TECHNOLOGY
UTILITY SUMMARY SHEET
Job No.: Sheet of Issue No.: 1 Date 2 Date 3 Date 4 Date 5 Date 6 Date
Job Name: Description
Document No. Made/Revised by
Project No. Checked by
Client Approved- Process
Location Approved by
Plant
Item No. Item Name NUMBER OFF ELECTRICITY STEAM/ CONDENSATE/ BOILER FEEDWATER COOLING WATER FUEL COMPRESSED REMARKS AND OTHER SERVICES
Inst/d Work'g Per Machine Total Consumption See Note 1 See Note 2 AIR
Motor Cons umption Installed Elect rical P= P= P= Condensate BFW Source I Source II Absorbed Fired P=
Efficiency
Shaft Electrical Electrical HT LT T= T= T= Flow DELTA T Flow DELTA T See Note 1
% kW kW kW kW kW kg/h= kg/h= kg/h= kg/h= kg/h= m3/h o
C m3/h o
C kW kW nm3/h