SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS
DIRECTORATE GENERAL OF ROADS AND
LAND TRANSPORT
CONSTRUCTION OF BATINAH EXPRESSWAY
PACKAGE 5 (Km. 180+000 to Km. 221+000)
TENDER DOCUMENT
(VOLUME III OF IV)
BILL OF QUANTITIES
APRIL 2012
BOTEK & PARTNERS LLC
(Joint Venture of BOTEK & ACE)
SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS
DIRECTORATE GENERAL OF ROADS AND
LAND TRANSPORT
CONSTRUCTION OF BATINAH EXPRESSWAY
PACKAGE 5 (Km. 180+000 to Km. 221+000)
TENDER DOCUMENT
(VOLUME III OF IV)
BILL OF QUANTITIES
APRIL 2012
TO BE RETURNED IN THE ENVELOPE WITH THE
TENDER
Consulting Engineers:
BOTEK & Partners Engineering Consultancy LLC
(Joint Venture of BOTEK & ACE), CR NO. 1072276
P.O. Box 3779, PC 112, Ruwi, Sultanate of Oman.
Phones : (+968) 24494628, Fax : (+968) 24493056
Email : [email protected]
CONSTRUCTION OF BATINAH EXPRESSWAY – PACKAGE 5
(From Km 180+000 to Km 221+000)
TENDER DOCUMENTS
INDEX
Volume I of IV: Prime Document
Part 1 – Technical
Part 2 – Financial (To be returned in the envelope with the
Tender)
Volume II of IV Special Specification
Volume III of IV: Bill of Quantities (To be returned in the envelope with the
Tender)
Volume IV of IV: Tender Drawings Part 1 of 2 (Civil Drawings)
Tender Drawings Part 2 of 2 (Structural Drawings)
(iii)
CONSTRUCTION OF BATINAH EXPRESSWAY – PACKAGE 5
(From Km 180+000 to Km 221+000)
TABLE OF CONTENTS
Page No.
PREAMBLE ............................................................................................. (vi) TO (vii)
BILL NO. – 1 PRELIMINARIES.................................................................. 1-1 TO 1-5
BILL NO. – 2 EARTHWORKS.................................................................... 2-1 TO 2-5
BILL NO. – 3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE
AND STABILIZED BASE COURSES ................................... 3-1 TO 3-2
BILL NO. – 4 BITUMINOUS PAVEMENT .................................................. 4-1 TO 4-2
BILL NO. – 5 CONCRETE AND CONCRETE STRUCTURES .................. 5-1 TO 5-8
BILL NO. – 6 INCIDENTAL CONSTRUCTION .......................................... 6-1 TO 6-7
BILL NO. – 7 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS .... 7-1 TO 7-6
BILL NO. – 9 PUMPING STATIONS AND UTILITIES ............................... 9-1 TO 9-3
BILL NO. – 10 DAYWORKS ........................................................................ 10-1 TO 10-9
BILL NO. – 11 PROVISIONAL SUMS.......................................................... 11-1 TO 11-2
GRAND SUMMARY ............................................................. GS(1)-1
(iv)
TABLE OF CONTENTS
Page No.
(4 - LANE OPTION)
BILL NO. – 1 PRELIMINARIES.................................................................. 1-1 To 1-5
BILL NO. – 2 EARTHWORKS.................................................................... 2-1 TO 2-5
BILL NO. – 3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE
AND STABILIZED BASE COURSES ................................... 3-1 TO 3-2
BILL NO. – 4 BITUMINOUS PAVEMENT .................................................. 4-1 TO 4-2
BILL NO. – 5 CONCRETE AND CONCRETE STRUCTURES .................. 5-1 TO 5-8
BILL NO. – 6 INCIDENTAL CONSTRUCTION .......................................... 6-1 TO 6-7
BILL NO. – 7 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS .... 7-1 TO 7-6
BILL NO. – 9 PUMPING STATIONS AND UTILITIES ............................... 9-1 TO 9-3
BILL NO. – 10 DAYWORKS ........................................................................ 10-1 TO 10-9
BILL NO. – 11 PROVISIONAL SUMS.......................................................... 11-1 TO 11-2
GRAND SUMMARY ............................................................. GS(2)-1
(v)
PREAMBLE TO BILL OF QUANTITIES
A detailed preamble to the bill of quantities is provided in the relevant chapter of Standard
Specifications for Road and Bridge Construction Volume-3, (June 2010). In addition to it
the following aspects are also to be considered by the bidders:
1. Quantities
Add the following to the clause 20.1.2 Quantities
f) Amendments shall not be made to these Bills of Quantities without the authority, in
writing, of the Tender Board during the tender stage.
g) The contractor is to ensure that identical items occurring in separate bill are not priced at
different rates unless this is the Contractor’s deliberate intention.
h) The price and rates entered by the Contractor against items in the Bills of Quantities
shall apply throughout the duration of the contract to the execution of these items in any
location and, except where otherwise provided for, to any additional work ordered by the
Engineer and / or the Employer.
i) A price or rate is to be entered against each item in the Bills of Quantities and the day
work schedules and any item left unpriced will be deemed to be included for elsewhere
in the Bills of Quantities for the day work schedules and hence the rate for that item will
be taken as NIL
j) According to the General Conditions of Contract the Engineer may, if in his opinion it is
necessary or desirable, order in writing that any additional or substituted work shall be
executed on a day work basis. The Contractor shall be paid for such work at the rates
entered by him in this list. The rates entered herein shall include and be considered
compensation for the costs incurred for organization of work, overheads, profits, taxes,
royalties, fees, payment to third parties for land or the use of land, or for damage to
property, incidentals, haulage, tools and all other costs necessary for the performance of
the work on a day work basis.
2. Description
Add the following to the clause 20.1.3 Descriptions
e) Xxiv) Damage to the surrounding properties by Contractors plant.
3. 4-Lane Option
The DGR< also require the Tenderer to include alternative bid prices for a 4-Lane
Option along with their 3-Lane (each carriageway) bid prices. For this purpose the
tender Document Volume III of IV (BOQ) contains a separate Bill of Quantities for 4-
Lane Option also. All other drawings remaining same, the Tender Document Volume IV
of IV (Drawings) contain additional drawings of Typical Cross Section of Expressway,
Typical Arrangement of Wadi Bridges and Underpass Bridge for 4-Lane Option over and
above the complete Drawings for 3-Lane (each carriageway) configuration.
In case the DGR< and Tender Board decide to construct 4-Lane (each carriageway)
Expressway, it will be necessary to update some of the relevant typical detail drawings
for Expressway and Bridges. The policy framework for updating the relevant typical
detail drawings shall be formulated as per directions of DGRLT and Tender Board, if and
when required.
(vi)
4. List of Spare Parts
List of spare parts as required in Item 15.1.20(ii) of Bill No. 7−Road Lighting and
Electrical Installations is as follows:
(i) Electrical Substation......................................................................... (2 Numbers)
(ii) Street lighting feeder pillars.............................................................. (2 Numbers)
(iii) Electrical Cables Nominal Conductor area 25 mm2 ......................... (2000 m)
(iv) Electrical Cables Nominal Conductor area 95 mm2 ......................... (200 m)
(v) Electrical Cables 33 kV Underground Cable area 120 mm2 ............ (500 m)
(vi) Electrical Cables Nominal Conductor area 240 mm2 ....................... (50 m)
(vii) Electrical Cables Green PVC Insulated 25 mm2 .............................. (1000 m)
(viii) 25m high mast with 4x600 Watt HPSV luminaries ........................... (10 Numbers)
(ix) 14m high Pole/Column with 1x600 Watt HPSV luminaries .............. (20 Numbers)
(x) 14m high Pole/Column with 2x600 Watt HPSV luminaries .............. (5 Numbers)
(xi) Under Bridge Lighting ...................................................................... (5 Numbers)
(xii) Three rod Earthing installation ......................................................... (5 Numbers)
(xiii) Single rod Earthing installation......................................................... (5 Numbers)
(vii)
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
CONDITIONS OF CONTRACT
The Contractor is deemed to have carefully studied and
understood and taken into account the provisions and
requirements of the General and Particular Conditions of
Contract. The rates and prices stated in the bill of Quantities
shall include for all costs of compliance with the Conditions
except for the costs of the items given in this Section 1 and for
which a separate amount is stated herein.
1 GENERAL
1.3 Project Site
1.3.5(i) Soil Investigation and report LS
1.4 Contractors Site Facilities
1.4.3(i) Mobiliztion and demobilization of Contractors site facilities LS
1.4.3(ii) Maintenance of Contractors site facilities month 36
1.5 Engineer's Facilities
1.5.13(i) Provision of Engineer's office
a) Type A1, 1 unit x 39 month 39
b) Type A2, 1 unit x 36 month 36
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
1.5.13(ii) Maintenance of Engineer's office
a) Type A1, 1 unit x 39 month 39
b) Type A2, 1 unit x 36 month 36
1.5.13(iii) Provision of surveying equipment for the Engineer month 36
1.5.13(iv) Maintenance of surveying equipment for the Engineer month 36
1.5.13(v) Provision of Engineer's accommodation
a) 2 - Bed room family unit (Type B1,1 unit x 39) month 39
b) 2 - Bed room family unit (Type B2, 3 units x 36 ) month 108
c) 2 - Single bed room bachelor unit (Type C,14 units x 36) month 504
d) Dining / Kitchen (Type D, 1 unit x 36) month 36
1.5.13(vi) Maintenance of Engineer 's accommodation
a) 2 - Bed room family unit (Type B1,1 unit x 39) month 39
b) 2 - Bed room family unit (Type B2, 3 units x 36 ) month 108
c) 2 Single bed room bachelor unit (Type C, 14 units x 36) month 504
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
d) Dining / Kitchen (Type D, 1 unit x 36) month 36
1.5.13(vii) Provision of site laboratory (1 unit x 36) month 36
1.5.13(viii) Maintenance of site laboratory month 36
1.5.13(ix) Provision of Client's vehicles
a) Four-wheel drive vehicle, hardtop, 4.6 Liters (2 unit x 36) month 72
b) Four-wheel drive vehicle, hardtop, 4.0 Liters (2 unit x 36) month 72
1.7 Control of Traffic and Access
1.7.6(i) Maintenance and protection of Traffic month 36
1.7.6(ii) Supply and compaction of sub-base (Class B) on diversions cu.m. 20,000
where ordered by the Engineer (Thickness = 200mm)
1.7.6(iii) Supply and compaction of bituminous basecourse (Class B) on cu.m. 10,000
diverions where ordered by the Engineer (Thickness =
100mm)
1.7.6(iv) Prime coat Kg 112,000
1.10 Management Procedures
1.10.6(i) Provision of 5 sets of photographs month 36
1.10.6(ii) Provision of 2 sets of video recordings month 36
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
1.11 Submittals
1.11.8(i) Provision of As-built drawings, record drawings, record LS
specifications and miscellaneous records as spcified
1.14 Contractor's Temporary Works and Services
1.14.8(i) Provision, erection, relocation, maintenance and removal of nr. 2
project signboards (Aluminium)
1.15 Commemorative Plaque and Opening Ceremony
1.15.4(i) Supply and erection of commemorative plaque nr. 1
1.15.4(ii) Opening ceremony including all facilities LS
1.15.4(iii) Stoppage of work due to V.I.P. visits as per instruction of Hour 48
R.O.P
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 1-1
Page No. 1-2
Page No. 1-3
Page No. 1-4
TOTAL AMOUNT OF BILL NO. 1 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2 EARTHWORKS
2.1 Clearing and Grubbing
2.1.5 (i) Clearing and Grubbing sq.m. 4,610,795
2.1.5 (ii) Removal and delivery or disposal of trees of 300mm trunk nr. 60
diameter or greater
2.2 Removal of Structures and Obstructions
2.2.5 (i) Removal of existing buildings (upto 200 sq.m.) nr. 3
2.2.5 (ii) Removal of reinforced concrete cu.m. 400
2.2.5 (iii) Removal of mass concrete cu.m. 150
2.2.5 (v) Removal of curbs lin.m. 100
2.2.5 (vi) Removal of tiles sq.m. 100
2.2.5 (vii) Removal of pipe culvert (per opening of any size) lin.m. 100
2.2.5 (viii) Removal of existing pavement (upto 200 mm Thickness) cu.m. 3,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.2.5 (ix) Removal of reusable road studs nr. 100
2.2.5 (x) Removal of steel safety barrier including post and foundation lin.m. 100
2.2.5 (xi) Removal of concrete safety barrier including foundation lin.m. 50
2.2.5 (xii) Removal of sign boards including post and foundation (any nr. 10
size)
2.2.5 (xiii) Removal of floodway marker posts including foundation nr. 10
2.2.5 (xiv) Removal of reusable steel safety barrier including post and lin.m. 50
foundation
2.2.5 (xv) Removal of reusable concrete safety barrier including lin.m. 50
foundation
2.2.5 (xvi) Removal of reusable sign boards including post and nr. 5
foundation (any size)
2.2.5 (xvii) Removal of reusable floodway marker posts including nr. 20
foundation
2.2.5 (xviii) Removal of drainage protection works
a) Mortared Riprap cu.m. 50
b) Gabions cu.m. 50
c) Loose Riprap cu.m. 100
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.2.5 (xix) Removal of existing fence and gates (upto 2m Height) lin.m. 200
Removal of existing block and masonary wall (Block type upto
2.2.5 (xx) cu.m. 400
2m Height)
2.2.5 (xxi) Removal of Ditches lin.m. 50
2.2.5 (xxiii) Removal of rocks and boulders larger than 0.2cu.m. or 500kg cu.m. 250
2.2.5 (xxvi) Removal of light poles including cabling and foundation nr. 20
2.3 Roadway Excavation
2.3.6 (i) Unclassified Excavation cu.m. 4,004,180
2.3.6 (ii) Excavation of unsuitable material outside Right-of-Way cu.m. 1,000
2.3.6 (iii) Unclassified Excavation under water cu.m. 8,000
2.3.6 (iv) Excavate and Stockpile suitable topsoil and recompact as cu.m. 145,904
directed
2.4 Borrow Excavation
2.4.6 (i) Borrow excavation for embankment and dykes cu.m. 11,529,233
2.6 Sub-Grade Construction
2.6.6 (i) Sub-grade preperation in cut sq.m. 409,090
2.6.6 (iii) Preperation of sub-grade construction on sabkha or gypsum- sq.m. 7,500
rich soils
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.7 Excavation and Backfilling for Structures
2.7.6 (i) Unclassified structural excavation (depth 0 to 2m) cu.m. 101,000
2.7.6 (ii) Unclassified structural excavation (2m < depth ≤ 4m) cu.m. 60,200
2.7.6 (iii) Unclassified structural excavation (depth > 4m) cu.m. 25,800
2.7.6 (iv) Structural Excavation under water cu.m. 600
2.8 Earthwork For pipe Trenches
2.8.6 (i) Trench excavation and bakfilling (Depth 0 to 2m) cu.m. 36,630
2.8.6 (ii) Trench excavation and bakfilling (Depth >2m ≤ 3m) cu.m. 4,029
2.8.6 (iii) Trench excavation and bakfilling (Depth >3m ≤ 4m) cu.m. 1,465
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 2-1
Page No. 2-2
Page No. 2-3
Page No. 2-4
TOTAL AMOUNT OF BILL NO. 2 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 3 – GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED BASE COURSES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE
AND STABILIZED BASE COURSES
3.2 Granular Subbase
3.2.6 (ii) Granular sub-base course (Class B) cu.m. 665,953
3.3 Aggregate Basecourse
3.3.6 (ii) Aggregate base course (Class B) cu.m. 349,173
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 3–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 3 – GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED BASE COURSES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 3-1
TOTAL AMOUNT OF BILL NO. 3 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 3–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 4 – BITUMINOUS PAVEMENT
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
4. BITUMINOUS PAVEMENT
4.2 Bituminous Materials for Prime and Tack Coats
4.2.8(i) Bituminous prime coat Kg 2,355,842
4.2.8(ii) Bituminous tack coat Kg 2,249,355
4.4 Bituminous Base Course
4.4.14(i) Bituminous Base Course, Class B cu.m. 345,817
4.5 Bituminous Binder and Wearing Courses
4.5.14(ii) Bituminous wearing course, Class B cu.m. 112,392
4.10 Pavement Widening
4.10.6(i) Pavement widening (upto 60 cm.) sq.m. 500
4.12 Surface Rideability Measurement
4.12.10(i) International roughness index (IRI) for bituminous pavement lin.m. 335,319
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 4–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 4 – BITUMINOUS PAVEMENT
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 4-1
TOTAL AMOUNT OF BILL NO. 4 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 4–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
5 CONCRETE AND CONCRETE STRUCTURES
5.1 Concrete Materials and Mixes
5.1.7(i) a) Concrete Class 15 for blinding for box barrels, apron, wing cu.m. 14,000
wall, retaining wall and breast wall
b) Concrete Class15 for blinding for bridges foundations cu.m. 3,300
c) Concrete Class15 for blinding of Berms in cut section cu.m. 670
d) Concrete Class 30 for surround of pipes & service ducts cu.m. 5,000
e) Concrete Class 35 for culvert head walls, wing walls, apron cu.m. 7,100
& cut-off walls
f) Concrete Class 35 for box culvert barrels cu.m. 130,000
g) Concrete Class 35 for retaining and breast walls cu.m. 1,665
h) Concrete Class 35 in foundations of bridges cu.m. 51,200
i) Concrete Class 35 in abutments & wing walls cu.m. 35,350
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
j) Concrete Class 35 in crossheads and circular piers cu.m. 15,000
k) Concrete Class 35 in diaphragms cu.m. 1,200
l) Concrete Class 35 in walk ways & bridge deck cu.m. 12,000
m) Concrete Class 45 in prestressed concrete "I" Girders cu.m. 25,050
n) Concrete Class 50 in prestressed Box Girders cu.m. 15,500
5.2 Reinforcing Steel
5.2.6(i) Mild steel bar reinforcement of any diameter t. 50
5.2.6(ii) High tensile steel bar reinforcement of any diameter t. 30,850
5.2.6(iii) Fabric wire mesh reinforcement of any size t. 250
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
5.4 Prestressed Concrete Structures
5.4.6(ii) Prestressing strands, 15mm (0.6") dia. t. 2,270
5.10 Waterproofing for Structures
5.10.6(i) Bituminous paint for Culverts and Bridges sq.m. 271,500
5.10.6(ii) Membrane waterproofing for Bridges sq.m. 74,500
5.10.6(iv) Epoxy coating to surfaces of concrete piers sq.m. 4,850
5.12 Load Testing of Bridges
5.12.7(i) Bridge Loading Test nr. 19
6 STRUCTURAL STEEL AND OTHER METALWORKS
6.6(i) a) Metal Access Doors for Box Girder Bridges nr. 98
6.6(i) b) H - Beam for Debris Deflectors as shown on Drawings nr. 1,880
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
8 DRAINAGE
8.1 Pipe Culverts
8.1.6(ii) Reinforced precast concrete pipe, 600mm Dia. lin.m. 5,723
(For Median Drainage)
8.2 Storm Sewers
8.2.6(i) a) Storm Sewer, HDPE Pipe ,300mm Dia lin.m. 200
b) Storm Sewer, HDPE Pipe ,400mm Dia lin.m. 200
c) Storm Sewer, HDPE Pipe ,500mm Dia lin.m. 250
d) Storm Sewer, HDPE Pipe ,600mm Dia lin.m. 700
d) Storm Sewer, HDPE Pipe ,900mm Dia lin.m. 300
8.3 Manholes, Inlets and Chambers
8.3.6(ii) a) Grated Inlet for Median Drainage,Type A as per Drawings nr. 250
b) Grated Inlet for Median Drainage,Type B as per Drawings nr. 44
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
8.3.6(vii) Curb, chute and outlet arrangement at high fill lin.m. 32,310
8.4 Drainage of Structures
8.4.6(i) Gully grate and frame for Bridges nr. 78
8.4.6(ii) Drainage pipe in structure, 75mm Dia. lin.m. 850
8.4.6(iii) Permeable bacfilling cu.m. 14,500
8.4.6(iv) Granular backfill cu.m. 29,175
10 PILING
10.1 Piling General
10.1.6(i) Setting up at each pile nr. 608
10.1.6(ii) a) Piling, Cast in place, 800mm Dia lin.m. 1,950
b) Piling, Cast in place, 1000mm Dia lin.m. 4,400
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
10.2 Pile Testing
10.2.6(ii) Static load testing of working piles, Cast in place nr. 6
10.2.6(iii) Non-destructive Integrity Test nr. 608
11 BRIDGE ACCESSORIES
11.2 Elastomeric Bearings
11.2.6(i) Elastomeric Bearing (Size:250x400x85mm, N=900kN) nr. 2,538
11.3 Pot Bearings
11.3.6(i) a) One way guided sliding pot bearing, Vertical Load Capacity : nr. 36
8500 kN
11.3.6(i) b) One way guided sliding pot bearing, Vertical Load Capacity : nr. 16
6300 kN
11.3.6(i) c) One way guided sliding pot bearing, Vertical Load Capacity : nr. 12
4300 kN
11.3.6(i) d) Fixed pot bearing, Vertical Load Capacity : 17400 kN nr. 4
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
11.3.6(i) e) Fixed pot bearing, Vertical Load Capacity : 14000 kN nr. 10
11.3.6(i) f) Fixed pot bearing, Vertical Load Capacity : 11000 kN nr. 12
11.3.6(i) g) Fixed pot bearing, Vertical Load Capacity : 8500 kN nr. 6
11.4 Bridge Expansion Joints
11.4.6(ii) Elastomeric Expansion Joint, Movement range ( 50 mm ), for lin.m. 1,575
bridge deck
11.6 Bridge Parapets and Railings
11.6.6(i) Concrete Barrier for bridge parapet lin.m. 9,960
11.6.6(v) Steel Pedestrian Railing lin.m. 200
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 5-1
Page No. 5-2
Page No. 5-3
Page No. 5-4
Page No. 5-5
Page No. 5-6
Page No. 5-7
TOTAL AMOUNT OF BILL NO. 5 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–8
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
9 SLOPE PROTECTION AND STABILIZATION
9.1 Riprap
9.1.6(i) Losse stone riprap (class B) cu.m. 22,919
9.1.6(ii) Mortared stone riprap (class B) cu.m. 298,431
9.1.6(iv) Filter Membrane sq.m. 124,278
9.2 Gabions
9.2.6(i) Gabions lining of varying thickness for wadi bed, slope cu.m. 142,329
protection and culverts inlet and outlet protecitons as Per Dwg.
9.3 Slope Netting
9.3.6(i) Wire netting slope protection sq.m. 47,626
9.4 Rock Bolts, Anchors and Sprayed Concrete
9.4.6(i) Rock bolts (25mm dia, upto 5m long) lin.m. 23,813
9.4.6(ii) Rock Anchors (25mm dia, upto 5m long) lin.m. 23,813
9.4.6(iii) Shotcrete cu.m. 16,840
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
9.4.6(v) Wire netting for shotcrete sq.m. 13,472
9.4.6(vii) Painting on Slope Protections sq.m. 67,360
9.5 Rock Grouting
9.5.6(i) Drillholes for grouting rock (75 mm) lin.m. 11,906
9.5.6(ii) Rock grout cu.m. 231
9.9 Ditch Lining
9.9.6(i) Paving slab protection and ditch lining (150mm Thick) sq.m. 101,343
9.9.6(ii) Grouted stone ditch lining (300mm Thick) sq.m. 5,060
9.12 Mechanically Stabilized Earth Retaining Walls
9.12.7(i) Mechanically Stabilized Earth Retaining Walls (MSERWs) sq.m. 10,600
9.12.7(ii) Standard Coping on MSERW lin.m. 240
9.12.7(iii) Concrete Barrier Parapet on MSERW lin.m. 600
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, paved areas and curbs
12.1.7(i) Precast concrete tile paving sq.m. 2,500
12.1.7(ii) Block paving at R.O.P Parkings sq.m. 3,168
12.1.7(v) Precast concrete curb
a) Lip type lin.m. 2,000
b) Non-Mountable lin.m. 4,000
c) Mountable lin.m. 4,000
d) For Edge Erosion Protection lin.m. 20,000
e) Back to Back lin.m. 6,000
12.1.7(vi) Cast in situ concrete curb lin.m. 1,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7(i) W - Beam G/rail, standard section lin.m. 173,168
13.1.7(ii) W - Beam G/rail, transition section lin.m. 3,484
13.1.7(iii) W - Beam G/rail, terminal nr. 318
13.1.7(vii) Concrete Barrier, single face at highfill (as per Dwg.) lin.m. 43,802
13.1.7(x) Impact Attenuator (GREAT) nr. 40
13.2 Fences
13.2.7(i) Chain link fence (2.4m) as per drawings for R.O.W. lin.m. 95,092
13.2.7(v) Gate as per drawings for R.O.W. sq.m. 184
13.2.7(vi) Noise Barrier lin.m. 850
13.2.7(vii) Emergency U-Turn Crossing Arrangements (as per Dwg.) nr. 10
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
14 TRAFFIC SIGNS AND ROAD MARKING
14.1 Traffic Signs
14.1.7(i) a) Highway sign, triangular, (Side - 1500mm) nr. 165
b) Highway sign, triangular, (Side - 1200mm) nr. 30
14.1.7(ii) a) Highway sign, circular, (diameter - 1200mm) nr. 135
b) Highway sign, circular, (diameter - 750mm) nr. 40
14.1.7(iii) Highway sign, rectangular - size (finished sign area) sq.m. 2,100
14.1.7(iv) Highway sign, octagonal, (Height - 1200mm) nr. 60
14.1.7(v) Sign post support assembly including foundation
a) Single post support assembly (100mm Dia.) nr. 300
b) Double post support assembly (120mm Dia.) nr. 100
14.1.7(vii) a) Single post support assembly including foundation for nr. 60
overhead cantiliver signs
b) Overhead sign support assembly including foundation nr. 16
(Gantry Sign)
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
14.1.7(viii) Km Post including foundation nr. 18
14.1.7(ix) Km Reference Post including foundation nr. 74
14.1.7(x) R.O.W. Marker Post including foundation nr. 470
14.1.7(xi) New flag poles including foundation as per special nr. 820
specification
14.1.7(xii) Precast Concrete Foundation with pole for R.O.P. Speed nr. 21
Control Camera (600X600X100mm) including Base plate,
Bolts, Hexagonal nuts, washers, uPVC ducts and any other
accessories required for installation as per special
specification
14.2 Road Markings
14.2.6 (i) Traffic lines (mechanical application) sq.m. 64,386
14.2.6 (iii) Special Road Markings (hand applied) sq.m. 6,500
14.2.6 (iv) Curb painting sq.m. 3,000
14.3 Road Studs
14.3.6(i) Reflecting road studs
a) Single Face nr. 20,000
b) Double Face nr. 2,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 6-1
Page No. 6-2
Page No. 6-3
Page No. 6-4
Page No. 6-5
Page No. 6-6
TOTAL AMOUNT OF BILL NO. 6 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
15.1 General
15.1.20(i) Power Supply connection to the feeder pillar nr. 49
15.1.20(ii) Spare Parts (5%) as per the approved list LS
15.2 Medium Voltage Intake Switching Stations
Mediam Voltage Switching Station 33 kV,
15.2.6(i) nr. 4
1 Incoming and + 2 Outgoing
15.3 Package Sub-stations
15.3.6(i)a Supply and installation of Electrical Sub station with 1Nr RMU, nr. 2
1 Nr OLU 1Nr 500 KVA Transformer and 800 A feeder pillar
etc complete, including cable terminations, testing and
commissioning.
15.3.6(i)b Supply and installation of Electrical Sub station M/V - 33 KV, 1 nr. 47
Nr 100 KVA Transformer and 100 A feeder pillar etc complete,
including cable terminations, testing and commissioning.
15.6 Feeder Pillars
15.6.6(i) Supply and install Street Lighting Feeder Pillars, 100 A nr. 49
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.7 Electrical Cables
Supplying, Laying , Testing and Commissioning 4-Core
cabling, copper conductor, XLPE insulated, Steel wire
armoured, PVC sheathed, 600/1000V rating, as follows:
15.7.6(i) a Nominal Conductor Area 25 mm2 lin.m. 88,500
15.7.6(i) b Nominal Conductor Area 95 mm2 lin.m. 9,800
15.7.6(i) c 33kV Underground Cable Area 120 mm2 lin.m. 40,700
15.7.6(i) d Nominal Conductor Area 240 mm2 lin.m. 500
15.7.6(i) e Green PVC Insulated 25mm2 lin.m. 100,000
15.8 Road Lighting Masts, Columns and Luminaries
High Mast
15.8.6(i) Supply and install Galvanized steel lighting column (Mid nr. 492
hinged Type) 25m high mast with 4 x 600 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc.
15.8.6(ii) a Supply and install Galvanized steel lighting column (Mid nr. 1,014
hinged Type) 14m high pole/column with 1 x 400 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.8.6(ii) b Supply and install Galvanized steel lighting column (Mid nr. 137
hinged Type) 14m high pole/column with 2 x 400 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc
15.8.6(iii) Column / high mast testing LS
15.9 Sign Illuminaition
15.9.6(i) a Overhead Sign Lighting System for Gantry complete incl. nr. 6
Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 44-50 sq m)
15.9.6(i) b Overhead Sign Lighting System for Cantilever complete nr. 15
incl.Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 19-24 sq m)
15.9.6(i) c Overhead Sign Lighting System for Cantilever complete nr. 17
incl.Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 14-17 sq m)
15.10 Under Bridge Lighting
15.10.6(i) Under bridge surface mounted lighting including Conduits, nr. 48
Cables, 150W High Pressure Sodium Lanterns, Junction
Boxes, including Supply, Installation, Testing and Putting into
service complete.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.15 Earthing
15.15.7(i) Supply and install Three rod earthing installation at street nr. 102
lighting feeder pillars
15.15.7(ii) Supply and install single rod earthing installation at street nr. 80
lighting feeder pillars
15.17 Civil Works for Electrical & Telecommunication
Installations
15.17.6(i) Building for Medium Voltage intake switching station nr. 4
15.17.6(vi) Supply and install Pre-cast concrete foundation for street nr. 49
lighting feeder pillars as per Dwg. including Bolts and any
other accessories required for installation.
15.17.6(vii)c Trench for low voltage cable for upto three cable lin.m. 80,000
15.17.6(ix) Supply and install Precast Concrete Foundation for columns nr. 1,151
14m high pole/column as per Dwg. including Base plate, Bolts,
Hexagonal nuts, washers, uPVC ducts and any other
accessories required for installation.
15.17.6(x) Supply and install Precast Concrete Foundation for 25m high nr. 492
mast as per Dwg. including Base plate, Bolts, Hexagonal nuts,
washers, uPVC ducts and any other accessories required for
installation.
15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with concrete lin.m. 6,500
encasement
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lighting lin.m. 575
with concrete encasement
15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with concrete lin.m. 1,000
encasement
15.17.6(xii)d 4Way 150 mm Upvc duct for street lighting with concrete lin.m. 50
encasement
15.17.6(xiii) Supply and Fixing of Cable Duct Route Marker. nr. 6,000
15.18 Weigh Stations
15.18.10(i) Weigh Stations complete in all respects nr. 4
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 7-1
Page No. 7-2
Page No. 7-3
Page No. 7-4
Page No. 7-5
TOTAL AMOUNT OF BILL NO. 7 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
18 UTILITIES
18.1 Location and Protecting Existing Utilities
18.1.6(i) a) Protection of Existing Electrical lines lin.m. 2,400
b) Protection of Existing Telephone lines lin.m. 2,400
c) Protection of Existing Water lines lin.m. 1,200
18.2 Removing and Disposing of or Relocationg Existing
Utilities
18.2.6(i) a) Remove and disposing of Electrical lines lin.m. 2,400
b) Remove and disposing of Telephone lines lin.m. 2,400
c) Remove and disposing of water lines lin.m. 1,200
18.2.6(ii) a) Remove and relocate Electric lines lin.m. 2,400
b) Remove and relocate Telephone lines lin.m. 2,400
c) Remove and relocate Water lines lin.m. 1,200
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
18.2.6(iii) a) Provide and install new Electric lines lin.m. 6,000
b) Provide and install new Telephone lines lin.m. 1,200
c) Provide and install new Water lines lin.m. 2,400
18.3 Future Utility Crossing Ducts
18.3.6(i) a) Service Duct uPVC 3 way (150mm dia) lin.m. 55,000
b) Service Duct uPVC 8 way (6 @ 150mm and 2 @ 225mm) lin.m. 2,000
c) Utility PVC pipes in bridge decks (Dia: 100mm and 150mm) lin.m. 27,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 9-1
Page No. 9-2
TOTAL AMOUNT OF BILL NO. 9 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19 DAYWORS
19.1 Wages
These include proper wages, all used allowance, medical
expenses and all other charges provided for by local laws.
19.1a Labourer - Skilled (Omani) hour 10
19.1b Labourer - Skilled (Expatriate) hour 10
19.1c Labourer - unskilled (Omani) hour 10
19.1d Labourer - Unskilled (Expatriate) hour 10
19.1e Carpenter hour 10
19.1f Mason / Concrete finisher hour 10
19.1g Driver : Heavy Duty hour 10
19.1h Driver : Light Duty hour 10
19.1i Pipe fitter hour 10
19.1j Plant Operator : Heavy hour 10
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.1k Plant Operator : Light hour 10
19.1l Steel Fixer hour 10
19.1m Welder hour 10
19.1n Painter hour 10
19.1o Electrician hour 10
19.1p Plumber hour 10
19.1q Driller hour 10
19.1r Gangers hour 10
19.1s Plasterers hour 10
19.1t Scaffolders hour 10
19.1u ………………………………………………….. hour
19.1v ………………………………………………….. hour
19.1w ………………………………………………….. hour
19.1x ………………………………………………….. hour
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2 Operating Equipment on Site
The rates inserted by the tenderer shall be deemed to include
for the use of the plant inclusive of all fuel and consumable
stores, overhauls, repairs and replacements, spare parts,
tyres, insurance and all other charges relating to plant
including haulage to and from the site but exclusive of driver
and attendants who shall be paid as laid down in the Labour
Schedule. Payments for working plants shall be for the Hours
worked only. No allowance for standing time will be made.
19.2a Bulldozer up to 100 HP hour 5
19.2b Bulldozer 100HP to 200HP hour 5
19.2c Bulldozer over 200HP hour 5
19.2d Motor grader upto 140 HP hour 5
19.2e Motor grader over 140 HP hour 5
19.2f Vibratory roller upto 3 tones hour 5
19.2g Vibratory roller over 3 tones hour 5
19.2h Pneumatic roller over 10 tones hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2i Tendem roller upto 10 tones hour 5
19.2j Tendem roller over 10 tones hour 5
19.2k Wheel loader upto 3 cu.m.. hour 5
19.2l Wheel loader above 3 cu.m.. hour 5
19.2m Excavator upto 1 cu.m.. hour 5
19.2n Excavator over 1 cu.m.. hour 5
19.2o water tanker, Minimum 6 cu.m.. hour 5
19.2p Concrete vibrator (poker/screed) upto dia 50mm hour 5
19.2q Dump Truck upto 5 tones hour 5
19.2r Dump Truck upto 5 to 10 tones hour 5
19.2s Dump Truck over 10 tones hour 5
19.2t Water pump 2 inch hour 5
19.2u Water pump 3 inch hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2v Air compressor upto 6000 liters capacity hour 5
19.2w Air compressor over 6000 liters capacity hour 5
Bituminous mixing plant with batching apparatus from 80t/hto
19.2x hour 5
150 t./h
19.2y Finisher upto 80 t./h hour 5
19.2z Finisher from 80 t./h to 120 t./h hour 5
19.2aa Bituminous sprayer upto 6 tones hour 5
19.2ab Crane with boom and jib 5 to 10 tones hour 5
19.2ac Crane with boom and jib over 10 tones hour 5
19.2ad Generator 60 kW hour 5
19.2ae Low Bed hour 5
19.2af Hiab hour 5
19.2ag Generator 75 kW hour 5
19.2ah Generator 100 kW hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2ai Generator 150 kW hour 5
19.2aj Generator 200 kW hour 5
19.2ak Welding plant hour 5
19.2al Concrete mixer upto 0.5 cu.m.. hour 5
19.2am Concrete mixer over 0.5 cu.m.. hour 5
19.2an Automatic concrete batching plant hour 5
19.2ao Pick up truck upto 3 tones hour 5
19.2ap Pick up truck over 3 tones hour 5
19.2aq Van or utility vehicle hour 5
19.2ar Welding set, 300A, including electrodes hour 5
19.2as …………………………………………………..
19.2at …………………………………………………..
19.2au …………………………………………………..
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.3 Materials
These rates includes all the charges for the supply of the
materials, loading, transportation to site, unloading and stores
as well as the charges provided in the General and Special
specification and in the Contract.
19.3a Aggregates for granular subbase course in accordance with cu.m.. 30
the General and Specification, in place as specified.
19.3b Aggregates for aggregate base course in accordance with the cu.m.. 30
General and Special Specification, in place as specified.
19.3c Aggregates for bituminous base course in accordance with the cu.m.. 30
General and Special Specification, near the asphalt plant, in
bulk
19.3d Fine aggregate for concrete in accordance with the General cu.m.. 30
and Special Specification, in place, in bulk
19.3e Course aggregate for concrete in accordance with the General cu.m.. 50
and Special Specification, in place, in bulk
19.3f Stone for Drainage masonry and slope protection in cu.m.. 50
accordance with the General and Special Specification, in
place, in bulk
10
19.3g Asphalt cement, grade 60-70 on site t.
10
19.3h Asphalt cement, grade 50-60 on site t.
10
19.3i Emulsion asphalt, grade RS-1, on site t.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.3j Cutback asphalt, MC and RC type, on site t. 10
19.3k Portland Cement, on site t. 10
19.3l Deformed billet steel bars AASHTO M31 grade 60 (High yield) t.
of any dia 10
19.3m Highway signs sq.m. 10
19.3n Highway Signs Supports - 1 post nr. 10
19.3o Highway Signs Support - 2 post nr. 10
19.3p Thrie-Beam type Guardrail lin.m. 10
19.3q End anchorage for W-beam type Guardrails nr. 10
19.3r Water depth gauges nr. 10
19.3s Wire mesh Gabions on site t. 10
19.3t Gasoline on site liter 100
19.3u Lubricant Kg 100
19.3v …………………………………………………..
19.3w …………………………………………………..
19.3x …………………………………………………..
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 8
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 10-1
Page No. 10-2
Page No. 10-3
Page No. 10-4
Page No. 10-5
Page No. 10-6
Page No. 10-7
Page No. 10-8
TOTAL AMOUNT OF BILL NO. 11 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 9
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 11 – PROVISIONAL SUMS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
20.3.1 (i) Miscelleneous Items for Unforeseen Utilities P.S. 100,000
CARRIED FORWARD TO SUMMARY 100,000
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 11 11 – 1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
BILL NO. 11 – PROVISIONAL SUMS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 11-1 100,000
TOTAL AMOUNT OF BILL NO. 11 (CARRIED FORWARD TO GRAND SUMMARY) 100,000
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 11 11 – 2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5
BILL OF QUANTITIES
GRAND SUMMARY
AMOUNT (R.O.)
BILL
DESCRIPTION
NO. IN FIGURES IN WORDS
GRAND SUMMARY
1 PRELIMINARIES
2 EARTHWORKS
3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED
BASE COURSES
4 BITUMINOUS PAVEMENT
5 CONCRETE AND CONCRETE STRUCTURES
6 INCIDENTAL CONSTRUCTION
7 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
8 LANDSCAPING AND IRRIGATION N/A
9 PUMPING STATIONS AND UTILITIES
10 DAYWORKS
11 PROVISIONAL SUMS 100,000
Sub - Total
Add 10% for Contingencies of Sub - Total
(Excluding Bill No. 1 ,10 and Provisional Sum Bill No. 11)
TOTAL TENDER VALUE CARRIED TO THE FORM OF TENDER
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 GS(1) – 1
Four Lanes Option
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
CONDITIONS OF CONTRACT
The Contractor is deemed to have carefully studied and
understood and taken into account the provisions and
requirements of the General and Particular Conditions of
Contract. The rates and prices stated in the bill of Quantities
shall include for all costs of compliance with the Conditions
except for the costs of the items given in this Section 1 and for
which a separate amount is stated herein.
1 GENERAL
1.3 Project Site
1.3.5(i) Soil Investigation and report LS
1.4 Contractors Site Facilities
1.4.3(i) Mobiliztion and demobilization of Contractors site facilities LS
1.4.3(ii) Maintenance of Contractors site facilities month 36
1.5 Engineer's Facilities
1.5.13(i) Provision of Engineer's office
a) Type A1, 1 unit x 39 month 39
b) Type A2, 1 unit x 36 month 36
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
1.5.13(ii) Maintenance of Engineer's office
a) Type A1, 1 unit x 39 month 39
b) Type A2, 1 unit x 36 month 36
1.5.13(iii) Provision of surveying equipment for the Engineer month 36
1.5.13(iv) Maintenance of surveying equipment for the Engineer month 36
1.5.13(v) Provision of Engineer's accommodation
a) 2 - Bed room family unit (Type B1,1 unit x 39) month 39
b) 2 - Bed room family unit (Type B2, 3 units x 36 ) month 108
c) 2 - Single bed room bachelor unit (Type C,14 units x 36) month 504
d) Dining / Kitchen (Type D, 1 unit x 36) month 36
1.5.13(vi) Maintenance of Engineer 's accommodation
a) 2 - Bed room family unit (Type B1,1 unit x 39) month 39
b) 2 - Bed room family unit (Type B2, 3 units x 36 ) month 108
c) 2 Single bed room bachelor unit (Type C, 14 units x 36) month 504
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
d) Dining / Kitchen (Type D, 1 unit x 36) month 36
1.5.13(vii) Provision of site laboratory (1 unit x 36) month 36
1.5.13(viii) Maintenance of site laboratory month 36
1.5.13(ix) Provision of Client's vehicles
a) Four-wheel drive vehicle, hardtop, 4.6 Liters (2 unit x 36) month 72
b) Four-wheel drive vehicle, hardtop, 4.0 Liters (2 unit x 36) month 72
1.7 Control of Traffic and Access
1.7.6(i) Maintenance and protection of Traffic month 36
1.7.6(ii) Supply and compaction of sub-base (Class B) on diversions cu.m. 20,000
where ordered by the Engineer (Thickness = 200mm)
1.7.6(iii) Supply and compaction of bituminous basecourse (Class B) on cu.m. 10,000
diverions where ordered by the Engineer (Thickness =
100mm)
1.7.6(iv) Prime coat Kg 112,000
1.10 Management Procedures
1.10.6(i) Provision of 5 sets of photographs month 36
1.10.6(ii) Provision of 2 sets of video recordings month 36
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
1.11 Submittals
1.11.8(i) Provision of As-built drawings, record drawings, record LS
specifications and miscellaneous records as spcified
1.14 Contractor's Temporary Works and Services
1.14.8(i) Provision, erection, relocation, maintenance and removal of nr. 2
project signboards (Aluminium)
1.15 Commemorative Plaque and Opening Ceremony
1.15.4(i) Supply and erection of commemorative plaque nr. 1
1.15.4(ii) Opening ceremony including all facilities LS
1.15.4(iii) Stoppage of work due to V.I.P. visits as per instruction of Hour 48
R.O.P
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 1 – PRELIMINARIES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 1-1
Page No. 1-2
Page No. 1-3
Page No. 1-4
TOTAL AMOUNT OF BILL NO. 1 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 1–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2 EARTHWORKS
2.1 Clearing and Grubbing
2.1.5 (i) Clearing and Grubbing sq.m. 4,610,795
2.1.5 (ii) Removal and delivery or disposal of trees of 300mm trunk nr. 60
diameter or greater
2.2 Removal of Structures and Obstructions
2.2.5 (i) Removal of existing buildings (upto 200 sq.m.) nr. 3
2.2.5 (ii) Removal of reinforced concrete cu.m. 400
2.2.5 (iii) Removal of mass concrete cu.m. 150
2.2.5 (v) Removal of curbs lin.m. 100
2.2.5 (vi) Removal of tiles sq.m. 100
2.2.5 (vii) Removal of pipe culvert (per opening of any size) lin.m. 100
2.2.5 (viii) Removal of existing pavement (upto 200 mm Thickness) cu.m. 3,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.2.5 (ix) Removal of reusable road studs nr. 100
2.2.5 (x) Removal of steel safety barrier including post and foundation lin.m. 100
2.2.5 (xi) Removal of concrete safety barrier including foundation lin.m. 50
2.2.5 (xii) Removal of sign boards including post and foundation (any nr. 10
size)
2.2.5 (xiii) Removal of floodway marker posts including foundation nr. 10
2.2.5 (xiv) Removal of reusable steel safety barrier including post and lin.m. 50
foundation
2.2.5 (xv) Removal of reusable concrete safety barrier including lin.m. 50
foundation
2.2.5 (xvi) Removal of reusable sign boards including post and nr. 5
foundation (any size)
2.2.5 (xvii) Removal of reusable floodway marker posts including nr. 20
foundation
2.2.5 (xviii) Removal of drainage protection works
a) Mortared Riprap cu.m. 50
b) Gabions cu.m. 50
c) Loose Riprap cu.m. 100
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.2.5 (xix) Removal of existing fence and gates (upto 2m Height) lin.m. 200
Removal of existing block and masonary wall (Block type upto
2.2.5 (xx) cu.m. 400
2m Height)
2.2.5 (xxi) Removal of Ditches lin.m. 50
2.2.5 (xxiii) Removal of rocks and boulders larger than 0.2cu.m. or 500kg cu.m. 250
2.2.5 (xxvi) Removal of light poles including cabling and foundation nr. 20
2.3 Roadway Excavation
2.3.6 (i) Unclassified Excavation cu.m. 4,004,180
2.3.6 (ii) Excavation of unsuitable material outside Right-of-Way cu.m. 1,000
2.3.6 (iii) Unclassified Excavation under water cu.m. 8,000
2.3.6 (iv) Excavate and Stockpile suitable topsoil and recompact as cu.m. 145,904
directed
2.4 Borrow Excavation
2.4.6 (i) Borrow excavation for embankment and dykes cu.m. 11,529,233
2.6 Sub-Grade Construction
2.6.6 (i) Sub-grade preperation in cut sq.m. 409,090
2.6.6 (iii) Preperation of sub-grade construction on sabkha or gypsum- sq.m. 7,500
rich soils
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
2.7 Excavation and Backfilling for Structures
2.7.6 (i) Unclassified structural excavation (depth 0 to 2m) cu.m. 101,000
2.7.6 (ii) Unclassified structural excavation (2m < depth ≤ 4m) cu.m. 60,200
2.7.6 (iii) Unclassified structural excavation (depth > 4m) cu.m. 25,800
2.7.6 (iv) Structural Excavation under water cu.m. 600
2.8 Earthwork For pipe Trenches
2.8.6 (i) Trench excavation and bakfilling (Depth 0 to 2m) cu.m. 36,630
2.8.6 (ii) Trench excavation and bakfilling (Depth >2m ≤ 3m) cu.m. 4,029
2.8.6 (iii) Trench excavation and bakfilling (Depth >3m ≤ 4m) cu.m. 1,465
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 2 – EARTHWORKS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 2-1
Page No. 2-2
Page No. 2-3
Page No. 2-4
TOTAL AMOUNT OF BILL NO. 2 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 2–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 3 – GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED BASE COURSES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE
AND STABILIZED BASE COURSES
3.2 Granular Subbase
3.2.6 (ii) Granular sub-base course (Class B) cu.m. 731,329
3.3 Aggregate Basecourse
3.3.6 (ii) Aggregate base course (Class B) cu.m. 398,205
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 3–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 3 – GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED BASE COURSES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 3-1
TOTAL AMOUNT OF BILL NO. 3 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 3–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 4 – BITUMINOUS PAVEMENT
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
4. BITUMINOUS PAVEMENT
4.2 Bituminous Materials for Prime and Tack Coats
4.2.8(i) Bituminous prime coat Kg 2,682,788
4.2.8(ii) Bituminous tack coat Kg 2,581,681
4.4 Bituminous Base Course
4.4.14(i) Bituminous Base Course, Class B cu.m. 399,937
4.5 Bituminous Binder and Wearing Courses
4.5.14(ii) Bituminous wearing course, Class B cu.m. 129,299
4.10 Pavement Widening
4.10.6(i) Pavement widening (upto 60 cm.) sq.m. 500
4.12 Surface Rideability Measurement
4.12.10(i) International roughness index (IRI) for bituminous pavement lin.m. 421,419
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 4–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 4 – BITUMINOUS PAVEMENT
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 4-1
TOTAL AMOUNT OF BILL NO. 4 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 4–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
5 CONCRETE AND CONCRETE STRUCTURES
5.1 Concrete Materials and Mixes
5.1.7(i) a) Concrete Class 15 for blinding for box barrels, apron, wing cu.m. 14,000
wall, retaining wall and breast wall
b) Concrete Class15 for blinding for bridges foundations cu.m. 3,400
c) Concrete Class15 for blinding of Berms in cut section cu.m. 670
d) Concrete Class 30 for surround of pipes & service ducts cu.m. 5,000
e) Concrete Class 35 for culvert head walls, wing walls, apron cu.m. 7,100
& cut-off walls
f) Concrete Class 35 for box culvert barrels cu.m. 130,000
g) Concrete Class 35 for retaining and breast walls cu.m. 1,665
h) Concrete Class 35 in foundations of bridges cu.m. 52,300
i) Concrete Class 35 in abutments & wing walls cu.m. 35,350
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
j) Concrete Class 35 in crossheads and circular piers cu.m. 17,650
k) Concrete Class 35 in diaphragms cu.m. 1,450
l) Concrete Class 35 in walk ways & bridge deck cu.m. 14,500
m) Concrete Class 45 in prestressed concrete "I" Girders cu.m. 30,650
n) Concrete Class 50 in prestressed Box Girders cu.m. 15,500
5.2 Reinforcing Steel
5.2.6(i) Mild steel bar reinforcement of any diameter t. 50
5.2.6(ii) High tensile steel bar reinforcement of any diameter t. 32,100
5.2.6(iii) Fabric wire mesh reinforcement of any size t. 250
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
5.4 Prestressed Concrete Structures
5.4.6(ii) Prestressing strands, 15mm (0.6") dia. t. 2,650
5.10 Waterproofing for Structures
5.10.6(i) Bituminous paint for Culverts and Bridges sq.m. 272,500
5.10.6(ii) Membrane waterproofing for Bridges sq.m. 87,000
5.10.6(iv) Epoxy coating to surfaces of concrete piers sq.m. 4,850
5.12 Load Testing of Bridges
5.12.7(i) Bridge Loading Test nr. 19
6 STRUCTURAL STEEL AND OTHER METALWORKS
6.6(i) a) Metal Access Doors for Box Girder Bridges nr. 98
6.6(i) b) H - Beam for Debris Deflectors as shown on Drawings nr. 1,880
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
8 DRAINAGE
8.1 Pipe Culverts
8.1.6(ii) Reinforced precast concrete pipe, 600mm Dia. lin.m. 5,723
(For Median Drainage)
8.2 Storm Sewers
8.2.6(i) a) Storm Sewer, HDPE Pipe ,300mm Dia lin.m. 200
b) Storm Sewer, HDPE Pipe ,400mm Dia lin.m. 200
c) Storm Sewer, HDPE Pipe ,500mm Dia lin.m. 250
d) Storm Sewer, HDPE Pipe ,600mm Dia lin.m. 700
d) Storm Sewer, HDPE Pipe ,900mm Dia lin.m. 300
8.3 Manholes, Inlets and Chambers
8.3.6(ii) a) Grated Inlet for Median Drainage,Type A as per Drawings nr. 250
b) Grated Inlet for Median Drainage,Type B as per Drawings nr. 44
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
8.3.6(vii) Curb, chute and outlet arrangement at high fill lin.m. 32,310
8.4 Drainage of Structures
8.4.6(i) Gully grate and frame for Bridges nr. 78
8.4.6(ii) Drainage pipe in structure, 75mm Dia. lin.m. 850
8.4.6(iii) Permeable bacfilling cu.m. 14,500
8.4.6(iv) Granular backfill cu.m. 29,175
10 PILING
10.1 Piling General
10.1.6(i) Setting up at each pile nr. 608
10.1.6(ii) a) Piling, Cast in place, 800mm Dia lin.m. 1,950
b) Piling, Cast in place, 1000mm Dia lin.m. 4,400
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
10.2 Pile Testing
10.2.6(ii) Static load testing of working piles, Cast in place nr. 6
10.2.6(iii) Non-destructive Integrity Test nr. 608
11 BRIDGE ACCESSORIES
11.2 Elastomeric Bearings
11.2.6(i) Elastomeric Bearing (Size:250x400x85mm, N=900kN) nr. 2,538
11.3 Pot Bearings
11.3.6(i) a) One way guided sliding pot bearing, Vertical Load Capacity : nr. 36
8500 kN
11.3.6(i) b) One way guided sliding pot bearing, Vertical Load Capacity : nr. 16
6300 kN
11.3.6(i) c) One way guided sliding pot bearing, Vertical Load Capacity : nr. 12
4300 kN
11.3.6(i) d) Fixed pot bearing, Vertical Load Capacity : 17400 kN nr. 4
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
11.3.6(i) e) Fixed pot bearing, Vertical Load Capacity : 14000 kN nr. 10
11.3.6(i) f) Fixed pot bearing, Vertical Load Capacity : 11000 kN nr. 12
11.3.6(i) g) Fixed pot bearing, Vertical Load Capacity : 8500 kN nr. 6
11.4 Bridge Expansion Joints
11.4.6(ii) Elastomeric Expansion Joint, Movement range ( 50 mm ), for lin.m. 1,850
bridge deck
11.6 Bridge Parapets and Railings
11.6.6(i) Concrete Barrier for bridge parapet lin.m. 13,400
11.6.6(v) Steel Pedestrian Railing lin.m. 200
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 5 – CONCRETE AND CONCRETE STRUCTURES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 5-1
Page No. 5-2
Page No. 5-3
Page No. 5-4
Page No. 5-5
Page No. 5-6
Page No. 5-7
TOTAL AMOUNT OF BILL NO. 5 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 5–8
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
9 SLOPE PROTECTION AND STABILIZATION
9.1 Riprap
9.1.6(i) Losse stone riprap (class B) cu.m. 22,919
9.1.6(ii) Mortared stone riprap (class B) cu.m. 298,431
9.1.6(iv) Filter Membrane sq.m. 124,278
9.2 Gabions
9.2.6(i) Gabions lining of varying thickness for wadi bed, slope cu.m. 142,329
protection and culverts inlet and outlet protecitons as Per Dwg.
9.3 Slope Netting
9.3.6(i) Wire netting slope protection sq.m. 47,626
9.4 Rock Bolts, Anchors and Sprayed Concrete
9.4.6(i) Rock bolts (25mm dia, upto 5m long) lin.m. 23,813
9.4.6(ii) Rock Anchors (25mm dia, upto 5m long) lin.m. 23,813
9.4.6(iii) Shotcrete cu.m. 16,840
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
9.4.6(v) Wire netting for shotcrete sq.m. 13,472
9.4.6(vii) Painting on Slope Protections sq.m. 67,360
9.5 Rock Grouting
9.5.6(i) Drillholes for grouting rock (75 mm) lin.m. 11,906
9.5.6(ii) Rock grout cu.m. 231
9.9 Ditch Lining
9.9.6(i) Paving slab protection and ditch lining (150mm Thick) sq.m. 101,343
9.9.6(ii) Grouted stone ditch lining (300mm Thick) sq.m. 5,060
9.12 Mechanically Stabilized Earth Retaining Walls
9.12.7(i) Mechanically Stabilized Earth Retaining Walls (MSERWs) sq.m. 10,600
9.12.7(ii) Standard Coping on MSERW lin.m. 240
9.12.7(iii) Concrete Barrier Parapet on MSERW lin.m. 600
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, paved areas and curbs
12.1.7(i) Precast concrete tile paving sq.m. 2,500
12.1.7(ii) Block paving at R.O.P Parkings sq.m. 3,168
12.1.7(v) Precast concrete curb
a) Lip type lin.m. 2,000
b) Non-Mountable lin.m. 4,000
c) Mountable lin.m. 4,000
d) For Edge Erosion Protection lin.m. 20,000
e) Back to Back lin.m. 6,000
12.1.7(vi) Cast in situ concrete curb lin.m. 1,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7(i) W - Beam G/rail, standard section lin.m. 173,168
13.1.7(ii) W - Beam G/rail, transition section lin.m. 3,484
13.1.7(iii) W - Beam G/rail, terminal nr. 318
13.1.7(vii) Concrete Barrier, single face at highfill (as per Dwg.) lin.m. 43,802
13.1.7(x) Impact Attenuator (GREAT) nr. 40
13.2 Fences
13.2.7(i) Chain link fence (2.4m) as per drawings for R.O.W. lin.m. 95,092
13.2.7(v) Gate as per drawings for R.O.W. sq.m. 184
13.2.7(vi) Noise Barrier lin.m. 850
13.2.7(vii) Emergency U-Turn Crossing Arrangements (as per Dwg.) nr. 10
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
14 TRAFFIC SIGNS AND ROAD MARKING
14.1 Traffic Signs
14.1.7(i) a) Highway sign, triangular, (Side - 1500mm) nr. 165
b) Highway sign, triangular, (Side - 1200mm) nr. 30
14.1.7(ii) a) Highway sign, circular, (diameter - 1200mm) nr. 135
b) Highway sign, circular, (diameter - 750mm) nr. 40
14.1.7(iii) Highway sign, rectangular - size (finished sign area) sq.m. 2,100
14.1.7(iv) Highway sign, octagonal, (Height - 1200mm) nr. 60
14.1.7(v) Sign post support assembly including foundation
a) Single post support assembly (100mm Dia.) nr. 300
b) Double post support assembly (120mm Dia.) nr. 100
14.1.7(vii) a) Single post support assembly including foundation for nr. 60
overhead cantiliver signs
b) Overhead sign support assembly including foundation nr. 16
(Gantry Sign)
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
14.1.7(viii) Km Post including foundation nr. 18
14.1.7(ix) Km Reference Post including foundation nr. 74
14.1.7(x) R.O.W. Marker Post including foundation nr. 470
14.1.7(xi) New flag poles including foundation as per special nr. 820
specification
14.1.7(xii) Precast Concrete Foundation with pole for R.O.P. Speed nr. 21
Control Camera (600X600X100mm) including Base plate,
Bolts, Hexagonal nuts, washers, uPVC ducts and any other
accessories required for installation as per special
specification
14.2 Road Markings
14.2.6 (i) Traffic lines (mechanical application) sq.m. 71,766
14.2.6 (iii) Special Road Markings (hand applied) sq.m. 6,500
14.2.6 (iv) Curb painting sq.m. 3,000
14.3 Road Studs
14.3.6(i) Reflecting road studs
a) Single Face nr. 25,000
b) Double Face nr. 2,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 6 – INCIDENTAL CONSTRUCTION
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 6-1
Page No. 6-2
Page No. 6-3
Page No. 6-4
Page No. 6-5
Page No. 6-6
TOTAL AMOUNT OF BILL NO. 6 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 6–7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
15.1 General
15.1.20(i) Power Supply connection to the feeder pillar nr. 49
15.1.20(ii) Spare Parts (5%) as per the approved list LS
15.2 Medium Voltage Intake Switching Stations
Mediam Voltage Switching Station 33 kV,
15.2.6(i) nr. 4
1 Incoming and + 2 Outgoing
15.3 Package Sub-stations
15.3.6(i)a Supply and installation of Electrical Sub station with 1Nr RMU, nr. 2
1 Nr OLU 1Nr 500 KVA Transformer and 800 A feeder pillar
etc complete, including cable terminations, testing and
commissioning.
15.3.6(i)b Supply and installation of Electrical Sub station M/V - 33 KV, 1 nr. 47
Nr 100 KVA Transformer and 100 A feeder pillar etc complete,
including cable terminations, testing and commissioning.
15.6 Feeder Pillars
15.6.6(i) Supply and install Street Lighting Feeder Pillars, 100 A nr. 49
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.7 Electrical Cables
Supplying, Laying , Testing and Commissioning 4-Core
cabling, copper conductor, XLPE insulated, Steel wire
armoured, PVC sheathed, 600/1000V rating, as follows:
15.7.6(i) a Nominal Conductor Area 25 mm2 lin.m. 88,500
15.7.6(i) b Nominal Conductor Area 95 mm2 lin.m. 9,800
15.7.6(i) c 33kV Underground Cable Area 120 mm2 lin.m. 40,700
15.7.6(i) d Nominal Conductor Area 240 mm2 lin.m. 500
15.7.6(i) e Green PVC Insulated 25mm2 lin.m. 100,000
15.8 Road Lighting Masts, Columns and Luminaries
High Mast
15.8.6(i) Supply and install Galvanized steel lighting column (Mid nr. 492
hinged Type) 25m high mast with 4 x 600 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc.
15.8.6(ii) a Supply and install Galvanized steel lighting column (Mid nr. 1,014
hinged Type) 14m high pole/column with 1 x 400 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.8.6(ii) b Supply and install Galvanized steel lighting column (Mid nr. 137
hinged Type) 14m high pole/column with 2 x 400 Watt HPSV
luminaries fixed on bracket complete with fused cut out,
control gear, wiring, connection etc
15.8.6(iii) Column / high mast testing LS
15.9 Sign Illuminaition
15.9.6(i) a Overhead Sign Lighting System for Gantry complete incl. nr. 6
Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 44-50 sq m)
15.9.6(i) b Overhead Sign Lighting System for Cantilever complete nr. 15
incl.Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 19-24 sq m)
15.9.6(i) c Overhead Sign Lighting System for Cantilever complete nr. 17
incl.Conduits, Cables, Lanterns, Junction Boxes, Design of
Lighting System complete as per Dwg (Area 14-17 sq m)
15.10 Under Bridge Lighting
15.10.6(i) Under bridge surface mounted lighting including Conduits, nr. 48
Cables, 150W High Pressure Sodium Lanterns, Junction
Boxes, including Supply, Installation, Testing and Putting into
service complete.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.15 Earthing
15.15.7(i) Supply and install Three rod earthing installation at street nr. 102
lighting feeder pillars
15.15.7(ii) Supply and install single rod earthing installation at street nr. 80
lighting feeder pillars
15.17 Civil Works for Electrical & Telecommunication
Installations
15.17.6(i) Building for Medium Voltage intake switching station nr. 4
15.17.6(vi) Supply and install Pre-cast concrete foundation for street nr. 49
lighting feeder pillars as per Dwg. including Bolts and any
other accessories required for installation.
15.17.6(vii)c Trench for low voltage cable for upto three cable lin.m. 80,000
15.17.6(ix) Supply and install Precast Concrete Foundation for columns nr. 1,151
14m high pole/column as per Dwg. including Base plate, Bolts,
Hexagonal nuts, washers, uPVC ducts and any other
accessories required for installation.
15.17.6(x) Supply and install Precast Concrete Foundation for 25m high nr. 492
mast as per Dwg. including Base plate, Bolts, Hexagonal nuts,
washers, uPVC ducts and any other accessories required for
installation.
15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with concrete lin.m. 6,500
encasement
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lighting lin.m. 575
with concrete encasement
15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with concrete lin.m. 1,000
encasement
15.17.6(xii)d 4Way 150 mm Upvc duct for street lighting with concrete lin.m. 50
encasement
15.17.6(xiii) Supply and Fixing of Cable Duct Route Marker. nr. 6,000
15.18 Weigh Stations
15.18.10(i) Weigh Stations complete in all respects nr. 4
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 7 – ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 7-1
Page No. 7-2
Page No. 7-3
Page No. 7-4
Page No. 7-5
TOTAL AMOUNT OF BILL NO. 7 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 7–6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
18 UTILITIES
18.1 Location and Protecting Existing Utilities
18.1.6(i) a) Protection of Existing Electrical lines lin.m. 2,400
b) Protection of Existing Telephone lines lin.m. 2,400
c) Protection of Existing Water lines lin.m. 1,200
18.2 Removing and Disposing of or Relocationg Existing
Utilities
18.2.6(i) a) Remove and disposing of Electrical lines lin.m. 2,400
b) Remove and disposing of Telephone lines lin.m. 2,400
c) Remove and disposing of water lines lin.m. 1,200
18.2.6(ii) a) Remove and relocate Electric lines lin.m. 2,400
b) Remove and relocate Telephone lines lin.m. 2,400
c) Remove and relocate Water lines lin.m. 1,200
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
18.2.6(iii) a) Provide and install new Electric lines lin.m. 6,000
b) Provide and install new Telephone lines lin.m. 1,200
c) Provide and install new Water lines lin.m. 2,400
18.3 Future Utility Crossing Ducts
18.3.6(i) a) Service Duct uPVC 3 way (150mm dia) lin.m. 55,000
b) Service Duct uPVC 8 way (6 @ 150mm and 2 @ 225mm) lin.m. 2,000
c) Utility PVC pipes in bridge decks (Dia: 100mm and 150mm) lin.m. 27,000
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 9 – PUMPING STATIONS AND UTILITIES
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 9-1
Page No. 9-2
TOTAL AMOUNT OF BILL NO. 9 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 9–3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19 DAYWORS
19.1 Wages
These include proper wages, all used allowance, medical
expenses and all other charges provided for by local laws.
19.1a Labourer - Skilled (Omani) hour 10
19.1b Labourer - Skilled (Expatriate) hour 10
19.1c Labourer - unskilled (Omani) hour 10
19.1d Labourer - Unskilled (Expatriate) hour 10
19.1e Carpenter hour 10
19.1f Mason / Concrete finisher - 10
19.1g Driver : Heavy Duty hour 10
19.1h Driver : Light Duty hour 10
19.1i Pipe fitter hour 10
19.1j Plant Operator : Heavy hour 10
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.1k Plant Operator : Light hour 10
19.1l Steel Fixer hour 10
19.1m Welder hour 10
19.1n Painter hour 10
19.1o Electrician hour 10
19.1p Plumber hour 10
19.1q Driller hour 10
19.1r Gangers hour 10
19.1s Plasterers hour 10
19.1t Scaffolders hour 10
19.1u ………………………………………………….. hour
19.1v ………………………………………………….. hour
19.1w ………………………………………………….. hour
19.1x ………………………………………………….. hour
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2 Operating Equipment on Site
The rates inserted by the tenderer shall be deemed to include
for the use of the plant inclusive of all fuel and consumable
stores, overhauls, repairs and replacements, spare parts,
tyres, insurance and all other charges relating to plant
including haulage to and from the site but exclusive of driver
and attendants who shall be paid as laid down in the Labour
Schedule. Payments for working plants shall be for the Hours
worked only. No allowance for standing time will be made.
19.2a Bulldozer up to 100 HP hour 5
19.2b Bulldozer 100HP to 200HP hour 5
19.2c Bulldozer over 200HP hour 5
19.2d Motor grader upto 140 HP hour 5
19.2e Motor grader over 140 HP hour 5
19.2f Vibratory roller upto 3 tones hour 5
19.2g Vibratory roller over 3 tones hour 5
19.2h Pneumatic roller over 10 tones hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 3
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2i Tendem roller upto 10 tones hour 5
19.2j Tendem roller over 10 tones hour 5
19.2k Wheel loader upto 3 cu.m.. hour 5
19.2l Wheel loader above 3 cu.m.. hour 5
19.2m Excavator upto 1 cu.m.. hour 5
19.2n Excavator over 1 cu.m.. hour 5
19.2o water tanker, Minimum 6 cu.m.. hour 5
19.2p Concrete vibrator (poker/screed) upto dia 50mm hour 5
19.2q Dump Truck upto 5 tones hour 5
19.2r Dump Truck upto 5 to 10 tones hour 5
19.2s Dump Truck over 10 tones hour 5
19.2t Water pump 2 inch hour 5
19.2u Water pump 3 inch hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 4
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2v Air compressor upto 6000 liters capacity hour 5
19.2w Air compressor over 6000 liters capacity hour 5
Bituminous mixing plant with batching apparatus from 80t/hto
19.2x hour 5
150 t./h
19.2y Finisher upto 80 t./h hour 5
19.2z Finisher from 80 t./h to 120 t./h hour 5
19.2aa Bituminous sprayer upto 6 tones hour 5
19.2ab Crane with boom and jib 5 to 10 tones hour 5
19.2ac Crane with boom and jib over 10 tones hour 5
19.2ad Generator 60 kW hour 5
19.2ae Low Bed hour 5
19.2af Hiab hour 5
19.2ag Generator 75 kW hour 5
19.2ah Generator 100 kW hour 5
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 5
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.2ai Generator 150 kW hour 5
19.2aj Generator 200 kW hour 5
19.2ak Welding plant hour 5
19.2al Concrete mixer upto 0.5 cu.m.. hour 5
19.2am Concrete mixer over 0.5 cu.m.. hour 5
19.2an Automatic concrete batching plant hour 5
19.2ao Pick up truck upto 3 tones hour 5
19.2ap Pick up truck over 3 tones hour 5
19.2aq Van or utility vehicle hour 5
19.2ar Welding set, 300A, including electrodes hour 5
19.2as …………………………………………………..
19.2at …………………………………………………..
19.2au …………………………………………………..
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 6
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.3 Materials
These rates includes all the charges for the supply of the
materials, loading, transportation to site, unloading and stores
as well as the charges provided in the General and Special
specification and in the Contract.
19.3a Aggregates for granular subbase course in accordance with cu.m.. 30
the General and Specification, in place as specified.
19.3b Aggregates for aggregate base course in accordance with the cu.m.. 30
General and Special Specification, in place as specified.
19.3c Aggregates for bituminous base course in accordance with the cu.m.. 30
General and Special Specification, near the asphalt plant, in
bulk
19.3d Fine aggregate for concrete in accordance with the General cu.m.. 30
and Special Specification, in place, in bulk
19.3e Course aggregate for concrete in accordance with the General cu.m.. 50
and Special Specification, in place, in bulk
19.3f Stone for Drainage masonry and slope protection in cu.m.. 50
accordance with the General and Special Specification, in
place, in bulk
10
19.3g Asphalt cement, grade 60-70 on site t.
10
19.3h Asphalt cement, grade 50-60 on site t.
10
19.3i Emulsion asphalt, grade RS-1, on site t.
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 7
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
19.3j Cutback asphalt, MC and RC type, on site t. 10
19.3k Portland Cement, on site t. 10
19.3l Deformed billet steel bars AASHTO M31 grade 60 (High yield) t.
of any dia 10
19.3m Highway signs sq.m. 10
19.3n Highway Signs Supports - 1 post nr. 10
19.3o Highway Signs Support - 2 post nr. 10
19.3p Thrie-Beam type Guardrail lin.m. 10
19.3q End anchorage for W-beam type Guardrails nr. 10
19.3r Water depth gauges nr. 10
19.3s Wire mesh Gabions on site t. 10
19.3t Gasoline on site liter 100
19.3u Lubricant Kg 100
19.3v …………………………………………………..
19.3w …………………………………………………..
19.3x …………………………………………………..
CARRIED FORWARD TO SUMMARY
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 8
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – DAYWORKS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 10-1
Page No. 10-2
Page No. 10-3
Page No. 10-4
Page No. 10-5
Page No. 10-6
Page No. 10-7
Page No. 10-8
TOTAL AMOUNT OF BILL NO. 11 (CARRIED FORWARD TO GRAND SUMMARY)
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 10 – 9
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 11 – PROVISIONAL SUMS
UNIT RATE (R.O.)
AMOUNT
ITEM NO. DESCRIPTION UNIT QUANTITY IN
IN WORDS (R.O.)
FIGURES
20.3.1 (i) Miscelleneous Items for Unforeseen Utilities P.S. 100,000
CARRIED FORWARD TO SUMMARY 100,000
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 11 11 – 1
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 11 – PROVISIONAL SUMS
AMOUNT (R.O.)
ITEM NO. DESCRIPTION
IN WORDS IN FIGURES
SUMMARY
Page No. 11-1 100,000
TOTAL AMOUNT OF BILL NO. 11 (CARRIED FORWARD TO GRAND SUMMARY) 100,000
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 11 11 – 2
CONSTRUCTION OF BATINAH EXPRESSWAY PACKAGE - 5 (4 - LANE OPTION)
BILL OF QUANTITIES
BILL NO. 10 – GRAND SUMMARY
AMOUNT (R.O.)
BILL
DESCRIPTION
NO. IN FIGURES IN WORDS
GRAND SUMMARY
1 PRELIMINARIES
2 EARTHWORKS
3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE AND STABILIZED
BASE COURSES
4 BITUMINOUS PAVEMENT
5 CONCRETE AND CONCRETE STRUCTURES
6 INCIDENTAL CONSTRUCTION
7 ROAD LIGHTING AND ELECTRICAL INSTALLATIONS
8 LANDSCAPING AND IRRIGATION N/A
9 PUMPING STATIONS AND UTILITIES
10 DAYWORKS
11 PROVISIONAL SUMS 100,000
Sub - Total
Add 10% for Contingencies of Sub - Total
(Excluding Bill No. 1 ,10 and Provisional Sum Bill No. 11)
TOTAL TENDER VALUE CARRIED TO THE FORM OF TENDER
TENDER DOCUMENT, VOLUME III OF IV: BILL OF QUANTITIES – PACKAGE – 5 GS(2) – 1