the Bidding Consortium.
9. It is hereby agreed that in case of selection of Bidding Consortium as the System Integrator,
the Parties to this Consortium Agreement do hereby agree that they shall furnish the
Performance Security and other commitments to Utility as stipulated in the RFP and System
Integrator Contract. The Lead Member shall be responsible for ensuring the submission of
the Performance Security and other commitments on behalf of all the Consortium Members.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 76
10. It is further expressly agreed that the Consortium Agreement shall be irrevocable and, for
the System Integrator, shall remain valid over the term of the Project, unless expressly
agreed to the contrary by Utility.
11. The Lead Consortium Member is authorized and shall be fully responsible for the accuracy
and veracity of the representations and information submitted by the Consortium Members
respectively from time to time in response to the RFP for the purposes of the Bid. The
representation by the Lead Member shall be deemed to be on behalf of and binding on all
members of the Consortium.
12. It is expressly understood and agreed between the Members of the Consortium and Parties
that the responsibilities and obligations of each of the Members shall be as delineated as
annexed hereto as Annexure-A forming integral part of this Agreement. It is further agreed
by the Members that the above sharing of responsibilities and obligations shall not in any
way be a limitation of responsibilities and liabilities of the Members, with regards to all
matters relating to the execution of the Bid and implementation of the Project envisaged in
the RFP Documents.
13. It is clearly agreed that the Lead Consortium Member shall ensure performance indicated in
the RFP. In the event one or more Consortium Members fail to perform its/ their respective
obligations, the same shall be deemed to be a default by all the Consortium Members.
14. It is hereby expressly agreed between the Parties to this Consortium Agreement that neither
Party shall assign or delegate or subcontract its rights, duties, or obligations under this
Agreement to any person or entity except with prior written consent of Utility.
a) has been duly executed and delivered on behalf of each Party hereto and constitutes the
legal, valid, binding, and enforceable obligation of each such Party;
b) sets forth the entire understanding of the Parties hereto with respect to the subject
matter hereof; and
c) may not be amended or modified except in writing signed by each of the Parties and
with prior written consent of Utility.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 77
Designation: Designation:
…..
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 78
WHEREAS [Utility] has issued for Tender No. [Tender Details] (the “RFP”) dated [Date] for
inviting Bids in respect of Selection of System Integrator for Supply, Installation,
Commissioning, Implementation and Support for Enterprise Resource Planning (ERP) System
(the “Project”) on the terms contained in the RFP;
WHEREAS M/s.……………., M/s. ………………., M/s. and M/s. ………………. [Insert names
of all Members of Consortium] the Members of the Consortium are desirous of submitting a Bid
in response to the RFP, and if selected, undertaking the responsibility of implementing the
Project as per the terms of the RFP;
WHEREAS all the Members of the Consortium have agreed under the Consortium Agreement
dated …………. (the “Consortium Agreement”), entered into between all the Members and
submitted along with the Bid to appoint ………... [Insert the name and address of the Lead
Consortium Member] as Lead Consortium Member to represent all the Members of the
Consortium for all matters regarding the RFP and the Bid;
AND WHEREAS pursuant to the terms of the RFP and the Consortium Agreement, we, the
Members of the Consortium hereby designate M/s …………... [Insert name of the Lead
Member] as the Lead Consortium Member to represent us in all matters regarding the Bid and
the RFP, in the manner stated below: -
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 79
matters in connection with our Bid, till completion of the bidding process as well as
implementation of the Project, if applicable, in accordance with the RFP.
We, as Members of the Consortium, hereby agree to ratify all acts, deeds and things done by
our said attorney pursuant to this Power of Attorney and that all acts, deeds, and things done
by our aforesaid attorney shall be binding on us and shall always be deemed to have been done
by us.
All the terms used herein but not defined shall have the meaning ascribed to such terms under
the RFP.
We, as Members of the Consortium, hereby agree to ratify all acts, deeds and things done by
our said attorney pursuant to this Power of Attorney and that all acts, deeds, and things done
by our aforesaid attorney shall be binding on us and shall always be deemed to have been done
by us.
All the terms used herein but not defined shall have the meaning ascribed to such terms under
the RFP.
Signed by the within named ………………………………. [Insert the name of the executant
Consortium Member] through the hand of Mr./ Ms./ Dr. ……………………………………….
duly authorized by the Board to issue such Power of Attorney dated this …………………. day
of ………….…
Accepted
………………………………
(Signature of Attorney)
[Insert Name, designation, and address of the Attorney]
Attested
…………………………………..
(Signature of the executant)
(Name, designation, and address of the executant)
…………………………………….
Signature and stamp of Notary of the place of execution
Common seal of ……………… has been affixed in my/our presence pursuant to Board of
Director’s Resolution dated……
2. WITNESS2...........…………………………..................... (Signature)
Name ………………………………………….
Designation...........……………………………
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 80
Notes
a. The mode of execution of the power of attorney should be in accordance with the procedure, if
any, laid down by the applicable law and the charter documents of the executant(s).
b. In the event, power of attorney has been executed outside India, the same needs to be duly
notarized by a notary public of the jurisdiction where it is executed. Such POAs must be duly
apostilled and (if required) suitable confirmation of the concerned consulate must also be obtained.
c. Also, wherever required, the executant(s) should submit for verification the extract of the charter
documents and documents such as a Board resolution / power of attorney, in favor of the
person executing this power of attorney for delegation of power hereunder on behalf of the
executant(s).
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 81
We hereby agree to ratify all acts, deeds and things done by our said attorney pursuant to this
Power of Attorney and that all acts, deeds, and things done by our aforesaid attorney shall be
binding on us and shall always be deemed to have been done by us.
All the terms used herein but not defined shall have the meaning ascribed to such terms under
the RFP.
Signed by the within named ........................................... [Insert the name of the executant company]
through the hand of Mr./ Mrs. ………………………………………. duly authorized by the
Board to issue such Power of Attorney dated this ………………………. day of ………
Accepted
Attested
…………………………………..
(Signature of the executant)
(Name, designation, and address of the executant)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 82
…………………………………….
Signature and stamp of Notary of the place of execution
Common seal of ……………… has been affixed in my/our presence pursuant to Board of
Director’s Resolution dated……
_________________________________________________________________________
Notes:
a. The mode of execution of the power of attorney should be in accordance with the procedure, if any,
laid down by the applicable law and the charter documents of the executant(s).
b. In the event, power of attorney has been executed outside India, the same needs to be duly notarized
by a notary public of the jurisdiction where it is executed. Such POAs must be duly apostilled and (if
required) suitable confirmation of the concerned consulate must also be obtained.
c. Also, wherever required, the executant(s) should submit for verification the extract of the charter
documents and documents such as a Board resolution / power of attorney, in favor of the person
executing this power of attorney for delegation of power hereunder on behalf of the executant(s).
_________________________________________________________________________
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 83
[On the letter head of Sole Bidder/ each Member of the Consortium including Lead Member]
[Reference No.]
From:
[Address of the Lead Consortium Member/ Sole Bidder]
[Telephone No., Fax No., Email]
[Date]
To:
THE SUPERINTENDING ENGINEER(IT),
JAIPUR VIDYUT VITRAN NIGAM LTD.,
3rd Floor, Data Center Building,
Old Powerhouse, Near Ram Mandir, Bani Park,
Jaipur- 302006
Sub: Bid for Selection of System Integrator for Supply, Installation, Commissioning,
Implementation and Support for Enterprise Resource Planning (ERP) System.
Ref: TN-101
We, ……................… [Insert name of the undersigned Sole Bidder/ Consortium Member] Sole
Bidder/ Member of Consortium and Lead by ……................… [Insert name of the Lead
Consortium Member] have read, examined, and understood the RFP and RFP Documents for
Selection of System Integrator for Supply, Installation, Commissioning, Implementation and
Support for Enterprise Resource Planning (ERP) System.
We hereby confirm our concurrence with the RFP including in particular the Bid / and
Consortium Agreement submitted by ……................… [Insert name of the Sole Bidder/ Lead
Consortium Member], in response to the RFP. We confirm that the Bid has been reviewed and
each element of the Bid is agreed to including but not limited to the commitment and
obligations of our Company.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 84
Phone Nos. :
Fax Nos. :
E-mail address :
Thanking you,
Yours faithfully,
………………………………..
[Signature, Name, Designation of Authorized Signatory of Consortium Member and Company's Seal]
Business Address:
[Name and address of principal officer]
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 85
Type of Client: (PSU / Power Utility/ Indian Power Utility/ Private/ Others):
Complete Documentary Evidence Attached Documentary Evidence (Start Page No. To End
(Yes/No): Page No.):
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 86
Table 1: Data Center (DC) and Disaster Recovery Center (DRC) Components [To be defined
by ERPSI]
Minimum Config of Each VM Total Quantity
Sl. Cloud Services Unit of Quantity -
No. Measure VM on Cloud
ment vCPU vRAM Storage
Table 2: Bill of Materials and Services for ERP System Licenses [Indicative Only. To be
defined by ERPSI]
Table 3: Bill of Materials and Services for Hardware [Indicative Only. To be defined by
ERPSI]
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 4. Bidding Forms – Technical Proposal P a g e | 87
The Bidder shall annotate the Table of Contents of each section to provide a high-level
summary of compliance status. In all cases, the following symbols, and no others shall be
used:
Only one symbol shall be assigned to paragraph and shall indicate the worst-case level of
compliance for that paragraph. This annotation may be handwritten.
The Bidder shall also underline, on the compliance copy, all requirements to which
exceptions have been taken (X) or to which alternatives have been proposed (A).
Each alternative shall be clearly and explicitly described. Such descriptions shall use the
same paragraph numbering as the bid document sections addressed by the alternatives. All
alternative descriptions shall be in one contiguous section of the bidder’s proposal,
preferably in the same volume, and titled "Alternatives." A separate section titled
"Exceptions" shall also be provided containing any discussion or explanation chooses to
provide concerning exceptions taken. Alternatives which do not substantially comply with
the intent of the Bid documents will be considered exceptions.
Any clause which is not included in this compliance table shall be treated as “fully
complied” or C.
The Utility will assess the merits of each alternative and exception and will be the sole judge
as to their acceptance.
Additionally, the bidder has to provide the details of PQR and TQR supporting documents
in the following format
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 88
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 89
[On the letter head of each Member of the Consortium including Lead Member/ Sole Bidder]
[Reference No.]
From:
[Address of the Lead Consortium Member/ Sole Bidder]
[Telephone No., Fax No., Email]
[Date]
To:
THE SUPERINTENDING ENGINEER(IT),
JAIPUR VIDYUT VITRAN NIGAM LTD.,
3rd Floor, Data Center Building,
Old Powerhouse, Near Ram Mandir, Bani Park,
Jaipur- 302006
Sub: Financial Bid for Selection of System Integrator for Supply, Installation,
Commissioning, Implementation and Support for Enterprise Resource Planning
(ERP) System.
Ref: TN-101
We, the undersigned …....................…. [Insert name of the Lead Consortium Member/ Sole
Bidder ‘Party 1’] representing …....................…. [Insert name of the Lead Consortium
Member ‘Party 2’], …....................…. [Insert name of the Lead Consortium Member ‘Party 3’],
..., and …....................…. [Insert name of the Lead Consortium Member ‘Party n’], having read,
examined and understood in detail the RFP for Implementation of [Utility]’s ERP System
hereby submit our Financial Bid. We hereby undertake and confirm that:
A. We have submitted our Financial Bid strictly in accordance with the RFP without any
deviations or condition.
B. Our Financial Bid is consistent with all the requirements of submission as stated in the
RFP and subsequent communications.
C. Price quoted clearly mentions the total cost (basic cost, Goods and Services Tax, or any
other taxes/duties/levies).
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 90
E. The details quoted herein shall stand valid at least for 9 months from the date of
submission of this Financial Bid and for implementation of Project, if awarded, as per
the timeframe indicated in the RFP.
F. Our Total Cost of the Project for the contract period is INR………; and the quoted ERPSI
Service Charge will be a fixed for the entire contract duration
Dated the ……………. [Insert date of the month] day of ……………. [Insert month, year] at
……………. [Insert place].
Thanking you,
Sincerely yours,
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 91
<Please Note: The items are indicative only. This needs to be detailed out and customized by Utility basis
project requirement. Any variation in GST and or cess on the Items specifically mentioned above shall be
on account of the Utility and no other items including hardware and software that may be necessary for
putting the ERP system in place>
Note:
Any item/ material either hardware or software or related service required to meet the functionality specified in
the tender document whose related component is missing in the above table has to be accounted by the Bidder
and the price of the same is assumed to be reflected and taken care in the price specified to the Rajasthan Discoms
by the Bidder in this commercial bid. Rajasthan Discoms is liable only to pay the Contract price as per the
payment terms mentioned in the RFP to meet all the requirements as specified in the RFP.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 92
Sl. ERP Software Unit of Total Quantity - Unit Rate GST GST Unit Total Price
No. License Measu No. of Licenses (In Rs.) (%) (Amount) Rate for Rajasthan
Application rement for Rajasthan (Excl (Incl Discoms
Discoms GST) GST) (Incl GST) -
(In Rs.) (In figures)
(In Rs.)
8 = (7) 9 = (8)x(4)
1 2 3 4 5 6 7 + (5)
ERP System
- Licenses
1 Full Use - No. 4900
ERP
Application
Users
2 Payroll No. 77600
ERPSI will provide the 30 nos. Desktops with UPS & Multi-function printer (10 for each
Discom) for centralized ERP Team for overall monitoring, execution, support &
operationalization of ERP.
Note:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 93
Cost of ERP
Implementation
1 service including Lump Sump
Configuration,
Customization,
Integration,
Testing and Go-
Live of ERP System
Total Cost for Part C (In Numbers for Rajasthan Discoms)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 94
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 95
Sr. Item Description (A) Total Estimated Person Day Total Cost
No. Person Days Rate (C) (D= B X
Required (B) C)
1 Project Manager 1x 455
2 ERP Module – Functional Leads 5x455
(Total XX - Resources one for each
Module)
3 Distribution Sector Specialist 1x 455
4 Change Management Expert 1x 455
5 ICT Infrastructure Lead 1x 455
6 Cloud services expert 1x 455
7 Lead Programmer 5x 455
8 System/Database Administrator 1x 455
9 Enterprise Architect/ Integration 1x 455
Expert
10 Solution Tester
11 Network Expert
12 Security Expert
13 Mobile Application Expert
14 Data Digitization Lead
15 Bid Management Expert
16 Facilities Management and Help
Desk Coordinator
17 IT Support Staff
Total
Note: The Man Power strength mentioned here is tentative. The Bidder has to deploy
required resources to implement ERP within the given timeline.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 96
Part H - ERP System - Annual Technical Support (ATS) Cost for Rajasthan Discoms
Part I - Cloud Service Provider (CSP) Cost (For 5 Years) < If Applicable>
(After Successful Go-Live of ERP System)
Sl. Description Year Price / GST Price / Year Price / Year
No. Year (In (Amount) (including (including
Rs.) GST)- (in GST) - (in
(Excluding figures) (In words) (In
GST) Rs.) Rs.)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 97
Note: Any item/ material either hardware or software required to meet the functionality specified in the tender
document whose related component is missing in the above table has to be accounted by the Bidder and the price of
the same is assumed to be reflected and taken care in the price specified to the Rajasthan Discoms by the Bidder in
this commercial bid. Rajasthan Discoms is liable only to pay the Contract price as per the payment terms mentioned
in the RFP to meet all the requirements as specified in the RFP
Part J - Cloud Service Provider (CSP) Cost (For One Year) (Indicative only, ERPSI may modify
as required)
(Same template can be used for all years if different costing for different years is to be
provided)
Note: The below table is indicative only. This needs to be detailed out and customized by ERPSI, in
consultation with the Rajasthan Discoms, based on the Project requirement and system configuration
to meet SLAs, performance targets, functional requirements and other conditions as mentioned in the bid
document.
Total Price /
Sl. Price / Year GST Year
No. Description Year (In Rs.) (Amount) (including
(Excluding GST)-(in
GST) figures) (In
Rs.)
1 2 3 4 5 (6) = (4) + (5)
1 Facility Management Service Year 1
2 Facility Management Service Year 2
3 Facility Management Service Year 3
4 Facility Management Service Year 4
5 Facility Management Service Year 5
6 Grand Total (1 + 2 + 3 + 4 + 5)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 5. Financial Proposal – Forms P a g e | 98
Note: Any item/ material either hardware or software required to meet the functionality specified in the tender
document whose related component is missing in the above table has to be accounted by the Bidder and the price of
the same is assumed to be reflected and taken care in the price specified to the Rajasthan Discoms by the Bidder in
this commercial bid. Rajasthan Discoms is liable only to pay the Contract price as per the payment terms mentioned
in the RFP to meet all the requirements as specified in the RFP
If a firm/bidder quotes impracticably low O&M charges i.e., less than 20% of the Total Cost of the Project,
Rajasthan Discoms reserves the right to treat the bid as unresponsive and not consider it.
Total Total
Sl. Components Reference Amount Amount
No. of the Inclusive Inclusive of
RFP/Section of all all Taxes
Taxes (in (in words)
figures) (In Rs.)
(In Rs.)
1 ERP System Implementation Phase Cost
Note:
a. Any item/ material either hardware or software required to meet the functionality specified in the
tender document whose related component is missing in the above table has to be accounted by the
Bidder and the price of the same is assumed to be reflected and taken care in the price specified to
the Rajasthan Discoms by the Bidder in this commercial bid. Rajasthan Discoms is liable only to
pay the Contract price as per the payment terms mentioned in the RFP to meet all the requirements
as specified in the RFP.
b. Responsibility of the supply of the OEM software and Services to the Utility shall be with the
Consortium Partner on whom MAF has been issued by OEM,
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 99
TABLE OF CONTENTS
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 100
The objective of the “Enterprise Resource Planning System Integrator (ERPSI)” or the
“ERPSI” shall be to implement an integrated Enterprise Resource Planning (ERP) System,
integrating the business processes across the geographical areas of Rajasthan Discoms
which include Circles, Towns, Sub-Divisions and other Administrative Offices, etc.
The ERP System shall be implemented for various functional areas across the
geographical locations of Rajasthan Discoms as given in the following tables:
JVVNL
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 101
AVVNL
JdVVNL
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 102
1.4 The ERP system should be designed such that all the required hardware, software, and
firmware with upgrades satisfy the ERP system requirements and service level
agreements as specified in this Contract while considering technical obsolescence over the
operating life of the system and suitability for future scale up. The ERP platform shall be
an available off the shelf product (COTS) capable of integrating the different business
functions mentioned above. Entire responsibility of the fully functional ERP system shall
rest with the ERPSI in order to meet the performance levels as given in the Contract. The
ERPSI shall ensure that the Solution complies with the Applicable Law, technical
specifications, and other provisions of the Contract.
The Scope of work shall include Supply, installation, customization, testing and
commissioning of ERP Systems with necessary Facility Management Services. The System
Integrator (ERPSI) will act as overarching agency and will support in Procurement,
Implementation, Commissioning, and Facility Management for Infrastructure. As for the
Software Defined-Wide Area Network (SD-WAN) solution for ERP System, the ERPSI
will assist the DISCOM in creating an RFP and handle the implementation and O&M of
the SD-WAN solution. Furthermore, System Integrator (ERPSI) will be Single Point of
Contact (SPOC) relating to all responsibilities and issues pertaining to Implementation of
overall ERP System including Infrastructure and Software Defined-Wide Area Network
(SD-WAN) solution at Rajasthan Discoms.
The ERP System shall be capable to run on both Internet/Broadband and SD-
WAN/MPLS network. Bidder will be responsible to provision requisite Network
Bandwidth for interconnectivity and application access to and from cloud/SDC. Network
bandwidth sizing and capacity to be provisioned will be decided by the bidder and
reviewed by them from time to time on basis of their solution requirement, user
concurrency, and data volume/traffic
The ERPSI shall be required to carry out the scope of work which shall include but not be
limited to the following:
1.6 Unless otherwise stipulated in the RFP or Contract, the scope of work shall include all
such items not specifically mentioned in the Contract but that can be reasonably inferred
from the Contract as being required for comprehensive, successful, and satisfactory
implementation of the Solution as if such items were expressly mentioned in the Contract.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 103
The same may be mutually enlisted and agreed upon by Utility and ERPSI during the
design phase as defined in the Contract;
1.7 Wherever references are made in the RFP to codes and standards in accordance with
which the Solution shall be executed, the edition or the revised version of such codes and
standards shall be those specified in the scope of work;
1.8 The systems which are at a risk of technical obsolescence over the operating life of the
system should be identified; this should include end-of-sale and end-of-support policies
governing the proposed technologies. Forward and backward compatibility need to be
considered and mitigation option shall be indicated in detail and shall not be limited to
periodic update from OEM/System supplier
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 104
b. ERPSI shall prepare and submit a detailed project plan for the software
development /customization.
c. The ERPSI shall deploy a dedicated team experienced in installation,
configuration, customization, integration and testing, implementation,
deployment of the proposed ERP system.
d. For customizations which are not part of the functionality of the offered
product, ERPSI must keep level of customization to a bare minimum
depending upon offered functionalities and best practices. This is important to
ensure that future upgrades, enhancements, and bug fixes are not impacted.
Every custom development must be documented in detail and the code /
script should be properly annotated with comments.
e. Configuring the specific ERP modules, third party bolt-on applications,
development of interfaces wherever and whenever necessary.
f. The ERPSI shall ensure that the proposed ERP system provides adequate
interfacing mechanisms (both at the application and data level) with a view to
integrate future applications of Rajasthan Discoms. Such interfaces shall
follow industry standards such as Application Programming Interface (API’s)
and web services, etc.
g. The ERPSI shall supply and install the application, database and related
software, integration tools, along with the customized source code and
requisite licenses for ERP. The ERPSI shall also describe and document the
process to be followed for installing and operating the same.
h. The ERPSI shall consider stakeholder inputs when they are finalizing all
processes including user interfaces, mode of data entry, storage and retrieval,
output reports, queries, and the application design as a whole. Essentially it is
expected that the ERPSI shall follow a SDLC Agile framework in
implementing the project establishing regular Conference Room Pilots.
i. ERPSI to suggest industry standard best practices for backing up (archiving),
purging and restoring current ERP data / future new ERP.
j. The UAT shall be carried out in the Testing environment created. Bidder shall
be responsible for setting up the Testing environment and also for creating /
populating the necessary configuration data as well as master data as would
be required for the purpose of UAT.
k. The patches/fixes shall be tested by the support team of ERPSI in
Development environment and subsequently UAT will be done in the Testing
environment before they are implemented in production.
l. ERPSI shall seek OEM’s advice in using high-availability and other database
features like partitioning, performance tuning etc. Database best practices like
indexes, custom Partitioning (using relative merits of range, list, hash,
composite partitioning etc.) should be utilized to get additional performance.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 105
3.1.2.1. Phase 1
Study of Business Processes Document, reference documents prepared by
functional team of Rajasthan Discoms and prepare/update AS-IS, TO-BE and
GAP Analysis.
Study of the current implemented environment and conduct assessment of the
business functions / Process flows and uncovered Business requirements for
which legacy systems are being continued including statutory and regulatory
reporting requirements if any.
Conduct a full-fledged assessment of the existing applications including a
thorough technical and functional review of all current applications.
ERPSI shall follow Agile Methodology for requirement study of the Business
Process and through interface with all application module owners revise
requirements at each sprint if all requirements cannot be identified at the
outset.
Compile and validate AS-IS, TO-BE and GAP Analysis in consultation with
Rajasthan Discoms. Submit & get approval of these documents Module wise.
Map the best practices available in the OEM product with the existing
business processes. Formulate business process re-engineering plan where
necessary, identifying clearly the impact on current business processes.
Draw up customization plan for gaps where the OEM Product does not meet
Rajasthan Discoms requirements.
Map all MIS / Dashboard / Reporting requirements and statutory reporting
requirements of Rajasthan Discoms and identify new reports that need to be
customized / freshly developed in standard format (e.g. .xlsx, .pdf, .xml etc.)
defined by users.
Define strategy for data migration from existing application databases to new
ERP database, providing appropriate filters in consultation with the
Rajasthan Discoms.
Establish industry standard policy for archiving and purging of enterprise
data in the ERP environment.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 106
3.1.2.2. Phase 2
Stage wise implementation of assessment Phase I as per approved design and
submitted documents.
Carry out data migration from existing application databases to new ERP
database by providing appropriate filters on the existing data.
Arrange Test Management Plan (Unit, System and UAT) for Rajasthan
Discoms.
Conduct Conference Room Pilot (CRP) including reports.
Conducting Final User Acceptance Test (UAT) and submission of final
documents inclusive of Integration Testing results.
Provide basic and specialized training to the user community pertaining to
their areas of work. Also, handhold and institute advanced training and
capacity building measures for system administrators, technical staff, IT
community regarding all aspects of technical and operational features of the
new ERP platform
The ERP solution together with relevant database, licenses, and other software in
conformance to Industry standards, shall include the following modules and sub-
modules, at the minimum
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 107
Assets Accounting
Employee Expenses
Audits
MIS
2. Human Resource Management Employee Master
Manpower & Succession Planning
Recruitment & Confirmation
Training & Development
Appraisal Management
Attendance & Leave Management
Transfer & Postings
Employee Self Service
Payroll Run
Compensation/Benefits Management
Gratuity & PF Management
Travel Management
Welfare, Medical Facilities & CSR
Grievance Redressal
Disciplinary Action & Vigilance
Employee Separation
3. Material Management
Stores Material Planning & Budgeting
Material Record Management
Indenting
Goods Issue & Return
Goods Receipt & Inspection
Inter Store Transfer
Material Disposal
Physical Inventory Verification
Purchase Vendor Records Management
Procurement Planning
Purchase Requisition
Purchase Order Management
RFQ Tendering
Turnkey Procurement
Procurement of Services
Contract Management
General Reporting
4. Project Management Planning & Scheduling
Execution Monitoring
Accounting
Integration with other modules
5. Maintenance Management Asset Viewer
Information System
Preventive Maintenance
Service Management
Maintenance Projects
6. Business Reporting Dashboard
Business Analytics & BI Tools
Document Management
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 108
Workflow Management
7. Document Management System Document Handling
Capture and Storage
Version Control
Indexing and Retrieval
Document Security
8. E-Office
9. Governance, Risk and Compliance Risk and control management
(GRC) Policy management
Audit management
Third-party risk management
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 109
Govt. of Rajasthan has established a Tier-IV certified 600 Rack data Centre known as
Rajasthan State Data Centre (RSDC). As per State Government’s mandate all State
Govt. Departments/PSU’s are required to host their Portals/Applications in RSDC
only.
Furter, in case of any query regarding RSDC, Shri. Manish Kumar Sharma (System
Analyst, Joint Director) (Mob No: 9414287185) may be contacted.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 110
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 111
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 112
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 113
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 114
3.2.2.5. Security
a) The ERPSI in coordination with CSP shall manages the security of Facilities,
Physical security of hardware, Network infrastructure and Virtualization
infrastructure including the security of the Virtual Machine Images,
Operating systems, Applications, Data in transit, Data at rest, Data stores,
Credentials and Policies and configuration.
b) Shall manage the underlying infrastructure and foundation services, the
operating system, and the application platform.
c) Shall provide services for management of security environment to maintain
performance at optimum levels on a 24 x 7 basis.
d) ERPSI must address ongoing needs of security management including, but
not limited to, monitoring of firewall, intrusion detection, content filtering
and blocking, virus protection, and vulnerability protection through
implementation of proper patches and rules.
e) Maintain an updated knowledge base of all the published security
vulnerabilities and virus threats for related software and microcode,
including, but not limited to, operating systems, application servers, web
servers, databases, security solutions, messaging solutions, etc.
f) Ensure that patches / workarounds for identified vulnerabilities should be
patched / blocked immediately.
g) Responding to security breaches or other security incidents and coordinate
with respective OEM in case of a new threat is observed to ensure that
workaround / patch is made available for the same.
h) Undertake management of security devices, including, but not limited to
maintaining firewall services to restrict network protocols and traffic,
detecting intrusions or unauthorized access to networks, systems, services,
applications, or data, protecting email gateways, firewalls, servers,
Desktops/Laptops from viruses.
i) The ERPSI should ensure that the security policy is maintained on an
ongoing maintenance and updates to the same are made regularly. Operating
system hardening through appropriate configuration and patch updates
should be undertaken on a regular basis.
j) Monthly Vulnerability assessment: Assess server for vulnerabilities locally
using automated scanning and manual assessment.
k) Half yearly Penetration testing: The ERPSI shall perform penetration testing
to ensure the following: Create a hacker’s view of the server, in terms of the
ways it can be hacked from outside. Identify security vulnerabilities and fix
holes discovered. Implement emergency quick fix solutions and long-term
solutions against successful exploits.
l) Firewall management: Initial setup of the firewall, implementation of rule
base on the firewall to enable customer specific applications and ports,
implementation of security policies based on services (HTTP, FTP, Telnet),
source address / name, destination / name, online monitoring of firewall
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 115
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 116
c) Reviewing the service level reports, monitoring the service levels and
identifying any deviations from the agreed service levels.
d) Monitoring of service level including availability, uptime, performance,
application specific parameters for e.g., triggering elasticity, request rates,
number of users connected to a service.
e) Detecting and reporting service level agreement infringements.
f) Monitoring of performance, resource utilization and other events such as
failure of service, degraded service, availability of the network, storage,
database systems, operating Systems, applications, including API access
within the cloud service provider’s boundary.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 117
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 118
3.2.2.11. Confidentiality
a) The ERPSI shall execute non-disclosure agreements with the Department
with respect to this Project. For the avoidance of doubt, it is expressly
clarified that the aforesaid provisions shall not apply to the following
information:
i. Information already available in the public domain
ii. Information which has been developed independently by the ERPSI,
without using the Rajasthan Discoms organization data
iii. Information which has been received from a third party who had the
right to disclose the aforesaid information
iv. Information which has been disclosed to the public pursuant to a court
order.
b) The ERPSI will be permitted to obtain Rajasthan Discoms data only to
deliver the services and will be prohibited from using Rajasthan Discoms
data for any other purpose. The ERPSI remains responsible for its
subcontractors’ compliance with ERPSI obligations under the Project.
c) ERPSI shall be responsible for data security, consumer’s data privacy,
protection, confidentiality, handling, and any kind of misuse of data by its
own employees, third party employees and other government and private
entities.
d) The ERPSI shall be permitted to obtain Rajasthan Discoms data only to
deliver the services and will be prohibited from using Rajasthan Discoms
data for any other purposes such as legitimate purposes (such as marketing,
research etc.) and illegitimate purposes (as when data is sold in bulk to third
party)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 119
d) Data shall not leave the boundaries of the country and data residing within
Cloud shall not be accessed by any entity outside the control of Rajasthan
Discoms or its authorized representative.
3.2.3. FUNCTIONAL REQUIREMENTS OF THE CSP
3.2.3.1. Operational Management
a) CSP shall provide ability to provision virtual machines, and storage
dynamically (or on- demand), on a self-service mode or as requested
b) CSP should provide access of cloud virtual machines either by SSH in case of
Linux and RDP in case of Windows servers.
c) CSP should enable Utility to get console access of cloud virtual machine from
portal and perform operations. There should be facility to view resource
type-wise (VM, database, storage etc.) quota usage. It should be possible to
configure automated alerts when the threshold of estimated quota is reached.
d) CSP should upgrade its hardware time to time to recent configuration to
delivery expected performance for this Project.
e) Investigate outages, perform appropriate corrective action to restore the
hardware, operating system, and related tools.
f) CSP should manage their cloud infrastructure as per standard ITIL
framework in order to delivery right services to Project.
g) Cloud should allow configuration of automated alerts when the estimated
cost is reaching the quota
h) CSP should provide option to view resource type wise (virtual machines,
database services etc.) quota usage
i) The ERPSI shall implement through the CSP, following User administration,
i. Identity and Access Management (IDAM) as a service that properly
separates users by their identified roles and responsibilities, thereby
establishing least privilege and ensuring that users have only the
permissions necessary to perform their assigned tasks
ii. Allow different users with different level of access on CSP portal. For
example, billing user should not be able to provision resources or
delete any resources.
iii. Allow quota management for each department/ISV/Group. The
resources to specific department/group/ISV should be as per
allocated quota only. If there is any request for more than quota
request, then it should be sent as request to admin.
iv. Securely control users' access to Cloud services using a range of
security credentials including passwords, key pairs, and X.509
certificates
v. Offer fine-grained access controls including, conditions like time of the
day, originating IP address, use of SSL certificates, or authentication
with a multi-factor authentication device.
vi. Implement multi-factor authentication (MFA) for the root account, as
well as any privileged Identity and Access Management accounts
associated with it.
j) The ERPSI, through the CSP, shall be responsible for managing the trouble
tickets, diagnosis of the problems, reporting, managing escalation, and
ensuring rectification of server problems as prescribed in SLA.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 120
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 121
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 122
e) CSP should deploy public facing services in a zone (DMZ) different from the
application services. The Database nodes (RDBMS) should be in a separate
zone with higher security layer.
f) CSP should give ability to create non-production environments and
segregate (in a different VLAN) non-production environments from the
production environment such that the users of the environments are in
separate networks.
g) CSP should have built-in user-level controls and administrator logs for
transparency and audit control.
h) CSP cloud platform should be protected by fully managed Intrusion
detection system using signature, protocol, and anomaly-based inspection
thus providing network intrusion detection monitoring.
i) CSP cloud platform should provide tools to define user-based access control
to cloud resources so that select users can access only certain set of resources
either through user interface or through APIs.
j) CSP cloud platform should include automated security assessment service to
help improve security and compliance
3.2.3.7. Data Management
a) CSP should clearly define policies to handle data in transit and at rest.
b) CSP should not delete any data at the end of agreement without consent from
Utility.
c) In case of scalability like horizontal scalability, the CSP should ensure that
additional generated data is modify/deleted with proper consent from
Utility.
3.2.3.8. Managed Services
The CSP shall be responsible for identification, diagnosis and resolution of
problem areas pertaining to the cloud infrastructure, application and
maintaining assured SLA levels
a) Network and Security Management:
i. Monitoring & management of network link proposed as part of this
Solution. Bandwidth utilization, latency, packet loss etc.
ii. Port monitoring: Monitor HTTP/HTTPS, DNS, SMTP, POP3, FTP, TCP
ports, etc. are continuously to ensure network and applications are up
and running
iii. Call logging and co-ordination with vendors for restoration of links if
need arises.
iv. Addressing the ongoing needs of security management including, but
not limited to, monitoring of various devices / tools such as firewall,
intrusion protection, content filtering and blocking, virus protection, and
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 123
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 124
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 125
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 126
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 127
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 128
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 129
g) Report of all the provisioned resources and view the configuration of each.
h) Summary of notifications, triggered each time a configuration change
i) Incident Analysis in case of any un-authorized configuration changes.
j) Summary of alerts with respect to security configuration gaps such as overly
permissive access to certain compute instance ports and storage buckets,
minimal use of role segregation using Identity and Access Management
(IAM), and weak password policies
k) Summary of security assessment report that identifies the possible
improvements (prioritized by the severity) to the security and compliance of
applications deployed on cloud
l) Report on upcoming planned changes to provisioning, either possible
optimizations, if any, indicating how the underutilized services can be
reduced to optimize the overall spend, or required enhancements (e.g.,
upgrade to additional storage) to meet the service levels defined in the RFP.
The ERPSI shall be responsible for migration of operational data as required, including
financial transaction data such as ongoing contracts, employee transaction data etc.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 130
In the event of any gaps in data migration, the ERPSI shall discuss with Rajasthan
Discoms, document the findings, and get it approved from Rajasthan Discoms.
a) ERPSI shall run mock data migration tests to validate the conversion programs that
have been written.
b) ERPSI shall validate the data before uploading the same to the production
environment.
The ERPSI shall support in conducting the acceptance testing and verifying the
completeness and accuracy of the data migrated from the legacy systems to the proposed
solution.
The tool and solutions required for performing data digitization and migration must be
designed by ERPSI after adequate study of the data to be migrated.
The ERPSI should submit data digitization and migration strategy in their bid, detailing
all the activities to be performed during the data migration. Indicative broad activities to
be performed by the ERPSI are as follows:
a) An assessment needs to be done to identify the database requirements for the
application envisaged for this project. The data requirements in terms of master data
and transaction data need to be identified, which is required for the envisaged
solution.
b) Migration of complete records available in electronic form is required to be performed
to acceptable quality and standards as prescribed in this RFP.
c) Development of merged database structure
d) Porting of all the data into the database
e) Final updating of the single database
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 131
e) The ERPSI shall ensure complete data cleaning and validation for all data migrated
from the legacy systems to the new application.
f) The ERPSI shall generate appropriate control reports before and after migration to
ensure accuracy and completeness of the data.
g) The ERPSI shall convey to Rajasthan Discoms in advance all the mandatory data
fields required for functioning of the proposed solution, and which are not available
in the legacy systems and are required to be obtained by Rajasthan Discoms.
h) The ERPSI shall develop data entry programs / applications that may be required for
data migration in order to capture data available with / obtained by Rajasthan
Discoms in non – electronic format.
i) ERPSI shall conduct the acceptance testing and verify the completeness and accuracy
of the data migrated from the legacy systems to the proposed solution.
j) The ERPSI shall give the template for data migration to Rajasthan Discoms and
Rajasthan Discoms shall furnish the required data on the templates provided by the
ERPSI. The ERPSI shall furnish adequate guidelines to fill the data templates to
Rajasthan Discoms.
The entire process of scanning, digitizing and data entry of office documents has been
divided into following stages:
Stage 1: Pre-Scanning
Stage 2: Document Scanning
Stage 3: Post scanning, Storage, Search, Retrieval & Backup
Stage 4: Data Entry
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 132
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 133
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 134
No document shall be scanned more than once, and no blank pages shall be
deleted if they are part of file. The blank page in a file is a page that is entirely
blank or has only Page number or has only rubber stamp.
n) The scanned documents shall be converted into PDF formats as per the requirement
of the end user department. Scanning of Green sheets and Correspondences would be
done separately and stored in a folder. All the pages of a single file will have to be
stitched together to generate an exact replica of the physical file. Scanned Green sheets
would be stitched into a single PDF File separately and Correspondence files would
be scanned separately into a single PDF File. All the pages that are scanned should
become sequential and become individual pages of a single PDF file. All the printed
pages should be scanned as searchable PDF not as Image wherever possible.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 135
The functional requirement specification for the DMS is given in Annexure A (Section
6). Vendors are encouraged to submit additional features over and above the basic
minimum.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 136
For JVVNL
Type of Data No. of items (Masters) Type of Digitization Paper Size in case of
(apprx.) (Data Entry/ Scanning) scanning
Employee Total Number of active Scanning old records of Most of the employee
personal details employees: 18647 and employees and entry the records in physical
Pensioners (11157). master data of employee papers in files (note
Presently payroll in ERP side legal and
processing is being corresponding side is
done through existing in A4)
ERP System
Employee Total Number of active
Photographs employees: 18647
Employee Complete service book
service records of employees
Payroll Data Total Number of active
employees: 18647 for
entire service
Open data for Total Number of active
leave employees: 18647
Leaves as per Norms
Employee Employees records
Human related to services such
Resource Data as promotion, ACR,
Transfer posting,
deputation etc.
Data Entry for All data related to
Employee Total Number of active
Human employees: 18647 for
Resource Data entire service
For JdVVNL
Type of Data No. of items Type of Digitization Paper Size in case of
(Masters) (apprx.) (Data Entry/ Scanning) scanning
Employee Total Number of Scanning old records of Most of the employee
personal details active employees: employees and entry the records in physical
13662 and Pensioners master data of employee papers in files (note
(9130). Presently in ERP side legal and
payroll processing is corresponding side is
being done through in A4)
existing ERP System
Employee Total Number of
Photographs active employees:
13662
Employee Complete service
service records book of employees
Payroll Data Total Number of
active employees:
13662 for entire
service
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 137
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 138
For AVVNL
Type of Data No. of items Type of Digitization Paper Size in case of
(Masters) (apprx.) (Data Entry/ Scanning) scanning
Employee Total Number of Scanning old records of Most of the employee
personal details active employees: employees and entry the records in physical
14755 and Pensioners master data of employee papers in files (note
(10255). Presently in ERP side legal and
payroll processing is corresponding side is
being done through in A4)
existing ERP System
Employee Total Number of
Photographs active employees:
14755
Employee Complete service
service records book of employees
Payroll Data Total Number of
active employees:
14755 for entire
service
Open data for Total Number of
leave active employees:
14755 Leaves as per
Norms
Employee Employees records
Human related to services
Resource Data such as promotion,
ACR, Transfer
posting, deputation
etc.
Data Entry for All data related to
Employee Total Number of
Human active employees:
Resource Data 14755 for entire
service
Table1: Estimated Volume of Data Digitization
Note:
* Please Note that these are estimated volume and can vary slightly on ground based on
further analysis.
For JVVNL
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 139
No of items
Type of
(Master or Paper Size in
Type of Data Digitization (Data
Transaction) case of scanning
Entry/ Scanning)
(approx.)
Material Master
Equipment Master
Master Data - Items with 990 Scanning A4 & Legal
Drawings
/Specifications/ Pictures
Asset Master 60 Scanning A4 & Legal
For AVVNL
No of items
Type of
(Master or Paper Size in
Type of Data Digitization (Data
Transaction) case of scanning
Entry/ Scanning)
(approx.)
Material Master
Equipment Master
Master Data - Items with 1586 Scanning A4 & Legal
Drawings
/Specifications/ Pictures
Asset Master 60 Scanning A4 & Legal
For JdVVNL
No of items
Type of
(Master or Paper Size in
Type of Data Digitization (Data
Transaction) case of scanning
Entry/ Scanning)
(approx.)
Material Master
Equipment Master
Master Data - Items with 1196 Scanning A4 & Legal
Drawings
/Specifications/ Pictures
Asset Master 60 Scanning A4 & Legal
B. Quantity Variance
Volume of the document or Record can be varied by 100% and above. Price per unit
will remain same as finalized in agreement at the time of contracts(s).
C. Quality Adherence
Quality check after scanning and metadata entry is of utmost importance. After QC1
level of quality verification, same will be verified by Rajasthan Discoms at QC2 level.
Images clearing this QC2 will lead to submission of the documents to Rajasthan
Discoms for acceptance.
The Quality Checking for Scanned Images shall include the following:
a) The ERPSI should do 100% on screen validation (along with department officials)
and submit the log for 100% QC work done.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 140
b) The ERPSI should check that no page has been scanned twice. Payment for such
extra scanning will not be made to the vendor.
c) Data should be traced back to file from which it got captured.
d) The ERPSI should check scanned records for DPI, Image Quality, Format, Noise
removal etc.
e) The ERPSI should check for the quality of the image
The image should not be too dark/too light
The image should not have been captured under improper lighting
The image should not be cropped from any side
The orientation of the image should be right
The image should be in true color mode
The color is consistent in all the images and not patchy
The image should not be skewed
The image should not be blurred
The image should not have excessive noise
There should not be any data loss due to folds
There should not be any data loss due to tight binding and bulge at the center
There should not be extra darkness at the edges
f) The Quality Checking for Metadata Entry shall include the following:
Whether all required metadata fields have been captured
g) Whether the metadata captured is correct
h) Vendor should also check that all records obtained from the Rajasthan Discoms
have been scanned and no document has been missed out.
i) The vendor shall generate a report which identifies any mismatch between the
number of documents submitted for scanning and number of documents scanned.
j) The ERPSI can also suggest their quality plan to the Rajasthan Discoms over and
above the quality checks mentioned here. Templates for the same will be decided
with the successful ERPSI before commencement of work
k) The ERPSI shall provide a QC module within the application tool for quality
check, which they will be using during total process of scanning, indexing and
metadata entry.
l) The ERPSI should also install the instances of the application in computers as
required by Rajasthan Discoms officials for quality check purpose at no extra cost
to the Rajasthan Discoms.
m) The ERPSI will appoint skilled and qualified manpower for QC purpose and not
get QC done by operators who have scanned and done metadata entry.
n) All records unacceptable by Rajasthan Discoms (due to improper image, missing
metadata, wrong metadata) will have to be rescanned by the selected ERPSI. The
selected ERPSI will not be remunerated for all such documents re-scanned.
o) Post 100% QC1 by vendor, Rajasthan Discoms officials will perform 2-5% quality
checking (QC2), and if required further Rajasthan Discoms officials may perform
100% quality checking (QC2) on scanned document and metadata.
p) Any damage to the collected documents shall make the ERPSI liable for the same
and can impose a severe consequence which may also lead to the termination of
the contract.
q) After validation, we encrypted this file for Transferring to client Server.
r) Ensure data got transferred to Client Server (or any other method to transfer the
files)
s) Audit by Rajasthan Discoms
Rajasthan Discoms are entitled to do sample audit of the work as a when
required.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 141
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 142
s) It is the absolute responsibility of the ERPSI to ensure that the contents of the digitized
documents shall be an exact replica of the original paper document maintained as part
of the records in the books/file. This will be a mandatory condition for the ERPSI.
t) Under no circumstances the documents shall be changed, mutilated, destroyed, or
replaced by some other documents.
u) Rajasthan Discoms, or any Rajasthan Discoms authorized agency/person can carry
out quality checks periodically for scanning and data entry services.
v) Once the project commences, the Rajasthan Discoms shall evaluate the vendor’s
performance based upon the outputs provided and the Rajasthan Discoms reserves
the right to ask the vendor to replace any equipment with similar equipment in better
condition or superior equipment if the output does not meet the requirements of the
Rajasthan Discoms.
w) Complete secrecy and confidentiality of physical/Digitized records is required to be
maintained by the successful ERPSI.
x) The Scanned and Digitized records will be the property of the Rajasthan Discoms.
The ERPSI will have no right, title, or interest in it and will not use it elsewhere.
ERP System must maintain integration logs that confirm the success or otherwise of the
integration interface. All external systems should be integrated with the ERP System based on a
consistent, real-time or batch processing data exchange methodology operating in an automatic
manner without any manual intervention unless specifically required.
The Bidder are expected to make note of the following application modules which are already
implemented at Rajasthan Discoms.
a) MDM by multiple AMISP
b) RMS (Billing) existing System / RAPDRP application suite
c) Smart Customer Care Center
d) SCADA/DMS/ OMS/ RT-DAS/ Basic SCADA (Existing/Upcoming)
e) FDRMS (Feeder Data Reporting & Monitoring System), GPRS Communication
f) Upcoming Utility Billing System under RDSS
g) Vendor Self-Management System – For Inspection of Material
h) AMR System - DT Meters & HT Consumers –MDM System, GPRS Communication.
i) AMI – MDM, HES, Meters, RF Communication – Approx. 4 Lakh meters
j) PMA – ARM Tool
k) Mobile application (Consumer/Discom) and/or Common mobile application for smart
meter (O&M, Customer, CI, MI),
l) Application Portals (Consumer/Discom)
m) State Government and National Portals/NPP, URJA App, 11kV RFMS, Urja Mitra, E Mitra,
PFC/ REC/ BEE/ EESL/ CEA/ NIC/ DoIT portals.
n) Roaster management and load forecasting
o) Power transformer and health monitoring
p) GIS, Network Analysis, Asset Management
q) SMS Gateways, email Gateways, various payment Gateways, Vidyut Saathi/ Urja Sarthi,
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 143
ERPSI needs to propose appropriate middleware solution for integration between ERP System
and other supporting system including but not limited to the followings:
1. All required data residing in existing legacy applications to be identified and transferred /
integrated with ERP System.
2. End to End Integration of supplied ERP system and supporting solution with existing IT
/Business Solutions and applications implemented across the value chain of Rajasthan
Discoms.
3. Integration with any upcoming IT/Business systems at Rajasthan Discoms like Payment
Gateway, Metering-Billing-Collection (MBC) Solution, Bio-metric system etc.
4. All interfaces should self-checking so that any exceptions or data validation errors are
reported by the system.
5. The integration middleware should be based on Service Oriented Architecture (SOA) and
other forms of Application Program Interfaces (API) and use publish / subscribe
mechanism.
6. The Solution to be proposed as part of the bid will need to be integrated with any or all
the above-mentioned application modules
7. To ensure that the integration is seamless with other applications would also be in the
scope of Bidder
8. Any adapters, licenses, tools, scripts etc. required for integration with the existing and
upcoming IT solutions of Rajasthan Discoms will need to be arranged by the Bidder
9. Since all the existing IT Solutions & application modules are already in production and are
business critical applications which bring in huge revenue for the Rajasthan Discoms, it
will be ERPSI’s responsibility to ensure minimal downtime for integration and flawless
integration which doesn’t disrupt any of existing business processes or cause any revenue
loss to the Rajasthan Discoms.
10. The integration mechanism adopted must have minimal impact on the existing systems
11. The access to data will only be through business rules i.e., the applications will not access
data directly without going through APIs managed by business
rules/validation/workflow.
12. The integration middleware/interface must validate the Data to be integrated
13. It must maintain integration logs that confirm the success or otherwise of the interface.
14. Rajasthan Discoms can arrange for a session with existing the ERPSI in case the ERPSI
need to understand any of the existing solutions and clarify their doubts.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 144
ERP System being deployed as a part of this project, will require an auditing and
validation both initially as well as on an ongoing basis. The audit activities are mandatory
and shall be carried out periodically inline to the timelines/frequency captured as per
audit requirements of RFP. However, in case of any exception the audit and validation
activities can be carried out in an ad-hoc basis, at the discretion of Rajasthan Discoms.
The ERPSI must understate to cooperate and support such audit or validation activities
conducted by Rajasthan Discoms or any of its appointed agency.
ERPSI will be responsible for facilitating and extending full cooperation for audits by any
internal authority, Product OEM, or any Third-party agency.
To carry out ERP System audit (OEM Audit), the cost for first 03 iteration shall be borne
by The ERPSI including the cost to incorporate any post audit suggestions
/recommendations.
However, for any other third-party audit, the cost will be borne by Rajasthan Discoms. If
in case, due to un-fulfilment of requirement due to ERPSI, multiple iterations (more than
1) are required to be carried out for any third-party audit, then the cost of further audits
will be charged to ERPSI for any subsequent iterations or visits of third-party auditors.
The audit and validation activity will be carried out to identify, assess, evaluate, and
recommend on but is not limited to, the following:
a. Performance
b. Security
c. Manageability
d. Customized Source Code
e. OEM Standard and Compliance
f. Availability of Services
g. Functional and Technical Specifications
h. Policy and Procedure
i. Service level requirement
j. Software and supporting system
k. Hardware and other components
l. Project Documentation etc.
6.1.1. Auditing
The purpose of audit will be to assess, evaluate and assure to the management of
Rajasthan Discoms, that the implemented ERP System, process, policy, and
elements of systems are functioning properly and effectively to achieve the
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 145
planned objectives. In case, any element of the solution is not functioning in line
to the specific requirements and standards, then audit shall recommend the
required corrections and corrective action.
The audit and validation activities under this will include but is not limited to,
the following mentioned activities:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 146
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 147
The duration of OEM Audit shall be min 80 days. However, utility may
decide the higher man-days for Audit OEM, if found necessary as per
their requirement days including all audit activities and post audit
compliance checks and validation.
The following will be the deliverables of such OEM engagements and the
mechanisms for follow up actions.
a. The mechanisms.
o All the review by the ERP OEM will occur in collaboration with
Rajasthan Discoms and the ERPSI team.
o The ERPSI shall be required to participate in the Review program
conducted by Rajasthan Discoms and the ERP OEM.
o The ERPSI shall depute their competent persons to participate in
the review programs.
o The Review program will look for best implementation practices
while following a prescribed methodology.
o The extent and frequency of the review shall be determined by the
ERP OEM in consultation with Rajasthan Discoms but shall be
frequent enough to validate each of the major project milestones.
o While some of the review will be required to be done at the
project site, some of the reviews of codes or documents can be
carried out at the location convenient to the ERP OEM.
o The ERP OEM team will plan the activities in consultation with
the ERPSI and Rajasthan Discoms and the ERP OEM will report
directly to Rajasthan Discoms on all the matters related to their
activities.
b. The deliverables.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 148
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 149
ERPSI will report to Rajasthan Discoms on how the feedback have been
incorporated into the project deliverables and take a sign off from the
designated authority of Rajasthan Discoms.
The overall audit activities shall be carried out with an intent of "As-Is"
assessments to assess the current operational capabilities of Data Center
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 150
6.1.1.6. Reporting
The ERPSI shall provide the necessary support and co-operation for
overall monitoring of the ERP System. For purpose of monitoring the
ERPSI shall provide the system generated reports with a provision of
further detailed analysis, if required.
The ERPSI shall formulate an exhaustive list of required reports and seek
the concurrence of Rajasthan Discoms. The ERPSI should submit the
reports on a regular basis in a mutually agreed format. Each report shall
be circulated and submitted to the designated Nodal Officer of Rajasthan
Discoms in the format mutually agreed upon. An indicative list and
frequency of such reports are as following:
1) Weekly reports
a. Backup and restoration
b. EMS / NMS Report
c. New Software Patches
d. Resource utilization of critical components
e. Data Migration Report
f. Changes Made in Database
g. Changes Made in Middleware
h. DC and DR Replication Report
i. DC and DR Access Reports etc.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 151
2) Monthly reports
a. Summary of resource utilization for all components in DC/DR
b. Log of preventive / break-fix maintenance undertaken
c. Summary of usage of storage media provisioned
d. Summary of major and minor changes undertaken in DC/DR
e. DC and DR Availability and Operations Report
f. Database Growth Report
g. Summary of Incidents reported
h. Consolidated SLA / Non-conformance Report
i. Integration Services
j. Help Desk Services
k. Project Management
l. IMAC Services
m. Resource Attendance
n. Service Management Controls Report
o. Change and Release Management
p. System Maintenance Reports etc.
3) Quarterly Reports
a. Asset database report and Asset audit report
b. Feedback report from users for services rendered.
c. Security Audit Report
Sl.
Activity Frequency Audit Agency
No.
At discretion of Rajasthan
1 SLA Audit Internal/Third Party
Discoms
Twice:
ERP System - 1. Post Solution Design
2 ERP System OEM
OEM Audit 2. Before ERP System Go-
Live
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 152
IT/ Cyber
3 Yearly Internal/Third Party
security Audit
4 BCP Audit Yearly Internal/Third Party
Table 2: Schedule for Audit
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 153
The ERPSI shall bring advanced data analysis and forensics insight to
provide the following services to Rajasthan Discoms:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 154
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 155
6.1.2.6. Hardening
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 156
Apart from the ERPSI’s tasks, a third party agency shall be appointed to
conduct:
o Source Code Review: Third party agency shall review the source
code of web and mobile applications for hidden vulnerabilities and
design flaws. It shall also verify whether security controls are
implemented appropriately.
o Secure Configuration Review: Third Party Agency shall review the
security configuration ERP System and provide the detailed report
that include the recommendations for remedial actions and submit
the results to Rajasthan Discoms
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 157
7. Training Requirements
The primary objective of the training is to achieve 100% user adoption through technical and
behavioral competencies covering all end users of Rajasthan Discoms. Training shall be
provided in both Second Language & English Language as required, mostly in Second
Language to Field Staffs. The ERPSI shall propose a training plan (including training
curriculum and calendar) so that there is a proper transfer of knowledge about the deployed
ERP systems to utility staff.
The audience of the trainings shall vary for each type of training. The basic computer & IT
Solution training will cover all Class-A, Class-B, Class-C, and Class-D [Technical & Non-
Technical] employees of the Rajasthan Discoms. The end user training for various ERP System
Modules and Other associated systems shall be for the users of the respective modules of the
system. The ERPSI shall provide training sessions to all employees from lower level to higher
level including officers from Rajasthan Discoms on the domains listed in below table.
Training for Employees of Rajasthan Discoms in case of ERP System shall be on below
areas:
a. Professional Training (Implementation team) - This is the training for the core group of
implementation team of the Rajasthan Discoms. The Implementation/Core team will
comprise of members from IT domain. Each member would be trained in the relevant
function / module. This Training would be required to be given to approximately 90 to 100
personnel for ERP System. It is the responsibility of the ERPSI to deliver this training.
Standard curriculum designed and agreed by the Rajasthan Discoms for Cloud Solution,
hardware, software, and network preferably from the OEM partner or OEM’s certified
training partner shall be arranged for each group.
b. End User Training - The ERPSI will provide training to all end users of ERP Systems. The
End Users/Business Users team will comprise of members carrying out day to day
operation and task at Rajasthan Discoms for ERP System. Each member of End
User/Business user group would be trained in the relevant function / module. This
Training would be required to be given to 8000 personnel in physical/virtual mode (For
each Discom, 600 sub offices with one user & 400 offices with 5 users. 200 higher level users
from all Discoms) for ERP System.
On instruction & approval of Nodal Officer, the train the trainer approach shall be adopted by
the ERPSI for training & handholding. The Certified Functional, Technical, System
administration and Database management training for core team of Rajasthan Discoms should
be arranged by the ERPSI directly from OEM/OEM Certified Resources.
The training must be conducted using assistance from official OEM course curriculum mapped
with the Cloud Solution and Software Product’s to be implemented in the Rajasthan Discoms.
The Training Curriculum along with Calendar need to be included as a part of technical
proposal. The details of minimum training curriculum and important consideration for training
is mentioned below:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 158
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 159
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 160
2. The Training Curriculum for ERP Modules mentioned above are indicative and will be finalized based
on agreement and discussion between Rajasthan Discoms and the successful Bidder i.e., ERPSI.
3. The Business Users and Core users will be identified by Rajasthan Discoms and shall be picked from the
entire organization and from all levels.
The training activity for ERP System shall comprise of the followings:
a. Training material must include documents and videos for usage of ERP System - Modules
(Bilingual - Second Language/English). These materials will be uploaded to the ERP System
itself and should be available as ready reckoners to the end users. The content should be
updated regularly and kept up to date as when changes take place to the ERP System
modules.
b. Training sessions shall cover more hands-on training rather than instructive mode.
c. The training and delivery options shall be on-line, CBTs (Computer based trainings),
instructor led classrooms. Training material will be organized by functional process that
will serve as the training documentation for a particular functional area.
d. Rajasthan Discoms plans to adopt training platform as e-classrooms in future. ERPSI
should consider the same for compatibility.
e. Necessary handholding and change management support shall be provided post training.
f. Feedback exercise shall be conducted for each training and accordingly evaluation will be
used for improvement of further trainings.
g. The ERPSI in consultation and convenience of the Rajasthan Discoms shall workout the
training program and all the other modalities of the training, which should be delivered by
OEM certified consultants and ERPSI.
h. The participants of Rajasthan Discoms will be issued a certificate by OEM/ERPSI for
attending these courses.
i. The ERPSI is required to submit the plan accordingly accommodating training requirements
to cover entire user base. If there is increase in end user base during the project ERPSI shall
impart training at no extra cost to Rajasthan Discoms. The expected increase in end user
base is approximately 2% YoY in the next 3 years.
j. The ERPSI shall provide associated documentation for all deployed systems to ensure a
smooth transition from deployment to post-deployment operations and maintenance of the
system.
k. The ideal approach of the training should be formulation and involvement of core
implementation group from the very start of the project to ensure maximum retention and
adequate technical competency level.
l. Subsequent trainings and re-trainings should be conducted for identified
groups/personnel.
m. Handholding during pre-implementation, implementation, Go Live and Post Go live
should be done by the ERPSI.
n. Training calendar should be published to stakeholders and training sessions should be
organized either on site or over the web as per the requirement of Rajasthan Discoms.
o. Knowledge sharing strategy should be adopted.
p. Training staff would be deployed at Rajasthan Discoms offices during the course of the
project as per requirement of Rajasthan Discoms.
q. The ERPSI shall provide the necessary access of OEM training platforms and data
repository to Rajasthan Discoms.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 161
r. Training shall be planned in stages as required - before the implementation, during the
implementation and post implementation depending on the frequency as finalized by
Rajasthan Discoms.
s. Rajasthan Discoms will consider competence development and capacity development
within Training. Product OEM will facilitate Rajasthan Discoms end users for the
customized code developed and deployed by the ERPSI.
t. The ERPSI shall carry out the capacity building of core team including functional and
technical employees with an intent to create a team of experts capable to independently
handle the application operations & maintenance task and issues, if any.
u. The ERPSI shall carry out the training of Rajasthan Discoms team on reports development,
configuration of application setups and other skill sets as required to create a team of
experts capable to independently handle the maintenance & support requirement by
Rajasthan Discoms.
v. The ERPSI shall carry out the hands-on training of core team members & end users on ERP
System and Other associated applications including training on system configuration,
database administration, backup & restoration, development, and maintenance task etc.
w. The ERPSI shall formulate user manuals of ERP System and Other associated applications
by considering the specific configuration of implemented solution.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 162
d. Plan and responsibilities for the development of the training materials, such as
instructor guides, participant guides, media-based training, and quick-reference guides.
e. Knowledge sharing strategy to enable to perform future customizations internally.
3. Content Development
Development of customized, modular training materials based upon user roles and
business process, and customized application. The OEM consultants along with ERPSI will
work together with Rajasthan Discoms Core team members and Project team to enable
transfer of knowledge. The following materials will be developed:
a. Paper-based classroom participant guides for each identified user group. These guides
include hands-on exercises and are based upon ‘Day in the Life’ scenarios.
b. Paper-based classroom instructor guides including instructor notes with additional
background information and points to be highlight during the training.
c. Media-based training simulations for pre-class preparation, in-class practicing and
knowledge and skills validation.
d. The ERPSI can also be required to provide context sensitive on-line help, which includes
all materials provided in the hard copy manuals. Where possible, users should be able
to add their own on-line help documentation.
e. Usage of ERP System must be documented in video form and made
available/distributed to all users of ERP System. All training manuals will be uploaded
to ERP System software, also as FAQs etc. for ready reference.
4. Train-the-Trainer Program
Development and delivery of a Train-the-Trainer program to prepare Organization for the
delivery of the training program. This program will include:
a. Training the Rajasthan Discoms Core Team members on the customized version of the
ERP System application’s as it would be trained to an end-user, allowing the training
team to model the approach.
b. Opportunity for knowledge sharing in the areas of leading practice, concepts, new
business processes and knowledge to the Rajasthan Discoms Core Team members.
c. Sharing of leading practices on creating an effective classroom and an appropriate
learning environment.
d. Sharing of leading practices on classroom communication to enable the Rajasthan
Discoms Core Team members to encourage student involvement and student
interaction.
e. The program includes instruction on non-verbal behavior, listening skills, questioning
techniques, how to manage difficult behaviors, interpreting body language, and general
presentation tips.
Task Deliverables
Role Analysis Training needs analysis matrix, identifying and defining the end-
users of all locations affected by the implementation of new
technology and associated processes
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 163
Task Deliverables
Curriculum Design Finalized-course designs, including:
List of business processes and system tasks
Outline of role-based training courses
Plan for incorporating business process and policy
information.
Education Project A project plan detailing:
Plan Timeline for entire project
Ownership and responsibilities for training material
development and delivery
Work efforts and resource requirements from the Rajasthan
Discoms
Table 5: End User Training Responsibility
c. Train-The-Trainer Program
Task Deliverables
Content Publishing Role-based training media courseware
Role-based instructor and participant guides
Train-the-trainer Training the Rajasthan Discoms’ Core Team members on the
workshop customized version of the ERP System as it would be trained to end-
users, allowing the training team to model the approach to train End
Users
Opportunity for knowledge sharing in the area of leading
practice, concepts, new business processes and knowledge to
the Rajasthan Discoms
Each workshop will have at least 30 people. The workshop
will be conducted in batches. The ERPSI will award a
certificate of completion, after completion of each training
workshop.
All the training material in soft and hard format will be
handed over to the utility and will be treated as utility
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 164
Task Deliverables
property.
Technical training Training the Rajasthan Discoms’ Core Team members on
Cloud Technology, HLD, LLD, Master Data Management etc.
This training will be given to the Rajasthan Discoms’ Core
Team members responsible for carrying out technical
activities related to the system like maintenance of database,
operating system, backups etc.
Table 8: Train the Trainer Program
8. Change Management
Rajasthan Discoms considers implementation of ERP will have significant impact on its
business processes and people. Effective change management activities will be required to
ensure that Rajasthan Discoms employees are aware about the ERP Project and the change in
work practices. The ERPSI will be required to carry out activities as part of change management
initiatives by focusing on the change management and capacity building approach and plan so
as to be able to tackle the issues that might arise due to new processes of the ERP system.
Training for ERP will allow multiple stakeholders to participate in the day to day management
of the solution and ensure sustainable programs to cover specific ERP programs in order to
ensure adoption of the system at each level.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 165
a change management plan with appropriate interventions for capacity building, training,
and stakeholder communications. A successful Change Management Program will ensure:
a. A smooth transition to the new way of working
b. The organization/people support the changes implemented
c. Individuals know how the changes affect them and the role they have to play
d. Stakeholders to understand the benefits of the changes and internalize it
e. The new system and its underlying concepts are understood
f. People are aware of how roles and responsibilities are changing
g. Everyone is motivated and committed to the change program
h. The success and progress of the program is monitored and measured
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 166
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 167
Business Blueprint
a. Prepare change management related materials such as newsletters, booklets, etc.
b. Conduct change management workshops at corporate office and agreed field locations
c. Identify process level changes and/or role level changes due to ERP implementation
and support Rajasthan Discoms in effectively conveying the same
d. Prepare Key Performance Indicators (KPIs)
Pre-Go-Live
a. Train the Trainer on Change Management Activities
b. Measurement of training effectiveness
c. ERP readiness assessment
d. Continuous communication
Go-Live
a. Cut-over Strategy
o All transitional data from legacy & physical systems
o Sunsetting of Operations on Legacy System to ERP System
b. Go-live communications
c. Help Desk assessment
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 168
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 169
Discoms. All requisite infrastructure and resources required for smooth functioning of the
FMS helpdesk would be provided by the ERPSI at no extra cost to Rajasthan Discoms.
j) The ERPSI shall deploy enough and qualified, skilled manpower to carry out the FMS
services. It is imperative for FMS staff to know the tender including scope of work, solution
etc. and be able to deal with all the queries related to the ERP System. The ERPSI shall
ensure replacement in not more than 7 days of the FMS staff whose performance is not
found satisfactory by the Rajasthan Discoms.
1) Functional Support
The Functional Support Services for application contemplated herein shall be provided
for ERP system implemented by ERPSI. The ERPSI shall render both on-site maintenance
and support services to Rajasthan Discoms.
The scope of the services is as below: -
a. Enhancements and defect fixes.
a) ERPSI shall incorporate technological changes and provide enhancements as per
the requests made by Rajasthan Discoms. ERPSI shall perform minor changes,
bug fixes, error resolutions and minor enhancements that are incidental to proper
and complete working of the application.
b. Routine functional changes:
a) The ERPSI shall be responsible for user and access management, creating new
report formats, and configuration of reports. ERPSI shall provide user support in
case of technical difficulties in use of the software, answering procedural
questions, providing recovery and backup information, and any other
requirement that may be incidental/ancillary to the complete usage of the
application. The ERPSI shall perform user ID and group management services.
The ERPSI shall maintain access controls to protect and limit access to the
authorized End Users of Rajasthan Discoms.
The services shall include administrative support for user registration, creating and
maintaining user profiles, granting user access and authorization, and providing
ongoing user password support.
c. Tuning of the ERP solution:
a) The ERPSI shall also undertake tuning of ERP, databases, any third-party
software, and any other components provided as part of the solution to optimize
the performance.
b) Deployment/Re-Deployment of ERP solution: The ERPSI shall be responsible for
deployment of the ERP solution and re-deployment in case of any upgrades to the
underlying hardware or operating System and carry out any necessary testing.
c) The key service level requirements need to be ensured by the ERPSI during the
operations and maintenance period. These requirements shall be strictly imposed
and either Rajasthan Discoms or a third-party audit/certification agency shall be
deployed for certifying the performance of the ERPSI against the target
performance metrics as outlined in the SLA’s defined in the RFP.
2) Operations and Maintenance support for ERP System
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 170
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 171
a) In addition to scaling, for any major expected increase in the workloads, carry out
the capacity planning in advance to identify and provision, wherever necessary,
the additional capacity to meet the user growth and/or the peak load
requirements to support the scalability and performance requirements of the
solution.
b) The scaling up/scaling down (beyond the auto-scaling limits or whenever the
auto-scaling limits needs to be changed) has to be carried out with prior approval
by Rajasthan Discoms. ERPSI shall provide the necessary details including the
sizing calculations, assumptions, current workloads, and utilizations, expected
growth /demand and any other details justifying the request to scale up or scale
down.
2. Patch and Configuration Management
ERPSI shall manage the instances of storage, compute instances, and network
environments. This includes agency-owned and installed operating system and other
system software. ERPSI is also responsible for managing specific controls relating to
shared touch points within the security authorization boundary, such as establishing
customized security control solution examples include, but are not limited to,
configuration and patch management, vulnerability scanning, disaster recovery, and
protecting data in transit and at rest, host firewall management, managing credentials,
identity, and access management, and managing network configurations.
3. Cloud Security Administration
a) Appropriately configure the security groups in accordance with the Security
policies.
b) Regularly review the security group configuration and instance assignment to
maintain a secure baseline.
c) Secure and appropriately segregate/isolate data traffic/application by
functionality using DMZs, subnets etc.
d) Ensure that the cloud infrastructure and all systems hosted on it, respectively, are
properly monitored for detection of unauthorized activity.
e) Conducting regular vulnerability scanning and penetration testing of the systems,
as mandated by Government Agency’s policies.
f) Review the audit logs to identify any unauthorized access to the government
agency's systems.
4. Monitoring Performance and Service Levels
ERPSI shall provide and implement tools and processes for monitoring the
availability of assigned applications, responding to system outages with
troubleshooting activities designed to identify and mitigate operational issues.
a) Reviewing the service level reports, monitoring the service levels and identifying
any deviations from the agreed service levels.
b) Monitoring of service levels, including availability, uptime, performance,
application specific parameters, e.g., for triggering elasticity, request rates, number
of users connected to a service.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 172
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 173
The ERPSI shall ensure the physical security of the media stored in cabinets.
The ERPSI shall also ensure that a 24x7 support for file, database and volume
restoration requests is available at the data centers.
The ERPSI shall also provide enough/adequate media (tape library) for daily, weekly,
and additional backups for the duration of the contract.
6) Cloud Data Center and Data Recovery Center Operations
ERPSI’s responsibilities shall include but are not limited to the below
a) Monitor, log & report of entire IT Infrastructure Solution including servers, storage,
supporting system, software, equipment & module operation etc. on 24x7x365 basis.
b) Perform periodic health checkup & troubleshooting of all systems & modules
installed & implemented in adherence to the proactive rectification measures
7) Server Administration/ Management
ERPSI’s responsibilities shall include but are not limited to the below
a) Provide the server administration and monitoring service to keep servers stable,
operating efficiently and reliably.
b) Provide administrative support for user registration, creating and maintaining user
profiles, granting user access and authorization, providing ongoing user password
support, and providing administrative support for print, file, and directory, services.
c) Setting up and configuring servers.
d) Installation of the server operating system and operating system utilities.
e) Re-installation on event of system crash/failures.
f) Administration of Operating System for IT system.
g) Manage Operating system, file system and configuration.
h) Ensure proper configuration of server parameters, operating system administration
and tuning.
i) Regularly monitor and maintain a log of the performance monitoring of servers
including but not limited to monitoring of CPU, disk space, memory utilization, I/O
utilization, etc.
j) Regular analysis of events and logs.
k) Apply OS Patches and updates.
l) Monitor & verify logs files and periodically clean up log files.
m) Ensure proper running of all critical services on the servers. Schedule and optimize
these services.
n) Maintain lists of all system files, root directories and volumes.
o) Resolving all server related problems.
p) Escalating unresolved problems to ensure resolution as per the agreed SLAs.
q) Responsible for periodic health check of the systems, troubleshooting problems,
analyzing, and implementing rectification measures.
r) Logical access control of user and groups on system.
s) Responsible for managing uptime of servers as per SLAs.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 174
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 175
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 176
Users can log the queries/complaints, which shall be resolved as per the Service Level
requirements. The helpdesk queries/complaints can be related to connectivity,
messaging, security, software, configuration, and any other issues that arise in the ERP
System.
Help Desk software shall take care of classification, automatic escalation, management,
and status tracking and reporting of incidents as expected by the service level
requirements. Status tracking shall be available to users through telephone number as
well as online through software.
a) The Helpdesk will respond to and resolve the problems as per the SLA.
b) Problems shall be classified into various levels of priority mentioned in the SLA. The
assigned priority for each problem shall depend upon:
i. The extent of the problem’s impact on the usability of the system
ii. The percentage of users affected by the problem
c) The initial assignment of priorities is the responsibility of the Help Desk’s Problem
Manager on basis of SLA. However, Rajasthan Discoms can change the priority
assigned to a particular problem and the procedures that exist for escalating a
problem to progressively higher management levels, until agreement is secured.
d) The precise definition of problem priorities shall be documented in the ERPSI’s SLA.
e) Helpdesk shall troubleshoot on systems, applications (software), network, cloud
services related issues, multimedia related issues, server administration, security
policies, 3rd party coordination etc.
f) After problem resolution, the logged problem in help desk will be closed and
notification will be sent to user for confirmation and rate the customer service on
defined parameter in helpdesk.
g) Help Desk shall be responsible for change management like schedule up gradation of
software components, cloud service components etc. Help Desk will co-ordinate and
take approval from Rajasthan Discoms for the same and will inform all users for such
event in advance.
h) Help Desk shall also be responsible for managing problems/incidents related to
network link at each Field/Substation location, offices, and HQ. Help Desk shall
ensure timely response and assigning the problem/incident on priority basis.
Help Desk shall be ITIL compliant & shall implement ITIL compliant help desk processes
like Change Control & Management Procedure, Incident & Problem management
approach etc. The ERPSI shall utilize help desk tools, which are ITIL complaint and are
open for integration with other enterprise management tools like EMS/NMS system etc.
Providing Help desk solutions application
The Service desk/help desk module shall include the automate “Helpdesk Solution
Application”. A solution record is a predefined response to a problem or commonly
asked question. A solution record consists of a symptom, a cause, and a resolution. The
solutions can be associated with incident and problem records. The Solution application is
used to create, approve, and manage solution records. Search Solution can be used to
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 177
search for and view solution records. The Helpdesk Solution application shall include the
following features:
a) Ability to specify which solution records shall be available to self-service users in the
Search Solutions application
b) Ability to specify a Classification for the solution
c) Ability to indicate a Status for a solution. A solution record can have one of the
following statuses: DRAFT, ACTIVE, or INACTIVE
d) Ability to attach documents or Web sites to a solution record
e) Ability to use the Solutions application to change the status of a solution record
f) Ability to create, update and delete a solution in Solutions Application.
Any event triggered shall be forwarded to service desk that submits & updates trouble
ticket & also updates status of ticket back to EMS/NMS. The EMS/NMS shall
automatically forward events to service desk. The EMS/NMS operator shall also be able
to generate tickets & forward it to helpdesk. Helpdesk personnel must also be able to
update ticket to EMS/NMS.
A. ERP System Services
a) Provide Level One Support for ERP System, including incident logging,
assigning incident numbers, and dispatching the appropriate support personnel
to remedy a problem.
b) Prioritize problem resolution in accordance with the severity codes and Service
Levels specified.
c) Provide system status messages, as requested.
d) Maintain the defined help desk operational procedures.
e) Notify designated personnel of failure of any component of ERP System, or of
an emergency.
f) Initiate a problem management record (“PMR”) to document a service outage to
include (for example) date and time opened, description of symptoms, and
problem assignment (Level Two/Level Three), and track and report on problem
status, as required.
g) Monitor problem status to facilitate problem closure within defined Service
Level criteria or escalate, as appropriate.
h) Monitor PMR closure, including documented problem resolution.
i) Provide Rajasthan Discoms with complete and timely problem status through
the problem tracking system, as requested.
j) Maintain an updated help desk personnel contact listing.
B. Management Services
a) Provide “ownership-to-resolution” of all help desk calls, monitor and report.
b) Progress of problem resolution confirm resolution of the problem with the End
User and log the final resolution via the problem management system.
c) Analyze and report on calls received by the help desk, including
i. Call volumes and duration,
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 178
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 179
This service provides for the availability monitoring of the network environment. The
network management includes proactive monitoring and management.
ERPSI’s responsibilities shall include:
a) Provide a single-point-of-contact for responding to Rajasthan Discoms’ SD-WAN
Network management queries or accepting its problem management requests.
ERPSI’s SD-WAN Network management specialist will respond to Rajasthan
Discoms’ initial request within agreed service level objectives set forth.
b) Monitor availability & escalate to SD-WAN service provider and notify Rajasthan
Discoms for Network Outages.
c) Review the service levels of the Bandwidth service provider (as per pre-defined
schedules on SLA performance) along with Rajasthan Discoms.
d) Provide network availability incident reports severity wise to Rajasthan Discoms in a
format mutually agreed.
e) Provide SLA performance management report of the SD-WAN Network.
f) System performance is to be monitored independently by the ERPSI and a monthly
report mentioning Service up time etc. is to be submitted to Rajasthan Discoms. The
report shall include:
i. SD-WAN Network configuration changes
ii. SD-WAN Network uptime
iii. Latency report (both one way and round trip) times
iv. Historical reporting for generation of on-demand and scheduled reports of SD-
WAN network metrics with capabilities for customization of the report
presentation
v. Generate SLA violation alarms to notify whenever an agreement is violated or is
in danger of being violated
g) Any other reports/format other than the above-mentioned reports required by
Rajasthan Discoms
h) The ERPSI shall monitor the SD-WAN network on a continuous basis using the
appropriate service tools and submit reports on monthly basis for SD-WAN system.
16) Service Management Controls
1. Incident Management
The ERPSI must have:
a) Ability to create an incident record to document a deviation from an expected
standard of operation.
b) Ability to create other ticket from the incident, if resolving the incident involves
creating a service request, problem, or work order.
c) Incident could be created automatically from sources such as email, system-
monitoring tools.
d) Ability to have ticket template containing data that agent can automatically insert
in common, high-volume records. Instead of manually entering standard
information each time, ERPSI can apply a template that contains information such
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 180
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 181
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 182
d) Ability to associate an asset for a Problem Record if the issue you are reporting or
working on involves an asset.
e) Ability to select related asset by hierarchical view.
f) Ability to relate other tickets and work orders to a Problem.
g) Ability to show similar tickets to search for and relate other tickets to the current
record.
h) Ability to show similar tickets, Problems to search for and relate other tickets,
Problems to the current record.
i) The similar ticket search results only list service requests, incidents, and problems
having the same Classification. Records are not included in the results if they
either are global records or history records.
j) Ability to identify a Problem as global record. A global record captures
information about an issue affecting many people. The record might be a created
for a shared asset i.e., the root cause of many other issues, such as a failed network
server.
k) Ability to relate a Problem to a Global record.
l) Ability to create a service request from a problem, creating a relationship between
the two records.
m) Ability to create a Release in the Problem application when resolving the Problem
involves releasing a set of bundled changes to users. The created Release will be
related to the originating Problem.
n) Ability to identify a global Problem, which is the root cause of many other issues
or that is something affecting many users. A global record might have many other
records related to it.
o) Ability to automatically assign one or more SLAs via Workflow or Escalation
process based on SLA’s criteria.
p) When you apply an SLA that includes a response commitment to a Problem, value
in the Target Start date field is set based on that SLA. and when an SLA that
includes a resolution commitment to a Problem, value in the Target Finish date
field is set based on that SLA.
q) Ability to relate existing service requests, incidents and problems to a global
record and manage them via the global record.
r) Ability to manage the tickets via the global ticket, when linked with global
relationships, so the statuses of related tickets can be changed by changing only
the status of the global record.
s) Ability to change status of each activity individually.
t) Ability to apply a template, which contains activities that can be viewed and
edited
u) Ability to select labor for activities on a Problem
v) Ability to report labor time either for a Problem as a whole, for activities on the
Problem, or for both types of labor time
w) Ability to enter start and stop times
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 183
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 184
d) Ability to create follow-up work orders. A follow-up work order is for when you
complete a job but notice that additional work is needed on the same asset or
location.
e) Ability to create a change from a change. It is needed when, for example, a
technician completing a change discovers that additional work not specified on
the change, such as a software upgrade, is required to solve a problem.
f) Ability to create an Incident, problem, release & work order from a change.
g) Once a change is approved, it cannot be deleted or modified.
h) Ability to change the status of the Changes to complete which indicates all the
physical work is finished.
i) Ability to execute the move or modification of assets under change order.
j) Ability to view information about previous status changes.
k) Ability to change the status of the Change order’s task.
5. Release Management
The primary objective of release management procedure is to deliver, distribute and
track one or more changes for/during release into the live environment and
a) O1 – To plan and oversee successful rollout of software releases.
b) O2 – To communicate and manage expectations of Rajasthan Discoms during the
planning and rollout of new releases.
c) O3 – To ensure that software being changed is traceable, secure and that only
correct, authorized and tested versions are installed.
d) The policy or procedural requirements arising out of the agreements signed or
agreed between the ERPSI and Rajasthan Discoms would supersede the
procedural requirements stated in this document. The applicability of the current
procedure is for personnel or process deploying releases of software and/or ERP
System components into the production or live environment. While the
responsibility to provide staffing (roles used as per rate card, effort required by
role, effort by months or weeks as applicable) and timeline for a change request
rests solely with the ERPSI.
e) ERPSI to Submit Rate Card for Change Management Duration.
This is broad level of scope of work of ERPSI with respect to the software
applications.
a) Release of new software, hardware, systems, and services into live environment
b) Release of changes to ERP System and services in the live environment
c) Quarterly release of functionalities
d) Publishing calendar for release – to be published by ERPSI in consultation with
the Rajasthan Discoms
e) Decision on packaging and distribution of releases
f) Implementation of changes to software, hardware, systems, and services
g) Building the change request.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 185
h) Provide staffing (roles used as per rate card, effort required by role, effort by
months or weeks as applicable) and timeline for a change request.
i) Rajasthan Discoms will absorb the added/modified functionality from
operational perspective which are implemented as part of Release Management in
15 days from the date of release if there is no major issue reported by Rajasthan
Discoms.
6. Performance Management
The recording, monitoring, measuring, analyzing, reporting, and forecasting of
current levels, potential bottlenecks, and enhancements of performance characteristics
for the services, networks, applications, system software, and equipment within the
scope shall be required. System tuning, and optimization is an inherent part of this
contract.
Where warranted, the ERPSI will utilize capacity management data in combination
with performance management data to identify ways to improve performance levels
of the resources, extend their useful life, and request Rajasthan Discoms to approve
revisions/upgrades to the computing and communications hardware, software, and
other equipment such that higher levels of performance of the resources are obtained.
7. Capacity Management
The continuous monitoring, periodic analysis, and forecasting of the changes
necessary to quantify capacity and configuration of finite resources comprising the
computing and hardware/software (cloud) infrastructure supported under this
initiative by the ERPSI. The categories of resources to be capacity managed include
but are not limited to servers & system software.
8. Security Management
The protection from unauthorized usage, detection of intrusions, reporting as
required and proactive prevention actions are to be provided by the ERPSI.
9. Resources for Project and Service Management
As mentioned in Minimum resource requirement section in the Tender.
10. Preventative Maintenance Activity
The preventive maintenance activities shall be performed by the ERPSI to keep the
system running at optimum level by diagnosis and rectification of all ERP System
failures and would broadly include:
a) Configuration routine checking as part of a preventive maintenance which would
include checking of functionality ERP System software,
b) Monitoring of the performance of the system and doing necessary tuning for
optimum performance to accommodate any changes such as addition of new
components.
c) Providing all necessary assistance to Rajasthan Discoms for addition and
modification of database and user interface & consumer portal displays and
Database sizing activities.
d) Take Backup of the system at regular interval
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 186
e) Restoration of the systems upon its failure and to restore the functioning of the
various systems.
a) All software should be supplied with applicable OEM warranties and support
(including back-to-back) for the entire duration of the project. During warranty period
vendor must provide updates and patches.
b) Annual Technical Support (ATS) will start from the date of acceptance of the
installation. ATS should cover 24 by 7 escalation supports from OEM for all software
products to be provided through Phone, Email or Onsite visit depending on the
criticality and nature of the problem. The support must be ensured by the ERPSI.
c) The ERPSI must carry out any requisite adjustments / changes in the configuration for
implementing different versions of the application software.
d) The ERPSI shall provide from time to time the Updates/Upgrades/New releases/New
versions of the software and operating systems as required. The ERPSI must provide
free upgrades, updates & patches of the software and tools to Rajasthan Discoms as
and when released by OEM. The ERPSI will implement from time to time the Updates/
Upgrades/ New releases/ New versions of the software and operating systems as
required after necessary approvals from Rajasthan Discoms about the same at no
additional cost without disturbing the implemented ERP system.
e) The ERPSI shall provide and apply regular patches to the licensed software including
software, operating system, databases, and other applications.
f) The ERPSI shall provide for software license management and control. ERPSI shall
maintain data regarding entitlement for software upgrades, enhancements, refreshes,
replacements, and maintenance. The ERPSI must perform periodic audits to measure
license compliance against the number of valid End User software licenses consistent
with the terms and conditions of site license agreements, volume purchase agreements
and other mutually agreed upon licensed software terms and conditions and report to
Rajasthan Discoms on any exceptions to ERPSI’s terms and conditions, to the extent
such exceptions are discovered.
g) The ERPSI shall manage complete OEM technical support for all the licensed software
problems and/or questions, technical guidance, defect, and non-defect related issues.
The ERPSI shall provide a single-point-of-contact for software support and provide
licensed software support including but not limited to problem tracking, problem
source identification, problem impact (severity) determination, bypass and recovery
support, problem resolution and management reporting etc.
h) The ERPSI shall undertake regular preventive maintenance of the licensed software. If
the Operating System or additional copies of Operating System are required to be
installed / reinstalled / de-installed, the same shall be done as part of ATS.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 187
Timeline
Project Phase Project Activity
(In Months)
1. Project Kick Off
2. Onsite Office Setup
3. Team Mobilization
4. Project Charter
a) Detailed project plan with work breakdown
structure along with dependencies
b) Resource schedule & deployment plan
c) List of complete deliverables
Project d) Project Governance structure & escalation T1 = T + 3
Initiation matrix Months
e) Stakeholder communication matrix
f) Project management templates such as Project
reports, SLA monitoring, Attendance etc.
g) Detailed survey to Identify End User Base,
License Requirement, Network
Communication Feasibility study, Change
readiness Assessment etc.
5. Training & Organization change management
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 188
Timeline
Project Phase Project Activity
(In Months)
strategy & schedule.
6. SLA and Performance Monitoring Plan.
7. Data Conversion and Migration Strategy
8. Develop Project Risk Assessment and Define
Quality Assurance Plan
9. Define Project Methodologies, Tools and Project
Governance Standards
10. As-Is Study report including existing business
process, workflows, reporting requirement,
process maps etc.
11. Gap analysis report with identified gaps & areas of
Improvement.
12. Requirement gathering to formulate specifications
of SD-WAN Solution
13. Initiation of data collection, data preparation, data
cleansing etc.
14. Procurement, installation & commissioning of
infrastructure i.e., Data Center & Disaster Recovery
Services, Storage
15. Assistance to the Rajasthan Discoms in entire
Procurement
of process including following for SD-WAN
Infrastructure a) Issue of RFP and Bid Submission T2 = T1 + 3
(DC, DRC) b) Pre-Bid Meeting & Query Response Months
and SD- c) Subsequent Corrigendum Documents
WAN d) Technical Evaluation
e) Financial evaluation with recommendation
including analysis and reasonability of rates
f) Finalization of Vendor
g) Draft LOI and Agreement for Selected ERPSI
16. Requirement gathering workshops with findings
for updated requirement specification.
17. Detailed To-Be report including:
a. Business Blueprint/design documents. (High
Level Design & Low-Level Design)
b. Updated Bill of Material/Bill of Quantity
c. Business Process Master List (BPML)
d. Business Process Re-engineering
e. Development Scope: Reporting, Interfaces,
Conversions, Enhancements
Business T3 = T2 + 1
f. FRS & BPML mapping document
Blueprinting Month
g. Business Solution Design Document
h. Updated Functional Requirement
Specifications
i. Updated Technical Requirement Specifications
j. Requirements Traceability Matrix
k. Non-functional Requirements Specifications
Documentation
l. ERP Module based Roles & Responsibilities
(Authorization Matrix) etc.
m. Mapped Organogram of Rajasthan Discoms
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 189
Timeline
Project Phase Project Activity
(In Months)
n. List of role-based End users of ERP system,
18. Finalize Development Scope
19. Business Continuity /Disaster Recovery Plan
20. Cyber Security Policy
21. Release Management and Change Management
Strategy.
22. Initiation of Training & Handholding
23. Refined Data Conversion and Migration Strategy.
24. Change Management Workshops.
25. Setup of Test & Development Environment
26. Design and Development of ERP Solution
27. Baseline Configuration
28. Customization and Configuration of ERP Solution
29. ERP System OEM audit (1st Iteration)
30. Configured ERP User Profiles and Roles
31. ERP Solution Testing
32. Develop and execute Integration Test Plan(s)
33. ERP System Integration with Existing Solutions
(Legacy, Other Systems)
34. Setup and Install Quality Assurance (QA)
Environment
Design & 35. Conference Room Pilot (CRP)
T4 = T3 + 3
Customizatio 36. Approved End-User Training Strategy (along with
Months
n End-User Training Curriculum, Manuals, and
Schedule)
37. Train Core team members and technical users
38. Strategy for ERP System implementation & rollout
39. User Acceptance Testing (UAT)
40. Documentation for Customization of RICEFW
(Reports, Interface, Conversion, Enhancements,
Forms and Workflow) Development Objects
41. Incorporation of UAT changes
42. Implementation Strategy, including Site Readiness
Assessment and Change Process Improvement
43. Data Digitization for minimum 40% volume as
envisaged in the RFP document
44. Set-up of Data Center Environment
45. Set-up of SD-WAN Network Connectivity at all
Locations for ERP System
46. ERP System - Software licenses
ERP System - 47. ERP System Performance testing (Execute Stress,
T5 = T4 + 2
Roll Out at Volume, Disaster Recovery and Backup Tests)
Months
All Locations 48. Data Digitization and Migration for All Locations
49. ERP System Roll out – All Locations
50. Tuning of ERP System
51. Demonstration & Acceptance
52. Incorporation of Changes & Observations
ERP System - 53. Stabilization Support
T6 = T5 + 3
Stabilization 54. ERP System OEM audit (2nd Iteration)
Months
Support 55. Pre-Go-Live Assessment & Review
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 190
Timeline
Project Phase Project Activity
(In Months)
56. ERP System Acceptance - All Locations
57. ERP System Go-Live - All Locations
Facility
Management 58. ERP System - Facility Management Support 5 Years
Support
Note:
1. The Project timelines and schedule mentioned above is indicative and will be finalized based on
discussion and agreement between Rajasthan Discoms and the successful Bidder (ERPSI).
2. Initially, the ERPSI will provide draft schedule with respective deliverables to Rajasthan Discoms
for their review and feedback within stipulated timelines.
3. Rajasthan Discoms will provide feedback within the agreed timelines to make necessary changes,
corrections, if required. The ERPSI will be required to resubmit the revised schedule document.
4. Feedback and revision of documents and deliverables will be an iterative process.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 191
Role
Role
Ensure change is made in an organized and controlled manner
Review/assessment of proposed request for change
Request for Change Prioritization
Advising business leaders on change management process
Support the review and approval process
Role
Functional teams are responsible for implementation of respective modules right
from AS-IS to final stabilisation of the project.
Functional teams are responsible for preparation of flow charts as per existing
procedures and submit the same to Module Lead Team.
Functional teams are responsible for guiding Module Lead team members and
providing any documents/ information sought by ERPSI.
Functional teams are responsible for understanding the ERP system and
recommend changes if any, in existing policies and procedures to suit the best
practices.
Functional teams shall act as change management agent and assist in training the
end users.
Functional team heads are responsible for certification of stage-wise completion of
the project as per tender conditions.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 192
I.T. team shall ensure all the technical aspects of the ERP project such as
Hardware/Cloud, Software, Network infrastructure, Data centre requirements etc.
Role
I.T. team is responsible for preparation of RFP for procurement of Cloud/
hardware, Network Infrastructure, Data centre/cloud for hosting ERP software in
consultation with ERPSI.
I.T. team shall assist Project manager for timely completion of the project.
I.T. team shall coordinate with ERPSI, and all other teams formed for
implementation of ERP software.
I.T. team shall ensure proper integration of all the modules.
I.T. team shall ensure integration of existing software with ERP software,
wherever possible.
I.T. team shall assist in testing and training,
I.T. team shall track, monitor, and resolve the issues raised by end users during
ERP implementation.
I.T. Team shall deploy suitable resources to take handover of IT task (Server, DB,
Network, Security etc.) after completion of project duration.
I.T. team shall assist Project Manager for sign-off of documents and arranging
payment.
Any other work assigned by Project Manager
Role
Assist the ERP Implementation Partner in coordination with respective functional
teams for Preparation of AS-IS study
Assist ERP Implementation Partner in Business process
Study and design of To-Be processes (Business Blueprint)
A point of contact between respective functional team, I.T team and System
Integrator (ERPSI). They shall act as bridge between ERPSI, I.T team and
respective Functional module teams. They are responsible for below:
o providing information & data required by ERPSI
o convincing ERPSI regarding procedure/system and Regulations currently
followed by Rajasthan Discoms
o Co-operate with ERPSI in development and complete implementation of
respective module in coordination with functional team
o Acquiring the knowledge about implementation process of ERP, such as
customisation of software, designing and generation of user defined
Reports etc
o Clarification of doubts raised by end users and assisting in using functional
aspect of software to users
o Arranging interactions with respective Team and ERPSI as and when
required.
o Reporting the progress of implementation, to respective Functional team
leaders and I.T team on daily basis.
o Reporting the complications that may crop up during the implementation,
to team leaders and shall make all efforts for solving such complications in
coordination with functional team and I.T team.
o Imparting Training to the end users
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 193
Role
o Assist in testing of the ERP system
o Coordinate for data preparation, validate and certify the master data for
data upload into ERP system
o Any other work assigned by <<Contact Person>> (IT).
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 194
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 195
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 196
The Key project resources including Project Manager and Functional Expert shall
be based at Rajasthan Discoms headquarters. Also, the ERPSI shall
deploy/depute requisite no. of IT/Subject matter resources before and during Go-
Live of sites for coordination and user handholding. This is an important ask as
the end users may face many problems during ERP Roll Out and Go-Live
declaration of individual sites.
The resources required before Go-Live is mentioned below.
The Key project resources including Project Manager and Functional Expert shall
be based at Rajasthan Discoms headquarters. Also, the ERPSI shall deploy
adequate no. of IT/Subject matter resources for overall support post Go-Live and
FMS phase of project which may be increase/decrease as per requirement. After
ERP System Go-live, the ERPSI should provide necessary resources and support
staff for Rajasthan Discoms.
The minimum resource requirement post Go-Live is mentioned in table below:
Sl. Position
Min No. of Resources Required
No
(After Go- Live)
.
1. Project Manager 1
2. ERP Module – Functional Leads 3
(Total XX - Resources one for each Module)
3. Distribution Sector Specialist ERPSI shall provide the resources
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 197
Sl. Position
Min No. of Resources Required
No
(After Go- Live)
.
4. Change Management Expert to meet the project timeline to
5. ICT Infrastructure Lead make ERP System Go-live.
6. Cloud services expert ERPSI shall provide minimum one
7. Lead Programmer resource under each domain and
8. System/Database Administrator minimum 07 resources for IT
9. Enterprise Architect/ Integration Expert support, Handholding support,
10. Solution Tester Facility Management Services &
11. Network Expert Help Desk support at the
12. Security Expert centralized help desk of Rajasthan
13. Mobile Application Expert Discoms staff. However, ERPSI
14. Data Digitization Lead should deploy adequate manpower
15. Bid Management Expert as required to meet the service level
agreements of this RFP. These
16. Facilities Management and Help Desk
resources will ensure and report
Coordinator
the compliance to the SLA as and
17. IT Support Staff
when asked for by Rajasthan
Discoms
Table 10: Manpower Requirement After Go-Live
As part of ERP implementation, the ERPSI shall submit all required deliverables as
necessary for successful completion of project and required by the purchaser.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 198
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 199
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 200
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 201
documents and manuals, required for operating and configuring the system.
The documents provided must include at least:
a) User Manual (both online and paper copies) providing detailed
instructions on how to use the ERP. In addition, it describes how to access,
submit inputs to, and interpret outputs from the application
b) System installation guide including the configuration of the supplied
infrastructure.
c) User will have the rights to duplicate the hardcopy and soft copy for the
documents created by the ERPSI without any financial and legal
implications
d) Module wise - ERP Application Training Manuals
b) Technical Documents
ERPSI shall supply operation and maintenance manuals for all deliverables.
These shall be in such details as to enable Rajasthan Discoms to operate,
maintain, adjust, and fix the system etc.
ERPSI must ensure that the ERP system components being developed are
thoroughly documented with comprehensive manuals and adhere to standard
methodologies in software development as per ISO and/or CMMi models. The
documents including but not limited to are:
a) Product installation and configuration steps
b) Application access procedures
c) User screen layout and content
d) Transaction entry procedures
e) Batch job setup, processing, and recovery/restart procedures
f) Error codes with full descriptions and recovery steps
g) Standard report layout and content
h) Internal processing controls
i) Application security
j) Operating specifications and system flowcharts
k) Database entity relationships, table formats, and data element descriptions;
and Program module descriptions
l) Quality Assurance Plan Documenting the planned and systematic pattern
of all actions necessary to assure confidence that the software developed
will conform to the Rajasthan Discoms functional and technical
requirements.
m) Interface Control Document - Documenting the interface characteristics of
one or more IT systems and document the Integration & interface
agreements between interface owners. It contains information on both
physical and data element requirements that are necessary to make the
transfer of information between systems feasible.
n) Test Plan Containing information on the software test environment to be
used for independent testing, the test cases to be performed, and the
overall testing schedule. This includes methodology, schedule, resources,
tools, procedures, environment definition, test cases, and software test
results.
o) Systems Manual Detailing the data structure, table, forms, and report
structures.
p) Installation and maintenance manual for the servers and other hardware
q) Operations Manual providing instructions for installing the application,
troubleshooting, interpreting message logs, and FAQs
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 202
Sl.
Project Phase Timeline (In Months)
No.
1. Letter of Award 2 Months
2. Project Initiation 3 Months
Procurement of Infrastructure (DC, DRC, Storage) 3 Months
3.
implementation
4. Business Blueprinting 1 Month
5. Design & Customization 3 Month
6. ERP System - Roll Out at All locations 2 Month
7. ERP System - Stabilization Support 3 Months
8. Facility Management Support 60 Months
Table 11: ERP System Implementation Approach
b. Scope Management
The requirements in general and the customization requirement in particular, shall be
collected and documented clearly. The scope and requirements shall be controlled
against a baseline and any changes shall be communicated to Rajasthan Discoms
and documented.
c. Time Management
The ERPSI shall prepare a detailed project schedule conforming to the stake-holder
expectations and exercise stringent control of the schedule. A periodic report on the
progress and deviations should be shared with Rajasthan Discoms. Any schedule
conflicts with respect to project and/or deliverable timelines will have to be resolved
by ERPSI in consultation with Rajasthan Discoms and/or its nominated agencies
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 203
and approved by Rajasthan Discoms. Thereafter the approved timelines will have to
be adhered to by the ERPSI, unless specified otherwise.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 204
Provide at its expense, the electrical energy required for performance of the Project
activities, installation, testing, and operation of the ERP Systems;
Providing necessary processes and procedures and approval for entry of all
operating personnel and for working on 24x7 timeframe in all facilities that would
demand such presence;
Implement major civil works such as expansions or construction of rooms,
trenches etc. as required for the ERP equipment and help desk;
Provide the required integration interface details of the legacy applications and
related information required for integration with the ERP system, within 1 (one)
month from date of execution of the Contract;
Review the specifications of the Goods proposed to be used to ensure compliance
with the provisions of this Contract.
Provide reasonable support to the ERPSI for the Operational Go-Live in terms of
the provisions of this Contract;
Provide necessary support to ERPSI in the Project area, in relation to (amongst
others) access to Utility’s premises, installation of ERP system, repair and
maintenance services, etc. Utility shall also:
i. Give access to ERPSI supervisor or its operation & maintenance staff to work
in the Project area during the Contract Period;
ii. Provide an office space for ERPSI personnel as mentioned in Clause 10 of this
Section document within the Utility premises;
iii. Give access to ERPSI to use existing power and water supply, and other
necessary equipment, as mutually agreed with the ERPSI;
iv. Not move, remove, modify, alter, or change the ERP system or any part
thereof in the boundary of the ERP system installed by the ERPSI without the
prior consultation and written agreement of ERPSI. Utility shall take all
reasonable steps to protect the ERP system from damage and shall follow
procedure for emergency action provided in advance by ERPSI;
Participate in periodic review meetings as per the project governance structure
and shall support with the required interventions requested;
Be responsible for operation and maintenance of power supply system, and
promptly attend to any break down including repair or replacement of any
equipment used/needed for maintaining continuity of electricity supply for ERP
system operation;
Permit ERPSI to perform the project activities during working hours, and also
after working hours as necessary, to meet the requirements of Project
Implementation Plan;
Attend to any irregularity with respect to ERP system operation, the cause of
which has been brought to its attention by the ERPSI;
Promptly notify the ERPSI of any events or circumstances that could affect the
Project outcomes, or the ERPSI’s Services and obligations under this Contract;
Appoint and notify to ERPSI of the names and contact details of the Utility
representative and its dedicated staff for the Project, which would include:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 205
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 206
Analyzing & managing system performance, network performance, call logs, etc.,
as well as providing the means of monitoring the SLA metrics
Regular backup of the solution data
Generation of MIS reports as per the requirements of Rajasthan Discoms
Generation of the report for the monitoring of SLAs
Providing Help features on the Application Modules that can be used by
stakeholders such as Frequently Asked Questions (FAQ), etc. including various
tests and audits as mentioned in this RFP
Any Other as mentioned in this RFP document
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 207
d. Unit Testing
e. System Integration testing
f. User Acceptance Testing
g. Data Migration
h. Training and Change Management
i. OEM Audit Services
j. Documentation
k. Cutover and Go-Live
Configuration: Based on the approved Business Design Document, the ERPSI will
undertake the system configuration and customization. After completion of configuration
to the ERP system, ERPSI shall carry out a trial run. If needed or/and the result is not up
to the expectation of Rajasthan Discoms, further reconfiguration will be done by the
ERPSI in order to close any gap left in meeting the desired objective.
All custom development should be carried out in a controlled and planned manner with
adherence to ERP prescribed coding standards and naming conventions. The ERPSI needs
to provide configuration, customization, and installation documents to Rajasthan
Discoms. ERPSI should follow disciplined approach for configuration and customization
which should not restrict Rajasthan Discoms for any future upgrades to its ERP system
to this effect, the ERPSI should provide a certificate from ERP OEM which certifies that
the ERPSI has followed disciplined approach for configuration and customization of ERP
system, and it will not stop Rajasthan Discoms from future upgrades.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 208
The ERPSI should explore all options available in Standard ERP to meet the
requirements, demonstrate standard options to Rajasthan Discoms. If Rajasthan
Discoms concludes that no option meets the requirement and the requirement is
critical for business, ERPSI shall submit the case for custom development to
Rajasthan Discoms or the agency appointed by Rajasthan Discoms. The
following details should be submitted:
a. User Requirement Specifications
b. Functional Specifications Document
c. Complexity Classification under Simple/ Medium/ High, with justification
d. Any impact to Standard functionality/ features and future upgrade
e. Effort and Time-line Estimation
f. Impact to project timelines/ deliverables
Rajasthan Discoms reserves the right to seek customization to meet its unique
requirements and validate the design or findings suggested as custom
development by the ERPSI. In case it is difficult to arrive at the reasonableness of
these requirements on customization during the implementation, the same shall be
resolved through discussions. In case the issue is not settled, the same shall be
referred in the first place to the Steering Committee. The committee may at its
discretion co-opt any subject expert internal/external of Rajasthan Discoms who
in its opinion may help in resolving the dispute. The decision of the Steering
Committee and or the subject expert internal/external of Rajasthan Discoms
appointed by the Steering Committee is final.
Rajasthan Discoms reserves the right to get the functional specifications and
effort reviewed by an external consultant.
12.4 Testing
As part of testing, the ERPSI shall cover all activities during the implementation process
(configuration of business processes, development such as conversions, interfaces,
reports) which prove that system settings are correct as per business requirement of
Rajasthan Discoms. In doing so, the ERPSI shall include test plans, tests cases, and
testing report.
The ERPSI shall create the test strategy document that defines the requirements and goals
of ERP configuration, determines the tools and methods used to check that the system
responds correctly, determines how and when the test will be performed and
recommends how the approval process should occur.
The test strategy document shall guide the project team through the implementation to
ensure that planning and conducting testing activities in the various phases of ERP
implementation as mentioned below.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 209
3) Test Baseline
a. ERPSI shall use the Baseline test plan and the test cases to test Baseline
configuration.
b. ERPSI shall update the Baseline worksheet with status and completion
date information.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 210
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 211
1. After the ERP System is customized and developed in line to the requirements of the
Rajasthan Discoms and all the system audits and tests are successfully cleared, a
Conference Room Pilot is conducted to ensure the proper operation of the
implemented ERP system before an organization-wide rollout.
2. Once the Conference Room Pilot is successfully completed, the ERP system is issued
the Pilot Go-Live.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 212
Rajasthan Discoms will consider Final Go-Live date of the ERP system once the ERPSI
has completed three (3) months of Stabilization Period after the successful rollout of the
ERP system at all the locations specified by the Rajasthan Discoms. Rajasthan Discoms
shall provide the “Go-Live Acceptance Certificate” on following acceptance criteria:
a. Error free operation and running of all ERP modules with real-time data during the
Stabilization Period at all the Rajasthan Discoms locations.
b. Resolution of all ERP System related issues (Not limited to software application, Data
Center & Disaster Recovery Center)
c. Documentation of all issues/problems that come up during the stabilization support
period and resolution methodology / solutions
The following table will be used to ensure compliance to all the activities prior to the Final
Go-Live Stage before issuing the ‘Go-Live Acceptance Certificate’
Compliance
Sl. No. Project Activities
(Yes/No)
1. Unit Testing
2. Completion of Customized ERP Objects
3. Execution of System Integration Testing
Execution of System Perform Test (Stress, Load, Disaster Recovery,
4.
Backup Tests etc.)
5. Commission of DC & DR Environment
6. ERP Software Provisioning & Installation
7. ERP System Installation on Cloud Infrastructure
8. User Acceptance Testing (UAT)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 213
Compliance
Sl. No. Project Activities
(Yes/No)
9. Completion of Data Digitization (Rollout locations)
Completion of Data Migration (Rollout locations)
a) Master Data (Employee, Material, Vendor etc.)
10.
b) Transactional data (Stock Balances, Opening Balances, Contracts,
Projects, Assets, Employee etc.)
11. End User Creation with defined roles & authorization
12. ERP System Accessibility to all End Users
13. Completion of advance ERP System Configuration
14. Finalize Cutover (Conversion) Plan
15. Successful Completion of End-User Training (Rollout locations)
16. Tuning of ERP System
Successful Completion of Stabilization period after ERP-System
17.
Rollout
Error free operations and running of all ERP modules with real-time
18.
data for a period three (3) months.
Documentation of all the issues/problems that come up during the
19.
stabilization period and resolution methodology / solutions
20. Operational Tools Readiness IVR, ITSM & IT Operations
21. Helpdesk Set-up
22. Establish Service Level Agreements
23. Go-Live Approval
The system is considered ‘Operational’ for all purposes of Payments and SLA compliance
after the Rajasthan Discoms has issued the ‘Go-Live Acceptance Certificate’ and the FMS
period is ongoing. The Rajasthan Discoms will also be responsible to issue the ‘Project
Completion Certificate’ post the completion of the FMS period as defined in this RFP.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 214
7. All Rajasthan Discoms components must be maintained with an ease, such that
corrective and preventive maintenance can be performed on the system without
affecting the entire working of the system.
8. The system should be designed to remove all single points of failure. The system
should provide the ability to recover from failures and should also provide clustering
features, thus protecting against many multiple component failures.
9. The system should have the ability to scale up as and when the new business
applications and services are added without compromising the performance of the
overall solution. The architecture should be proven to be highly scalable and capable
of delivering high performance as and when the transaction volumes increase.
10. The system should provide application architectures that are highly granular and
loosely coupled. The solution architecture design should promote flexible business
process management for future scalability. The solution should be interoperable in
nature and design and development should be based on Service Oriented
Architecture (SOA).
11. The system is required to cover critical business function and process modules and
provide modularity that should support addition / removal of one or more modules
as and when required. However, these modules should be seamlessly integrated in
the core application system. The solution architecture should allow minimum
modifications to preserve the upgrade path.
a. The system should support interfacing with Personal Digital Assistant (PDA),
Smart Card readers, RF devices, data acquisition system, webcam, barcode reader,
biometric system etc.
b. The system should support standard interfaces such as adapters, APIs to interface
with standard application and legacy applications.
c. The system should support real-time data updates and interfaces with software
from other vendors.
d. Operating systems should have longer product life cycle (10 years or more) to
avoid non-availability of various device driver (current and future) support as
well as telephonic and web-based support infrastructure in place directly from
OEM. The OS should be the latest version available in the market.
e. The application should have automatic way of migrating the data from existing
database in case of data structure change and during transfer to new versions.
f. The system should support export and import of data possible from different
legacy systems/other systems/databases in different file formats and on specified
time intervals.
g. The ERP application should support SSL and digital certificates.
h. The system should be compatible to remote access integration.
i. The system should support the use of fault-tolerant multiprocessor architecture
and cluster processing.
j. The system should support auto-switching failover to other available server in
case of server failure.
k. The system should support distributed processing.
l. The system should support load balancing.
m. The Enterprise grade Server operating system should support the essential
network services like Directory Services, DNS, DHCP, Radius, Web Server,
Application server, Cluster services (High Availability and Fail over Support),
Global File system support and virtualization.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 215
At the end of Contract period, the ERPSI will be required to provide the necessary handholding
and transition support including all information as may be necessary and reasonable to effect as
a seamless handover as practicable in the circumstances to Rajasthan Discoms or designated
staff or any other agency that is selected for maintenance of ERP system post completion of
Contract with the ERPSI.
The ERPSI will provide all information, handholding, and support for all the activities and
information in its possession or control at any time during the exit management period.
Anything in the possession or in the control of ERPSI, associated entity (CSP, SD-WANSP), or
sub OEM is deemed to be in the possession or control of the ERPSI. The transition and
handholding process will include but not be limited to, conducting a detailed walkthrough and
demonstrations of the ERP System, handing over all relevant documentation, addressing the
queries/clarifications with respect to the working/performance levels of the DC/DR at
Infrastructure, SD-WAN Service Provider (SD-WANSP), Software Licenses, handover of
customized source codes, policies, and procedure document, conducting training sessions etc.
The Knowledge transfer activity is an integral part of the scope of work assigned to ERPSI. This
knowledge transfer activity will have to be carried out effectively, even in the case of end of
Contract with the ERPSI or is terminated before the planned timelines.
Please note that this is an indicative list, any other activity, over and above these, as may be
deemed necessary by the Rajasthan Discoms or designated staff or any other agency that is
selected for maintenance of ERP System to meet the service levels and requirements specified in
the contract are also required to be performed by the ERPSI at no additional cost.
In the case of closure or termination of the project, the Parties shall agree at that time whether,
and if so during what period, the provisions of this schedule shall be applied. The Parties shall
ensure that their respective associated entities will carry out their respective obligations set out
in this Exit Management Schedule.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 216
operations for a period of 3 months after termination orders are issued. In case of
contract being terminated by ERPSI, Rajasthan Discoms reserves the right to ask
selected ERPSI to continue running the project operations for a period of 6 months
after termination notice is served by ERPSI.
d) Upon service of a notice under this Article, the following provisions shall apply:
i. All title to the assets shall be transferred to Rajasthan Discoms, on or before the
last day of the exit management period.
ii. Payment to the outgoing ERPSI shall be made to the tune of last set of completed
services/deliverables, subjected to the approval and compliance on contractual
and SLA terms & conditions.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 217
i) An Exit Management plan shall be furnished by the ERPSI in writing to the Rajasthan
Discoms or its nominated agencies within 90 days from the date of signing the
contract.
The System Integrator (ERPSI) should produce a completion/ installation certificate indicating
“Ready-for-use” status (i.e., delivery, installation, commissioning, and successful operation of
system) for respective deliverable/services for ERP system, duly signed as accepted by the
Rajasthan Discoms
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 218
letter
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 219
14.3 In the event that the ERPSI has duly followed the procedure and the Utility fails to make
any payment within the 45 days of production of invoice along with all supporting
documents upto satisfaction of the Utility, the Utility shall pay interest to the ERPSI on
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 220
such delayed payment amount (including disputed amount) as from the due date of
payment. The applicable interest rate on the delayed payment amount will be equal to
the marginal cost of funds-based lending rate (MCLR) for one year of State Bank of India
(MCLR shall be as applicable on the 1st April of the financial year in which the date of
release of delayed payment lies). In case the period of default lies in two or more
financial years the interest amount shall be calculated separately for the periods falling
in different years.
14.4 The Utility named in the Bidding Documents intends to use the capital subsidy {60%
(90% in case of special category states) of cost of the project} under Revamped Reforms-
based and Results linked, Distribution Sector Scheme (RDSS), 40% (10% in case of
special category states) to be arranged by the State Government/Employer through
loans from REC/PFC/or other FIs/own resources. However, the payment as per the
contract payment terms will be released timely by the Employer, without any linkage to
disbursement of the funds under RDSS scheme.
14.5.1 For Implementation Phase, JVVNL will make the payment on behalf of all three
Discoms. ERPSI will raise the invoice to SE (IT), JVVNL, Jaipur for verification and
Sr. AO (CPC), JVVNL, Jaipur will make the payment.
14.5.2 For O&M Phase, single cost for all three Discoms will be taken from ERPSI and
same shall be shared equally by three Discoms, accordingly respective SE (IT) will
issue separate work order. ERPSI will raise the invoice to respective SE (IT) of
discoms for verification and respective Sr. AO (CPC) will make the payment.
14.5.3 However, Payment Mechanism may be reviewed at the time of award of Contract.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 221
d) For requirement of SLA audit, the Rajasthan Discoms may perform a visit either by
internal department or by an external contractor at respective DC/DR locations.
e) The review / audit report will form a basis of any action relating to imposing penalty
on or breach of contract of the System Integrator (ERPSI).
15.2 Service Level Agreements and Targets
The service levels agreements shall be agreed by the System Integrator (ERPSI) as a key
performance indicator for this engagement. These key indicators shall be used while
monitoring and measuring performance of System Integrator (ERPSI). The service level
indicators have been categorized under:
a) Availability management
b) Problem Resolution and Notification Times
c) Performance Parameters
d) Services related SLA
All management tools required to monitor the performance of the service should be
provided by the System Integrator (ERPSI) at no extra cost. The System Integrator (ERPSI)
would be required to provide access to the management tools to the Rajasthan Discoms
for monitoring purposes and would also provide the MIS reports for overall project and
SLA monitoring as a part of the contract.
System Integrator shall provide all the necessary diagnostic/monitoring tools and
technology as requested and required by the Rajasthan Discoms to monitor the ERP
System. These tools shall monitor the product, process, and elements of the system to
generate the reports and logs which can be utilized by the Rajasthan Discoms for further
improvement and enhancements of overall system.
The description of the indicative Service Level Agreement (SLA) has been presented
below. A complete Service Level Agreement will be made with the successful bidder at the
time of signing the contract.
15.2.1 Availability Management
1. Availability of IT system - High Availability is a key requirement of Rajasthan
Discoms as the application will enable Rajasthan Discoms officials to deliver
the key activities related to various activities. The expected availability of IT
system should be at minimum 99%. The project must also be able to rebound or
recover from any planned or unplanned system downtime, ensuring a minimal
impact on the operations. The selected System Integrator should provide a
single point of contact on a 24*7 basis.
2. Availability will be measured on quarterly basis. Planned downtime will not be
classified as unavailability. Planned downtime where both main as well
redundant systems are not available for providing service will be limited to
maximum of 48 Hours in a quarter. The selected bidder should endeavor to
take such downtimes only during weekends or holidays preferably after End of
Day (EoD). However, duration of the maximum allowable planned downtime
time will be reviewed on yearly basis.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 222
>=5% of No
SLA Payment
>=10% No
of SLA Payment
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 223
Validated by
Monthly SLA
Performance
Report.
>=5% of No Payment
SLA
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 224
Problem ERPSI shall analyse all 100% timely Root cause 5% penalty of the
Management the incidents and submission Report. Incident Quarterly Payment of that
provide a root cause covering Report stating location/site, if the ERPSI
problems does not submit a
report every month if all incidents
problem report for that
there are more than 5 logged in faced by the
month.
incidents of the same that month users. Report
type. ERPSI shall take detailing
the needed corrective corrective and
5% penalty of the
action to prevent further preventive
Quarterly Payment of that
issues due to the same actions
location/site if the ERPSI
cause.
does not perform the
corrective action for more
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 225
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 226
ERP / Other ERPSI to furnish details 100 % Monthly Report 1 % of the Quarterly
Application of active users O&M charges for each
license default beyond SLA
monthly
configuration
report
Remarks: Although SLA penalties shall be calculated as per above table, however total penalty to be deducted is to
be capped at 10 % of the billable amount for O&M charges.
As per Problem Delivery Initial Critical 1 Hour Initial review for Category, Priority
Report (PR) Response and whether the PR has sufficient
information to understand the
High 2 Hour problem
As per Problem Delivery Complete Critical 4 Hour Detailed analysis of Problem Report
Report (PR) Analysis/ and provide, root cause, potential
Resolution High 6 Hour risk / impact, effort estimate for
resolution and closing of the
Medium 8 Hour problem
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 227
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 228
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 229
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 230
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 231
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 232
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 233
3. If Rajasthan Discoms authorities are not satisfied with the reply, the
performance bank guarantee may be forfeited, and contract may be terminated
by Rajasthan Discoms as per the contract.
15.5.3 Exclusions
The selected bidder will be exempted from any delays or slippages on SLA
parameters arising out of following reasons: -
a) Delay in execution due to delay (in approval, review etc.) from Rajasthan
Discoms’ side. Any such delays will be notified in written to the IT Team
b) Force Majeure
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 234
Annexures
Annexure A - Functional Specifications
(Fully Compliant – FC; Partially Compliant – PC; Not Compliant – NC)
Compliance
Sr. No. Functional Requirements
(FC/PC/NC)
A. Finance and Accounts:
A.1. General Ledger
Capability to provide the facility to have multiple, independent general
1.
ledgers/ schedules
Capability to allow information to be consolidated within and across general
2.
ledgers for (month end) reporting purposes
Capability for each General Ledger (GL) to support and be fully integrated with
3.
sales, purchase, stock and management accounting ledgers and cashbook
Capability of each sub-ledger to relate to a separate control account in the
4.
general ledger
5. Capability to open Memorandum Accounts for recording financial information
Capability of automatic posting (Postings to sub-ledgers should result in
6.
automatic postings to the control accounts in the general ledger)
Flexibility to accommodate current and any proposed chart of accounts
7.
structure and corporate/field organization structure
Option to have centralized or decentralized account maintenance of chart of
8.
account value
9. Capability to have parent-child hierarchy in chart of account values.
10. Addition /deletion of any account code should be restricted
Capability to provide facility to amend and delete the entities (e.g.: Capture
11.
short as well as long description of accounts)
12. Capability to manage Multiple foreign currency transactions
13. Capability to display GL account balance in multiple views as follows:
Statutory
Responsibility (e.g., strategic business unit, Area Office/departmental
reporting)
Geographical
14. Capability to hold balances for multiple ledger types such as:
Actual
Budgeted
Forecast
Taxation
Tariff &
As per requirement
15. Capability to allow enquiry by:
Account codes and names
Wild search
Specific range of period, year and month batch entry number
16. Capability of the system to display:
Online at least 5 years of history for account balances and posted transactions
Account activity including opening balance, movement for the period, closing
balance and year to date balance
Breakdown of balances by drilling down to source document
17. Capability to store balances for future years based on past balances
Capability to maintain the following master data records to store control
18.
information on how postings done into the general ledger account:
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 235
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 236
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 237
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 238
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 239
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 240
17. Capability to capture the following information, but should not be limited to: -
Vendor code, Internal transaction reference, vendor transaction reference,
transaction date, due date for payment calculated by the system from the
payment terms, posting period, transaction value, order value to which the
invoice relates, narrative for pu
General ledger account code, ledger narrative, value, debit credit indicator and
analysis code
18. Capability to provide manual entry for non-material related expenses
Capability to provide facility for entering invoices for prepaid expenses and
19.
apportion the amount between prepaid accounts on periodic basis
20. Capability to provide facility for entering invoices pertaining to prior periods
Capability to produce payable reports on demand within the system (but
21.
should not be limited to):
By invoice date
By vendor type
By user defined selection criteria
Capability to trigger a warning if invoice amount exceeds balance of operating
22.
expenditure budget
Capability to block posting if invoice amount exceeds balance of capital
23.
expenditure budget
24. Capability to create debit and credit memos into vendor account
25. Capability to reference multiple invoices in single debit/ credit memos
26. Capability to post retention request into vendor account
27. Capability to perform:
Refund retention to the vendor and automatically post the refund to the vendor
account
Automatically offset retention paid up against the balance outstanding of
vendor account
28. Capability to refund to the vendor using various payment methods such as:
Cash
Cheque
Bank Transfer
29. Capability to provide functions to block for payment
30. Capability to manage direct payment to vendors by 3rd parties
31. Capability to comply with all TDS related requirements
Capability to trigger automatic alerts prior to due dates of statutory lenders and
32. posting related accounting entries requirements like tax payments/ return
filings etc.
33. Capability to create a proposed payment list by determining: -
Item to be paid - items to be paid are selected and grouped for payments based
on user-defined rules
Payment amount - based on user needs (e.g.: due date of the items)
To whom the payment is made - by specifying the payee
Payment Method - based on the payment method (e.g.: cash/cheque/ Third
Party) according to the rules defined by the user
Payment through - the payment is made - based on the specified bank and a
bank account for the payment
34. Capability to make payment via methods such as:
Cash
Cheque - manual and pre-printed
Direct payment by 3rd Parties like lenders
Bank transfers/ Electronic Fund Transfer
Foreign currency
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 241
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 242
vouchers
Capability to split payment to more than one payee (e.g.: payment involving
57.
withholding tax)
Capability to automatically clear items based on user criteria after payment has
58.
been made: -
By account
By document number
By user defined criteria
59. Capability to post payments for update to the Vendor Account
60. Capability to automatically post to general ledger:
Cash discounts received
Gains or losses from underpayment or overpayment
GST and GST TAN
Bank Charges
Gains or losses from exchange rate differences
Capability to provide the facility to offset balances of vendor accounts in AP
61.
with balance of customer accounts in AR (for vendors who are also customers)
Capability to provide access to projected cash requirement information based
62. on selected items to notify head office of funds required to be transferred to the
paying account
Capability to print TDS certificates and print CEN VAT, Service Tax, GST,
63. Income Tax and TDS report compliant with regulations, and in file-formats
which support e-filing
Capability to post transactions such as debit and credit memos into vendor
64.
account
Capability to identify the transaction via document number series or document
65.
type
66. Capability to provide facility for:
Automatic numbering of documents
Allow for multiple document series
67. Capability to update to the vendor accounts with the following transactions:
Transfer from one vendor account to another
Miscellaneous debit/credit memo for adjustment
Capability to automatically update the corresponding account codes in the
68.
general ledger after posting to the individual vendor account in the sub ledger
Capability to provide for automatic integration with cash book, general ledger,
69 bank ledger, penalties/ LD account, purchasing, Material management system,
TDS account, expense accounts
Capability of the system to support multilocation payments. Payments through
70.
multiple sub–Area Offices and Area Offices and zones
Capability to credit all payments first to the bank Clearing Account. Post
71.
confirmation from the bank the same will be updated to the books
Capability of the system to maintain cumulative register of cheques and to
72.
generate the cheque register print immediately after printing the cheque
73. Manage Vendor Account Enquiry
74. Capability to view the account balances: -
In summary (opening balance, transaction per posting period and closing
balances)
By line items (drill down from summary)
Drill down to document detail (e.g., purchase requisition, purchase order,
invoice, expected delivery date)
Capability to perform various display functions within a vendor account such
75. as search, sort, display additional details (e.g., vendor master information),
total, view by currency, obtain total purchase per posting period etc.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 243
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 244
Capability of the cash book to receive automatic postings from the accounts
3. payable and accounts receivables together with manual postings of other
payments and receipts
Capability to have integration with General Ledger. Posting will update
4.
specified general ledger accounts and general ledger cash book balances
Capability to generate daily incoming report and daily outgoing report 190
5.
Capability to generate daily/ weekly/ monthly cash flow report
6. Capability to provide daily balances from the Cash Book
Manage Inter Unit Accounting for Account payable, Account Receivable,
7.
General Ledger & as required
Capability of the system to maintain the funds released to the units by the
8. expense heads and automatically post the ledger entries against inter unit
account
Capability to generate the advice for the unit to pass the journal entry to reverse
9.
the inter-unit account post receipt of funds
10. Capability to perform automatic bank reconciliation
11. Capability to integrate bank reconciliation system with the payment
12. Capability to enter bank statement details: -
Manually
By electronic means to match bank transaction information with receipts and
payments in the system to produce an electronic bank reconciliation
198 Capability to record bank statement transactions including: -
Bank and other charges
Interest received or paid
Electronic fund transfers
Periodic payments
Dishonoured cheques (incoming/ outgoing)
Capability to automatically generate postings into the general ledger for
13.
outgoing cheques/ transfers as follows:
Cleared cheque/ bank transfer data delivered by the bank to generate the
clearing entries
Capability to automatically generate postings into the general ledger for
14.
incoming cheques/ transfers as follows: -
Bank transfers and cheques received/ banked in to generate the clearing entries
15. Capability to print cheque deposit and bank transfer listing
16. Capability to post incoming cheques individually or in batch
Capability to provide function to overview cheque deposit processing status
17.
online
18. Capability to: -
Record stop payment of cheques
Enable the matching of multiple receipts in the system with a single receipt
transaction on the bank statement
Capability to allow for short term planning from sources affecting the cash
19.
position. This includes: -
Bank balances
Maturing deposits and loans
Notified incoming payments posted to the bank accounts
Incoming payments (e.g., cheques) with a value date
Outgoing cheques posted to the bank clearing account
Post-dated cheques
20. Capability to: -
Allow update of bank balance by bank accounts
Group bank accounts in a logical hierarchy by the type of account
Display bank accounts by group or in more details by bank accounts via drill
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 245
down
The system should automatically reverse items outstanding for more than 3
21.
months upon approval Cheque register
22. The system will maintain records of all cheques
23. Manage Cash Register
24. The system will maintain details of all cash
25. Cash Management for Payment Accounts
26. Capability to forecast cash outflow based on:
Liabilities from account payable and borrowings, payroll due within a user
specified period
User defined level. For example, at HO (e.g., centralized) for Area Office or
zone
Capability to provide function to create, change and delete payment advice
27. from sending bank (e.g., main) account to the receiving (e.g., Payment) bank
accounts
Capability to provide function to create bank correspondence and/or print
28.
cheque
29. Capability to post payment advice to the respective bank account
Capability to post automatically to the respective bank accounts in the general
30.
ledger
31. Manage Cash Flow Forecast and Information Systems
32. Flexibility to provide for:
Electronic bank reconciliation
Drilldown reporting tool
Journal/ posting overview (e.g., bank transfers, deposit)
Comparison between actual cash flows with forecasted cash flows
Capability to produce forecast cash flow statement for at least 12 months with
33.
the following minimum details:
Opening balance
Cash outflows for: Loans, Capital projects, Revenue expenditure, Interest
payment, Tax, Dividends
Cash inflow from: Customers, Interest received, Loan draw down, Net
excess/surplus, Closing Balance
Capability to provide drill down capabilities to view details of outflows and
34. inflows. For example, payment from capital projects can be further analysed by
projects/ jobs.
Capability to allow medium and long-term planning from sources affecting the
35.
liquidity position. This includes:
Receivables as expected incoming payments
Payables as expected outgoing payments (e.g., materials, project and capital
expenditure) Planned payments of wages and salaries
Investments and borrowings
Planned dividend payment
Planned tax payment
36. Capability to forecast these cash outflow and inflows based on:
Trends in fees and charges for providing distribution services based on
estimates and collection due dates (Accounts Receivable)
Expenditure trends based on payment due dates (Accounts Payable)
Fixed deposit and borrowing terms
37. Capability to:
Enter forecast cash flow amount manually (e.g., dividend)
Calculate averages
Apportion forecast amounts based on historical data (e.g., Collection and
expenditure patterns) in preparation of cash flow statement.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 246
Capability to perform ‘What if’ analysis on cash flow based on user- defined
38.
assumptions
39. Manage Loans/ Grants and Deposit Management
Capability to maintain the following information in the loans and deposit
40.
master, but should not be limited to:
Lender
Agreement date (If any)
Loan Term, Moratorium
Instalment amount
Interest rate, reset clause
Loan type (Borrower’s note loans, Policy loan, General loan, etc.)
Loan Source (Government or Private)
Security Details
Other loan details and conditions
Capability to provide function for handling the complete loan process for loan
given and loan taken e.g., calculation of repayment schedule, Instalments due,
41.
Interest calculation, payment of instalment and interest, capability calculation
and posting into
42. Capability to view the detailed source of loan report (local and foreign loan)
43. Manage Inter-Unit Transfer Details
44. The system will maintain details of all inter unit transfers of:
Drawing account transfers from HO account to unit accounts
Details pertaining to transfers provided by bank like UTR number etc. will also
be maintained
45. Manage Cash Management/Treasury Reporting
46. Total Collections into Bank Vs. Total Confirmations from Bank
Total Transfers to unit HO account by bank account number and transaction
47.
Cheques deposited Vs. Cheques credited into bank
48. Dishonoured checks by bank account number and identifying issuer of cheque
49. Total cheques issued Vs. Bank debits by bank account number and bank name
50. Un-reconciled statement at the area offices
51. Total cheques issued Vs. Bank debits by cumulative amount
52. Total Transfers to HO account by bank account number and transaction
53. Cheques deposited Vs Cheques credited into bank
Capability to send to Internal Audit (IA) and others as required for pre-
54.
auditing for bills/documents
55. Capability to update utilization of internal Resources
A.5. Budgeting / Analysis
1. Manage Budget Preparation
2. Capability to create the following budgets but not limited to:
Revenue Expenditure budget
Operating Expenditure/Depreciation budget
Capital Expenditure budget
Forecast Balance Sheet for 10 years
Forecast Profit & Loss for 10 years
Forecast Cash Flow for 10 years
Forecast Financial Ratio
Forecast Retained Income
3. Capability to prepare budget with Top Down and Bottom-up method
Capability to provide function to compute retained Income (RI) and cash for
4.
investment forecast based on user-defined criteria
Capability to import/export budget details from / to external systems
5.
electronically (e.g., Spreadsheet -Excel)
6. Capability to provide Windows-based spreadsheets for budget preparation
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 247
Capability to check and balance the detailed-level budget and the summary
7.
level budget
Capability to navigate within the budget hierarchy (e.g., expand/ collapse
8.
structure, drill down for details)
9. Capability to provide a graphical representation of the budget hierarchy
10. Capability to calculate and compare budget vs. actual in:
Amount variance
Percentage variance
Capability to provide text facility to document any changes made and reasons
11.
of amendments within each version of budget
Capability to retain user-specified versions of the budgets upon subsequent
12.
reviews
Flexibility to maintain, the original budget version and the revised budget
13.
version
14. Update the original budget by
Increasing the budget amounts
Reducing the budget amounts
Transferring budget amounts. e.g., transfer budget from Area Office to other
Area Office
Capability to allow changes to be made for the 5-year forecast revenue and
15.
expenditure items either by manual entry or electronic upload
Capability to meet process/reporting requirements of Budget Policy &
16.
Procedures of Discom
Capability to control the following activities by account, date of change and
17.
user IDs:
Lock subsidiary budgets and master budget so that no changes can be made
once approved
Unlock such budgets to reflect budget changes
Capability to aggregate the inputs from the different accounting units and
18.
prepare a draft consolidated budget
Capability to segregate the final consolidated approved budget, accounting unit
19.
wise Manage Revenue/ Operating expenditure budget
Capability to define revenue / operating expenditure budget hierarchy for
20.
responsibility areas within the organization to facilitate control and monitoring
Capability to classify revenue and expenditure items by means of a hierarchy.
21.
For example, personnel costs may consist of salary, wages, overtime, bonus etc.
Capability to provide edit functions to create, insert, copy, and delete
22.
responsible area or revenue / expenditure item within the hierarchy
Capability to identify revenue and expenditure as controllable and
23.
uncontrollable for budget control purposes
24. Capability to:
Allow posting into a GL account prior to budget approval with proper approval
Allow posting into a GL account after approval of budget
Capability to control authorization to create, change, delete, budget, transfer
25.
and post by:
Budget version
Responsible area/ unit
Type of revenue/ expense
Capability to provide level of access to create and maintain relevant assigned
26.
budgets:
Units can only amend/ input their own budget
Budgeting Cell can amend/ input all budgets for Area Offices/zones/ Head
Office / departments; and Budget can only be approved by authorized person
as defined in the system
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 248
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 249
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 250
Capability to provide exception reports for responsible areas (e.g., Area Office,
61.
zones) that exceeded budget with details such as:
Revenue/ expenditure (according to chart of accounts)
Actual to date
Budget
Variance (i.e., amount more than budget)
Capability to automatically check and highlight abnormal data i.e., actual
62.
exceed budget more than 10% or less than 10%
63. Capability to provide over/under budget reports
64. Capability to check fund in real-time basis (for capital budget)
Capability to view source of fund for each project in capital expenditure budget
65.
report
66. Capability to generate budgeted financial statements for the accounting units
Capability to send periodic Management Information System (MIS) as & when
67.
required
Capability to prepare reports for various government agencies audit and
68.
provision for editing and preparing other reports as required
Capability to generate Cost Records Plant wise, Unit wise and as per statutory
69.
requirement as required by the Department & as per Companies Act, 2013
Capability to perform comparison of actual budget with tariff set by the
70.
Regulator
A.6. Fixed Asset Accounting
1. Manage Fixed Asset Master Data maintenance
Centralized definition of fixed assets categories, description, multiple
2.
depreciation rates, predefined residual values etc.
Centralized definitions of content of Fixed Asset Register to support Companies
3. (Auditor’s Report) Order, 2013 or latest [CARO] and other statutory
requirements
4. Capability to maintain parent-child relationship across assets classes
Capability to maintain the following information in the fixed asset master, but
5.
should not be limited to:
Asset number
Group asset number
General information (e.g., description, make/model, quantity, acquisition date,
owner unit, using unit)
Posting information (e.g., capitalization date and amount, asset expiry date)
General ledger account assignment
Accumulated depreciation
Depreciation
Gain/ loss on disposal
Revaluation
Information on the origin of the asset (vendor information e.g., serial number)
Purchasing information (e.g., vendor number, purchase order number,
receiving number)
Physical inventory data
Budgeting data (e.g., budget number)
Insurance data/ warranty
Depreciation data - asset useful lives, useful date, residual value, depreciation
method
Asset location
Asset class/subclass
Asset type
Project/ job number
Remarks-Examples of information required to be maintained within the Fixed
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 251
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 252
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 253
Asset history
Asset values (book value)
Capability to electronically route proposed disposal listing to specific users for
41.
approval within the system
42. Capability to perform the following within the Fixed Asset system:
Perform complete/ partial retirement
Provide simple method of retiring low value assets
Perform mass retirement
Capture cost of retirement (e.g., removal cost)
Capability to make provisions against losses on retirement of assets in respect
43.
of Assets waiting for disposal
44. Capability to automatically calculate the gain or loss on disposal/retirement
45. Capability to capture disposal information such as:
Date of retirement
Cost, accumulated depreciation and net book values written off
Sales proceeds
Gain/ loss on disposal
Reasons for retirement
Mode of retirement e.g., sold, scrapped, donated etc.
Capability to post automatically or manually to the respective account codes in
46.
the General Ledger:
Gain or loss on disposal.
Sales proceeds.
Capitalization cost; and
Accumulated depreciation
Depreciation
Capability to automatically determine the corresponding depreciation charge
47.
for the partial disposal, based on one of the following entries:
Amount of the acquisition costs being retired
Percentage rate
Quantity
Capability to manually amend the partial disposal amount calculated by the
48. system and then recalculate the corresponding depreciation for posting to the
General Ledger
Capability to post automatically or manually to issue invoice in the Account
49.
Receivable
50. Capability to reinstate fixed assets incorrectly retired
51. Manage Depreciation of Fixed Assets
52. Capability to support different methods of depreciating an asset, such as
As per Regulatory Requirement
User-defined rate tables
Sum of digit
Unit of use
Useful life
53. Support change of useful life and effective rate of depreciation
Support change in method of deprecation and rates of depreciation for a
54.
specific fixed asset or group of fixed assets during the life of the asset(s)
Capability to maintain multiple depreciation rates vis-à-vis the periods to which
55. they apply and Capability to calculate depreciation with retrospective effect
wherever required
Capability to facilitate adjustment of depreciation of fixed assets prior to and
56.
after updates to general ledger
Capability to automatically post to the corresponding accumulated depreciation
57.
and depreciation expense accounts in the General Ledger
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 254
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 255
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 256
Capability to provide ad hoc listings via screen and/or print listings based on
87.
user defined specifications such as (but not limited to):
Select and sort by asset category
Select and sort by asset class
Select or exclude fully depreciated assets
Select or exclude retired assets
Select by GL account codes
Select by business units
Select by asset status
Select by asset location
Select by asset life within asset book
88. Capability to provide reports that can analyse asset information:
By owner unit or using unit (e.g., zones, Area Office)
By time (e.g., year)
By company, asset type, department and location.
By movement (such as addition, transfer or disposal) by account, current month
or year-to-date activity
89. Provide for complete asset history, for example:
Depreciation, depletion and amortization current period, year-to-date,
accumulated
Net book value and residual value for finance, tax and regulatory requirement
Remaining life
History transactions with line-item
Repair and maintenance tracking
Warranty claims and settlements tracking
Insurance claims and settlements tracking
Acquisition and retirement date
Capability to provide the following details or reports for taxation purposes:
90.
Additions
Qualifying cost
Non-qualify cost
Year of assessment of acquisition
disposal/ write off
Qualifying cost
Non-qualify cost
Sales proceeds
Year of assessment of expiry Adjustments/ transfers
Qualifying cost
Year of assessment of adjustment/ transfer Reconciliation of fixed asset
movements
Opening balance
Additions
Disposals
Transfer in/ out
Adjustments
Qualifying costs
Non-qualifying costs
Closing balance Auditing Process
A.7. Auditing Process
System should allow User (Auditor) creation with access limited to viewing of
1.
the Customer Transaction data etc.
System should have the facility to provide Ad-hoc report writing facility for the
2.
auditors
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 257
System should have the facility to provide Interface enabling the data to be
3.
downloaded to the audit software for analysis of data for audit purpose
System should have the facility to Concurrent audit whereby
4. transactions/activities deviating from business rules are diverted on real-time
basis to internal auditors
System should have the facility to provide Internal Audit Report Template for
5.
writing of Reports
System should have the facility to provide Monitoring & Scheduling of Internal
6.
Audits, Statutory Audits etc.
System should inform the Internal Audit modules users about any new
7. product/service/facility to customers/employees (such as loans) introduced by
Discom by way of a monthly MIS report
System should be able to generate MIS report highlighting any new product/
8. service/facility to customers/employees introduced in the specific office chosen
for audit between the last audit date and current audit date
9. Capability to generate any statutory report as required for compliance
10. Capability to generate pending audit unit wise or as required by Discom
The system shall have dashboards that depict the various key performance
11.
parameters at various levels
A.8. Bank Reconciliation
Capability to prepare cashbook on daily / monthly basis with valid accounts
1.
codes
2. Capability to generate section-wise cash ledger
3. Capability to generate section-wise cash trial
4. Capability to generate consolidated cash ledger and cash trial
5. Capability to update the GL once any transaction is triggered
6. Capability to prepare Bank wise pay in slips reports
7. Capability to prepare List of Dishonoured cheques issued by UH_DH
8. Auto generation of adjustment entries (JV) arising out of correction in cash book
9. Capability to prepare Schedules with details
Capability to restrict use of wrong account code by sensing the routine account
10.
codes used by each section
Produce Trigger based e-mails on the occurrence / non- occurrence of certain
11.
events to designated persons
A.9. Employee Expenses
Capability to capture variable data of recovery/income from various sources
1.
for Payroll
2. Capability to adjust the bills against the advances
3. Capability to capture variable data like pay advance, Festival
Advance, TA advance, medical, LTC/LLTC (ESS workflow will be enabled for
4.
employee travel process, planning, approval, ticketing etc.)
Capability to account all employee income and recoveries and preparation of
5.
various Schedules
6. Capability to prepare statutory returns and certificates
Capability to maintain the employee-wise sub-ledger for advances &
7.
receivables
Capability to prepare bank payment vouchers for payment of salary to
8.
employees and forwarding the same to cash section
Capability to capture salary details according to responsibility canter wise &
9.
bill-wise for costing appropriation
10. Capability to capture elementwise, account-code wise salary element details
Capability to Generate Final Settlement Sheet, Loan Sheet, VR Compensation
11.
Sheet for processing final settlement dues.
12. Capability to Generate checklist, Voucher related to final settlement dues of
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 258
retiring employees
13. Capability to make monthly payment related to various VR schemes
Capability to capture Address and Bank details, Retiring TA Bill of retiring
14.
employees
15. Capability to capture medical bill, cabin/dietary charges, referred hospital bills
Capability to check eligibility criteria for Housebuilding/Vehicle/PF-NRL/PF
16.
Refundable Loan
Capability to calculate various Loan Amount and its EMI as per company's
17.
policy for recovery
18. Capability to produce TDS certificate for employees
19. Capability to show & print Employees pay-slip at users end
Support Statutory Compliance with Labour Laws Viz. Wages Act, Factories Act,
20.
etc.
Capability to recover PF, CPF, VPF etc. and make payment to
21. employee/nominee at the time of superannuation / resignation / termination /
death
Capability to segregate the employer's contribution towards PF and Pension
22.
and distribute to respective authorities through payment voucher
Capability to generate Pension form and transmit filled in forms electronically
23.
to Pension Authority
Capability to support gratuity payment, PF loans, PF interest, PF status, loan &
24.
VPF deductions, Life cover payment in death cases.
Capability to timely prepare and submit various statutory returns like TDS,
25.
Professional Tax and receive acknowledgement electronically
Capability to process employee recovery data and payment to authorities like
26. Provident Fund, Co-operative Bank and societies, LIC, Death Benefit Scheme
etc.
27. Capability to generate Employee Pay-slip
28. Capability to generate Wages analysis
29. Capability to generate TA/LTC/LLTC Advance and Final payment
30. Capability to generate Manpower Statement
31. Capability to generate OT & Absenteeism Report
32. Capability to generate LIC Deduction
33. Capability to generate All Loans & Advances Ledger.
34. Capability to generate Professional Tax statement
35. Capability to generate Refundable Loan statement
36. Capability to prepare Festival Loan statement
37. Capability to prepare VRS payment vouchers
38. Capability to prepare Final settlement voucher
39. Capability to prepare Income Tax salary certificate (Form 16) and Form 12B(A)
Capability to prepare PF contribution by employee and same amount
40.
contributed by employer segregated to PF and Pension
41. Capability to prepare List of the monthly pension contribution
42. Capability to prepare Loan recovery list
Capability to prepare Ledger of superannuated and separated employees as per
43.
the claim
44. Capability to prepare Schedule for life cover scheme
45. Capability to prepare Monthly various return as per the proforma of the Act
Capability to prepare Yearly return on the pension subscription of each
46.
pensioner
Capability to prepare new joining / separated members of the pensioner as per
47.
the Act
Capability to prepare Yearly individual PF & Pension contribution statement
48.
with opening & closing balance
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 259
49. Capability to prepare Monthly dues & payments statement as per proforma
50. Capability to prepare monthly dispatched challans
51. Capability to prepare Annual ledger of each pensioner
52. Capability to prepare Daily report of Medical / LTC / LLTC / TA advances
Capability to prepare Daily report of all types of bills processed for pay bill &
53.
cash
At any point of generation of report of advance (TA / LTC / LLTC) and its
54.
correlation with Accounts (Trial Balance) employee
Capability to prepare report on LTC / TA paid to employee quarterly etc. For
55. LTC: Type-wise (LLTC/LTC and Exe and NonExe), Block wise, separate case
on roll case
56. Capability to prepare Refer bill payment report age-wise, party wise
57. Capability to prepare Air party bill payment report - party- wise, Air lines wise
58. Capability to prepare Quarterly I.T. return to I.T. authority
A.10 Others
1. Ability to integrate with existing Billing Module (multiple billing modules)
2. Ability to generate A6 & A9 vouchers by integration with billing module or
directly
3. Online payment facility for A9 payments for O&M and other than O&M units.
4. Ability to generate MIS related vouchers by integration with billing module,
Excel import or directly.
5. Reconciliation of MIS revenue with actual receipts and payment collection
vendors provided reports.
6. Ability to maintain consumer inventory for CSD, MSD and advance
7. Generation of cost records and reports and reports as per the prevailing laws
8. Ability to maintain the Loan and Bond Management
9. E invoicing as per GST law compliances
B. Material Management:
B.1 Material Records Management (Material Master)
Ability to record and maintain item master list with availability of material
1 number/code/part code as primary identifier for various material types
including spares and consumables
Ability to generate material code automatically for item entry to item master as
2
well as support manual entry
3 Ability to support alphanumeric material codes & HSN codes
Ability to capture detailed material information including the categories of data
4 to support core material management transactions like goods receipt, goods
issue etc.
Basic data like Material No, Item Description, UoM, Status, Origin, type,
(a)
conversion factors, ownership details etc.
Inventory management data i.e., material history, ABC classification, inventory
(b)
location, safety stock, ROL etc.
(c) Purchasing data i.e., purchase rule, tax/duties rule, ordering batch size etc.
(d) Cost data i.e., standard price, moving average price, weighted average price etc.
(e) Criticality
Ability to support item groups or categorization of material into material
5
groups, type and location etc.
6 Ability to create BOM
7 Ability to integrate BOM with proposed expansion/extension
Ability to support approval workflow and automatically trigger material data
8
authorization upon material data entry
9 Ability to modify material details and resubmit for approval
10 Ability to track material authorization status pre and post approval
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 260
Ability to track changes made to material record with details of changes made,
11
changing entity and approver of changes
12 Ability to reject material record and update material record status with reasons
Ability to record whether material is moving or non-moving or obsolete delete
13
a material record which are non-moving, obsolete
14 Ability to link material to vendor / supplier details
Availability of search functionality based on material numbers, wild card
15
entries, partial item description, shelf life, warranty period, specifications, etc.
Ability to display partial or full material master information to users across
16 functional areas and restrict display of all information based on user
roles/display authorization levels
17 Ability to support multiple Units of Measure (UoM) for an item
Ability to create catalogues for different material types, spares and
18
miscellaneous items
19 Ability to capture details regarding insurance of the materials
20 Ability to generate detailed item wise report of material information
Ability to generate report on revaluation of materials and display valuation
21
history
Ability to generate report on material performance e.g., material history report,
22
material blacklist report, damage during warranty period
Ability to generate material reports for separate material type, material group,
23
location, consumption history etc.
B.2 Manage Inventory
Ability to record multiple physical store locations, capturing individual store
1
physical description details
Ability to support multiple inventory status for individual items including the
2
following:
Available for Issue vis-à-vis Order Position
Scrapped
Obsolete
In Transfer
Blocked
Restricted Use
Under Repair
Special Project Stock
Reserved Stock
3 Ability to track material movement for each store including:
Issues
Inter Store Transfers
Transfer to Obsolete Stock
Consignment movements
Quarantines Stock
Returns
Under Repair
Ability to track and monitor stock at various store locations like, Central Stores,
4
Area Stores, Sub-station Stores, at individual store level and at aggregate level
Ability to plan for inventory based on consumption pattern, present stock,
5
procurement lead times, projected requirements etc.
Ability to analyse inventory in terms of 'items reached re-order/ safety level'
6. and 'critical' items and generate appropriate alerts when inventory reaches
predefined re-order points
Ability to store shelf-life details for items and display alerts when items reach
7.
end of life (user defined) and remains un-used.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 261
Ability to store material movement history in each store and for each item e.g.,
8.
fast, slow moving and non-moving.
Ability to Block Materials for posting. Due to delay between material
movement and the posting of that movement, there is a short-term discrepancy
9.
between actual warehouse stock and book inventory. To avoid such
discrepancy during physical inventory, it is
Ability to classify inventory under bulk material, finished goods, capital items,
10.
job work and disposables
Ability to assign a service level to an inventory item e.g., 100% for critical items
11.
and this will be linked to re-order levels
Ability to schedule stocktaking as per predefined business rules e.g. A Level
12.
Items will be counted once every month and freeze inventory for stocktaking
Ability to support in stock replenishment for all stock items based on
parameters like re-order point, safety stock level, consumptions patterns etc.
13.
The system should estimate ordering quantity and delivering schedule which
can be converted automatically
Ability to trigger stock replenishment for all stock items on the basis of various
14.
parameters like reorder level, safety stock level, material consumption
Ability to estimate suggested ordering quantity and delivering schedule for
15.
individual items for stock replenishment
Ability to generate purchase requisitions based on re-orders automatically for
16.
items based on predefined system configurations
Ability to support inventory valuation methods like FIFO/LIFO/Weighted
17.
Average, Standard Cost, etc.
Ability to revalue inventory, with tracking to revert back / to get original value,
18. if required. This is to facilitate credit refund to Govt at current rate on original
value.
Ability to estimate total inventory carrying cost based on inventory valuation
19.
method
Ability to generate item wise stock status reports on current inventory status
20.
based on goods receipt, goods issue and stock balances on a daily/weekly basis
Ability to generate consolidated inventory report on receipts, issues, stock
21.
adjustments, scrap inventory, goods returned to suppliers, etc.
Ability to consolidate and generate report on item wise total inventory levels
22.
for all stores
23. Ability to generate stock-out reports
Ability to generate report on inventory analysis e.g., material consumption
24.
pattern across stores
Ability to generate report on availability of inventory during requisitioned and
25.
actual service level for items
26. Ability to generate report on age analysis and shelf-life evaluation
27. Ability to generate report on un-used materials procured for a specific purpose
B.3 Goods Receipt
Ability to record receipt of inventory items received from vendors/suppliers
1 and generate Stores Receipt Voucher (SRV) including record of place/location
of receipt and goods details (unit, weight, specifications etc.)
2 Ability to roll back/update the SRV in case the data is wrongly entered
Ability to record receipt of commercial documents received with goods like
3
excise invoice duplicate for transport copy along with goods
Ability to record receipt of technical documents like quality certification report
4
received along with goods.
Availability of control functionality for goods receipt i.e., receiving in
5 excess/shortfall of Purchase Order (PO) quantity, quantity tolerance
functionality or PO revision functionality
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 262
Ability to support quality inspection after goods receipt and before delivery of
6 goods to inventory and generate quality inspection report and record the
inspection results for the goods as per Purchase order
Availability of workflow-based inspection notification to quality control on
7 receipt on parts at store and return notification to store on completion of
inspection for posting the item to inventory.
Ability to support three-way matching of Stores Receipt Voucher (SRV) with
8 Purchase Order (PO), Quality Inspection Report (QC) and Dispatch Instruction
Report
9 Ability to club multiple lorry receipts (LRs) / consignments into single SRV
Ability to record partial delivery of items and track different lots of supply from
10
suppliers for the same PO
Ability to automatically trigger evaluation of goods receipt and initiate
11
payment process
Ability to raise bill for payment with workflow-based approval hierarchy for
12
evaluation of payment
13 Ability to record receipt of goods and track inter store transfers
Ability to receive goods without P.O. or without proper documents and
14
subsequent adjustment/regularization
Ability to display updated inventory status after goods receipt for individual
15
items, item groups and across stores
16 Ability to receive advance shipment notice and attach scanned documents
Ability to record receipt of inventory items purchased at different levels of
17
hierarchy like Head Office Purchase and Area Office Purchase
Ability to generate intimation notice to purchasing authority in case of return of
18
rejected goods
Ability to generate report on all SRV created over a period i.e., weekly\monthly
19
for a storage location
Ability to generate inventory status report based on goods received over time,
20 opening balance, goods issued, closing i.e., daily, weekly and monthly status
report.
21 Ability to generate report for all SRV and bill payments against individual PO
Ability to generate exceptions during Goods Receipt including rejected
22
quantity, items not as per P.O etc.
Ability to generate report on bills raised against SRV over a periodic basis in a
23
store
Ability to generate list of items with guarantee clauses, in particular guarantee
24
period along with Delivery Instruction (DI) date
25 Ability to send alert to the vendor as per delivery schedule
B.4 Goods Issue
Ability to create material issue request/store requisition (SR) for material
including spares and miscellaneous items. The requisition record should have a
1
reservation number, date of reservation, requestor name, stock location,
material part number, quant
Ability to generate SR manually and automatically based on maintenance work
2
orders, capital works project requirements estimated in system
Availability of control functionality for goods issue i.e., issuing in
3 excess/shortfall of SR quantity, quantity tolerance functionality or SR revision
functionality
4 Ability to modify material issue requests/SR based on approver update
5 Ability to track changes made to SRs and display reservation history
Ability to delete SRs automatically based on cancellations in work orders,
6
capital works project etc. and record reasons for cancellation
7 Availability of configurable approval workflow for SR approval
8 Ability to display material issue requests awaiting approval
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 263
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 264
store
Availability of material control functionality to check goods issued from issuing
11
store with goods received in receiving store and post transfer of goods
Ability to capture the Rate Contracts for Inter Store Transfer and rationalize the
12
transportation linkage to Finance Module
Ability to generate report on item wise inter-store transfer consolidated across
13
stores
Ability to generate report on all items received and issued for inter- store
14
transfer for a storage location on a periodic basis
Ability to generate exceptions and item quantity mismatches arising out of
15
inter-store transfer
Ability to report on trends of regular item shortages in a store resulting in inter-
16
store transfers
B.6 Store Return
Ability to record and support workflow for return of un-used or excess material
1.
from field/substation to stores
Ability to record and segregate dismantled material into scrap and healthy
2
category
3 Ability to generate Store Return Note on goods to be returned from field
Ability to record receipt of goods at receiving store, generate Goods Receipt
4
note and track its SR when goods are returned to store
5. Ability to update the Store Return Note in the store base on prior approvals
Ability to display updated inventory status after goods receipt in receiving
6.
store
Ability to generate accounting adjustments on a consolidated basis at Area
7.
Office level for all the Store Return Notes generated for that period
Ability to generate report on materials returned to a store over a periodic basis
8.
e.g., weekly, bi-weekly
Ability to generate summary report of Store Return Notes generated by the
system over a periodic basis or location wise scrap/obsolete items (as declared
9.
by appropriate authority) returned to the store from the field operations of the
Discom.
B.7 Material Disposal
1. Ability to compile periodic report of scrap goods returned to the stores
Availability of configurable approval workflow for scrap approval and capture
2.
the recommendation of the scrap disposal committee
3. Ability to display scrap requests awaiting approval
Ability to generate alert to initiate material disposal workflow with the scrap
4.
goods report completion as the trigger
Ability to generate material list for auction/sale by Stores based on material
5.
disposal report
Ability to record auction/ sale result for scrap disposal including buyer
6.
information and material disposal details
Availability of workflow to support configurable payment norms for scrap
7. disposal and generate goods issue based on buyer compliance to payment
norms
Ability to generate Goods Disposal note (GDN) after checking against payment
8.
information
Ability to generate accounting adjustments on a consolidated basis at Area
9.
Office level for all the disposals generated for that period
Ability to generate report on scrap items available in a storage location over a
10.
periodic basis e.g., weekly, bi-weekly etc.
Ability to generate exception report for goods disposal process i.e., goods which
11.
are not being disposed on time, auctions not held as planned
12. Ability to generate report on auction results and record auction sale information
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 265
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 266
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 267
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 268
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 269
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 270
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 271
Ability to support different business rules and policies for each Contractor
26.
class/category and Contractor type
27. Ability to amend/cancel /offloading of contracts/ LoAs.
28. Ability to track LoA wise performance guarantee, Bank guarantee expiry dates
Ability to track LoA history, search work orders by Contractors, nature of job,
29.
etc.
30. Ability to record payment terms and actual payments made
Ability to link payment to the Contractor with the status of the contract
31.
execution for real-time monitoring
Ability to send alerts at defined period/ status for a contract when specified
32.
parameter value is reached
33. Ability to generate report on change history for a particular LoA
Ability to generate reports on LoA by user defined criteria e.g., LoA numbers,
34.
Vendors, originator, etc.
Ability to generate report on LoAs due or overdue Ability to generate report on
35.
LoA outstanding payment history
Ability to generate report on exceptions based on delivery slippages, deviations
36.
and cost overruns
37. Ability to generate report on LoA status
C.7 Service Procurement
Ability to support procurement of services through recording details of list of
1.
service items, bill of services, estimated rates etc.
Ability to make detailed estimates for civil, mechanical, electrical,
2.
instrumentation works, etc.
3. Ability to revise estimates, if required, during the execution of the order
Ability to support multiple type/modes of tendering for service procurement
4.
like RFQ, direct PO etc.
Ability to create a schedule of rates for various service items that would be used
5.
for all cost estimation for service procurement
6. Ability to create a service requisition/ proposal from an existing requisition
Ability to capture terms and conditions information for each contract proposal
7.
or Execution Order (EO, also referred as "Order" in Discom)
Ability to direct the tender to the appropriate authority fund allocation/
8.
approval as per defined hierarchy
9. Ability to generate Execution orders from the tender and the services chosen
10. Ability to create multiple execution orders from one requisition
Ability to compare the current offer with previous offers on another Execution
11.
Order
12. Ability to record execution order receipt confirmation from the vendor
13. Ability to generate unique execution order number
14. Ability to specify staggered job completion pattern
Ability to create a blanket execution order/ rate contracts with or without
15.
quantity commitment and with or without schedule
Ability to generate automatic alerts/ reminders when a contract is about to be
16.
expired or requires renewal
Ability to generate a work schedule for various activities along with service
17.
item number, description, completion date, status updation, etc.
Ability to monitor the order execution with respect to time and cost budgeted
18.
vs. the time and cost left
Ability to track whether payments are made to the workers by the Contractor as
19.
per the statutory requirements
Ability to record acceptance/ rejection/ partial acceptance of the service
20.
provided
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 272
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 273
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 274
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 275
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 276
Ability to date and time stamp all changes in the database enabling data
25.
availability on 'as on date/time' basis
Flexibility of additionally capturing any information relating to employee at a
26.
later date
Ability to link employee data with the position based standard responsibility
27.
(Job) Matrix
Ability to maintain concurrent jobs for employees with additional
28.
responsibilities/special duties in addition to regular responsibilities
Ability to link employees with the membership with various Committees
29.
(permanent or temporary) and membership of any professional organization
30. Ability to maintain the record of displeasure issued to the employee
Ability to update only authenticated data reflected in the employee master on
31.
prompt
32. Ability to maintain employee data with regards to claims, etc.
33. Ability to maintain and view employee leave details
Ability to maintain employee data with respect to PF, Gratuity, etc. and the
34.
nominations for the same
35. Ability to create organizational chart of all positions and reporting relationships
36. Ability to provide restricted access to different classes of employee master data
Ability to maintain the insurance related details for each employee, like
37.
insurance number, nominee details, amount etc.
38. Ability to maintain Audit trial of all changes made to sensitive information
Ability to maintain performance appraisal rating of last all years and promotion
39.
details
Updation of all information in Employee Master data since recruitment (such as
40.
personal details, addresses, transfers, deputation, change of location
Ability to maintain service files documents in scanned form including Proof of
41. Date of Birth, domicile, Bonds, if any, executed, disciplinary cases details,
photograph etc.
Ability to process Discom House Building Loan (For Class-IV employees) for
42. land purchase, house/flat purchase, construction of residential house,
addition/alteration of constructed house and repair of house
Ability to issue Release Orders to release the loan money by the respective
43.
accounting unit against sanction order
44. Ability to provide details of employees applying for higher education
45. Ability to submit and declare of assets by employees
Ability to provide reports of employees based on blood group, length of service,
46.
age, qualification, experience, Discom, salary bands etc.
Ability to provide reports to HR&A Discom on employees personal,
47.
educational & professional details not updated in the system
Ability to provide reports on all employee details as per Discom, class/cadre-
48.
wise, location in specified period
Ability to provide reports on employee counts retired, resigned, suspended,
49. terminated or left, per Discom, class/cadre-wise, superannuating in a specified
period
Ability to provide reports on status of details of disciplinary proceedings, time,
50.
progress, status
Ability to provide reports on personnel released from one place and not joined
51.
other office
D.3 House Building Loan
Ability to process House Building Loan under tie-up arrangement with
1.
scheduled bank(s)
Ability to process charges of interest and other terms and conditions of tie up
2.
arrangements with scheduled banks in respect to HBL
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 277
Ability to process formal permission in case the employees do not avail of dept.
3.
H.B. Loan but intend to avail housing loan from outside agencies
Ability to process waiver of H.B. Loan for the deceased employees with
4.
concurrence of the competent authorities.
5. Ability to penalize for non-utilization or delay in utilization of HBL
Ability to generate report son monthly/quarterly /half yearly and yearly
statements covering sector wise activities of HBL and retrieve relevant data of
6.
loanees of recoveries made and outstanding amount if any linking the same
with appropriate financial mo
Ability to auto-generate NDC or else for grant of HBL, recommendation of
7. sanction for HBL, permission for purchase and sale of properties, conveyance
and reconveyance of mortgage deeds
Ability to provide reports on all information regarding HBL (including
8.
recovery stats)
Facilitate employee to apply for changes in permanent & correspondence
9. addresses, details of family members, emergency contact details, contact details,
office location, nomination for various schemes like PF /Gratuity, etc.
Ability to add /update bank information for expense reimbursement, PAN no,
10.
passport details, driving license no. etc.
Ability to allow employee to update online through ESS the non-critical
11.
personal data (such as weight, height, etc.)
12. Ability to provide address proof letter to employer for various purposes
Ability to remind the employee through self-service/e-mail/SMS regarding
13.
modification or requirement of additional data
14. Ability to send the employee confirmations after changes are made online
D.4 Attendance & Leave Management
1. Ability to mark attendance and fill time sheets
Ability to apply for leave under the appropriate category and state the reasons
2.
for it
3. Ability to apply for NOC for abroad tour
4. Ability to Check the status of leave request
5. Ability to approve/cancel/modify leave requests by employees
6. Ability to view accrued leave balances
7. Ability to approve or cancel leaves of subordinates
Ability to intimate the controlling officer when an employee goes on
unauthorized leave (unmarked attendance) / returns from unauthorized leave/
8.
extends leave/ reports in the middle of the sanctioned leave period (along with
appropriate reduction in sancti
Ability to provide reports to subordinates and HR&A in ESS on attendance &
9.
leave details
Ability to provide reports to HR&A and HoD on employees presently on leave
10.
in the Discom
Ability to provide the Manager consolidated status of present/absent
11.
employees working under him/her
12. Ability to provide report on attendance details & leave quota/balances
Ability to provide reports on number of employees for whom leave has not
13.
been approved/declined/modified
Ability to view vacancy list & status of vacancy (Filled/vacant/abolished)
14.
(Integrate with Recruitment Module)
15. Ability to post CVs of references as per the vacancy list
16. Ability to view Discom -wise manpower strength by HoD
17. Ability to internally apply for a job and view the status of the application
Ability to record requests by employees for passport/visa /study and outside
18.
employment and permission granted/rejected thereof
19. Ability to submit / update declarations for Income Tax calculation
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 278
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 279
Ability to formulate and update Annual Training Calendar with list of Training
22.
Programmes, Batch size, target group etc.
Ability to provide input to Finance & Accounts Module for payment to
23.
Trainers/Institutes
24. Ability to update list of Trainers/Institutes for various training programmes
Ability to record participant's attendance in training programmes and
25.
employees nominated but did not attend a training programme
26. Ability to notify HoD/employees about the nomination for training programme
Ability to define and print training nomination letters to be sent to employees
27.
for invitation
Ability to customize training feedback form, effectiveness form and training
28.
nomination letters
29. Ability to analyse training feedback
30. Ability to book training rooms by Discom for specific training programmes
Ability to capture course content of all training programmes along with list of
31.
Target group, batch size
Ability to support the process of Induction Training for new recruits by
32.
integrating with the recruitment module
Ability to maintain topic/subject-wise database of internal & external faculty,
33. number and details of courses conducted by them quarterly, half-yearly, yearly
and cumulative
Ability to maintain training budget (for each category of training) - cost of
training - actual expenses. Link the TA/DA/Hotel expenses payment records to
34.
find out total cost of training. (The TA bill passing system should be linked to
the Training system
Ability to maintain data for internal training exam and certification obtained by
35.
staff
36. Ability to maintain data on external certifications obtained by the staff
Ability to have online registration, cancellation, reminder, and confirmation of
37.
training classes
Ability to upload external brochures or training programme received from
38.
external institutes
Ability to raise Requisition / Purchase Orders (PO) for clearing professional
39. fees of Trainers/Institutes/Stationery/Photocopy of training course
content/material etc.
Ability to monitor Planned Training against actual training conducted based on
40.
user defined parameters such as number of trainings, budget, participants etc.
41. Ability to maintain training database with full training history of all employees
Ability to raise requests for guest house booking for guests & other field
42.
employees nominated for training
Ability to view status of requests for guest house booking for guests & other
43.
field employees nominated for training
Ability to provide details of vocational training and GoI (apprenticeship) - only
44.
period of training, name and age/CSR training
45. Ability to produce individual and Discom training reports
Ability to provide report with the participant list and total training hours for
46.
each employee during specific period
47. Ability to calculate total Training Cost in a year against the T&D Budget
Ability to provide reports on training programmes nominated for but not
48. attended during employment (reasons for not attending) Employee Exit (Full
and Final Settlement)
D.7 Employee Exit (Full & Final Settlement)
Ability to request for VRS (integrate with Employee Master for status of
1.
disciplinary proceedings and HBL)
2. Facilitate employee to fill exit interview form (for resignation)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 280
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 281
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 282
payments)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 283
Ability to forward the overtime schedule to the top management for approval if
56.
the amount of overtime is over a defined percentage of the basic salary
57. Ability to maintain a salary range for each job family or job class/career band
Ability to automatically adjust calculations for mid-pay period salary, advanced
58.
salary, and employment actions
59. Ability to convert the payroll to an excel sheet
Ability to assign work calendar (scheduled workdays, scheduled holidays, etc.)
60.
to one or more employee groups
61. Ability to default standard holiday data, as well as user-defined holiday data
62. Ability to create and maintain work calendars over user-defined years
Ability to provide input to Finance & Accounts Module for salary payment
63.
based on attendance. Statutory and voluntary deductions
64. Ability to calculate arrears in case promotion is made with retrospective effect
65. Ability to update salary details on promotion, Succession Planning
66. Support for allowances, reimbursements, loans etc.
Ability to support encashment of Leave, Tours and travel and on retirement
67.
with consequent tax adjustments
Ability to release of festival advance and other advances (user defined) against
68.
salary
Ability to Employee-wise recovery position, recovery list and outstanding
69.
balances list - month-wise or as user defined
Ability for payment of medical reimbursement, allowances, recovery and
70.
taxation (if any) thereon
71. Ability to support Recovery of club/ union contributions
Ability for provision of Housing loan or any other loan component to be
72.
adjusted against the employee salary
Ability to support payment of educational allowance, transfer allowances and
73.
any other user defined allowances
Ability to support recovery of all other types of loans with reports like
74.
recoveries made, overdue list etc.
Ability to support calculation of incremental arrears with consequent tax
75.
adjustments
Ability to support payment of salary arrears as per the industry level
settlements with tax adjustments. Also support payment of arrears calculated in
76.
user defined instalments or in lump sum Ability to define loans and its various
characteristics such as p
77. Ability to attach loan sanctioning rules to every loan type
Ability to allow payroll to deduct the amount due from an employee (in case of
78.
loans/advances etc.)
D.9 Employee Taxation
Ability to Define tax rules to determine employees tax liability as per changes in
1.
statutory legislation for actual tax liability of employee
Ability to capture employee asset details such as various land holdings,
2.
investments in shares, any bank deposits and various sources of income
Ability to provide investment declaration form in electronic format. The
3. employee will be required to fill and submit the form electronically so as to
automatically updation of salary record and tax calculation by the system
Ability to ensure support for major statutory reports / certificates of taxes in the
4.
user defined format
D.10 Employee Deductions
Ability to establish deduction limits for each deduction based on various
1.
parameters like: Employee, Job Classification, Company, Benefit plan, Salary
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 284
Ability to make deductions effective: In the current period, in any pay period or
2. periods selected, in any user-defined frequency selected, between user-defined
start and stop dates, until a user defined limit is reached
Ability to have Start and stop dates for deductions should be maintained: On
3.
the Employee Master file, On employee level
Ability to reverse deduction to be included in next paycheck if incorrectly
4.
withheld / Option with user
Ability to determine deduction amounts by: Amount of earnings, Percent of
5.
earnings, Number of hours
Ability to prioritize deductions: Using the deduction code, Using a separate
6.
priority number
Ability to be prompted by system when employee status changes to leave to
7. determine how deductions will be paid while on leave: take when return lump
sum
8. Ability to apply or stop various deductions based on employee status changes
D.11 Pay Slip Run
Ability to provide for online ad-hoc calculation of employees pay slip / salary
1.
amount
Ability to perform on-line calculation of pay and benefits for terminated
2.
employee based upon termination date
3. Ability to evaluate different scenarios for change in pay-roll structures
Ability to provide an impact analysis tool for analysis of impact of revision of
4.
any / all components like pay, allowances, deductions etc.
5. Ability to display the status of the payroll calculations
Ability to run Payroll multiple times before finalization to ensure accurate pay
6.
computation
Ability to post the amount of salary paid for each element of pay for an
employee, based on the relevant GL account code and employee cost center
7.
information to General Ledger. Financial postings include, Element, Amount,
GL Account, Cost Centre
Ability to Post salary payment advice including multiple payment methods
8.
such as bank, cash and Cheque to General Ledger
Ability to generate pay slip with following detail: Taxable and non- taxable
components in separate columns, Tax till date, Calculated, Recovered,
9.
Projected, Loan balances and no. of instalments deducted / left, Provident fund
opening balance, interest til
D.12 PF & Terminal Benefit Management
Ability to support pooling the monthly contribution of PF into the online PF
1.
management system
Allows differentiation of employees (e.g., PF not deductible based on eligibility
2.
criteria)
Ability to Support PF settlement process including generation of settlement
3.
sheets and relevant vouchers for accounting
Ability to support calculation of periodic interest and crediting the amount to
4.
the accounts
Ability to perform PF application processing, loan sanctioning, loan
disbursement, modification of loan instalments, loan short closure, recovery
5.
through payroll, final settlement during closing/transfer for different type of PF
loans (support linkage with
Ability to deduct loan instalments (& separately track deductions, loan balance
6.
etc.)
Ability to Generate all types of MIS reports as per request of Bank (like PF
7.
ledger, PF loan ledger, Pension rule, PF rule, Gratuity rule (online) etc.)
Ability to maintain nominee details and payment to nominee in case of death of
8.
an employee (Integrate with Employee Master)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 285
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 286
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 287
Ability to draw a competency matrix in the system and define the competencies
23.
/ skills/roles/responsibilities required at each level/position for promotion
Ability to intimate the outcome of various stages of promotion (interview, first
24.
shortlist etc.) to the employees through ESS Module
25. Ability to redefine the promotion process on change of policy
Ability to record transfer option of an employee at the time of promotion and
26.
generate reports for the management for making transfers on promotion
Ability to maintain complete history of employee transfers since recruitment
27.
Reporting Requirements
Ability to generate a list of eligible candidates for promotion of different grades
28. and streams in consideration of period spent under suspension, extra ordinary
leave without pay etc.
29. Ability to generate list of pending cases with requirement of particulars
Ability to generate reports on status of officers/staff whether released or not
released or whether joined/not joined (along with dates) as per
30.
transfers/promotion orders as on date or cross section of time is available
readily from this system
Ability to generate seniority list of all officers and staff (with particulars like
31.
DoB, DoJ, Qualifications) on any date/time
Ability to provide reports on total employees promoted during specific period,
32.
category wise, unit wise, designation wise (all details)
Ability to provide reports on employees not selected for promotion or cases
33.
deferred or pending or dropped with reasons
D.16 Compensation & Benefits
1. Ability to maintain the compensation and benefits policies of the organization
2. Ability to perform Income Tax calculation
Ability to calculate compensation and benefit details (Pay Slip) of each
3.
employee
4. Ability to issue orders granting Band Pay
5. Ability to issue orders granting annual increments
6. Ability to approve loans and advances of employees (by appropriate authority)
7. Ability to Check Loan Balances
Ability to handle making online application for sanction of LTC/HTC/other
8.
entitlements through ESS and approval through workflow
9. Ability to process application for medical advance, HTC/LTC reimbursements
10. Ability to approve general claims and expenses through the system
Ability to track loan requests made by employees and send reminders,
11.
Feedback & Grievances
Ability to track and record all compensation payment made towards accident-
12.
related cases under Workmen Compensation Act of 1923
Ability to show details on all aspects, place of accident (office), cause, report on
how the accident happened, witnesses, name of investigation officer, and other
13.
officers involved in the process at the field, investigation details and
determination of co
D.17 Appraisal-Compensation Reporting Requirements
1. Ability to provide report on past salary slips & income tax statements
2. Ability to provide report on expense requests approved/claimed/rejected/paid
Ability to provide report on month-wise/year-wise accident compensation
3.
sanctioned, and all details related to it
4. Ability to provide report on month-wise insurance premium payment receipt
5. Ability to generate marks on attendance
Ability to capture Performance Appraisal Policy and customize process to
6.
update/edit the policy
7. Ability to define the structure of appraisal process
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 288
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 289
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 290
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 291
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 292
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 293
Facility to generate reports on the total amount of pay out on litigation cases
35.
during a specified period
36. Facility to incorporate the outputs of Litigation Management System (LMS)
37. Facility to generate report on review of court cases at the site offices.
Facility to generate reports on the total number of legal cases filed against the
38. company by employees (per year) against disciplinary actions /non- settlement
of terminal dues/other issues
Facility to appeal against the punishment/disciplinary action taken against
39.
employee
Facility to generate reports on the total number of legal cases filed against the
40.
company by others during a specified period
Facility to generate reports on the total number of employee court cases decided
41.
in favour of the company
Facility to generate reports of pending cases allotted to particular advocates by
42.
any office
Facility to generate reports of pending cases according to involvement of
43.
outstanding dues
Facility to generate reports of pending cases according to date/month of filing
44.
the cases
Facility to generate reports on amount of revenue allowed by court in favour of
45.
company after disposal of cases
46. Facility to generate reports advocate wise and office wise legal expenditure
47. Facility to generate reports on amount realized through out of court settlement
D.25 Procurement & Issue of Medicines
1. Ability to automate the requisition process for purchasing medicines
2. Ability to automate the tendering process for purchasing medicines
Ability to update the stock amount, number of medicines issued in past
3.
months, etc.
Ability to calculate the total amount spent on purchasing medicines against the
4.
allocated budget, remaining balance, etc.
Ability to provide reports on the total number of medicines purchased within a
5.
specified time, number issues, stocks in balance, etc.
Ability to provide reports on the total amount spent on purchasing medicines
6.
against the allocated budget, remaining balance, etc.
D.26 Travel Management
1. Ability to automate the process of Travel Request
2. Ability to define Travel Request (Rail/Air/Road/) Forms
3. Ability to define & select calendar and time schedules for travel planning
4. Ability to define Country/state/city for travel planning
5. Ability to select type of Travel (Local/Domestic/International Travel)
6. Ability to select mode of travel (Rail/Air/Road)
Ability to recommend Train Name & Number, Flight Number / Name of
7.
Carrier
8. Ability to add number, name, age, Discom, function of travelers
9. Ability to raise Travel Requisition for Local/Domestic/International Travel
10. Ability to select the cost center while raising travel requests
Ability to define approving authority and reviewing authority for
11.
checking/approving/declining travel requests
Ability to select approving and reviewing authority for approval of travel
12.
requests
Ability to provide any additional comments before submitting the travel
13.
request (lowest fare/berth preference)
Ability to approve/decline/modify travel request of employees by approving
14.
authority
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 294
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 295
Ability to issue the No Demand Certificate when occupants vacate the quarters
18. and consequently stop deducting rent from salary (integrate with Payroll
module)
Ability to provide reports on the list of present occupants of the quarters,
19.
quarters they are occupying, and list of vacant quarters
Ability to provide reports on the total number of applications processed
20.
regarding quarter allotment in a year
D.29 Employee Welfare & CSR
Ability to maintain the history of employee welfare and CSR initiatives
1.
undertaken over time, separately
Ability to calculate the amount spent on employee welfare and CSR initiatives
2.
separately
Ability to provide separate reports on the total number of employee welfare
3. and CSR initiatives undertaken within a specified time with amount spent on
each Performance Linked Incentive (PLI) Scheme
4. Ability to automate the revised PLI scheme for Discom
5. Ability to capture the time to revisions/edit any changes in the PLI scheme
Ability to take input from the corporate and Discom scorecards to update data
6.
such as target setting etc. for computing the PLI for Discom
Ability to calculate the amount disbursable for PLI for all employees in each
7.
Discom and unit of Discom
Ability to calculate and maintain the history of PLIs earned by each employee in
8.
a year (integrate with PMAS and Payroll modules)
9. Ability to make comparisons of year wise PLIs earned by functions/ Discom
Ability to provide reports on the total amount disbursed as PLIs in each year,
10.
Discom level as well as employee wise
D.30 Others
1. Ability to add legacy entry in Service Books
2. In Employee Master, RGHS & GPF-SAB details to be added
3. KPI to be added with APAR module
4. Process like working arrangement within Discom, Charge Assumption/
Relinquish, Joining/Relieving, Deputation In/Deputation Out are to be
incorporated
5. Employee Payments File to be prepared which are acceptable by the Bank
6. Pay Fixation on promotion, ACP or upgradation to be added
7. Seniority (multi level in case of Technical Employees) and DPC is to be
incorporated
8. Enquiry to be initiated through System
9. Encashment Application, Approval and Payment through system
10. Overtime calculation and payments
11. Orderly, conveyance and medical reimbursement
12. Biometric integration with Attendance sub module
E. Project Management:
E.1 Project Planning
1 Project Initiation - Communication within organization
2 Project Management Tools for developing project plan
3 Ability to revise project plans
4 Ability to suggest financing plan at the project planning stage itself
Ability to tie-up all documents related to a project (including documents related
5
to required statutory clearances and compliances) in project control folder
Ability to classify type of projects- turnkey/ modular at project planning stage
6
itself
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 296
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 297
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 298
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 299
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 300
All data must be identified to its correct financial year and month in that
financial year so that any queries over the accuracy of charging resources to the
11.
project can be properly investigated. Consolidated data for each year is not
adequate.
View all the reports related to inventory management in respect of construction
12. and O&M materials for financial accounting purposes from System with
appropriate security.
Capitalization of Projects (Capital Work in Progress). From projects to Assets
13.
Management.
Possible to link Purchase Order number of contracts (with contractors) with the
14.
project number
Integration with the Materials Management module to ensure material
15.
availability in site based on current stock and requirement of the project
E.7 Project Management General Requirements
Capture documentation related to execution of various projects (existing & old)
1.
for retrospective analysis in future.
Comprehensive project database to capture the data pertaining to all aspects of
2.
projects
3. Resource tracking across projects
Ability to generate technical / financial specifications for projects and to
4.
analyse and evaluate the bids received
Full data on any project must be kept throughout the life of a project and must
5.
be able to be printed out and/or reviewed on screen at any time.
Prevent further transaction processing/transfers against finalized jobs/projects-
6.
No post fact editing
7. Ability to generate Gantt charts, histograms, tables, charts etc.,
Ability to send SMS alerts to concerned officials at defined milestones for
8.
actions to be taken (e.g. payments) and deviations from schedules
Ability to provide necessary information to populate predefined Balanced Score
9. Cards for monitoring of Key Performance Indicators for Planning, Engineering
and Project function
F. Maintenance Management:
Ability to prepare a Maintenance Budget for Discom with appropriate linkages
1. with Capital Repair Plan, Preventive Maintenance Plan, Annual Business Plan
etc.
Ability to collate budgetary requirements for maintenance from concerned
2.
departments as part of Maintenance Budget exercise
Ability to generate format for estimation based on budgetary offers or
3.
otherwise
Provision to forecast the cost, including cost of spares, manpower and
4. purchased services, of Preventive Maintenance activities based on pre-defined
checklist
5. Ability to register breakdown call online. Online refers to ERP system.
Ability to send Alert/ Trigger/notification for initiating and closing of request
6.
(SMS facility/ mail) should be sent to all stakeholders by the system.
7. Ability to do Breakdown Calculation based on working hour of the machine
Ability to show Online stock position, online generation of requisition- Ability
8.
for Auto indenting of regular consumable materials
9. Ability to record technical specification of equipment and maintain it on ERP
Ability to search/ trace the material based on specification/ description/
10.
vendor - Traceability for non-stock items (where material code is not available)
Ability to generate single tender certificate based on various parameters. It is a
11. certificate issued by requester justifying the emergency/proprietary reasons
allowing purchase to go for single tender.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 301
Ability to Vendor to Check the purchase order (PO) Status, Billing Status,
12. Vendor Performance Rating, Upload Test Certificates, Booking Inspection Call
/ Transporter etc should be available online
Maintain vendor specific warranty information and display the same when a
13.
problem for the equipment is notified
Ability to capture PM activities carried out for individual machines under the
same annual maintenance contract (AMC). If more than one equipment is
14.
covered in an AMC (since only one PM plan can be created for each AMC), it is
not possible to capture PM de
15. Ability to deactivate disposed equipment from equipment master
Ability to provide online workflow-based processes for raising notifications,
16. assigning jobs to relevant personnel, preventive maintenance, breakdown
maintenance, calibration of equipment for repair, spares requisitions.
Ability to integrate Maintenance Module processes with other functions like
17.
materials management, production, sales & distribution and finance
Ability to send an alert to the concerned stakeholders if the Preventive
18. Maintenance (PM) is not completed on time. Alert refers to Email as well as
SMS.
Ability to compute MTBF (Mean Time Between Failures) and MTTR (Mean
19.
Time to repair) for an equipment
20. Ability to show Depreciated value of machine
Ability to Upload measurement parameters through upload of excel for the
21.
logbook maintenance
22. Ability to view steps and milestones of a maintenance order to be executed
23. Ability to interface with all identified metering points for data collection
Ability to capture testing related parameters of equipment’s whose tests are
24.
carried out
Ability to transfer information from SCADA to collect real time parameters of
25.
key elements across multiple locations Clarification: Please refer
Ability to view precautionary steps / safety instructions to be followed for
26.
executing every work order as per Discom rules and regulatory requirements
27. Ability to upload the list of maintenance plan on system
System should support requirements for following types of maintenance for
Power Plants, Power Stations, DAM, Barrages, Offices, Staff colonies etc.:
28.
Electrical, Mechanical, Civil, Battery Bank Maintenance, Auxiliary Equipment
Maintenance, Powerhouse Store
29. Ability to prepare schedule of calibration for equipment
Ability to identify equipment which need periodic calibrations for ensuring
30.
accuracy and determining and defining the periodicity
Ability to define various parameters monitored can measuring points for that
31.
equipment.
32. Ability to view the list of pending maintenance plans
Ability to raise maintenance execution orders pending list as SMS alerts at
33.
defined intervals to concerned officials to assist proactive work plans
Ability to raise the flags to the concerned officials assigned for the work orders
34.
and Execution orders
Ability to help reviewing Maintenance Schedules execution orders as per
35.
geographical locations
Ability to allocate online, work to concerned department / group of personnel
36.
/ individual
37. Ability to view job allocations for individual resources
Ability to reallocate field resources as per job requirement both for internal
38.
Employees of Discom or contract laborers
39. Ability to view the real-time location wise material availability
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 302
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 303
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 304
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 305
completion.
The solution will enable the user to inquire on work progress at maintenance
129.
order and Work Task level.
The Solution will have the capability to readily provide a list of open
130.
maintenance orders against an individual / work group
The Solution will have the capability to provide a list of open maintenance
131.
orders against a productive unit and its child equipment
It must be possible to identify defects found during an OHL inspection from a
132. user-friendly, equipment types specific list and for this to result in maintenance
orders being created/amended/closed based on specified rules.
133. The solution will provide the ability to update a maintenance order status
Capture activity of all Capex activities including Connections down to
134.
equipment class e.g., Distribution Switchgear, Transformer
Opex high-volume, low-cost work to be captured by standard job (equipment &
135.
voltage) by activity e.g. Inspection, Civil work, Link boxes
Opex maintenance activity on 132kV/11kV plant captured by equipment e.g.
136.
transformer, Isolator, circuit breaker
Distribution Maintenance Module activity captured by activity / EGI /
137.
equipment
138. Fault activity captured by equipment
Ad Hoc work activity captured by equipment for high voltages and EGI for low
139.
voltages
Need to record in The Solution who i.e., own staff/contractor has carried out
140.
task
Need to be able to easily link cost in SAP to The Solution data to calculate unit
141.
costs at appropriate level
Work carried out during or following a storm period needs to be identifiable so
Will clarify
that it can be excluded from similar work done at other times so that it is not
142.
included in the routine calculation of performance or returns to regulatory
bodies.
The Solution will have the ability to follow different processes based on work
143. type (e.g., The Solution will have the ability to prioritize emergency work over
other activities)
The Solution will have the Capability to capture Defects at equipment level,
144.
either manually or electronically from the Field
The Solution will have the ability to capture Follow-on work at equipment
145.
level, either manually or electronically from the Field users
The Solution will have the ability to track costs at an individual equipment level
146. including all maintenance order costs (equipment, Labour & materials) to
enable whole equipment lifecycle tracking
147. maintenance orders must be linked to the original maintenance notification
The solution will update, or allow the maintenance order Status to be updated
148.
to reflect the current position.
The solution will allow Work Tasks to be assigned individually within a
149.
maintenance order
The solution will allow maintenance orders to be comprised of individual work
150.
tasks
The solution will present a suggested list of possible Work Tasks for the
151. maintenance order based on the Work Type and pre-defined work templates.
The user may select from the list to create these or create new ones from scratch.
The solution will present suggested details for the selected maintenance order
152. based on the work templates and other information that was captured on the
original maintenance notification
The solution will update the expected end date of a Work Task that has already
153.
started, this will be because of progress updates applied either automatically or
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 306
The solution will enable templates for maintenance orders and Work tasks to be
154.
created and maintained.
155. The solution will allow a template to be based on another template.
The solution will allow a template to have a status that the user can update.
156. There will be a status representing "live" in which case the template will be
offered as one of the templates to base a work item on.
157. Requirement to hold civil equipment work and condition history in the solution
158. equipment still under warranty will be flagged
Processes will support the need to ensure that only current data collection
159.
forms / scripts are in use.
For any unplanned work identified the originator will be identified on the
160.
maintenance order/request.
Any inspection work completed as part of a fault restoration activity will be
161.
recorded in the solution.
The solution will provide the ability to raise maintenance orders for clean-up
work. Contamination history (including what clean-up works have been done)
162.
will form part of the maintenance order. Free text notes can be added to the
maintenance order. Also r
Confined Spaces risk rating to be highlighted on maintenance orders raised
163. against the relevant equipment (sites/buildings/tunnels/shafts) or their
children equipment.
Ability for maintenance users to raise defects against equipment, subject to
164.
policy
Standard jobs will have the ability to hold a Priority, which is set when the job
165.
is raised, and is easily identifiable by Discom
166. The solution will allow multiple users to inspect the same group of equipment.
The solution will provide the ability to create new standard jobs to meet new
167.
business policy
User profile shall determine the level of access to create/modify/delete
168.
maintenance orders / Work requests
The Solution will provide the ability for Control Engineers to have visibility of
169.
The Solution and raise ‘Work Requests’ / maintenance orders.
Solution must only allow maintenance orders to be generated if it is associated
170.
with a Site/Location or with an equipment or group of equipment
171. Ability to secure / reserve materials against maintenance orders
Ability to generate a Bill of Materials and associated requisitions / reservations
172.
from a designed maintenance notification
Ability to procure unavailable or nonstock materials / services from a
173.
maintenance order
Ability to plan all activities across the short, medium and long term (e.g.
174.
Resources, Availability of materials / services etc.)
175. Ability to manage and report on capacity planning
The solution will allow the duration and/or effort required for a Work Task to
176.
be updated (this will cause a reschedule).
Need to be able to identify whether work planned is using internal or external
177.
resources, to identify costs involved.
The maintenance & inspection plan will be made available to commit
178. maintenance orders. maintenance orders should be committed automatically
when plan is approved and committed
The Solution will have the ability to automate parts ordering process (i.e. part
lists linked to maintenance orders which are ordered automatically) or
179.
manually add parts or services to a maintenance order which then initiates the
appropriate purchasing pr
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 307
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 308
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 309
12 The system shall provide facility for securing annotations for selective users.
13 The System shall provide facility to index folders, files and documents on user-
defined indexes like:
• File Number
• File Name
• Subject /Title of the File
• Created On (Date)
• Wing /Section/Department
• Employee name (In case of personal file)
14 The system shall provide extensive search facility to retrieve documents or
Folders/Files. Solution should have search facility based on system defined, user
defined index parameters as well as Content based / Full Text search.
15 The system should be certified to Record Management standard like DoD 5015.02
or equivalent standard.
16 The system shall support saving of search queries and search results.
17 The Document management system should have in-built User Management
module that shall support definition of Users, Groups and Roles relation in the
system
18 The system shall support multiple levels of access rights (Delete/ Edit/ View/
Print/ Copy or Download).
19 The system shall have a facility to define password policy with extensive password
validations like passwords must be of minimum 8 characters, shall be
alphanumeric, locking of user-id after three un-successful attempts, password
expiry, password history so that passwords are not same as previous passwords
etc.
20 The system shall provide LDAP support for integrating with directory services and
shall support single sign on
21 The system shall support web-based administration module for the complete
management of system.
22 The system shall support Extensive Audit-trails at user, Folder and Cabinet levels
and it shall provide facility to generate Audit trails on separate actions, and
between specific date/times
23 The system should have the capability to set automatic reminders and alarms to
concerned users.
24 The system should be based on open standards and have API support for data
import & export.
E-Office
(Fully Compliant – FC; Partially Compliant – PC; Not Compliant – NC)
S.N. File, Correspondence & Office Note (FC/PC/NC)
1 The system shall have a repository or predefined folder / area where all new
correspondences are received after scanning. The system should be secure and
should be tested for OWASP top ten vulnerabilities at one of the Govt/PSU
organization.
2 The system should have the facility to add hyperlink to document/file notes.
3 The system shall have a facility to add correspondences in electronic format from
local computer drive.
4 The system shall have a facility to add a Note with correspondence. Using the
tablets and mobile users should be able to access the Correspondence.
5 The system shall have a facility to save the correspondences in an existing file.
6 The system shall have a facility to route the correspondences using workflow
feature of a system.
7 The system shall support ad-hoc routing of a document
8 The system shall have a facility to prepare response and attach with the
correspondences workflow
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 310
9 The system shall provide an interface to track & search the status of a
correspondences in a workflow
10 The system shall have a facility to send the reminders.
11 The system shall have a facility to generate various reports w.r.t. correspondences
workflow such as pending with users, pending since, elapsed time, initiated by,
completed by etc
12 The system shall have a facility to track a department where correspondence is
pending.
13 The system shall provide an advanced search interface for tracing & searching a
correspondence based on dates, subject, pending with, completed by, pending
since etc
14 The system shall have a feature to recall correspondence from another user. The
system should be built using the Business Process Management framework.
15 The system should have facility to put the completed Correspondence in a new or
an existing file.
16 The system shall have a facility to save the file in the desired location folder.
17 The system shall have facility to add documents in the File.
18 The system shall provide facility to view all letters/documents at the right-hand
side (RHS) of the folder with note-sheet on left hand side
19 The system shall provide facility to users to append their notes, which shall be
automatically stamped with username, date and time
20 The system shall provide facility to secure notes in File View
21 The system shall have the facility of Note linking wherein the users can link a note
easily with a document or an existing note.
22 The system shall have an In-built Web based Text Editor with basic functionalities
such as bold, alignment, font, colour etc.
23 The system shall provide pre-defined templates for adding notes to
correspondence.
24 The system shall provide an interface to search the status of a file in a workflow.
25 The system shall provide a facility to track a department where a File is pending.
26 File view shall provide facility to view all documents inside file, Noting /
commenting, edit file properties.
27 The system shall have facility to mark a file as complete/closed and thereby un-
editable except with special approvals.
28 The system shall have a facility to add or upload a document or letter in electronic
format from local computer/network drive/scanner/external storage drive.
29 The system shall have a facility to route the Letter using workflow feature of a
system in a flexible manner forward, backward, and level jumping.
30 The system shall support ad-hoc routing of a document.
31 The system shall have a facility to prepare response and attach with the Letter
workflow.
32 The system shall provide an interface to track & search the status of a Letter in a
workflow.
33 The system shall have a facility to send the reminders and the E-office module
should be built on Low code No code Platform configurable workflows and
comply to workflow standards, BPMN 2.0, BPEL, WFMC open standards.
34 The system shall have a facility to generate various customizable reports w.r.t.
Letter workflow such as pending with users, pending since, elapsed time,
initiated by, completed by etc.
35 The system shall provide an advanced search interface for tracing & searching a
letter based on title, dates, subject, pending with, completed by, pending since,
etc. along with a configuration provision for these search parameters in the
system.
36 The system shall have a feature to recall a letter from another user.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 311
37 The system should have facility to put the completed Letter in a new or an
existing file.
38 The system should have the facility to forward the correspondence based on roles
or groups.
39 The system Should have a track sheet mechanism to track the status of
correspondence in sent items, inbox and multiple forward Correspondence.
40 The track sheet feature should also have the capability to share the priority of the
different correspondence received by the user
Note: ERPSI to make provision to provide access to view the files of particular
wing/section/office for audit.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 312
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 313
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 314
Storage Services
1 Offer users the ability to increase the size of an existing block storage volume
without having to provision a new volume and copy/move the data
2 Support point-in-time snapshots, that are incremental in nature to speed up
provisioning and recovery
3 Support complete eradication of data such that it is no longer readable or
accessible by unauthorized users and/or third parties
4 Offer server-side encryption of data ‘at- rest’, i.e., data stored on volumes and
snapshots
5 Offer object storage tiering capability, i.e., the ability to recommend transitioning
an object between object storage classes based on its frequency of access
6 Support managing an object's lifecycle by using a lifecycle configuration, which
defines how objects are managed during their lifetime, from creation to deletion
7 Offer the ability to create and use policies to manage stored data, its lifecycle, and
tiering settings
8 Offer users the capability to create policies that can restrict access to the data
based on user/request location and time of request
9 Support server-side encryption (SSE) of data ‘at-rest’
10 Offer server-side encryption (SSE) capabilities using customer provided
cryptographic keys
11 Support server-side encryption (SSE) using a Key Management Service that
creates encryption keys, defines the policies that control how keys can be used,
and audits key usage to prove they are being used correctly
12 Support versioning, i.e., the ability to store and co-exist multiple versions of an
object
13 Offer the capability for a user to mark an item as undeletable
14 Support multi-factor authentication (MFA) for delete operations as an additional
security option
15 Offer the ability to send notifications when certain events happen at the object
level (i.e., addition/deletion operations)
16 Offer the capability of generating audit logs that include details about a single
access request, such as the requester, the request time, the request action, the
response status, and the error code
17 Offer an object inventory to give users the ability to quickly visualize objects and
their status, allowing users to quickly spot objects with public access
18 Offer users the ability to retrieve only a subset of data from an object by using
simple SQL expressions
Security Services
1 Restrict provider personnel from logging into compute hosts, instead automating
all tasks carried out on compute hosts where the contents of these automated jobs
are logged, with the logs retained for a minimum of 90 days
2 Offer a Web Application Firewall (WAF) that helps protect web applications from
common web exploits that could affect application availability, compromise
security, or consume excessive resources
3 Offer a service to protect from common, most frequently occurring network and
transport layer Distributed Denial of Service (DDoS) attacks, along with the
ability to write customized rules to mitigate sophisticated application layer
attacks
4 Offer a service to automatically assess potential vulnerabilities in applications and
resources
5 Automated security assessment service that helps improve the security and
compliance of applications deployed on cloud by automatically assessing
applications for vulnerabilities or deviations from best practices. After performing
an assessment, the tools shall produce a detailed list of security findings
prioritized by level of severity.
6 Monitoring of cloud resources with alerts to Client on security configuration gaps,
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 315
such as overly permissive access to certain compute instance ports and storage
buckets, minimal use of role segregation using identity and access management
(IAM), and weak password policies.
7 Automated security assessment services to improve security and compliance of
applications deployed on cloud by automatically assessing applications for
vulnerabilities or deviations from best practices.
8 Capture logs of all user activity within an account. The recorded information shall
include identity of the API caller, the time of the API call, the source IP address of
the API caller, the request parameters, and the response elements returned by the
cloud service. This is required to enable security analysis, resource change
tracking, and compliance auditing.
Managed Relational Database as a Service
1 Offer the industry leading RDBMS as a managed relational database service in the
cloud
2 Relational database service offers mechanisms to support higher degrees of
Availability and Durability for the databases
3 Relational database service support synchronous replication of a primary
database to a standby database copy in a separate physical datacenter to improve
data redundancy
4 Relational database service offers the capability of an automatic failover from the
primary database to the standby database
5 Relational database service offers the capability of performing a manual failover
(i.e., forced failover) from the primary database to the standby database
6 Relational database service support in- region replication through the use of read
replicas within the Region, i.e., active/online copies of the primary database to
handle read requests as a way to improve performance
7 Relational database service support deploying replicas of the read replicas for
increased performance
8 Relational database service offers a mechanism to support a certain level of
performance, expressed in IO Operations Per Second (IOPS) or any other metric,
for mission-critical, sensitive database workloads
9 Relational database service offers encryption of data ‘at-rest’
10 Relational database service offers encryption of data ‘in-transit’
11 Relational database service supports the creation of on-demand (i.e., user-
initiated) point-in-time copies (snapshots) and the restoration of a database
instance using one of these copies (snapshots)
12 Support automated database backups
13 Support vertically scaling the database instance
14 Support scaling the instance’s storage
Data Migration Services
1 Capability of migrating on-premises databases to the cloud
2 Capability of performing a database migration to the cloud with minimum
downtime, i.e., the source database should remain fully operational during the
migration process
3 Support migrating different database sources
4 Ability to perform heterogeneous database migrations, i.e., from one source
database to a different target database
5 Offer a solution to seamlessly integrate a customer’s data center with cloud
storage services that will allow to perform enterprise backups and store these
backups in the cloud
Cloud Management and Monitoring Services
1 Offer a monitoring service for managing cloud resources and applications that
collects, monitors, and reports using pre-defined metrics
2 Monitoring services allow users to set up alarms
3 Monitoring services allow users to create and monitor custom metrics
4 Monitoring services provide various levels of monitoring granularity, down to the
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 316
1-minute level
5 Service that logs, monitors, and stores activity against cloud resources both at the
Console and at the API level for improved visibility
6 Enable the capability of sending out notifications based on API activity levels
7 Offer a service to assess, audit, and evaluate the configurations of resources
deployed by a user
8 Automatically record a resource configuration change when it happens
9 Offer the ability to examine resources configuration at any single point in the past
10 Offer guidelines and recommendations for provisioning, configuring, and
continuously monitoring compliance
11 Offer users the capability of creating, provisioning, and managing a collection of
resources in a template-like fashion
12 Offer a service to create and manage a catalog of services, i.e., servers, virtual
machines, software, databases, etc.
13 Offer a web-based user interface to facilitate management and monitoring of
cloud services
14 Offer a unified tool to manage and configure multiple cloud services from the
command line and allow to automate management tasks through the use of
scripts
15 Offer public support forums for customers to discuss their issues
16 Offer a service health dashboard that displays up-to-the-minute information on
service availability across multiple regions
17 Offer a dashboard that displays a personalized view into the performance and
availability of the services underlying user’s specific resources
18 Offer 365 days’ worth of Service Health Dashboard history
19 Offer a service that acts like a customized cloud expert and helps compare
resources’ usage against best practices
20 Offer support for common operating systems and common application stack
components
21 Offer good quality, publicly-viewable technical documentations for all its services
including, but not limited to User Guides, Tutorials, Frequently Asked Questions
(FAQs), and Release Notes
22 Shall have an audit and compliance features which enables the Client agency to
monitor the provisioned resources, performance, resource utilization, and security
compliance.
23 System-wide visibility into resource utilization, application performance, and
operational health through proactive monitoring (collect and track metrics, collect
and monitor log files, and set alarms) of the cloud resources.
24 Visibility into the performance and availability of the cloud services being used,
as well as alerts that are automatically triggered by changes in the health of those
services.
25 Event-based alerts, to provide proactive notifications of scheduled activities, such
as any changes to the infrastructure powering the cloud resources.
26 Ability to discover all provisioned resources and view each of the configuration.
Notifications shall be triggered each time a configuration changes, and agencies
shall be given the ability to dig into the configuration history to perform incident
analysis.
27 Continuous monitoring and optimization of auto-scaling rules and limits.
28 Optimize overall cost of resources require to run overall operations of the Client.
29 Resource inventory, configuration history & change notifications functionalities
shall be provided.
30 Automatically records a resource’s configuration when it changes.
31 Examine the configuration of resources at any single point in the past.
32 Send notification of any configuration change.
33 Dashboards shall provide a personalized view of service health, consumption,
and usage.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 317
Desktops Specifications
Sl. Compliance
Particular Minimum Requirement
No. (Y/N)
Operating
7 Windows 11 or latest version
System
Keyboard & OEM USB Keyboard and USB two button optical mouse with
10
Mouse pad
Sl. Compliance
Particular Minimum Requirement
No. (Y/N)
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 318
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 319
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 320
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 321
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 322
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 323
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 324
Annexure D – Deliverables
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 325
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 326
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 327
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 6. ERP System Requirements and Service Level Agreement P a g e | 328
PART II
Contract for
Between
AND
[ SELECTED BIDDER]
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for Enterprise
Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 329
Articles/Clauses
1. Definitions and 1.1 In this Contract, unless the context otherwise requires, the
Interpretations following words, expressions and abbreviations shall have the
following meanings:
(a) Definitions (a) “Affected Party” means any of the ERPSI or the Utility
whose performance has been affected by an event of Force
Majeure or Force Majeure Event;
(b) “Applicable Laws” shall mean the laws and any other
instruments having the force of law in India as they may be
issued and in force from time to time;
(c) “Bid” means the bid submitted by the Bidder(s) in response
to the RFP and shall include the Technical Bid and the
Financial Bid;
(d) “Bidder(s)” means individual entity or consortium of entities
bidding in response to the RFP;
(e) “Change Order” shall have the meaning as ascribed thereto
in Article 13 of this Contract;
(f) “Consortium Member” Any member of the bidding
consortium other than the ERPSI-Lead;
(g) “Contract” or “ERPSI Contract” shall mean this Contract
entered into between, Selected Bidder(represented by the
ERPSI-Lead acting for and on behalf of the consortium if the
Selected Bidder is a consortium) and the Utility for
undertaking the ERP Project and is the legally binding
written agreement signed by the Parties and which includes
all the attached documents listed in its paragraph 1 of the
Form of Contract (the General Conditions (GCC), the Special
Conditions (SCC), and the Appendices, Attachments,
Annexures etc.).
(h) “Contract Period” or “Term of the Contract” shall have the
meaning as ascribed thereto in Article 2.1.2 of this Contract;
(i) “Contract Price” shall have the meaning as ascribed thereto
in Article 4.1 of this Contract;
(j) “Day” means a calendar day unless indicated otherwise;
(k) “Enterprise Resource Planning” or “ERP” refers to the
software used to manage a company’s financials, accounts,
inventory, projects, reporting and human resources. The
functional blocks of ERP typically include the ERP software,
Cloud-based Data Centre (DC) and Disaster Recovery Centre
(DRC), and the Communication Network (SD-WAN);
(l) “Enterprise Resource Planning System Integrator” or
“ERPSI”, means the responsible implementation agency
named in SCC appointed by Utility for the Supply,
Installation, Commissioning, Implementation and Support
for Enterprise Resource Planning (ERP) System at the Utility
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 330
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 331
the ERPSI;
(bb) SLA Default Notice means notice to be issued by the Utility
in the event ERPSI fails meet any of the criteria specified in
the SLA for cumulatively 3 (three) months in past 6 (six)
months so as to entitling levy of maximum penalty for such
criteria;
(cc) “Solution” shall mean the ERP system implemented in its
entirety including but not limited to the designing, financing,
supply of hardware, software, transportation, installation,
integration, testing, commissioning, operation, maintenance,
training, and other services by the ERPSI;
(dd) “Termination Payment” shall have the meaning as ascribed
thereto in Article 10 of GCC in Section 7;
(ee) “Utility” shall have the same meaning as ascribed to it in the
recital clause of the Form of Contract.
1.2 In the interpretation of this Contract, unless the context
otherwise requires:
1.
(b) Interpretation 1.1.
1.2.
1.2.1. Unless otherwise specified a reference to an Article number is
a reference to all of its sub-articles;
1.2.2. Unless otherwise specified a reference to a clause, sub-clause
or section is a reference to a clause, sub-clause or section of
this Contract including any amendments or modifications to
the same from time to time;
1.2.3. A word in the singular includes the plural and a word in the
plural includes the singular;
1.2.4. A word importing a gender includes any other gender;
1.2.5. A reference to a person includes a partnership and a body
corporate;
1.2.6. A reference to legislation includes legislation repealing,
replacing, or amending that legislation;
1.2.7. Where a word or phrase is given a particular meaning, it
includes the appropriate grammatical forms of that word or
phrase which has a corresponding meaning;
1.2.8. In the event of an inconsistency between the terms of the RFP,
Bid submitted by the Selected ERPSI and the subsequent
Contract, the terms of the Contract hereof shall prevail;
1.2.9. Whenever a material or article is specified or described by the
name of a particular brand, manufacturer or trademark, the
specific item shall be understood as establishing type,
function, and quality desired. Products of other
manufacturers may also be considered, provided sufficient
information is furnished so as to enable Utility to determine
that the products are equivalent to those named.
1.2.10. No amendment or other variation of this Contract shall be
valid unless it is in writing, is dated, expressly refers to this
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 332
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 333
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 334
5. Performance 5.1 The ERPSI has furnished Performance Security in the form of an
Security irrevocable bank guarantee valid up to a period of 6 (six) months
beyond the end of the Contract Period or extended thereafter, for
the amount indicated in SCC on the prescribed format. However,
in case of delay in Installation Milestone, the validity of the
initial Performance Security shall be extended by the period of
such delay. In the event delay is solely due to acts and/ or
omission of the Utility cost of extending the validity of
Performance Security shall be reimbursed to the ERPSI by the
Utility.
5.2 Any payments shall be made to the ERPSI only after receipt of
the initial Performance Security by Utility.
5.3 Upon Termination of the Contract due to Utility Event of default
or expiry of the Contract Period, the separate Performance
Security shall be discharged by Utility without any interest and
returned to the ERPSI not later than 14 (fourteen) working days
following the date of Termination of the Contract.
5.4 Upon Termination of the Contract due to ERPSI Event of default,
the Performance Security shall be forfeited by Utility.
5.5 In case of any delay by the ERPSI in performing the activities of
the scope of work with respect to the Project Implementation
Schedule, then upon Utility’s request, the ERPSI shall extend the
validity of the separate Performance Security for the period for
which the Contract is extended. In the event delay is solely due
to acts and/ or omission of the Utility cost of extending the
validity of separate Performance Security shall be reimbursed to
the ERPSI by the Utility.
6. Liquidated 6.1 Except in case of Force Majeure or where the delay in delivery of
Damages, the Solution is caused due to any delay or default of Utility if the
Penalty, and delivery, site installation, integration, and operationalization of
Incentive ERP System with related hardware, software and equipment is
delayed by more than 9 (nine) months from the date of execution
of the Contract the ERPSI shall be liable to pay liquidated
damages as per the rates specified in SCC.
7. SLAs and SLA 7.1 The ERPSI shall be liable to penalties in the event of non-
Audit compliance of Service Level Agreements, as specified in Section
6;
7.2 A designated team/ person from Utility may review the system
generated SLA performance report of ERPSI each month. The
review/ audit report will form basis of any action relating to
imposing penalty on or breach of Contract of the ERPSI.
7.3 In case, there is no review/ audit report submitted within 10
(ten) working days of every month, it shall be deemed that all
SLAs were met in the previous month.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 335
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 336
motivated sabotage;
b. radioactive contamination or ionizing radiation
originating from a source in India or resulting from
any other Indirect Non-Natural Force Majeure Event
mentioned above, excluding circumstances where the
source or cause of contamination or radiation is
brought or has been brought into or near the Site by
the Affected Party or those employed or engaged by
the Affected Party; or
c. industry wide strikes and labour disturbances, having
a nationwide impact in India.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 337
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 338
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 339
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 340
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 341
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 342
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 343
Management Plan.
10.6 Exit Management
10.6.1 Exit Management
In case the Contract with the Utility ends or is terminated
before the expiry date of Contracts, the Parties shall agree
at that time whether, and if so during what period, the
(f) Exit provisions of this Exit Management Plan shall apply. The
Management Parties shall ensure that their respective associated entities
carry out their respective obligations set out in this Exit
Management Plan. The exit management shall be done in
such a manner that operations should continue without
any restriction on access/usage of any kind of
functionality. At the end of the Contract period, ERPSI
shall provide necessary handholding and transition
support to the Utility or its agency for maintaining the
system post the Contract with the ERPSI. This includes (but
not limited to):
a. Conducting detailed walkthrough and demonstrations
for the ERP Solution;
b. Handing over of ERP Solution, Utility’s data and all
other relevant documentation including updated
detailed bill of quantities for materials and services
provided under the Contract;
c. Addressing the queries/clarifications of the designated
staff / new agency with respect to the working /
performance levels of the infrastructure;
d. Conducting training sessions;
e. Knowledge Transfer;
f. Any other activity, over and above these, as may be
deemed necessary to meet the service levels and
requirements specified in the RFP.
10.6.2 Transfer of Assets / ERP Solutions
a. Utility shall be entitled to serve notice in writing on the
ERPSI at any time during the Exit Management Period
requiring the ERPSI and/or its sub-contractor to
provide the Utility with a complete and up to date list
of the Assets and System configurations, License
details, Customized Code within 30 (thirty) days of
such notice. Utility shall also be entitled to serve notice
in writing on the ERPSI at any time prior to the end of
the Exit Management Period requiring the ERPSI to
transfer the overall control to the Utility or its
nominated agencies in accordance with Article 10.
b. In case of contract being terminated by Utility, Utility
reserves the right to ask ERPSI to continue running the
project operations for a period of 3 months after
termination orders are issued. In case of contract being
terminated by ERPSI, Utility reserves the right to ask
the ERPSI to continue running the project operations
for a period of 6 (six) months after termination notice is
served by ERPSI. In such case, payments during the
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 344
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 345
Services;
b. documentation relating to the Project’s Intellectual
Property Rights;
c. documentation relating to sub-contractors;
d. all current and updated data as is reasonably required
for purposes of Utility or its nominated agencies
transitioning the services in a readily available format;
e. all other information (including but not limited to
documents, records, and agreements) relating to the
services reasonably necessary to enable Utility or its
nominated agencies, to carry out due diligence in order
to transition the provision of the Services to Utility or
its nominated agencies, (as the case may be).
10.6.5 Transfer of certain agreements
On request by the Utility or its nominated agency, the
ERPSI shall affect such assignments, licenses and sub-
licenses as Utility may require in favor of the Utility or its
nominated agency reasonably necessary for the carrying
out of replacement services. These agreements may include
equipment lease, maintenance, or service provision
agreement between selected ERPSI and third-party lessors,
service providers, and any other agreements related to the
Services.
10.6.6 General obligations of the ERPSI during exit management
period
a. The ERPSI shall provide all such information as may
reasonably be necessary to effect as seamless a
handover as practicable in the circumstances to the
Utility or its nominated agency and which the ERPSI
has in its possession or control at any time during the
Exit Management Period.
b. For the purposes of this Schedule, anything in the
possession or control of the ERPSI or associated entity,
or sub-contractors is deemed to be in the possession or
control of the ERPSI.
c. The ERPSI shall commit adequate resources to comply
with its obligations under this Exit Management
Schedule.
10.6.7 Exit management process
The ERPSI shall prepare an Exit Management Plan for
transfer of operations to the Utility or its nominated
agency, in the event of termination or expiry of the contract
with the Utility, without affecting services to stakeholders
adversely. ERPSI shall get this process approved by Utility.
The Plan shall include, but not be limited to, the following-
a. A detailed program of the transfer process including
details of the means to be used to ensure continuing
provision of the Services throughout the transfer
process or until the cessation of the Services and of the
management structure to be used during the transfer;
b. Plans for the communication with such of the ERPSI’s
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 346
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 347
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 348
Property Rights.
12. Governing Laws 12.
and Settlement of 12.1 The Utility and the ERPSI shall make every effort to resolve
Disputes amicably any disagreement or dispute arising between them
under or in connection with the Contract, by direct informal
negotiation.
12.2 If the Utility and the ERPSI fail to resolve such a dispute (the
date of commencement of the dispute shall be taken from the
date when this Article reference is quoted by either Party in a
formal communication clearly mentioning existence of dispute
or as mutually agreed) or difference by mutual consultation
within 28 (twenty-eight) days from the commencement of such
consultation, either Party may require that the dispute be
referred for resolution to the formal mechanisms specified in
this Article.11. If either Party objects to any action or inaction of
the other Party, the objecting Party may file a written Notice of
Dispute to the other Party providing in detail the basis of the
dispute. The Party receiving the Notice of Dispute will consider
it and respond in writing within fourteen (14) days after receipt.
If that Party fails to respond within fourteen (14) days, or the
dispute cannot be amicably settled within fourteen (14) days
following the response of that Party, Clause GCC (12.3) shall
apply. The Parties shall use their best efforts to settle amicably
all disputes arising out of or in connection with this Contract or
its interpretation.
12.3 All disputes or differences in respect of which the decision, if
any, has not become final or binding as aforesaid shall be settled
by arbitration in the manner hereinafter provided. The
arbitration shall be conducted by three arbitrators, one
arbitrator each to be nominated by the ERPSI and the Utility
and the third to be appointed as the presiding arbitrator by both
the arbitrators in accordance with the Arbitration and
Conciliation Act,1996. If either of the parties fails to appoint its
nominee arbitrator within 60 (sixty) days after receipt of a notice
from the other party invoking the arbitration, the nominee
arbitrator appointed by one of the parties invoking the
arbitration clause shall act as the sole arbitrator to conduct the
arbitration under the Arbitration and Conciliation Act 1996, as
amended from time to time. Any Dispute related to tendering
process shall be dealt as per RTPP Act-2012/RTTP Rules-2013.
Any dispute between the Parties arising under or related to this
Contract that cannot be settled amicably may be referred to by
either Party to conciliation in accordance with the provisions
specified in the SCC 12.3. However, in case of any dispute
among CPSEs & Govt Departments, it may be settled as per
DPE Guideline on Resolution of Dispute, dated: 14.12.2022. and
amendments thereafter
12.4 The arbitration shall be conducted in accordance with the
provisions of the Arbitration and Conciliation Act, 1996 or any
statutory modification thereof. The seat of arbitration shall be as
specified in SCC.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 349
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 350
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 351
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 352
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 353
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 354
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 355
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 356
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 357
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 358
GCC
Amendments of, and Supplements to, Clauses in the
Article/
General Conditions of Contract
Clause
6.1 0.5% of the Contract Price per week, subject to maximum 10% of Contract Price
In any time, any question, dispute or difference what so ever which may arise
between Discom and the Agency, the same shall be decided by CMD/MD of
Discom or by the settlement committee constituted by him and shall be final
and binding on both the parties.
Settlement committee(s) have been constituted to settle the disputed purchase
cases where the firm(s) do not agree with the Nigam viewpoint and have given
their representations. The settlement committee(s) will be empowered to
decide all disputed cases. The committee is also authorized to settle such cases
which are either sub judice in case firm make formal request in this regard. In
case of disagreement amongst committee members, the case with full details
shall be put-up before the next level committee for decision.
a) For settlement, firm shall furnish in writing their representation indicating
the details of dispute / grievances along-with requisite settlement fee
within a period of 6 months after receiving communication giving rise to
12.3
cause of dispute / grievances. Appeal against any decision of settlement
committee can be filed within three months from the date of conveying
such decision to the firm.
b) The requisite fee either in cash / demand draft / pay order to be deposited
to the Sr. Accounts Officer (Cash/CPC) of Respective Discom(s), along-
with detailed representation for various settlement are detailed as under:
I. For CE Level Settlement Committee (Cases upto Rs. 2.5 Lacs) Rs.
1000/-
II. For Nigam Level Settlement Committee (Cases above Rs. 2.5 Lacs) and
Appeal against CE level committee Rs. 3000/-
III. For review of Decision of Nigam level Settlement Committee by BOD
Rs. 5000/-
The GST will be charge extra at the prevailing rate on all the settlement fees.
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 7. Contract Forms & Conditions of Contract P a g e | 359
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 8. Contract Related Forms P a g e | 360
PART III
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 8. Contract Related Forms P a g e | 361
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 8. Contract Related Forms P a g e | 362
To:
THE SUPERINTENDING ENGINEER(IT),
JAIPUR VIDYUT VITRAN NIGAM LTD.,
3rd Floor, Data Center Building,
Old Powerhouse, Near Ram Mandir, Bani Park,
Jaipur- 302006
WHEREAS……………. [Insert name of the ERPSI-Lead / Sole Bidder] with address …………….
[Insert address of the ERPSI-Lead/ Sole Bidder] having its registered office at ……………. [Insert
address of the ERPSI-Lead/ Sole Bidder] (hereinafter, the “Contractor”), subsequent to participation
in Tender No. [Tender Details] (the “RFP”) issued by [Utility] (hereinafter, the “Beneficiary”)
for Appointment of System Integrator for Supply, Installation, Commissioning, Implementation
and Support for Enterprise Resource Planning (ERP) System, have been issued the Letter of
Award as the Selected Bidder. The Selected Bidder was required to incorporate the ERPSI.
Further the ERPSI was required to furnish a Performance Security in the form of a Bank
Guarantee
And WHEREAS a Bank Guarantee for Rupees ……………. [Insert amount in words equivalent]
(…………….) [Insert amount in figures] valid till……………. [Insert Contract Period] is required to
be submitted by the ERPSI as per the terms and conditions of the RFP.
In consideration of the [details of the Bidder] agreeing to undertake the obligations under the
[insert details of the bid document], we, …………….[Insert name of the Bank and address of
the Branch giving the Bank Guarantee] having our registered office at …………….[Insert
address of the registered office of the Bank] (“Guarantor Bank”) hereby give this Bank
Guarantee No. …………….[Insert Bank Guarantee number] dated …………….[Insert the date
of the Bank Guarantee], and hereby agree unequivocally, irrevocably and unconditionally to
pay immediately on demand in writing from the Utility any officer authorized by it in this
behalf any amount not exceeding [Amount] to the said Utility on behalf of the Bidder.
We, [Insert name of issuing bank] do hereby undertake to pay the amounts due and payable
under this bank guarantee without any demur, protest, dispute or any inquiry. Any such
demand made on the Guarantor Bank, shall be conclusive as regards the amount due and
payable by the Guarantor Bank under this bank guarantee. Our liability under this present
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 8. Contract Related Forms P a g e | 363
being absolute and unequivocal. The Guarantor Bank hereby expressly agrees that it shall not
require any proof of the terms of the [bid documents] or the occurrence of any event specified
thereunder and shall make the payment to the Utility immediately on the written demand from
the Utility, made in any format, raised at the above-mentioned address of the Guarantor Bank.
We ……………. [Insert name of the Bank] also agree that non-performance, delayed performance
or violation of any of the terms and conditions of the contract by ERPSI would constitute a
default on the part of the Bidder and that this Bank Guarantee is liable to be invoked and
encashed within its validity by the Beneficiary in case of any occurrence of a default on the part
of the ERPSI or the Selected Bidder and that the encashed amount is liable to be forfeited by the
Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of …………….
[Insert the date of validity of the Bank] and shall not be terminable by notice or by Guarantor
change in the constitution of the Bank or the firm of the Bidder Or by any reason whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or
variations or alternations made, given, conceded with or without our knowledge or consent by
or between the Bidder and the Beneficiary.
[Insert the address of the Bank with complete [Insert signature of the Bank’s
postal branch code, telephone, and fax numbers, Authorized Signatory]
and official round seal of the Bank]
Attested:
_________________________________________________________________________
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101
Section 8. Contract Related Forms P a g e | 364
REF: - 1. Request for Proposal for selection of ERPSI dated [•] (“RFP”)
2. Your proposal dated [•] (“Proposal”)
3. Your clarification [•]
Dear Sir,
2.Pursuant to the evaluations of the Bid, your bid has been found to be most suited.
3. A draft of the ERPSI Contract was provided to you along with the RFP. Please note that there
shall be no change whatsoever in the terms and conditions as set out in the draft Contract.
4.Please note that in the event of failure to comply with any terms and conditions of this Letter
of Award, the entire Bid Security may be forfeited.
5.Any further correspondence in connection with the Project should be addressed to the [insert
details of the appropriate authority •]” with a copy to Chairman/ Managing Director, till
further instructions are issued.
6.The terms and conditions as set out in this Letter of Award shall stand valid until execution of
the ERPSI Contract.
7.Please acknowledge the receipt and return the duplicate copy of this Letter of Award after
signing and stamping it in all the pages to the undersigned as a token of acceptance.
Thanking You
Yours truly
[insert details of the Utility]
RFP for Selection of System Integrator for Supply, Installation, Commissioning, Implementation and Support for
Enterprise Resource Planning (ERP) System at RAJASTAN DISCOMS (JVVNL, AVVNL & JdVVNL) RFP/ Tender No
JVVNL/SE/IT/RDSS/ERPSI/TN-101