Software Development Life Cycle (SDLC) models show how to navigate the complex and demanding process of
building software. A project’s quality, timeframes, budget, and ability to meet the stakeholders’ expectations
largely depend on the chosen model, so choosing the right SDLC model makes all the difference. However,
there are more than 50 recognized SDLC models in use nowadays, and each brings its favorable aspects and
disadvantages for a specific software development project or a team.
With more and more software development trends are rising, Savvycom as your trusted software development
company, we’ve chosen 08 most popular Software Development Models to show you their core features and
how they would benefit your business.
1. Waterfall
The preliminary model we’ll discuss is the waterfall software development process – Image Source: Adobe
Stock.
The process moves cascaded through all development stages (analysis, design, coding, testing, and
deployment). Each step has specific deliverables that are meticulously documented. The following stage
cannot begin until the preceding one has been finished completely. As a result, software requirements, for
example, cannot be re-evaluated during development. Furthermore, there is no way to examine or try the
software until the final development step is completed, resulting in significant project risks and unexpected
project outcomes. Testing is frequently rushed, and fixing errors is expensive.
Use Cases:
Simple small to mid-sized projects with well-defined, repeatable needs (small company website
development).
Projects that require a higher level of control and a more predictable budget constraints and
timeframe (e.g., governmental projects).
Multiple rules and regulations must be followed when working on a project (healthcare projects).
Another linear model is the V-model, which has a testing activity for each level. Such workflow organization
ensures high-quality control, making the V-model one of the most costly and time-consuming models.
Furthermore, even though problems in requirements specifications, code, and architecture can be spotted
early, changes throughout development are still expensive and difficult to implement. All requirements are
gathered at the start, just like in the Waterfall instance, and they cannot be modified.
Use Cases:
Projects where downtime and failures are unacceptably costly (e.g., medical software, aviation fleet
management software).
The incremental development process is divided into multiple iterations (“Lego-style” modular software design
is required!). In each iteration, new software modules are added, with no or minor changes to previously
added components. The development process can be carried out in either a sequential or parallel manner.
Parallel development speeds up the delivery process, whereas sequential development takes a long time and
can increase software development cost.
With iterative development, software evolves and grows with each iteration. The software design remains
consistent as each iteration builds on the preceding one.
Because software is given in pieces, there is no need for a detailed specification at the outset of the project,
and tiny adjustments to requirements can be made during development. However, conditions cannot be
drastically altered; essential requirements, particularly those for system architecture in the event of
incremental development, must be established at the outset, as future integration of the provided software
elements may become a problem.
Because tiny requirements amendments may be required during the development process, this SDLC approach
often involves some client input.
Use Cases:
Large, mission-critical enterprise programs made out of loosely linked components like microservices
or web services.
4. Spiral Model
The Spiral model emphasizes extensive risk analysis when you are making any software audit process. To get
the most out of the model, you’ll need to work with people with a good risk assessment history. A typical Spiral
iteration lasts about 6 months and includes four key activities: comprehensive planning, risk analysis,
prototyping, and review of previously delivered parts. Spiral cycles that are repeated significantly lengthen
project timelines.
This is the model in which the consumer is heavily involved. They can participate in the cycle’s exploration and
review stages. The customer’s revisions are not acceptable during the development stage.
Use Cases:
Projects with ambiguous business needs or requirements that are too ambitious or inventive.
The launch of a new service or product through research and development (R&D).
5. The Rational Unified Process (RUP)
The Rational Unified Process (RUP) is a framework that combines linear and iterative approaches. According to
the paradigm, Inception, elaboration, construction, and transition are the four phases of the software
development process. Except for Inception, each step is typically completed in numerous cycles. All basic
development activities (requirements, design, etc.) are carried out parallel across these four RUP phases,
though at varying intensities.
RUP aids in the development of solid and flexible solutions, although it is still slower and less adaptive than a
pure Agile group (Scrum, Kanban, XP, etc.). Depending on the project requirements, the level of client
interaction, documentation intensity, and iteration length may vary.
Use Cases:
Large and high-risk projects, particularly use-case-based development and high-quality software
development in a short period.
Of all software engineering models, Agile methodology in software engineering is used by more than 70% of
businesses in their IT projects. Iterative development, intensive communication, and early client feedback are
at the heart of Agile in general.
Each Agile iteration usually lasts a few weeks and results in a fully functional software version. This group’s
approaches place a greater emphasis on swiftly delivering an active element of the application. They give more
attention to software testing activities than thorough software documentation (detailed requirement
specification, detailed architecture description). This encourages rapid creation, but it also delays software
transfer to the support team and complicates maintenance because it takes longer to detect a problem when
there isn’t a clear program description.
Agile emphasizes close collaboration among team members as well as with consumers. After each iteration,
stakeholders analyze the development progress and re-evaluate the priority of activities for the next iteration
to maximize the return on investment (ROI) and guarantee alignment with user needs and business goals.
As a result, Agile models are known for their frequent releases. They also help deliver applications that better
suit customers’ expectations by allowing for continuous software enhancement through simple fixes and
changes, quick updates, and feature addition. However, it is impossible to accurately predict the project’s
budget, time, and personnel requirements because of a lack of precise planning and a willingness to change.
Use Cases:
SDLC model for small projects or startup initiative that requires early input from end customers.
Most mid-sized custom software development projects where business needs cannot be reliably
converted into detailed software requirements.
Large projects can be broken down into small functional components and developed slowly over time.
Which in this article, I will go through some of the most popular Agile Models like Scrum, Extreme
Programming, and Kanban which you can find more about down below.
6. Scrum
Scrum is the most widely used Agile software development methodology. Iterations (‘sprints’) typically last 2-4
weeks and are preceded by comprehensive planning and prior sprint evaluation. After the sprint activities have
been defined, no alterations are permitted.
A typical iteration in Extreme Programming (XP) lasts 1-2 weeks. If the team hasn’t started working with the
appropriate software element yet, the paradigm enables changes to be made even after the iteration has
begun. The supply of high-quality software is substantially hampered by such flexibility. To address the issue,
XP recommends pair programming, test-driven development and automation, continuous integration (CI),
limited releases, and simple software architecture and adhering to code standards.
8. Kanban
The absence of significant iterations is a fundamental differentiating aspect of Kanban. If they are used, they
are kept to a minimum (‘daily sprints’). Instead, the focus is on visualizing the plan. The team uses the Kanban
Board tool to keep track of all project activities, their quantity, accountable individuals, and progress. Increased
transparency aids in a more accurate estimation of the most pressing tasks. Furthermore, because the model
lacks a specific planning stage, a new change request can be made at any time.
Customer communication is ongoing; they can review work outcomes at any time, and project team meetings
can take place daily. The model is commonly used in software support and evolution projects due to its nature.
Just like we have mentioned at the beginning of the article. There are many Software Development Models for
you to choose from, and here are some honorable mentions.
The RAD Model, short for Rapid Application Development, is a variation of the Incremental Model. Several
components are produced simultaneously as if they were smaller, individual projects when this model is
implemented. The various elements are then put together to create operational prototypes.
Operational process of the RAD model -Image Source: Kissflow.
Advantages: The RAD Model provides for faster development and greater client feedback during the
software development process.
Disadvantages: The RAD Model’s application is limited because the project must be easily modularized
into many steps. It also necessitates experienced developers with solid modeling and planning abilities.
Issues with final component assembly could lead to unanticipated setbacks and the need to redesign
components to fit correctly with the rest.
The Prototype Model is based on generating software applications or system software prototypes used to
visualize various software components. This model is intended to close the gap between misunderstood needs
by allowing for extensive engagement and input with the user.
Advantages: With a high level of user interaction, the Prototype Model can save time and money.
Disadvantages: This model may produce misunderstanding among users as to the difference between
a prototype and a finished product, and it may add unnecessary development time to prototype
development.
Each of these SDLC Models offers a unique process for the variety of project challenges you will encounter in
your career. Finding the right one depends heavily on not just the expected outcome, but the parameters by
which the project is executed.
Software development methodologies are structured processes and techniques used to plan, design, develop,
and test software applications. These methodologies provide a framework for managing the lifecycle of a
software project, including requirements gathering, coding, testing, and deployment.